,. . _ _ _. . - _._ . .. . _ . ._ .

YANKEE-ATOHIG-E6EGTRIG-60HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l . Vermont Operation Quality Assurance Manual l

l V00AP-1-AV00AM PREPARED BY: @kiff K MbDA j Walter K. Petersor. '

Manager. Quality Ass ment Services Department REVIEWE0'BY: ,/ - b 4(uls' ell Clark ' '

[Exeest4ve-01 rector,QualityAssurance ,

l REVIEWED BY:

h Robert J. W Director c yk gy fety and Regulatory Affairs j Vermo Yi n e l APPROVED BY: (  ! ,  ?.n l GcerMALMtTohld-Ar-Refd l DErectoi%Y OperationsSentee-V4ee-Pres 4dentr-0perattens i Vermont Yafikee i

i i

1 j -l

Title:

V00AMV00AP-1-A E Page: -I l [ Rev.- J. 28 9810210 9 h h 271 PDR A PDR P

J

q j' .VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION j- V00AMV00AP-1-A TABLE OF CONTENTS /INDEX Section No.

Title' Revision

-l -

AMENDHENT/ REVISION l'28

~

.l - P0LICY STATEMENT, 1 28

l. I ORGANIZATION 1 28~

[ II. QUALITY. ASSURANCE PROGRAM 1~ 28 l lIII DESIGN CONTROL 1 28-l IV PROCUREMENT DOCUMENT CONTROL 1 28

~

.l. 'V INSTRUCTIONS,-PROCEDURES, AND 1 28 DRAWINGS l- VI DOCUMENT CONTROL'- 1 28

!: VII CONTROL OF PURCHASED MATERIAL, 1 28 EQUIPMENT, AND SERVICES Ll VIII. IDENTIFICATION AND CONTROL OF 1 28 MATERIAL, PARTS, AND COMPONENTS l- IX -CONTROL-OF SPECIAL PROCESSES 1-28 l- .X INSPECTION 1 28 Ll.

=XI TEST CONTROL 1 28 j .' XII CONTROL OF MEASURING AND TEST 1 28 EQUIPMENT

[] XIII PANDLING, STORAGE, AND SHIPPING 1 28

_l: XIV INSPECTION, TEST, AND OPERATING 1 28 STATUS

'l 'XV NONCONFORMING MATERIALS, PARTS, 1 28 AND COMPONENTS l- .XVI CORRECTIVE ACTION >

1 28

c I

_ _ _ _ _ _ _ _ - ~

l YANKEE-AT0HIG-ELEGTRIG-60HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l V00AMV00AP-1-A TABLE OF CONTENTS /INDEX

, (Continued)

Section No. Title Revision l XVII QUALITY ASSURANCE RECORDS 1 28 l XVIII AUDITS 1 28 l APPENDIX A QUALIFICATION REQUIREMENTS 1 28 l APPENDIX B EXCEPTIONS 1 P8 l APPENDIX C VY CLASSIFICATION 1 28 l APPEN91X-D -VR-GLASSIFIGATION 28

Title:

Table of Contents Page: III l Rev. 1 28

l VANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON l V00AMVOQAP-1-A AMENDMENT / REVISION SHEET Revision No. Date Reason l 0 4 Amendment-14. 12/10/79 -Te-address-quest 4 ens-submitted-by-letter-from l NRG-fK -Rr-Geller4-te-br-H -He4dee-411/1/76) l 0-fAmendment-24 -1/13/77 Te-address-guest 4 ens-submitted-by-lettee-from l NRG-fKr-Rr-Geller4-to-br-H--He4 der-412/28/76) l l -l 9/16477- -Te-address-organizationalr-programmatier-and l ed4terial-ehanges i

l2 11/01/77 Te-address-ergan428tional-ehangest l

l 0-- 11/25/77 Te-address-ergan4aat4enal-ehanges-at-Verment l Vankee-l l4 --

4/13/78 Te-address-eemb4ned-4nspeet4en-numbers l 60-29/77-20+-60-281/77-16t-and-50-809/77-16 l uneeselved-4 tem-4:ar I

l5 -1/30/78-----To-addeess-ehange-4n-exeeptven-for-ANSI l N46 2 3-1973 I

l 6- 10/19/78-----Te-address-exeeptiens-te-ANSI-N45:Gr2-1972 l

l 6-4 Amendment-14 3/29/79- --Te-reselve-4tems-submitted-by-letter-from-NRG l 4Wr-P--Haass+-to-br-Hr-Heider-43/6/79) l l7 --- --

9/11/79-----To-address-changes-te-Vankee-Rewe-fAppend4*-9)

{ and-Vermont-Vankee-4 Append 4*-E4-Safety l Glassif4 eat 4ensr l

l8 -- -4/04/80 --Te-address-ergantaational-ehanges:

l l5- ---

-3/09/81 Te-address-erganifattenal-ehanges I

l I g ---- --------4/03/81-----Te-a4d 2Paekag4ng-of-Radieaetive-Mater 4als a-and l 1 Fire-Proteetten-of-Safety-Related-Areasi-te l 20ther-Items-Requiring-Qua44ty-Assuraneeir

Title:

Amendment / Revision Sheet Page: IV l Rev.. J_ 28

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY

' VERMONT YANKEE NUCLEAR POWER CORPORATION

,l V00AMV00AP-1-A l AMENDMENT / REVISION SHEET (Continued)

Revision No. Date Reason ,

!- l 41-- 3/01/82 Te-reselve-4tems-subm4tted-by-lettee-feem-NRG l' 4Wr-Pv-H a a ssi-te-W r-Pr-J eh nsen-46/10 / 81-)r I-I' l 12 --3/11/83 Te-address-eegantaat4enal-ehanges: ,

I l .' 13 Te-address-eegan4 Eat 4enal-and-pregeammatie.

l' ehanges l

l 14 10/12/83 To-address-eeganiaat4enal-ehanges; I i To-addeess-pregeammatte-ehanges l 16- 2/16/84-l l 16 10/31/86 Te-address-eegan4 sat 4enal-and-programmat4e l- shanges I q

.j' 17 12/06/86 -Te-address-eeganf f ational-and-pregrammat4e '

-l ehanges: ,

I l 17A '8/14/87 --Te-clae4fy-surve444anee-aet4v4 ties-and-shange l

-l VP-H00-Fespens4b444 ties-fee-the-level-ef def4eiene4es-requ4eing-evaluat4en:

.l. 'l

l.

.l 18 4/29/88 Te-address-eeganvaat4enal-and-pregrammatie l ehanges. j l  :

l- 19 10/02/89- Te-addeess-eeganizat4enal-and-respons4bi44ty l' .ehanges-and-deletten-ef-Appendix-Gr I

i .19A 6/01/90 40-update-eegantsational-ehart-ffee-VVI-te-be

~l eens4 stent-w4th-Peepesed-Ghange-Nor-167-and-to l l address-eegan4 fat 4enal-ehanges-at-Verment l Vankeer

I j . 20 12/21/90 Te-update-eegan4zat4enal-ehanges-at-Yankee-and l ehange-QA9'-s-respons4b444ty-from-eev4 ewing j
l des 499-desuments-to-aud4t4eg-these-deeuments l
l. fee-4nelusien-of-qua44ty-Pequ4Pements

Title:

Amendment / Revision Sheet Page: V

! l Rev., . J_ 28 l

l

1

.[ VANKEE-ATOMIG-EbEGTRIG-GOMPANY

. .< VERMONT YANKEE NUCLEAR POWER CORPORATION -

l V00AMV90AP-1-A AMENDMENT / REVISION SHEET l

, (Continued) l Revision No. 'Date Rcason l

l-21 11/16/91- Te-update-ergan42at4enal-ehanges-at-Vankee-and .

l Verment-Vankee-and-ehange-QAO-respens4b444ty )

l frem-revis4eg-reesmmendatiens-te-prevent l l'

resurrenees-of-s499ff4eant-send 4t4en-adverse-te

.l qua44ty-te-prev 4 ding-the-eptien-te-review 1 l and/er-aud4t-resemmendat4 ens l'  ;

l 22 4/16/92--- 40-delete-Append 4*-D-14st4Hg-and-referenee j l- Yankee-Safety-Glass 4ffeat4en-ef-Systems-Manual I l l 23 ---9/30/92 ~Te-address-erganisattenal-and-respons4b444ty l ehanges- 1 i

l 24 12/16/93 Te-address-organ 4cational-ehangesr-and l 90A/NSARG-reperting-slar4f4 eat 4en. fer-Verment i l Vankeev

[.

l 26 12/16/94 Te-address-ergantaat4enal-ehanges-made-at-the '

l Vankee-Nue4 ear-Pewee-Stat 4en-address 4ag-the l desemm4ss4entag-ergantaat4ent--G4ar4ffeat4 ens l &n-the-rev4 sed-eerreet4ve-aet4en-preeess-at i Verment-Vankeer-and-te-address-an-exeeptien-te -

l l Regulatery-Gu4de-1 647-and-te-elartfy

-l respons4b444t4es-between-the-Vankee-and-Verment l Vankee-Plants l

-l 26= '12/21/96-----Te-address-erganteat4enal-ehanges-at-the-Vankee

.l Nuelear-Pewee-Stabien-and-the-Verment-Vankee l Nuelear-Power-Statten --Te-address-exeeptions

, l te-ANSI-18 7-and-Regulatery-Guide-1 33-l l 27 - ---12/20/96 Te-address- ergan4aattenal-ehanges i 2 l l . 28 --

-6/30/97-- To-update-ergan4zational-ehanges:--Ghanged  ;

l exeeptien-to-Regulatery-Gu4de-4:26-by-adding l l ANS-62 1-and-Seet4en-2d-ef-Regulatery i l Guide-4 26-as-alternat4ves:

l

Title:

Amendment / Revision Sheet

. Page: VI

l Rev.- 1. 28 i

- - _ . , , , . , . . . . _ , --. .-4 . - . - - - -

I l

l l l VANKEE-ATOMIG-EEEGTRIG-GOMPANY

( VERMONT YANKEE NUCLEAR POWER CORPORATION 1

l l l V00AMY00AP-1-A l l AMEN 0 MENT / REVISION SHEET (Continued) l r

Revision No. Date Reason l0 5/1/98 To adopt Rev. 27 of the Y00AP as Rev. O for the l V00AM. (Reference VY letter to NRC. dated l 'l 4/12/98.) I 1

l l1 10/16/98 To update organizational changes. removed all l references to YAEC and YNSD. VY assumed all l YNSD responsibilities. Changed Sr. Vice l President. Operations to Director of l Operations.

l

Title:

Amendment / Revision Sheet I Page: VII l Rev. 1 28

l I

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATlON POLICY STATEMENT l

OPERATIONAL QUALITY ASSURANCE PROGRAM It is the policy of those organizations operating under this Quality Assurance Program to strive for excellence in all aspects 'of nuclear power plant operation. This goal can only be cttained if each individual recognizes that Quality is everyone's' responsibility. Each worker, supervisor, and l manager has a role to play in achieving the goal of "doing it right the first time." Only if we recognize that Quality is of paramount importance can we continue to provida for the safe and reliable generation of power.

The function of the quality verification program is to assess the adequacy, content, and appropriateness of the work being performed and to l

facilitate continuous enhancements. This function supports the line i organizations and provides management with needed feedback. However, I supervision and management should not rely solely upon the efforts of the ,

Quality Assurance Groups for quality verification; they must also take an I l active role in self-assessment of those activities under their control to identify quality problems. As previously noted, the ultimate responsibility for quality lies with the line organization. j i

l l Under the program, the-Vankee-Atemte-Eleete4e-Gempany-President-4s-the l final-management-authee4ty-responsible-fee-assueing-that-th4s-pel4ey-statement l and-the-Quality-Assuranee-Peegram-are-4mplemented-with4n-the-Vankee-Atemte l E4eetete-Gempany- T t_he Director of Operations Veement-Yankee-Sen4ee-V4ee l Pres 4dentr-0perattensr is the final management authority responsible for assuring that the Quality Assurance Program is implemented within the Vermont Yankee Nuclear Power Corporation. l

~

l The Pres 4 dent-ee-a Vice President / Director / Department Head is responsible for implementing the program for those departments under his (or

-l her) direction. The Exeeutive Director of Quality Assurance reportinq to the l Director of Safety and Regulatory Affairs, is responsible for preoaration l establ4shment, control, and distribution of the Quality Assurance Program and revisions thereto, and shall establish policies under which the Guality Assurance Department operates. The Quality Assurance staff shall have the

Title:

Policy Statement Page: 1 of 2 l Rev. 1 28

l YANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION authority and organizational freedom to meet the requirements of 10CFR50, Appendix B.

l The Plant SupeF4ntendent/ Manager shall be responsible for the day-to-day implementation of the program's procedural requirements at the plant.

