ML20086D708

From kanterella
Revision as of 16:35, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated AO 73-15:on 730612,first-stage Turbine Pressure Permissive Pressure Switch 5-14A Failed to Actuate at Proper Setpoint.Switch Reset.Surveillance Test Will Be Conducted Again in 3 Months Rather than 6 Months
ML20086D708
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/21/1973
From: George Thomas
VERMONT YANKEE NUCLEAR POWER CORP.
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086D712 List:
References
AO-73-15, VYV-2742, NUDOCS 8312020463
Download: ML20086D708 (1)


Text