_ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ - _ - - - _ - - _
1 o
o Q
i 5:,
t -
4 VERMONT YANKEE NUCLEAR POWER CORPOR ATION SEVENTY SEVEN OROVC STREEr RUTLAND, VeaMosT osvoi P
DOX 157 VERNON, VERFtONr 05354 i
j October 16, 1974 I
Director Directorate of Regulatory Operations, Region I United States Atomic Energy Cocmission 631 Park Avenue King of Prussia, Pennsylvania 19406
REFERENCE:
Operating License DPR-28 Docket No. 50-271 Abnornal Occurrence No. A0-74-14 (24 !!our Report)
Dear Sir:
As defined by Technical Specifications for the Vermont Yankee Nuclear Power Station, Section 6.7, we are reporting the following Abnormal Occurrence as A0-74-14 and confirning our telephone conversation with your office.
At approxinately 1115 on October 15, 1974, while pressurizing the primary centainment in preparation for the Class A leak rate test, a leak in the primary contM=nt was evident. The leak was identified as a missing 1/2 inch test connection plug on_drywell penetration X-16A, which is the Core Spray System 'A' containnent penetration.
The missing plus resulted in an abnormai degradation of one of the several boundaries designed to contain radioactive materials.
A pipe plug was immediately obtained and. installed in the test connection and pressurization of the primary containment was continued.
Very truly yours, h2 DO O 00 VERHONT YANKEE Nt! CLEAR POWER CORPORATION TM G.S. Thonas
,~
Assistant Plant Superintendent p ; <.( J