The Nuclear Safety Audit and Review Committee shall review the adequacy and effectiveness of this program. Any discrepancies and/or recommendations l for corrections or enhancements shall be reported to the Director of l Operations Gegatzant-Geeperate-Off4eee.

The safe and reliable generation of power can only be achieved with the cooperation and support of all personnel. We expect that every individual will_ perform his or her task with the skill, professionalism, and dedication necessary to achieve this goal.

I l

i l

i

Title:

Policy Statement Page: 2 of 2 l Rev. 1 28 I

l VANKEE-AT9HIG-ELEGTRIG-60HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION I. ORGANIZATION A. SCOPE This section of the Operational Quality Assurance Program describes the duties and responsibilities of the personnel involved-in establishing and executing the Operational-Quality Assurance Program.

B. RESPONSIBILITY The responsibility for design, redesign, evaluation and l operation of.the Plant rests with the Yankee-Atemte-64estete l Gempany-Nueleaf-Seevises-94v4sien-and Vermont Yankee Nuclear l l Power Corporation. The-respons4b444ty-fee-develeping-and l 4 m p l eme n t 4 n g-t h e-O pe ra t 4 enal-Qu a 44ty- As s u r a nee-P rog rawi-w ith 4 n-t h e l Vankee-Nueleae-Seev4ees-Div4sien-and-the-Vankee-S4te-4s-vested-4n l the-Pres 4 dent-of-the-Vankee-Atem4e-E4eete4e-Gempany The responsibility for implementing the Operational Quality Assurance j l Program within Vermont Yankee is vested in the Director of l Operations Sen4ee-V4ee-President--Operattens--ef-Verment-Vankee

l. Nue4eae-Pewee-Geeperat4ent--They-have who has delegated certain areas of authority for the development and implementation of certain phases of the Program as set forth in the following paragraphs of this section. I l Vermont Yankee retains a contracted services organization as its l authorized agent for Drovision of certain ouality assurance and l related support services: selected enqineering and related l technical services: and various adminictrative and other general l .s_upport services, All work affecting avality assurance performed l

by the approved contractor under the terms of the contractual l agreement shall be conducted in accordance with the programs and

'l Drocedures reauired by this Operational Quality Assurance Program l

or the contractor's approved Quality Assurance Program.

l The Nuelear-Seevises-9+ vision Quality Assurance Department.

l reporting to the Pres 4 dent-fee-NSD-fee-the-Vankee-Site-and

Title:

Section 1. Organization Page: 1 of 46 l Rev. J_ 28

l l

l l VANKEE-ATOM 4G-ELEG4R4G-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION I

l eeporting-te-the VY Director of Safety and Regulatory Affairsy l fee-Verment-Vankeer has the organizational responsibility for the continuing review and audit of the implementation of the Operational Quality Assurance Program.

l l

C. ORGANIZATIONAL RELATIONSHIPS l The lines of authority for of all personnel involved in the implementation of the Operational Quality Assurance Program are j shown in Figures 1. and then 0A-related responsibilities deferred l in the following sections and-2. Integratien-between-the-Vankee l l S4te-and-the-Vankee-Nuelear-Serv 4ees-94visien-aet4v4t4es-4s l prev 4ded-by-the-Deeemmiss4ening-Hanager Interfacing between the Vermont Yankee plant and any contracted service organization the l

l Vankee-Nueleae-Servises-94v4sien is provided by the cognizant VY l organization, as stipulated in the contracts. Vermont-Vankee l l Senfee-V4ee-Pres &denty-Operat4 ens:-and-his-staff.

l The cualification recuirements for those key personnel are l l identified in .iob descr1Dtions maintained in accordance with l Plant Technical SDecifications, i l Or----QUAb4TV-ASSURANGE-PROGRAM-4ESPONSIB464T4ES l i l

l l 1. Yankee---Nuelean-Serv 4ees-04v4 sten l

l ar--- President l

l 1r----Assumes-and-ma4ntains-evera44-respens4bl44ty j

l. fer-the-Operational-Qua44ty-Assuranee-Program  !

l l 2r----Delegates-to-the-Exeeutive-Direeter-of-Quality l Assuranee-the-responsib444ty-for-establishmentr j l sentrel-and-distr 4 button-ef-the-Operattenal l Quality-Assuranee-Program -and-revistenc l thereter l

l l

Title:

Section I, Organization Page: 2 of 46

j Rev. 1 28 l

_ _ - . _ . _ _ . . - . . . . _ . - - . _ . - _ . - - _ . _ - - . _ . _ . _ - . - _ . _._._..m_....--

P o

l .VANKEE-AT0HIG-ELEG4R4G-GOMPANY VERMONT ~ YANKEE NUCLEAR POWER CORPORATION l '3 . Establishes-and-enferees-eempany-pe44efes-4n l the-area-ef-Operattenal-Qua44ty-Assuranser l

! 'l 4. Establ4shes-and-4mplements-an-ergan4zatten )

l l eapable-ef-and-d4Feeted-toward-a-peepee l~ OpePat4enal-Qua44ty-Assuranee-Pfegeam

! I i l 6. ---Resolves-disputes-between-Qua44ty-Assuranee/

-l. Qua44ty-Gentfel-peesennel-and-ethee

i. .l ergan42at4ensr-4evelvfag-qua44tyr-fee-the '

l ll Vankee-S4te-and-the-NSO-eeganizattent

!- l l 6. Responsible-fee-Vankee-S4te-nueleae-safetyr I

l 7, Review-and-appeeve-all-shanges-te-the

~l Operattenal-Qua44ty-Assuranee-Program 'j l'

l l- br- -V4ee-Pres 4 dents l  ;

j 4. Repeet-te-the-Peesidente )

l l

l- B. Prev 4de-fee-4mplementatten-ef-the-Pre 9Fam l w4th4n-thefe-eespeet4ve-departments

.I l' l. 3. Review-all-shanges-te-the-OpeFational-Quality l Assuranee-PfegFamr I

l. 4 '. Peev4de-fee-4ndependent-rev4ew-and-aeeeptanee
j. fer-seleeted-p3 ant-repa4es-and-engineer 4ag l ehanges l

l- 5. Ensure-that-app 44eable-Program-preeeduees-are l 4mplemented l ~(MOVED SECTION I.C.1.c. Director of Quality Assurance TO SECTION 1.C.3.d l-I-

Title:

Section I. Organization Page: 3 of 46 l Rev.- 1_ 28.

-l VANKEE-AT0HIG-EL:EGTRIG-G0MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION i

l d. --Traintne-Geerdinater I

_l 1. -Reports-to-the-Human-Reseueses-Hanageer

!. 'l

l. j' 2. Respens4ble-fee-4mplementatten-ef-teatn4ng  !

! l_ pregeams-at-NSDr ,

l. 1 L I
l- 3. Assists-the-eempany-49-aeeemp14shing-4ts-geals i l through-development-of-sk&41s-and-knewledge-l- l f: l 4. -Ensures-that-peesennel-are-prev 4ded-with-both l the-teehnteal-and-peefess4enal-sk+44s-requ4eed l' te-selve-preblemsv-week-togethee-effeet4velyr l present-InferP3tleny-and-respend-to-spensee l needs l I l 6. Prev 4 des-training-needs-assessments-te-ensure l that-eegan42664enally-relevant-ted4ning-4s l peevided:

I Ll 6. Genduets-tea 4ning-evaluatiens-te-determine-when l des 4eed-ebdeet4ves-are-ebta49ed:

l l er----Deeemmiss4on4ne-Manaaee--

I

-l 4. -Repeets-te-the-Pees 4 dent:

l'

'l 2c 94eests-engineee4997-14eens4agr-eest-eenteel

-l and-plann4ngr-and-s4te-desemm4ss4en4ng l aet4v4 ties:

! l l 3 ----Gesedinates-VAEG-eeseurees-te-meet l desemm4ssien4ng-needs:

'l l 4. -Peev4 des-fee-implementat4en-ef-Operattenal l -Qual 4ty-Assuranee-Peegeam-w4 thin-the l Decomm4ssioning-Gegan4aat4en:

Title:

Section 1, Organization j

Page: 4 of 46 l Rev. I'28

_ . . . . _y. .. . _ . . _ _ . . . _ . _ _ .. _ ___. _ _ _ _ .. _ ... _ .. . _ _ _ ._ .

i' l4- VANKEE-A40H4G-ELE 64R4G-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

.l '5. - Ensures-that-app 44eable-Peogram-preeedures-are >

l 4mplemented-w4th4n-the-Deeemmiss4en4ng l Gegantaat4en:

l l~+ ,

i l 6r---P ro v4 des-f e e-4 ad e pe nde n t-re v 4ew-a n d-a eee p ta nee l ! . fee-seleeted-plant-repa4rs-and-all

-l ' safety-related-eng4neee4ng-des 49n-ehanges-fee ,

[- the-site-and-desemm4ssientag-week-paekages:

L ll

'l 7. ---Prev 4 des-fer-rev4ew-of-matee4al-serv 4ee l purehase-eequestsr-deaw4ngsr-spee4fieat4ensr l: and-apprepe4 ate-peeeedures lV I l, i .l 8. Previdesr-theeugh-the-Deeemm4ssfening l\" l Geganisat4enr-fee-4ntegratten-between-the l (f l Vankee-S4te-and-the-Vankee-Nue4eap-Serv 4ees l Div4s4en y'

l l jy 'l fr----Peo4eet-Manaaees lI l

, l 1. Repeets-to-a-V4ee-Presidentr

! l  :

-l 27---P ee v 4 d es-f e r-4 m pl eme n t a t4e n-o f-t h e-P r eg r a m

-l with4n-the4e-respeetive-prefeetr l- L 'l

. l 3. Ensures-that-appl 4 sable-Peegram-preeedures-are l- 4mplemented-with4n-thefe-respeetive-presestr i
l

~h 4r----Peevides-fee-4ndependent-rev4ew-and-aseeptanee l

l fee-seleeted-p4 ant-repairs-and-all-safety-

-j 'l Pelated-eng49eering-des 49n-ehanges-fee-the4e

.l. eespeetive-plante

-l l 6r- Deevides-fee-seleeted-Feview-ef-material t j.

I' l seev4ee-purehase-eequestsr-draw 4ngsr 1

l spee4fieattens-and-apprepefate-preeedures i

l.

p )

Title:

Section I. Organization t i Page: 5 of 46 l~Rev.: .

1 28 i-lt l

-l- VANKEE-ATOM 4G-ELEG4R4G-60MPANY -l VERMONT YANKEE NUCLEAR POWER CORPORATION l 6. Geerd4 nates-eng4neeefag-eequffements-neeessary l te-suppeet-ehanges-related-te-the-operat4en-ef '

l the-planer l.

l l 7. Peev4desr-through-Eng4neee4ngt-fee-the-Qua44ty l Assuranee/ Quality-Genteel-Standards-and/ee

]

l . requirements-en-all-applieable-deeuments I

-l 8. Provides-d4eest4en-te-the-Predeet-Eng49eee4ng i 1

-- [ Managers: I l ~ MOVED SECTION I.C.2.g. Management.of Quality Assurance, to SECTION 1.C.3.e. i l

l h. Ene49eeP4ne-Seavjees-Manaeen l

l 4 .- Reports-te-a-V4ee -Pees 4 dent l

-l l 2. Prev 4 des-fee-4mplementatten-of-the-Pregeam

'l w4th49-h4s/her-funet4en:

I

_ .l- 3. Ensures-that-app 44eable-Pregeam-preeedures-are l 4mplemented-with49-his-funet4en Jl l- '4. Gesedinates-Vankee-teehnteal-eequ4eements-neeessaey-to-suppert-aetiv4ttes-related-te I l

l euts&de-eng4neee4ag-seev4ees?

