Text
.
r O
O VERMONT YANKEE NUCLEAR POWER CORPORATION s -,
{
sevenTv ceven onove sTncer RUTLAND, VERMONT 05701 E
VYV-3887 7
P. O. DOX 157 VERNON, VcRMONT 05354 F
b June 9, 1975 k
[
"' !v o
4 I
United States Nuc1 car Regulatory Commission 3
E
/
((4g' / (((
Office of Inspection and Enforcement 0-Region 1 a
4,h, d/g8,y 631 Park Avenue
' g King of Prussia, Pennsylvania 19406 4
's %
i.~1
- '-6h'y ty,[/
4, o ;
?-
E ATTENTION: James P. O'Reilly, Director
\\
8>h5mb/
g REFERL'NCE: Operating License DPR-28 Docket No. 50-271 Abnormal Occurrence No. A0-75-12 (24 IIour. Report)
F
Dear Sir:
g E
d As defined by Technical Specifications for the Vermont Yankee f
Nucicar Power Station, Section 6.7, we are reporting the following Abnormal Occurrence as AO-75-12 and confirming our telephone conversation with your office.
E At approximately 0700 on June 9, 1973, while performing a routine
~
scheduled surveillance test, it was deternined that th "B" Standby Liquid
. Control System Pump delivered a flow rate of 40.9 gpm at 1160 psig. Vermont
?
Yankee Technical Specifications, Section 4.4.A.1, requires a flow rate F
verification of 35 gpm at 1275 psig. Prior to this discovery, the redundant system pump had been successfully tested.
=
r Action has been initiated to investigate 'the cause of this occurrence.
L The plant was in a cold shutdown condition at the time of this incident.
=
Very truly yours,,
I G
j.
bM'k l
Bradford W. Riley Plant Superintendent L
WFC/kbd 7
F
F 8312060034 750618 i
PDR ADOCK 05000271 g
S PDR g
u-,
COPY SENT REGION 2
s