ML20086D603

From kanterella
Jump to navigation Jump to search
AO 73-33:on 731204,pressure Switch Ps14-44B Failed to Actuate at Required Setpoint,Resulting in Failure of B Core Spray Subsystem.Switch Reset & B Core Spray Subsystem Declared Operable
ML20086D603
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/05/1973
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086D605 List:
References
AO-73-33, VYV-3088, NUDOCS 8312020420
Download: ML20086D603 (1)


Text

. _ _ . . . - -_._ - .

1 i ,

)

A) V MN MONT Y A N K MM N UCLM A N l'OW MN ('ON I'ON ATION i

St Vr tJ f Y tit.Vr H OH OVt" t T 84C E.T l(UTI.ANO, VI:let0NT 07701 VYv-3088 " " " ' '

l', O. IlOX 157 l VL*HNON VI:HMONT 05:134 l

! December 5, 1973 l

( 0) l D

United Staten Atonic 1:nergy Cor.nission // f/A \\

Directorate of Rer,ulatory Operations, Region I [

631 Park Avenue D l

' King of Prussia, Pennsylvania 19406

~

pDe%O j>

4e IO)j'

.L$ g

{- " " h9h k l REFERI;NCE: Operating License DPR-28 *g. /p l Dochet No.. 50- ? l:

'g57,]UK. W;fl}/

l Abnormal Occurrence No..AO-73-33 k Centlemen:

As defined by Technical Specificationn for the Verriont Yanhec

( Nuclear Power Station, Section 6.7.B.1, we are reporting the following Abnornal Occurrence as A0-73-33 and confirming nur rolophono j conversation with your office.

i At approximately 1530 on December 4,1973, while performing a

inonthly functional test on the Core Spray System, pressure switch l PS14-44B failed to actuate at the required setpoint of 100(+10) psig l as specified in Tabic 3.2.1 of the Technical Specifications.

j runctionally, thin nuitch operates as a pressure permissive in the Automatic Depressurization System indicating the fact that a core spray pump is running.

As a result of the switch failure, the "B" Core Spray Subnysten was declared inoperable at 1535, cnd the operability verification required by Section 4.5. A.2 of t he Technical Specifications was begun.

The reactor was operating at approximately 68% power at the time of this incident.

The switch was immediately reset, functionally tested and verified to be operabic within the specilled tolerance. The "B" Core Spray Subsyntem was declared operable at 1545 on the date of the occurrence.

Very truly yours ,

VI:RMONT YANR!:0 SUCU:AR POWER CORPORATION O hh ,

S n,g, nijey C

Plant Superintenglent g

urC/kbd y i

r y o4 '

y l i COPY SENT REGION 7 _

, . - .- ..