-l l, 4, D4Peeter-ef-Env4Penmental-Ene49eeP4n_q l

I 4. Repeets-d4Peetly-te-a-V4ee-Pres 4d(nt

-l l: 'l 2. Prev 4 des-fee-the-eev4ew-and-fe44ew--of-ead4at4en l pretee t4en-peegeams -a nd-aettv444es- at-the-plant l ee-s4ter l

L l- 3r Prev 4 des-fee-teehnteal-ass 4stanee-to-the-plant l ee-stte-en-mattees-ef-rad 4eleg4eal-peeteet4ent

Title:

Section I. Organization Pagei 6 of 46

-l.Rev.: 1 28

.-.. _ .._ .__._. ~ _ ... _. _ _ ..___m _, _ . _ _ _ _ _ _ . . . _ . _ . - . _ . . _ . _ _ _ . _ _ _

l 1

l

'l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l' radselegteal-engineee4ng-and-env4renmental J l~ preteetten -i l i l- 4. Gesedinates-the-4mplementat4en-and-ma4ntenanee

.l ef-Pad 4eleg4eal-env4Fenmental-surve414anse l programs-eeneerning-rad 4 east 4ve-effluents-frem- l l the-planer l

l 6. SuppeeM-the-implementalien-and-maintenanse-ef j

.i : -l the-Emergeney-Plan-puesuant-to-state-and )

l federal-Fegulatery-FeQuffements: l 1- j

.l 67----Prev 4 des-fee-the-rev4ew-ef-plant-meteefelegteal l

' l. moniteeing-datar j

,l 1

l 7. Geerdinate-the-radielegieal-and-env4Fonmental l eng4Hees ing- eequ4fements-nesessary-to-suppert l

-l ehanges-related-te-eperation-ef-the-plant-ee l siter l i

i

!- d- --9+ Fester-of-Fuel-Mana9ement l-l 4. -Repeets-dtreetly-te-a-V4ee-Presidenty l

l 2. Performs-fuel-eyele-and-eeenem4e-studies-te l 4mpreve-pewee-eests-and-as-requested-by

l. management:

l-l 3. Prev 4 des-fee-the-general-superv4s4en-and

l. esordinat4en-of-a14-eeee-eempenent-des 499-and l presurementr-nueleae-matee4al-and-serv 4ees I l preeurement-and-fuel-eyele-eeenem4e-aet4vit4es I

.l 4; Ensures-that-the-Operat4enal-Qual 4ty-Assuranee l PFe9Fam-and-the-appl 4eable-pFeeedures-dee l 4mplemented-w4 thin-the-department

Title:

Section I, Organization Pa g e : -- 7 of 46 l Rev.. J. 28 n,.a - w r- ..*, 2 , ,w~ y r- 2

I l VANKEE-A10HIG-ELEGlRIG-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

l. 6r----Issues-b4d-4avitattens--evaluates-propesalsr

~l, a nd-neg e t4 a t es-e e n t r a e t s-f e e-f uel- eye le l seev4ees-and-related-matee4al-regateementsr I

-l 6. Geerd4 nates-the-fuel-eyele-eequ4Fements l neeessary-te-suppeet-ehanges-related-te

l. eperat4en-of-the-planer l I-l F. Peev4 des-suppeet-of-spent-fuel-sterage l

l 'aet4v4t4es-at-the-Vankee-Siter

l l l k. 04 rester-of-Env4renmental-baberaterv l

l 1. Repeets-dieestly-to-a-V4ee-Pees 4 dent:

I l 2. Prevides-fee-the-ead4eehemveal-preeess4ng-ef l

j' envveenmentalv-effluentr-and-waste-samplest I

[. -3 . Peev4 des-fee-the-peseess4ng-and-4nternal L-l des 4meteis-evaluat4en-of-bieassay-samplesr l'

[ 4- - Peev4 des-fee-the-eeu t4ne-/-R-Si-CH-measurements l 4n-suppset-ef-env4renmental-leshnteal l Spee4fisations-as-well-as-ad-hee-emergeney

'l ee s pen se- /-R-si Ef+-mea s u remen ts-e e-emergeney l eesponse-labefatery-sample-measueements?

-l .

l Br----P ro y 4 d es-a nd-see ed in a t es-t-eeh n t ea l-q u a 44ty l- assuranee-programs-49-the-deeds-ef-plant l' ehem 4s t ey-4r a d f eleg 4 ea l-e nlyl-a nd-w h ele-be dy l eeunt4ng:

l l {

l 6r----Peevides-fee-the-presess4ag-ef-persennelv  !

l extrem4tyr-and-env4eenmental-desimetey-needed

l. te-suppert-N9G-and-plant-eadiele94eal j assessment-requirementsr. 4 I I L

Title:

Section I.' Organization L Page: '8'of 46

j Rev
)_ . 28 i

l l  !

i 1 I

l- l VANKEE-A40 MIG-ELEG4R4G-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l l 7. Provides-fee-the-neeessary-spee4al-Fad 4atten

! l flux-measurements:

I l 0. P e e v i d e s-f e e--e n-s i t e- s u p p e e t-d u e i n g -e u t a g e s -4 n

, the-peesennel-des 4meteyr-whele-body-eeunt4agr

[ and-health-phys 4es-areasr l

l 9. -Prev 4 des-f e e- the-ge ne ral-enginee r4ag-and l teeknieal-suppeet-in-the-besad-areas-ef

[ Fadiatien-measurementsr-health-phystesr l l Fad +eehemisteyr-and-qua44ty-assuranee-l l 4. 9teeetoe-of-Nue4 ear-Enq4neertne l l l 4. Reports-dieeetly-to-a-V4ee-President:

I l l 2-----Performs-nueleae-engineering-and-eeenemie I l studies-Fequested-by-management:

I l 3. Provides-fee-the-general-supervision-and j l eeeedination-ef-eeaetee-phys 4esr-safety l l assessmentr-teansient-analysisr-and-4ess-ef l seelant-analysis-aet4vit4es l

l 4-----Ensures-tbat-the-Operat4enal-Quality-Assueanee l l Pre 9Fam-and-the-app 44eable-presedures-afe l 4mplemented-with4n-the-department:

l l

[ Sr---G e e r d i n a t e s-e n g i n e e ri n g-a n a ly si s-re q u 4 e e m e n t s l neeessary-te-suppeet-shanges-related-te l eperatien-of-the-plant-ee-siter l

l m----P la n t-S u p en e t-Dee a e t me n t--M a na a e e l

l 4r----Repeets-dieeetly-to-a-Viee-Peesident:

l ,

l 2r----Peov4 des-fee-the-genera 4-superv4s4en-and j l eseedinat4en-4n-the-areas-ef-mateffals 1

i

Title:

Section 1, Organization i Page: 9 of 46 i l Rev. J_28

!- -l VANKEE-ATOMIG-EEEGTRIG-G0HPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION

'l evaluatten;-eperattenal-serv 4ees-44aeludtag

-l- eensteuet4en-seev4eesfr-and-deaft4ng/ des 499 l suppeetv L I l- 3. --Peev4 des-fee-the-Plant-Suppset-review-ef-des 49n l

ehanges l

l' I l- 4. Prev 4 des-eng49eee4ng-seev4ees-te-the-Predeets

[ 9epartmentsr-upen-requeser l l ,

l l S. --Responsible-fee-the-adm4ntsteat4en-ef-the -

'[ ' NDE/ ANSI-N46:2r6-Tea 494ng-and-Geet4fieatten l

l Peegeams:--fie-malatain-the-4ndependenee-ef-the '

l N9E/ ANSI-N46:2r6-teatntag-and-seettf4 eat 4en

~l peeeessr-eveea14-eespensibi44ty-fee-appe4a$4ag

'l- t h e-N D E/ A N SI-N 46:2:6- Le v e l-MI-E x a m 4 a e r-w & M l- -rema4n-w4th-the-Exeeut4ve-94Festee-ef-Qua44ty t[ Assueanee---AM-eequ4eements-fee-eee%4ffeab4en '

l sham-be-met-pe4ee-te-appe4atmen6-as-bevel-H +.

l' l Examineer+

l l n. -Ene4neertne-and-b4eens4ne-Manasee l- '

I l: 1r----Reperts-te-the-Desemm4ss4en4ng-Hanageer

I
l 3. Respens4ble-fee-eeeed4 eat 4en-of-aet444 ties l' pertai n4ng-te-Sta ter-Fedef alv-a nd-Meense l Fequ4Fements; l-l- 3. Peev4 des-fee-4adependent-review-and-aseeptanee l' fee-seleeted-plant-repafes -aM-safety-related

'l engineeF4ng-des 49n-ehanges-and-desemmisstening

.l week-paekages-fee-the-s+ter l

.l 4r--- P e e v 4 d e s -f e e-re v 4e w -e f-m a t e e v a l-s e r v 4 e e j' purehase-eequestsr-deaw4egsr-speeff4 eat 4ensr l and-appeepe4 ate-peseeduresy l-l' -Title: Section I, Organization L 'Page: 10 of.46

[ l Rev.: 1 28 L

. -. _ - _ _ _ _ . - _ _ . . _ _ . _ _ . _ _ _ _ _ _ _ _ _ . . . - _ _ . _ . ~ . . _ .

i t

l.' VANKEE-ATOMIG-EEEG4 RIG-G0HPANY I.

VERMONT YANKEE NUCLEAR POWER CORPORATION l 6-. lGeerdinates-and-d4eeets-engineering-serv 4ees l neeessary-to-suppeet-the-deeemm4ssvening-ef-the ,

! l~ s4ter -

l l- >

l- 6, Assuees-seerd4 Rat 4en-and-4mplementat4en-ef-the L l~ Emergeney-plaar

l. I l T. Assures-eng4neering-ast4v4t4es-are-eendueted-4n l ll aseeedanee-w4th-the-Qua44ty-Assuranse-Peegeam I-L ll 8. Assures-the-Qua44ty-Assueanee/ Quality-Genteel l- ' standards-and/ne-eequ4eements-aee-peev4ded-en
l. all-appl 4eable-deeuments:

~ l.

l' er Autematten-Teehneleav-9esaetment-4AT94-Manager l

l 1. Repeets-to-a-Viee-Peesidente l'

l 2. Prev 4 des-eng4neee4ag-seftware-development-and l suppset-serv 4ees-te-NSD-departmentsr-sponsee

-l plantsr-and-ethee-e44entsr-as-Pequested-ee  ;

" l l -eenteaetede I

l 3. Prevides-automated-plant-systems-development l and-suppeet-seeviees-fee-spensee-plants-and l' ethee.elfeatsr-as-requesled-er-eentraeted; l-l 4. Prev 4 des-and-4'mplements-advaneed-analytteal-and

.l eemputat4enal-methods-and-systems-to-NS97 l- spensers--and-ether-eltents I

ll; 2. Plant---Vankee

'[

l a.  : Site-Manaaee/ Manager-ef-Operations I

l 1. 'Repeets-dteestly-te-the-Deeemmissioning i l1 Hanageer L . .

l

Title:

..Section I. Organization ic Page: 11 of 46 l -l Rev. L28

. ___. . _ _ . ..._ . - _ _ _ __ _ _ . _ . _ - ..._ _.. . - _ ~ ~ .. ._ _ _ -. _

l.

l

_l VANKEE-AT0HIG-ELEGIRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATlDN l 2. Respons4ble-fee-the-safer-eedeely-and-eff4e4ent l eperatien-of-the-stter-and-feF-eemp44anee-W4th

.l the-eequ4rements-of-the-44eense-and-app 44eable l State-and-Federal-4aws-and-regulat4 ens L l l- 3- Responsible-fee-the-en-s4te-4mplementat4en-of L l the-Operat4enal-Qual 4ty-Assuranee-PregFamr

! I l l 4. -Respensible-fee-the-eenteel-and-sueve444anee-of ,

{ all-s pe e va l-n u ele a r-m a t e e 4 al- a t-t h e-s 44er I l.

Ll S .- Prov4 des-4efermatten-and-repeets-te-the-Yankee l Nuelear-Seev4ees-04v4sion-as-requ4 Ped-aHd-as l direeted-by-the-Deeemm4ss4ening-Hanageer I

L l 6. -Peevides-fee-and-eeerd4 nates-Feview-ef-4ndustry J l eperat4ng-peeblems-with-the-a4m-ef-m4ntm4a4ng ]

l 44kelthood-af-seeuerenee-at-the-plante l l .I l 77----Des 49 nates-an-alteenate-to-the-64te-Wanager/

.l M a n ag e r-e f-Ope r a t te n s-d u ri ng-h 4 s/he e- a b s ense

-l w4th-the-authee4ty-and-respons4b444ty-thereefr l

l 8. Ha4nta4ns-eemmunfeat4 ens-w4th-the-4ra4n4ag

.] - Geerd4aatep-4avelvfag-plant-tea 4ateg-needs: J l l g .l 9. Evaluates-the-siteis-pes 4tten-en-spee4f4ed-in-j plant-aud4t-d4serepane4es-and-prepares

l- 11mplementatten-94reet4ves
-fee-the-stter l'

l b. -Plant-SHDefintendent I

, I lv----Repeets-d4eestly-te-the-S4te-Managee-and l- Manager-ef-Operat4 ens:

' lL l

-l: 2. =D4reet4y-Fespons4ble-for-the-safer-orderlyr-and i

j. effie4ent-speratten-ef-the-S4te-fer-eempl4anee l- with-the-requ4rements-of-the-44eense-and L

Title:

Section I. Organization-

[

Page: 12 of 46 1 Rev.: J_ 28

  1. ~.

r l VANKEE-ATOMIG-EbEGTRIG-GOMPANY

' VERMONT YANKEE NUCLEAR POWER CORPORATI ON l- a pp44 ea ble--St a te-a nd-Fed e r a l-4 a w s-a nd l regulat4ense 1

I l av -Respons4ble-fee-sh4ft-supervisees-and

~l . operat4 ens-support l

l. 4. Admin 4stra t4en-ef-the-Gee t4f 4ed4uel-Handlees

' l- Tra4ning-Peegram C' l l l 6. Adm4n4stratten-ef-the-Equipment-0peratees

  • l l Training-Pregeamr l.
l. 6. Geerdinates-Plant-Qua44ty-Assuranee-aet4v4ttes

_] 'with-the-Managee-of-Opeeattens-and l Desemm4ss4ening-Hanageer  !

I Respens4ble-fee-seeue4ty;-ma4atenanee;

-l 7.

l eperattensr-teehnteal-servisesr-inelud4ng-the

.l Seeue4ty-and-Fire-Preteetten-Pregeams

-l l 8. Gesedinates-test 4ng-ef-plant-hydre

!? l eequ4rements; l- i

' l. 9 ----Aets-as-Ghaieman-of-the-Plant-0peratiens-Rev4ew  ;

j l Gemmittee-w4th-autheefty-and-responsibi44ty-as  ;

j establ4shed-4n-the-Teehn4eal-Spes4ffeat4 ens-ef  ;

-l the-site-44eenser l l I l 40r tMainta4ns-eeee-eempenent-h4stery-441e-ef-all I

-l fuelv-eenteel-redsr-seurees-and-49eere h

i detestees

, I

-l. 11r---Aeeeunts-fee-a44-spee4al-nuelear-mateefal-at I l the-plant-s4ter i

j 12r---Respens4ble-fee-s4te-ma49tenanee-and-repa4er L ,

I

Title:

Section I, Organization Page: 13.'of 46

( l _Rev. 1 28 L

1 I

I v - , w , - - ,em .-----s--,- - - - ~

.m __ _. .. . _ _ . _ . _ . _

l l

l l VANKEE-ATOMIG-ELEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATI ON l 13. 04reets-the-aetiv414es -of-Meehan4eal-and l Eleete4eal-Ma4ntenaneer-Instrumentat4en-and l l Genteel-and-Ma4ntenanee-Engineeringr l

I l er Shift-Superv4 sees I

l 1. -Repeet-d4eest4y-te-the-Operatiens-Supeeviseer l whe-repeets-te-the-Plant-Supee4ntendener l l l 24 Responsible-fee-plant-eperatiens-4n-aseepdanee l with-appeeved-deeuments-and-spee4ficat4 ens: l I I l 3. Respens4ble-fee-peeparing-deeuments-eut44n4ng l l system-funettens-and-eperating-medes:

i 1

l 4. -Responsible-fee-ensue 4ng-that-personnel-undee l

l thefe-supervisien-perform-thefe-dut4es  !

l aeeerding-te-applieable-44eenses:

l spee4f f eat 4ensr-sa f ety-rulesr-regulationsr-and l eeft4f4 eat 4 ens:

I l 6. Respons4ble-fee-ensueing-that-maintenanee l eequests-dee-peev4ded-fee-the-eepale-se l Feplaeement-ef-defeettve-parts-and/ee )

l eempenentsr l

l 67----Respens4ble-fee-vee 4fying-the-operab444ty-ef i j systems-and/ee-eempenents-fellewing-ma4ntenanee l l er-ehanges-by-peeviding-fee-the-performanee-of l we4tten-test-desuments-wh4eh-4neseperate-the l Feeuffements-and-aeseptanee-setter 4a-senta4ned l

-l 4n-appl 4eable-design-deeuments I

l A Respons4ble-fee-ensueing-that-fuel-hand 4+Hg l eperations-aee-safely-performed-in-aeeeedanee l with-appeeved-peeeedures  ;

l l-

Title:

Section I, Organization Page: 14 of 46 l Rev., J_ 28 l

1 l VANKEE-ATOMfG-ELEGIRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l 87---Re s p on si ble-f o r-eee rd 4 na t ten-a n d-pe e f o rma ne e-e f l l hydretesting l l l d. Genstruetten-Manager l

l l h Reports-direetly-te-the-S4te-Manager / Manager-ef  !

l Operat4 ens j l

l 2 .- Geerd4 nates-the-review-and-update-ef-plant l draw 4ngs-and-spee4ficat4 ens:  !

l l l 3r----04reets-plant-design-ehanges-and-assures l eemplianee-with-applieable-Stater-Federalv-and l lieense-requirements:

I  !

l 4. Preser4bes-and-d4reets-sehedules-and-programs l l as-neeessaryr-te-assure-the-safe  !

l, desemmissie6499-ef-the-s4ter l

l 6r----Prev 4 des-for-mader-eentraeter-desemm4ssientag j suppert-4nelud4ng-establishment-of-appropriate l eentraetual-arrangements ,

I l l 6r----Ensures-that-eentraeter-desemmission499 l aetivit4es-are-performed-in-a-safe-manneer l

l 7-----04reets-en-s4te-eng4neering-and-eraft-support l ef-desemmissioning-aet4vities l

l Br----Geerdinates-and-transmits-4nfermatten j eeneernfag-Plant-Ehanges-te-the-Manager-ef l Operattens-and-Deeemmiss4ening-Managerv l'

l er----Tra4n4na-Geordinater l

l T. --Reports-direetly-to-the-S4te-Manager / Manager-ef l Operatiens:

l

Title:

Section 1. Organization Page: 15 of 46 l Rev. .1,28 l

l l

1

_ . . _ . - , . _ . . _ . _ _ . . _ _ . _ . _ _ . _ _ .._ _ . . .m . . _ . . _ . . .- _ _. .

Ii

! [ -YANKEE-ATOMIG-ELEGTRIG-60HPANY L

VERMONT YANKEE NUCLEAR POWER CORPORATION l 2. Respens4ble-fee-sehedu14ng-and-deeumentat4ea-ef L ll Tplant-general-employee-tra4ntage

! l '.

L l 3. 'Respons4ble-fer-admin 4stratten-ef-al4-plant

1. Ll staff-teate4ng I- . -

'l. .f. S4te -Serv 4ees-Superv4see

]

'l .

l - F.- Repeets-d4Feetly-te-the-54te-Manager /Managee-of '

- l Operat4 ens-L I l 3. -Supervises-the-Stepe-Superv4 seer l

l a+ Preparat4en-ef-eequ4s4t4en-fee-pueehase' l: erders, L I: l

_l. b)---T h e-re s e 4 p t v-h a n d 14 n g r-a n d -s t e r a g e-e f }

I

.l- mateefals-and-equipment I

.l e4---Adm4n4sterf ag-a-system-of-ma terf al-and

-l equ4pment-4 dent 4fteat4en l d+---H a f n t a 4 n i ng-a -sy s tem-w h 4 e h-p rev 4 de s

? l teaeeab444ty-and-eetefevab444ty-ef

_l . Quality-Assuranee-deeumentatfon-fee

-l: papehased-mateefals -

I

l -Geefdtnates-the-eev4ewr-rev4s4enr-and l d4ste4but4en-ei-peeeedures:

-l l ~4. Respons4ble-fee-the-operat4 ens-ef-the-Plant

?l 9eeument-Genteel-Genter-fee-the-Petent4en-of spee4ffed-Qua44ty-Assuranee-eeeerdsr-reportsr l- and-peesennel-feeeeds l

!l' 6. Ma4ntates-and-d4sseminates-tafermat4en

-l Fegard4ng-eedesr-ee4 tee 467-standardsy Ti t l e': Section I, 0rganization

.Page: _16 of 46

l~Rev : J_ 28 n.

_ _ . _ _ . . _._.m . . . _ _ . . . _ . - - . _ . _ . _ _ _ _ _ _ - . . _ _ _ . _ _ . . _ . . . _ _ .

L j~ .l~ . VANKEE-ATOH46-EbEGTRIG-G9HPANY ,

l

_ VERMONT YANKEE NUCLEAR POWER CORPORATION .

'l guide 44 nest-and-pe44ey-te-app 44eable-plant ,

l personne4r

.l-l- 6. Supervises-Plant-Adm+nistrat4ve-personne4r

I-
  • l l; 7. Responsible-fee-the-F4tness-fee-Outy-Program:

-l-

[. 9 Rad 4atten-Proteetten-and-Ghemistey-Manaaes  !

I~

l 4. Repeets-d4eestly-te-the-54te-Hanagee/Hanager-ef i

l. Operat4 ens:

l 3. -94eests-maintenanee-of-water-eend4ttening-en

-l the-s4te-as-pee-spee4f4 eat 4 ens-and/ee ,

l .desumented-and-authee4aed-eeeemmendattens I

l 3. Has-dtfeet-aesess-to-the-Plant-Supee49tendent l .. fee-mattees-relatteg-te-Fad 4elegieal-health-and l safety-ef-employees-and-the-publ4er i

l

.I 4, 94eeets-a-progeam-te-aseertain-the l eadteast4vity-levels-ef-444uidsr-gases-and sel4ds-as-Pequ4eed:

l' l '

l 6. 94Feets-the-eeview-and-49teepeetatien-of l ehemistey-test-results

'l.

.l- 6. -Offeets-the-desumentatien-and-ma4ntenanee-ef l ehem4stey-and-ead4atien-peeteetien-reseedsr I

l. 7. Respons4ble-fee-the-development-and

'l 4mplementation-of-the-Rad 4atten-Peeteetten l Program-44neluding-ALARAlv-assuefag-that-these j' l pregeams-meet-s4te-standards-and-State-and

l. Federal-44eense-Fequifements

.I l- 82----94eests-the-ma4atenanee-ef-the-Persennel l Exposure-Reeeed-System 1

Title:

Section I, Organization Page: 17 of 46

-l.Rev.- 1 28 l

l l

l l VANKEE-A40HIG-El-EGTRIG-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l

l ,

9 .- -94eeets-Padieaetive-matee4al-shipments-and '

l Feee4 pts-pursuant-te-s4te-and-gevernment l Fegulat4 ens-l-

l 40r---Ma4ntain-step-week-autheetty-when-radieleg4eal l safety-4s-deepaedized-ee-when-unnesessary l peesenne4-exposure-4s-oeeueF4ng-l l h. Health-and-Savety-Managee j l

l 1r----Reports-dieestly-te-the-Site-Manager / Manager-ef l Operat4 ens l

l 2-----94eeets-the-plant-Med4eal-Servises-Peegeam-and l a e ts-a s- p la n t-ma na gemen t '-s-poin e-ef-een t a e t l l relative-te-medveal-mattees-4n-eeeed4nat+en l l with-the-Plant-Med4eal-Gensultant; j l l l 3. -94eeets-the-maintenanee-of-persennel-medieal

.) Feeerdsr l  :

1

[ 4. --Respons4ble-fee-the-development-and l implementatien-of-the-plant-Geeupational-Safety l pregramsr-assuetag-that-these-pregeams-meet l s4te-standards-and-Federal-OSHA-eequirementsr I

l 6-----Responsible-fee-rev4ew-and-eemmunteat4en-ef l plant-safety-pe44efes-theeugh-the-plant-safety l manual-and-safety-meetings-l l l 6-----Respons4ble-for-week-site-4nspeet4 ens-by-safety l l department-persennelv i

l 7-----Aets-te-safeguard-weekee-health-and-safetyr l l l Br----94eests-the-review-and-4nterpretatten-ef l eseupat4enal-safety-exposuee-men 4 teeing:

Title:

Section 1. Organization Page: 18 of 46 l Rev, 1 28

l VANKEE-ATOMEG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON l 9r----Direets-the-maintenanee-ef-personnel-exposure l mentter4Hg-reeefd-system l- 13. Vermont Yankee Nuclear Powe' Corocration l

l a. Di rector of Senior.-V4ee -pres & dent- Operations

1. Reports to the President - Vermont Yankee Nuclear Power Corporation.
2. Ensures the QA Program is effectively implemented.
3. Dispositions In-Plant Audits and issues l concurrence directives-to-the-plant.
4. Ensures that applicable programs and procedures effectively implement the QA Program.
5. Reviews and approves all changes to the Operational Quality Assurance Program.
6. Appoints the NSAR Committee members including Chairman and Vice Chairman.
7. Acts as the Manager of Operations.

l b. Vice President. Engineering I

l 1. Reports to the President.

l l 2. Has overall responsibility for design and plant l engineering. Oversees the planning, schedulina.

l and direction of activities of employees l engaged in design changes. alterations, and l systems readiness.

l l

Title:

Section I, Organization Page: 19 of 46 l l Rev. 1 28 i

l VANKEE-ATOMEG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l 3. Provides for review and approval of safety-l related design change documents, selected plant l orograms and Dolicies ,

I l 4. Provides for review and approval of drawings l and specifications.

l l 5. Provides for interfacina between the Plant and

[ Engineering.

I l 6. Responsible for Fire Protection.

l 7. Ensures that acolicable programs and procedures l effectively implement the 0A Program.

[ cb. Director of Safety and Regulatory Affairs l 1. Reports to the President---VVNPG

2. Oversees the activities of the Quality  ;

Assurance Department. l

3. Oversees the development, implementation, and maintenance of the Quality Assurance Program j and implementing procedures. Reviews all changes to the QA Program.
4. Acts as the Chairman of the NSARC.

I

5. Evaluates In-Plant Audits and recommends l disposition to the Director of Sen4eP-V4ee l Pres 4denh Operations.

l 6. Provides for the review of and compliance with l

federal and state regulations and standards for l

nuclear power facilities.

Title:

Section 1. Organization Page: 20 of 46 l Rev. J.28

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l d.e . E*eeut4ve Director of Quality Assurance I

l 1. Reports directly to the Director of Safety and j Regulatory Affairs Pres 4 dent.

l l 2. Establishes the qualification requirements for l the principal Quality Assurance management l positions to assure competence commensurate l with responsibility. See Appendix A.

l l 3. Reviews Approves all changes to the Operational l Quality Assurance Program.

l l 4. Reviews or recommends prev 4 des company policy l relative to Quality Assurance practices l eendueted-at-the-Site-and-Vankee-Nue4eaf l Serviees-94v4sien, I

l 5. Authorizes personnel performing Quality l Assurance functions to have direct access to l management levels which will assure l accomplishment of quality-affecting activities.

l l 6. Establishes policies under which the Nue4eae l Serviees-94vis4en Quality Assurance Department l functions.

I l 7. Provides for oreparation. establishment-ofr-and I control m and distribution of the Operational l Quality Assurance Program and revisions l thereto.

I l 8. Provides for implementation of the Program l within the OuJlity Assurance Department.

l l 9. Provides to NSARC a periodic review of the l Operational Quality Assurance Program to l determine the adequacy and effectiveness of the l

Title:

Section 1. Organization Page: 21 of 46 l Rev.* 1 28

l l VANKEE-ATOMIG-ELEGTRIG-69MPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON l Program. Provide for evaluations of changes to l the Quality Assurance Program to the l requirements of 10CFR50.54(a)(3).

l l 10. Provides, through the Quality Assurance l Department, for independent verification of l site operation by individuals or groups who do l not have direct responsibility for performing l the work, to assure that applicable approved l procedures, specifications, licenses and safety l regulations are satisfied.

l l 11. Ensures that personnel performing Quality l Assurance functio, have sufficient authority l and organizational freedom to:

i l a. identi fy quality problems, I

l b. initiate, recommend, or provide solutions l through designated channels, and I

l c. verify implementation of solutions.

l l 42r---Prev 4 des See-Feview-ef-and-eemp44anee-w4th l federal-and-state-regulattens-and-standards-feF l nue4eae-pewee-fae444t4es l

l 1_2_3 . As directed by the Vermont Yankee Director of l Safety and Regulatory Affairs, assures that the l QA Program 1s effectively implemented.

l l 134. Appoints the NDE and N45.2.6 Level III Examiner l e_g . Manager-Management of Operational Quality Assurance l Qua44ty-Assuranee-4s-div4ded-4 ate-two-f24 l departmentsr--They-are-the-Quality-Suppset-Department l 40SO4-and-the-Qua44ty-Assessment-Department-40A047-

Title:

Section 1. Organization Page: 22 of 46 l Rev.- 1_ 28

- . . - - . - - - - - _ - . - . . ~ . . - . - .. .. .. .- . . - . - . . - . - _ _ . _

G t

i O l VANKEE-ATOH4G-ELEGTRIG-GOMPANY

-VERMONT YANKEE NUCLEAR POWER CORPORATI ON J I- l lhe-Qua44ty-Assessment-Department-peeferms-aud4ts-and I

l sueve444anees-at-Verment-Vankee-and-dud 4tsr l .surve444aneesr-4nspeet4 ens-at-the-Vankee-S4ter-and j l aud4ts-and-suFve444anees-at-the-Geeperate-Eng4neee4ng j eff4ee---The-Qua44ty-Suppeet-Department-peeferms l.

'l aud4ts-and-serve 444anees-at-vender-fae444t4es-l 1. The-Managee-ef-eaeh-department Reeports l d4eestly to the E*eeut4ve Director of Quality Assurance.

~l 2. Assures Beth-department-managees-assure that the Operational Quality Assurance Program satisfies the requirements of 10CFR50 Appendix B and ANSI N18.7-1976.

l~ 3. The-QAD-Managee Pprovides for the audit of design changes and specifications to verify adequacy of quality requirements. Independent review shall be performed by an uninvolved, but technically knowledgeable person in the I

engineering discipline.

.l- 4. The-OSD-Managee Pprovides for the audit, inspection and/or surveillance of contractor / vendor activities for operating plants to assure the effectiveness of contractual interfaces and compliance with the applicable criteria of 10CFR50, Appendix B and ANSI N18.7-1976. i 1

i

.l' 6. The-QAD-Managee-peevides-fee-the-4nspeet4en l l fVankee-Plant-enly47-sueve444anee-and/ee-aud4t

l. ef-ast4v4t4es-pertaining-te-plant-ee-s4te l repa4esr-and/ee-ehangese l 5,6 . Beth-depaetment-managees Pprovides for the ]

training and retraining of Quality Assurance

Title:

Section I, Organization Page: 23 of 46 j.Rev,- l'28

~ ~ ' ' - _ .

1 i

l VANKEE-ATOMEG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION personnel in quality assurance and audit techniques.

l s?. Beth-department-managers Eensures through verification that the Program is implemented for all activities requiring Quality Assurance.

l 18. Beth-department-managers Pyrovides for the stoppage of unsatisfactory work; and for the j control of further processing or delivery of nonconforming material.

I  !.9 . The-QAO-Manager Ddirects the independent verification through audits and surveillances of plant or site operational activities to assure that applicable approved procedures, specifications, licenses, and safety regulations are satisfied.

l l

l. 9.10. The-QAD-Managee Eensures that the 0A Program is  !

modified and/or revised as standards, regulations and experience dictate.

l l 10. Ensures that aoolicable OA Department Programs l and Procedures effectively implement the OA l Program.

l fe. Procurement Manager Direeter-ef-Preeurement l 1. Reports to the Direction of Administration V4ee l president-F4aanee-end-Teeasueee.

1 2. Responsible for procurement and receiot l inspection of all materials and services required for operations and continued maintenance of the facility.

Title:

Section I, Organization Page: 24 of 46 l Rev. 1 28

l YANKEE-ATOMfG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

3. Oversees the storage and preservation of materials.
4. Responsible for ensuring regulatory compliance for materials and services procured, stored, and utilized in the plant's safety-related systems.

l 2d. Director of Design Engineerina l 1. Reports to the Sen4ee Vice President. l l Engineerinq Operations. j l 2. Has-everall-responsibt44ty-fee-design-and-plant l eng4neee4agr Oversees the planning. I scheduling, and direction of activities of I employees engaged in design changes and alterations. )

3. Reviews and approves safety-related design change documents, selected plant programs and policies.
4. Provides for review and approval of drawings and specifications.
5. Provides for interfacing between the Plant and l Engineering the-Yankee-Nueleae-Serv 4ees l 04v4s4en.

l h,e . Training Manager l 1. Reports to the Director of Sen4ee-V4ee PFesident, Operations.

2. Establishes and maintains all operator and plant training programs.

Title:

Section I, Organization Page: 25 of 46 l Pev. 1 28

l VANKEE-ATOMIG-ELEG-TRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

3. Remains current on all regulatory requirements  ;

concerning training and qualifications of plant personnel and ensures that Plant training l programs and procedures are revised in a timely l manner in response to changing needs and regulations.

1

4. Provides overall coordination and supervision for the Technical Support Training Supervisor.

)

l the Engineering and Maintenance Training l Supervisor, the Operations Training Supervisor. l and the Training Support Supervisor in carrying out their duties. l l

5. Evaluates the effectiveness of the training programs and the performance of the individuals participating in the training.

I if. System Engineering Manager l

l l 1. Reports to the Sen4ee Vice President. l l Engineering Operations. l

2. Provides engineering support to Operations and .

1 Maintenance departments.

3. Assesses the performance of plant systems and makes recommendations for improvement.
4. Oversees and manages programs associated with l the systems engineering function. Includes l Maintenance Rule.
5. Responsible for electrical and mechanical systems engineering.

Title:

Section I. Organization Page: 26 of 46 l Rev. 1 28

l I

l VANKEE-ATOMEG-EEEGTR46-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION 1

6. Maintains formal documentation associated with I system engineering programs for required I operational and license requirements, l
7. Fulfills other responsibilities common to all supervisory positions and carries out other  ;

duties and responsibilities as may be assigned l by the Vice President. Difeeter-ef Engineering.

l 24. Plant - Vermont Yankee

a. Plant Manager  !

l 1. Reports to the Director of Senter-V4ee l President- Operations.

2. Directs the on-site implementation of the Operational Quality Assurance Program. I
3. Prescribes and directs the development of Plant procedures, instructions, schedules. and programs as necessary to assure the safe and dependable operation of the facility. I
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant. l I
5. Directs the preparation and maintenance of power plant records, reports, and logs.
6. Acts as Chairman of the Plant Operations Review Committee with authority and responsibility as established in the Technical Specifications of the plant operating license.

Title:

Section I, Organization Page: 27 of 46 l Rev.. 1 28

1 I

I l VANKEE-ATOMIG-ELEG4 RIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION j l 7-----Peevides-4afermatien-and-eeperts-te-the-Vankee l Nueleae-Serv 4ees-94v4s4en-as- dieeeted-by-the  !

l Senier-V4ee-Pees 4dentr-0peratiens:

l 7_8 . Provides information and reports to the Nuclear Safety Audit and Review Committee as required I

l and as directed by the Director of Senfee-Viee l Pres 4 dent: Operations.

l 19. Directs the control and surveillance of all special nuclear material on site.

]

l 9,10. Assures the implementation of training / retraining programs as required by the Plant license, regulations, or applicable standards; and as necessary to assure safe work practices and compliance with standard operating practices. license and Technical Specifications. safety rules, and applicable l regulations.

b. Maintenance Superintendent
1. Reports to the Plant Manager.
2. Oversees planning, scheduling, coordination, l

and direction of activities of employees engaged in the installation. inspection, and maintenance of all equipment. buildings, and structures as appropriate. Is responsible for l

the Electrical & Ctatrol Maintenance, Work l Control and Mechanical Maintenance and l Facilities areas. and-4nstrumentatien-and l Gonteel-areas

3. Assists in the development of Plant procedures, instructions, schedules, and programs as i

Title:

Section I. Organization Page: 28 of 46 l Rev. J, 28

l VANKEG-ATOMIG-EtkGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION necessary to assure the safe and dependable l maintenance of the facility.

I

4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for maintenance of a nuclear power plant. )

l

5. Acts as Vice Chairman of the Plant Operations )

l Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

l

6. Directs the preparation and maintenance of power plant records, reports, and logs as l applicable.
7. Provides information, reports, and records as i directed by the Plant Manager.

i

8. Assists in directing the establishment of safe work practices, and the training and instruction of plant personnel in the observance of standard operating practices, NRC license and Technical Specifications, safety rules and regulations.
c. Technical Services Superintendent l
1. Reports to the Plant Manager.

l l 2. Responsible for the Reaetoe-Engineeringr l Security. Radiation Protection. Technical l

l Support. and Chemistry Departments.

3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable I

Title:

Section I. Organization Page: 29 of 46 l Rev. 1 28 l

I~ l l l VANKEE-ATOMIG-ELEGTRIG-GOMPANY l

VERMONT YANKEE NUCLEAR POWER CORPORATION l

operation of the facility and the safe conduct j l of refuel operations.

4. Maintains a thorough knowledge of, and assures  ;

compliance with, the regulatory requirements of a nuclear power plant.

5. Acts as Vice Chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of l the plant operating license.

i 1

6. Directs the preparation and maintenance of power plant records, reports, and logs as applicable.
7. Provides information, reports, and records as directed by the Plant Manager.

)

8. Assists in directing the establishment of safe I work practices, and the training and I

! instruction of plant personnel in the observance of standard operating practices NRC l license and Technical Specifications, safety rules and regulations.

l l d. Operations Superintendent l

l 1. Reports to the Plart,0, nager.

l 2. Responsible for the Operations and the Reactor l Engineerina Departments. l l 3. Has the responsibility and authority for l insurinq the safe and efficient operations of l the plant and its supportina systems in ,

l accordance with applicable station licenses, l technical specifications , orocedures.

l

Title:

Section I, Organization Page: 30 of 46 l l Rev.- 1 28 1

i

l VANKEE-ATOMIG-ELEGTRIG-G0HpANY VERMONT YANKEE NUCLEAR POWER CORPORATION l instructions, established company Dolicy and

-l safety rules l 4. Acts as Vice Chairman of the Plant Operations l Review Committee with resDonsibilities as j established in the Technical Specifications of l the plant operatinq license.

l e.d . Operations Manager l 1. Reports to the Operations Superintendent Plant l Hanagee.

2. Has the responsibility and authority for insuring the safe and efficient operation of the plant and its supporting systems in accordance with applicable station licenses, Technical Specifications. procedures, instructions, established company policy and i safety rules.
3. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures and j insures that department administrative systems i exist such that the responsibilities assigned j to the Operations Department are executed I effectively and efficiently in accordance with company intent. Insures that necessary l documentation is prepared, reviewed, approved, and properly processed to verify that department activities meet all established requirements.
4. Maintains current status of Operations Department activities and requirements.

Prepares and maintains, plans and schedules for

Title:

Section I. Organization

. Page: 31 of 46 l Rev. 1 28

l^

l l

l VANKEE-ATOMIG-ELEGTRIG-G0i4PANY VERMONT YANKEE NUOLEAR POWER CORPORATI ON department commitments such as personnel training, retraining and qualification.

l S. Insures that all records, tests, reports, and logs maintained by the Operations Department are properly reviewed and approved.

6. Insures that all Operations Department personnel in a training status are actively pursuing the established program and that their l performance is being adequately evaluated.
7. Reviews all Operations Department procedures to insure that they are current, accurate, and approved.
8. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Operations Department.

l l- fe. Proiect Engineerina Manaaer l 1. Reports to the Vice President. 04feetee-ef Engineering, l

2. Oversees and manages the Project Engineering i efforts necessary to support emergency needs of l the plant.
3. Provides for the generation of project plans, schedules budget, manloadings, etc. necessary to support field activities.
4. Manages the contracts, contractors used to accomplish projects, and oversee project implementation.

l I

j

Title:

Section I. Organization Page: 32 of 46 l Rev. 1 28 l

! l VANKEE-ATOMIG-ELEGTRIG-60MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

5. Develops maintenance and oversight of implementation of programs and procedures associated with Project Engineering.
6. Maintains formal documentation of Project Engineering activities for required operation and license requirements.

l

7. Fulfil?s other responsibilities common to all supervisory positions and carries out other I

duties and responsibilities as may be assigned by the Director of Engineering, j l

l 8. Manages the Fire Protection Program.

l gf. Technical Supocrt Manager l 1. Reports to the Technical Services l Superinterdent 04FeeteP-ef-EH94HeeF4Pg.

2. Oversees and manages programs associate,' with the technical / administrative supports ar3as.
3. Maintains formal documentation associated with

! the technical and administrative activities for required operational and licensee documentation.

4. Fulfills other respansibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned l by the Technical Services Superintendent l 94reetee-of-Engineef4eg.

l 5-----Oversees-and-manages-Fire-Proteetien-PfogFam-1 l h.g . Electrical Design Engineering Manager

Title:

Section I, Organization Page: 33 of 46 l Rev. J, 28 I

I

l l

l l V ANKEE-A40 MIG-El-EG4 RIG-GOMP ANY VERMONT YANKEE NUCLEAR POWER CORPORATION l l

l 1. Reports to the Director of Design Engineering. l l

I l 2. Design authority for the electrical and l instrumentation & control engineering ef forts l

l necessary to support the. normal and emergent l l needs of the olant.

l l 3. Oversee and manage programs associated with j l desian engineerinq l l

l l 4. Provide for the generation of design chance and l l installation documents and suonort for the j l installation of these desian changes and the l l close-out of =' ociated documentation.

l 5. Maintain formal documentation of plant desian l basis and desian chance activities for reauired l operational and license requirements. l l Nuelear-Serviees-Manacee l

l 4. Reports-te-the-94eeeter-ef-Engineeeing: l l l l 2-----Des 49n-autheetty-fee-peegeams-assee4ated-With l nuelear-serv 4ees-4neluding-the-areas-of-nueleae l l and-env4eenmental-engineering-and-fuel l management-l l 3 ----Mainta4ns-feemal-desumentatien-asseefaled-With l nuelear-serviees-fee-eequ4 red-operational-and l 44eense-eequirements:

I l 4 ----Peevides-adm494strative-suppeet-fee-NS9 l employees-at-the-plant-siter l

l l 6 ----Fulf444s-ethee-eespens4b444t4es-eemmen-te-a44 l l superv4seey-pesiliens-and-earetes-eut-ethee l

Title:

Section I. Organization Page: 34 of 46 l Rev. 1 28 l

I l

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY l

VERMONT YANKEE NUCLEAR POWER CORPORATION l duties-and-responsib444 ties-as-may-be-ass 49ned l by-the-Direetee-Engineee4ng-l 12 Fluid Systems Engineering Manager l 1. Reports to the Director of Desian Enginee"ina.

l l

l 2. Desian authority for the system engineeriqq l efforts necessary to support the normal and l l emergency needs of the plant. I 1

l 3. Oversee and manage procrams associated with l design engineerina.

l l 4. Provide for the Generation of desian chance and l . installation documents, and succort for the l installation of these desian changes ard the ,

l close-out of associated documentation. 1 l

l S. Maintain formal documentation of olant desian l basis and desian chance activities for required l l coerational and license reouirements. l 1

l 2. . 1anical/ Structural Desian Engineerina Manager Desinn-Engineee$nn-Hanagers l 1. Reports to the Director of Desian Engineering.

l 2. Design authority for the eleeteveal/l&GI l mechanical structural / fluid systems engineering efforts necessary to support the normal and emergent needs of the plant.

3. Oversee and manage programs associated with design engineering.
4. Provide for the generation of design change and i installation documents, and support for the

Title:

Section I. Organization Page: 35 of 46 l Rev. 1 28

l l

l l VANKEE-ATOMIG-ELEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION l installation of these design changes and the close-out of associated documentation.

5. Maintain formal documentation of plant design basis and design change activities for required operational and license requirements.
6. Fulfill other responsioilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering.

l 1.4 . Electrical & Controls Maintenance Manager

1. Reports to the Maintenance Superintendent.
2. Plans, schedules and supervises the activities of the Electrical and Controls Department.

Such activities to include; installation, inspection, calibration, adjustment, maintenance. and repair of the plant electrical and controls equipment.

3. Coordinates the activities of the Electrical ar,d Controls Department with all other plant functions.
4. Establishes and directs a program of preventive maintenance, calibration, and surveillance testing as required by the plant license, approved plant procedures, or other plant requirements.
5. Establishes calibration techniques, frequencies, and records as necessary to assure reliable indication and control for plant system parameters.

Title:

Section I. Organization Page: 36 of 46 l Rev. 1 28 l

l YANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

6. Establishes and directs a program of departmental training that will assure a staff of Electrical and Controls personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations,
7. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
8. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Electrical and Controls  !

Department. ]

9. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above responsibilities. ,

l l-J . Mechanical Maintenance and Facilities Manager

1. Reports to the Maintenance Superintendent.
2. Is responsible for mechanical maintenance activities throughout the plant.

l

3. Consistent with plant policies and applicable instructions, institutes necessary programs, l issues instructions, originates procedures, and l insures that department administrative systems i exist such th<t the responsibilities assigned l to the Mechan;;al and Facilities Maintenance Department are executed effectively and efficiently in accordance with company intent.

l Insures that necessary documentation is  !

prepared, reviewed, approved, and properly  !

Title:

Section I, Organization Page: 37 of 46 l Rev. 1 28 j I

i

l VANKEE-ATOMIG-EEEGTMG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORAT1ON I

filed to establish that department activities ,

meet all requirements.

I

4. Consistent with plant policies and applicable  ;

instructions, organizes department functions I and activities, assigns duties, and schedules l personnel to accomplish department requirements. Reviews and supervises all I l

department assignments. l l

l

5. Maintains current status of department i activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, plant modifications, etc. l l
6. Staffs and trains Mechanical Facilities Maintenance Department personnel. )

J

7. Implements aspects of the Plant Quality i Assurance Program which relate to the activities of the Mechanical Facilities Maintenance Department.

l 8. Reviews mechanical and-eleetrieal equipment failure frequency and evaluates equipment j reliability.  !

9. Assumes responsibility for the condition.

maintenance, and reliability of all plant mechanical equipment other than that l

specifically assigned to other departments. j l mk. Work Control Manager i

1. Reports to the Maintenance Superintendent. j i

Title:

Section I, Organization l

Nge: 38 of 46 '

l Rev. J_ 28

i l- VANKEE-ATOMIG-EhEGTRIG-GOMPANY VERMONT' YANKEE NUCLEAR POWER CORPORATI ON l

2. Manages the planning and scheduling of activities necessary to support the operation and maintenance of the facility.
3. Provides and maintains the necessary administrative systems and procedures to effectively perform the department's functions
4. Ensures that the department personnel supporting the operations and maintenance activities are properly trained.
5. Ensures that the maintenance planning and 1 control data base for equipment and preventative maintenance is maintained.

l

6. Manages the Preventative Maintenance Program.

l

7. Establishes and maintains equipment history records.
8. Selects and orders materials and spare parts in areas of assigned responsibility. l l

l nl. Chemistry Manacer

1. Reports to the Technical Services Superintendent.
2. Consistent with the policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Chemistry Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared. reviewed, approved.

Title:

Section I, Organization Page: 39 of 46 l Rev. 1 28

I l l VANKEE-ATOMIG-EEEGTRIG-G0MpANY l VERMONT YANKEE NUCLEAR POWER CORPORATION and properly filed to establish that department activities meet all requirements.

3. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
4. Maintains current status of department activities and requirements. Prepares and J

maintains long-range plans and schedules for I department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant I modifications, etc. 1

5. Assumes responsibility for providing the necessary administrative supervision and required personnel to meet the needs of the established Radiciogical Environmental Monitoring Programs.

I

6. Prescribes and maintains chemistry conditions and purification of coolants within applicable limits.
7. Develops and maintains records of all chemistry and radiochemistry aspects of the plant.

l om. Radiation Protection Manager

1. Reports to the Technical Services Superintendent.
2. Consistent with the policies and applicable j instructions institutes necessary programs, issues instructions, originates procedures, and

Title:

Section 1, Organization Page: 40 of 46 l Rev. 1 28 e

.) VANKEE-ATOMIG-ELEGTRIG-60HpANV VERMONT YANKEE NUCLEAR POWER CORPORATION insures that department administrative systems exist such that the responsibilities assigned to the Radiation Protection Department are i executed effectively and ef ficiently.. Insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that department activities meet all requirements.

3. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
4. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant modifications, etc.

5 .. Develops and maintains records of all radioactive waste shipments.

6. Develops work and housekeeping practices in radiologically controlled areas of the plant to minimize personnel exposure and the spread of radioactive contamination.
7. Assumes responsibility for receipt. Storage, shipment, and disposal of radioactive material utilizing proper Federal and State regulations (other than nuclear fuel).

l 8. Has direct access to the Plant Manager in all

[ health Dhysics matters.

j

Title:

Section I, Organization Page: 41 of 46 l Rev. 1 28

l l

l l VANKEE-ATOMIG-EbEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON l- 23 Reactor Engineerina Manager l l

l l 1. Reports to the Teehnieal-Serv 4ees Operations i Superintendent.

1

2. Plans, schedules, and supervises the activities of the Reactor Engineering Department which includes the Process Computer Engineering Group. Such activities to include: nuclear and thermal core analysis, planning and  ;

scheduling of fuel rearrangements and fuel  ;

1 cycling, rod withdrawal sequences, rod patterns, and reactor maneuvering during plant startup. I l

3. Coordinates the activities of the Reactor  !

Engineering Department with all other plant l

functions. Maintains the Emergency Response Facility Information System (ERFIS) and the Safety Parameter Display System (SPDS) in i 1

support of normal and emergency plant  ;

operations. 1 I

4. Establishes and directs a program of Nuclear Performance Monitoring and Surveillance Testing as required by the plant license, approved plant procedures, or other plant requirements.
5. Establishes a program of control, accountability and record keeping as required to maintain an accurate inventory of licensed special nuclear material.
6. Establishes and directs a program of departmental training that will assure a staff of Reactor Engineering personnel capable of safely and efficiently performing their duties

Title:

Section I, Organization Page: 42 of 46 l Rev. 1 28

l' VANKEE-ATOM 16-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l

in accordance with established practices, procedures, and regulations.

7. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
8. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Reactor Engineering Department.
9. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above requirements.

l D.E . REVIEW AND AUDIT l Two committees have been established for Vankee-and the Vermont l Yankee plants whose objectives are to insure the plant is operated safely, utilizing good engineering practices. The committees are charged with making recommendations to modify operational methods or safety precautions.

The Plant Operations Review Committee is made up of Plant personnel.

l The Nuclear Safety Audit and Review Committee fee-Vermont-Vankee shall have no more than three members selected from the organization reporting to the Manager of Operations.

l The-Vankee-Nueleaf-Safety-Aud+t-and-Rev4.;w-Gemmittee-sha44-not-be {

l membees-of-the-plant-s taf f--

Title:

Section I, Organization Page: 43 of 46 l l Rev. 1 28 l

l VANKEE-ATOM 4G-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

1. Plant Operations Review Committee l a. Vankee-Plant---See-Seetten-6:5 " Review-and-Audit"-ef l Append 4x-A-Defueled-Teeknieal-Spee4ffeations-te-the l Pessess4en-Only-b4eense-OPR-3r l ab. Vermont-Vankee-Pla9t---See Section 6.2.A " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. Nuclear Safety Audit and Review Committee l ar----Vankee-Plant---See-Seet4en-6r6:2-NSARGr-ef-the-Vankee l Befueled-Teehnteal-Spee4f4 eat 4 ens-te-the-Possess 4en l 994y-b4eense-Ne--DPR-3 l b. Vermont-Vankee-Plant l a.4 . See Section 6.2.B " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.

l h.3 . The NSAR Committee shall be responsible for evaluating changes to the Vermont Yankee l organizational chart (Figure 1.2 to Section 1).

Title:

Section 1. Organization Page: 44 of 46 l Rev.. 1 28

l' l VANKEE-ATOMIG-ELEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION l

REMOVED YANKEE ATOMIC ELECTRIC COMPANY ORGANIZATION CHART t

i i

I

! -l T441e+--Seet4en-1 l -F49uee-17

! l -Vankee-Gegan42ation l Page+---45-ef-46 l Revr+---28

~

." cu

. "a -

$52$

$oS$"n

~' 8 ?o o VERMONT YANKEE ORGANIZATION sr :s 5 ~

- PRESIDEN1

% & CHIEF m EXECUTIVE

  • OFFICER D

S <

o 2: <

DIRECTOR DIRECTOR VICE PRESIDENT.

DIRECTOR OF M$

OF 0F ENGINEERING SAFETY & -< g REGUEATORY ADMINISTRATION OPERATIONS (1)

I $$

MANAGER OF i

I l

i l

i l

i DIRECTOR 2@

c+

PROCUREMENT NUCLEAR PLANT SYSTEM DIRECTOR OF PROJECT QUALITY p?

^ TR^lNI G yghDT MANAGER HANA ENGINEERING DESIGN ENGINEERING ASSURANCE (5) g7 COMM.(4) I2}*(3) MANAGER ENGINEERING MANAGER xm I

l l  ; l l l OPERATIONAL o

$+$.

OPERATIONS MAINTENANCE PLANT ELEClRICAL MECHANICAL FLUID QUALITY A350RANCE g?

OPERAT IONS DESIGN DESIGN SYSTEMS MANAGER (S) .(5) en SUPERINTENDENT (2)

SUPERINTENDENT (2)  ;

. COMMITTEE REVIEW ENGINEERING MANAGER ENGINEERING MANAGER ENGINEERING MANAGER Q$

xv l o$

l WORK l g*

OPERATIONS SER ICES EN 'N G Z MANAGER SUPERINTENDENT MANAGER MECHANICAL I2)

MAINTENANCE MANAGER l l RADIATION CHEMISTRY TECHNICAL ELECIRICAL PROTECTION SUPPORT

& CONTROL MANAGER

_ MANAGER MANAGER MAINTENANCE MANAGER Notes:

(1) Responsible for fire protection.

(2) ANSI 18.1-1971 Re: License.

(3) in Health Physics matters, the Radiation Protection Manager has direct access to the Plant Manager.

(4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Vermont Yankee Director of Operations.

(5) Outsourced to approved contractor.

CD\BOZEnVYrlG2

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON II. OVALITY ASSURANCE PROGRAM A. SCOPE This section establishes the criteria to be applied to systems requiring Quality Assurance which prevent or mitigate the consequences of postulated accidents which could cause undue risk to the health and safety of the public. The structures, systems, components and other items requiring quality assurance are listed l in the Yankee-Safety-Glass 4ffeat4en-of-Systems-Hanual-fee-the l Vankee-plant---A-14st4ng-fer-the-Verment-Vankee-plant-49-pFeV4ded l in-the Vermont Yankee Saf ety Classi fication Manual .

8. RESPONSIBILITIES
1. Compliance with the requirements of the Operational Qualitj Assurance Program - based on the criteria of Title 10 of the Code of Federal Regulations Part 50, Appendix B, and ANSI N18.7-1976 - shall be the responsibility of all personnel involved with activities affecting operational l Safety. The Plant Eaeh-fae444ty shall have a matrix of major quality assurance procedures cross referenced to each .

I applicable criteria of 10CFR50 Appendix B. The performance of quality-related activities shall be accomplished with specified equipment under suitable environmental conditions. ,

1 Note: Each criterion section for the Program incorporates the designation of specific organizational responsibilities.

2. Individuals having direct responsibilities for l establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section I " Organization" of the Program. '

i

Title:

Section II, Quality Assurance Program Page: 1 of 7 l Rev. 1 28 i

l l

t

l l

l l

l V ANKEE-ATOMIG-EL-EGTRIG-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION C. IMPLEMENTATION Establishment of an ef fective Operational Quality Assurance Program is assured through consideration of and conformance with l the Regulatory Position in the below listed Regulatory Guides as modified in Appendix B. Implementation of this Program is assured through Quality Assurance procedures derived from Quality Assurance policies goals and objectives. The Quality Assurance Department shall review Quelity Assurance program procedures to assure their derivation from the policies, goals and objectives established by the President.  !

1 Title 10 of the Code of Federal Regulations. Part 50.

Appendix 8. Quality Assurance Criteria for Nuclear Power  ;

Plants

2. ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.33. Revision 2)
3. ANSI N45.2.1-1973. Cleaning of Fluid Systems and Associated Components During Construction Phase of Nuclear Power Elants (Endorsed by Regulatory Guide 1.37. March 16. 1973)  !
  • AN51 N45.2.3-1973. Housekeeping During the Construction 5.

Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.39. Revision 2)

6. ANSI N45.2.4-1972. Installation. Inspection and Testina Re,quirements for Instrumentation and Electric Equipment Durino_the Construction of Nuclear Power Generating Plants (Endorsed by Regulatory Guide 1.30. August 11. 1972) l

Title:

Section II Quality Assurance Program Page: 2 of 7

Rev. 1 28

I l VANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

7. ANSI N45.2.5-1974 SuDDiementary Quality Assurance Reauirements for Installation. Insoection and Testina of Structural Concrete and Structural Steel During the Construction Pnase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.94, Revision 1)
8. ANSI N45.2.6-1978. Qualification of Insoection.

Examination, and Testing Personnel for the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.58. Revision 1)

9. ANSI N45.2.8-1975. Supplementary Ouality Assurance Reauirements for Installation. Inspection and Testino of Mechanical Eauipment and Systems for the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.116. Revision 0-R)
10. ANSI N45.2.9-1974 Reauirements Tor Collection. Storage, and Maintenance of Quality Assurance Records for Nuclea_r Power Plants (Endorsed by Regulatory Guide 1.88.

Revision 2)

11. ANSI N45.2.10-1973. Quality Assurance Terms and Definitions
12. ANSI N45.2.11-1974 Quality Assurance Reauirements for the Desian of Nuclear Power Plants (Endorsed by Regulatory Guide 1.64, Revision 2)
13. ANSI N45.2.12-1977 Reauirements for Auditing of Qualitt Assurance Program for Nuclear Power Plants (Endorsed by Regulatory Guide 1.144. Revision 1)
14. ANSI N45.2.13-1976. Quality Assurance Reauirements for Control of Procurement of Items and Services for Nuclear Power Plants (Endorsed by Regulatory Guide 1.123.

Revision 1)

Title:

Section 11. Quality Assurance Program Page: 3 of 7 l Rev.. 1 28

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON

15. ANSI N45.2.23-1978. Qualification of Qualit y Assurance Prooram Audit Personnel for Nuclear Power Plants (Endorsed by Regulatory Guide 1.146 August 1980)
16. ANSI N18.1-1971. Selection and Trainino of Nuclear Power Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)
17. Regulatory Guide 1.26, Revision 3, Quality Group Classifications and Standards for Water . Steam . and Radioactive-Waste-Containino Components of Nuclear Power Plants
18. Regulatory Guide 1.29. Revision 3. Seismic Desion Classification Notes: 1) When conflicts in similar requirements contained in Technical Specifications and

, the above documents exist, the requirements contained in Technical Specifications override those in the documents. Requirements in the documents will be considered when they supplement and are not in conflict with similar requirements in Technical Specifications.

2) Revisions to the above listed documents will be considered for applicability to l the Vermont Vankee Operational Quality Assarance Program upon written direction thereof by the Regional Administrator.

Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region I.

3) Only those documents listed above shall l be considered applicable to the Yankee l and Vermont Yankee plants. Documents further referenced by the above listed

Title:

Section II, Quality Assurance Program Page: 4 of 7 l Rev. 1 28

l l VANKEE-ATOMEG-ELEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION documents shall not be considered applicable. They may, however, be considered as guidelines.

  • Exceptions and alternatives to the provisions contained in this Standard / Guide are detailed in Appendix B. l I
4) This Program shall be applicable to those ;

activities requiring quality assurance I which occur commencing within 90 days after acceptance of the Program by the Nuclear Regulatory Commission.

5) The NRC shall be notified of changes, that reduce commitments in the accepted description of the QA program, for their l review and acceptance prior to implementation. Acceptance will be assumed 60 days after submittal unless notified otherwise.
6) Changes that do not reduce QA program commitments shall be submitted to the NRC at least annually.
7) Editorial changes or personnel reassignments of a nonsubstantive nature do not require NRC notification. ,

l D. MANAGEMENT EVALUATION I l The Director of Operations Gegn42 ant-Gerporate-Off4eer directs a thorough evaluation of the established Operational Quality Assurance Program by assigning the Nuclear Safety Audit and Review Committee the task of reviewing for compliance with and evaluating the effectiveness of quality related activities.

Title:

Section II, Quality Assurance Program Page: 5 of 7 l Rev.. 1 28

l VANKEE-ATOMIG-ELEGTRIG-GOMpANY l l i j VERMONT YANKEE NUCLEAR POWER CORPORATION l E. TRAINING l l l 4. -The-V4ee-President 4s4-and-Managee-of-Operat4 ens-are  !

( l respens4ble-fee-the-indeete4nat4en-and-train +ng-of-the4e l staffs-favelved-w4th-aet4v4 ties-affeeting-quality-dur4ag l p la n t-ope r a tie n-a n d /or-44ee ns e-som m 4 t me n t :-

l l 13. The Training Manager at-Verment-Vankee is responsible for j the indoctrination and training of piant staff personnel performing activities affecting operations or requiring quality assurance, and of the operators who are formally licensed or qualified. 1 I

l 3----The-Training-Gesedinater-at-the-Van. < o-Site-4s-respens4ble l fee-4adoete&nat4en-and-tra4ning-ef-site-stafs-peFsennel l performing-astivities-affeet4ng-14eense-requ4rements-l _2_4 . Within-YNS9- Eeach Ddepartment Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting I quality in applicable design and engineering, test, operational, construction, or quality phases.

]

l 3_5 . The indoctrination and training programs shall provide the following:

a. Instruction as to the purpose, scope, and implementation of quality-related manuals, '

instructions, and procedures.

b. Training and qualification in the principles and techniques of the activity being performed,
c. Documentation of the scope, objective, and method of implementing the program.  !
d. Maintenance of personnel proficiency by retraining.

I re-examining, and/or recertifying.

I

Title:

Section II. Quality Assurance Program Page: 6 of 7 l Rev. 1 28

l VANKEE-ATONIG-ELECTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON

e. Documentation of the training sessions including content attendance. dates, and results waere applicable.

i

)

)

l l

l

Title:

Section II. Quality Assurance Program Page: 7 of 7

, l Rev. 1 28 i

l l

l

I VANKEE-AT0HIG-EEEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION l

III. DESIGN CONTROL I

A. SCOPE L

This section of the Operational Quality Assurance Program establishes measures to assure that the design of and changes to structures, systems, and components covered by the Operational Quality Assurance Program are controlled.

B. RESPONSIBILITIES l

l l 1. The Nuelear-Servises-94v4 sten Quality Assurance Department '

shall be responsibie for auditing desi n documents and engineering specifications to verify that quality )

requirements, such as inspection requirements and acceptance criteria. have been included by the responsible parties.

l 2. The Nuelear-Serv 4ees-94v4sien Engin,eering/Predeet l Departments / Plants shall be responsible for:

l a. The design-and control of design activities  :

(including design interfaces) for the change of l structures, systems, or components including the I requirement for independent review. (This NRC mandated review shall be performed by an uninvolved. I but technically knowledgeable, person in the j engineering discipline.) i i

b. Identification, documentation, and control of deviations from specified design requirements and/or quality standards.
c. Design analysis and delineation of acceptance criteria for inspections and tests.

i l

Title:

Section III. Design Control Page: 1 of 4 l Rev. 1 28

1 I

l l

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

d. Verification of the adequacy of a specific design ,

feature by implementation of a prototype test when l required. l l

1

e. Review of inspection and test data for compliance l with established engineering criteria.

l

3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending their approval or disapproval to the Plant j l Superintendent / Manager,
b. Determination of whether proposed changes involve unreviewed safety questions.  ;

l 4. The Plant 54te Manager shall be responsible for:

a. Review of the recommendations of the Plant Operations Review Committee.
b. Review and approval of proposed plant changes.
5. The Nuclear Safety Audit and Review Committee shall be responsible for the review of plant changes.

l 6. The Director of Operations V4ee-president (s)-and-Manager-ef l Operations and the4e staff shall be responsible for:

a. Approval of procedures for processing plant design changes and engineering design changes,
b. Review, approval and distribution of piant change documents. I l l 7. The Engineerina Nuelear-Serv 4ees-94visien-Plant-Suppert l Departments shall be responsible for the distribution of l

l

Title:

Section III, Design Control Page: 2 of 4 l Rev. J, 28

I I

l l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION design change documents to the contractor performing the l work where contract administration responsibilities have l been assigned.

)

C. IMPLEMENTATION 1

1. Satisfaction of this criterion shall be assured through the I l implementation of the Nuelear-Servises-94v4sien-and/ee i j plant actions listed below:

l

a. Correct translation of applicable regulatory requirements and design bases into specifications, drawings and written documents, i
b. Application of suitable design controls to such ,

activities as reactor physics; seismic, stress, I thermal. hydraulic. radiation, and accident analyses; j compatibility of materials; and accessibility for inservice inspection, maintenance and repair.

l C. Design reviews to assure that design characteristics can be controlled, inspected and tested.

1

d. Performance of proper selection and accomplishment of !

design verification or checking process such as design reviews, alternate calculations, qualification testing or test programs. When a test program is used to verify the adequacy of a design, a j qualification test of a prototype unit under the most adverse design conditions shall be used. The responsibilities and qualifications of the verifier, the areas and features to be verified, the pertinent considerat' ions to be verified, and the extent of documentation are identified in procedures. ,

l Procedures will provide the criteria that specify when verification should be by test. If the l l verification method is by test only, prototype.

l

Title:

Section III, Design Control Page: 3 of 4 l Rev. J.28

l l VANKEE-ATOMIG-EbEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON component, or feature testing is performed in ,

accordance with written procedures prior to relying upon the component, system, or structure to perform its function.

e. Subjection of design and specification changes, including those originating "on-site", to the same design controls and approvals that were applicable to the original design unless designated in writing to another responsible organization.

I

f. Documentation of errors and deficiencies in the design process that adversely affect safety classified structures, systems, and components;

)

performance of corrective action to preclude repetition. I

q. Review of standard "off-the-shelf" commercial or previously approved materials. parts, and equipment that are essential to the safety functions of j structures, systems. and components, for suitability of application prior to selection.

i I

h. Selection of suitable materials, parts, equipment, j and processes for safety classified structures, systems, and components.
i. Establishment of procedures to assure that computer programs are verified and validated for a particular application.

l l

1 1

Title:

Section Ill. Design Control Page: 4 of 4 l -Rev. - 1 28

. . . - .- - =. . .

l l VANKEE-ATOMIG-ELEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION IV. PROCUREMENT DOCUMENT CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes the measures necessary to assure that applicable regulatory requirements, design bases and other requirements which are necessary to assure adequate quality, are suitably included or referenced in the documents for procurement of material, equipment and services.

B. RESPONSIBillTIES l 1. The Nueleae-Serv 4ees-04v4s4en Quality Assurance Department

-l shall be responsible for auditino the eeview-ef procurement l process. requ4sitions-494tiated-by-the-Plant-and-the-Yankee l Nueleae-Serv 4ees-04v4 sten--exeept-fee-VeFment-Vankee-who l may-eequest-sueh-eev: ews --The-Vermont-Vankee-staff-shall l be-eespons4ble-fee-the-PFeeufement-Requis4t4en-rev4ews-l 2. The Plant or the4e corporate staffs shall be responsible for:

a. The preparation, review, issue, and control of purchase documents.
b. Preparation of detailed procedures as to how purchase documents are prepared, reviewed, approved issued.

and controlled, l c. Review of plant procurement requisitions (Verment l Vankee-plant-enly4 l 3. The Nueleae-Seevises-Div4sien Engineering and/ee-Peeseet Departments shall be responsible for:

l

Title:

Section IV Procurement Document Control Page: 1 of 3 l l Rev. 1, 28

l' l~

ll 'VANKEE-A10HIG-ELECTRIG-GOMPANY VERMONT YANKEE-NUCLEAR POWER CORPORATlON

a. Preparation'of' engineering specifications which

, detail the. technical and quality requirements for

! ' material, equipment and services.

l b. Init4at4en-and/ee-rev4ew-fVankee-plant-enly)-ef l purebase-desumentat4en-fee-mateefalv-equipmentr-and l seev4ees-required-for-Plant-ehanges l

l. 4. The Plant Neelear-Servises-Div4sfen-Plant-Support

-l - Department shall be responsible for, initiation and/or

-l review fVankee-plant-only+ of purchase documentation for l construction services including contractor supplied' L material and equipment required for plant changes where ,

i contract administration resp'onsibilities have been i assigned.

. l l l S. Fee-VHSDr-the-V4ee-Peesidentfs)-and-Hanagee-ef-Operattens

! and-the4e-staff-shall-be-respens4ble-fee-the-eev4ew-and l

l appeeval-ef-presurement-desuments:--Fee-Vermont-Vankeer l- l this-funst4en-4s-performed-by-the-Verment-Vankee-staffv

C. IMPLEMENTATION l

L

1. Satisfaction of the criterion shall be assured through the j implementation of the Nueleae-Serv 4ees-Divis4en-and/ee
l. l plant actions listed below:
a. Documentation of the review and approval of procurement documents prior to release and l

availability of this documentation for verification,

b. Identification of the vendor's applicable quality I -

assurance requirements of 10CFR50, Appendix B and/or ANSI N18.7, and/or other applicable codes, standards or regulatory documents referenced in procurement documents which are to be reviewed by the qualified

.l personnel knowledgeable in quality assurance.--Fee i

Title:

Section IV. Procurement Document Control

, Page: 2 of 3 i .l Rev., 1 28 I.

I -

l VANKEE-ATOMIG-ELEGTRIG-60MpANY VERMONT YANKEE NUCLEAR POWER CORPORATION l Vermont-Vankeer-th46-funet4en-w&44-be-the l FespeHS4bf44ty-of-the-Vermont-VdHkee-Staff;

c. Identification in the procurement documents of the documentation to be prepared, maintained, and/or submitted to the purchaser prior to use, such as:
1. Drawings specifications. procedures:
2. Inspection and fabrication plans:
3. Inspection and test records:
4. Personnel and procedure qualifications:
5. Chemical and physical test results of material; and l 6. Quality Assurance Department's right of the access to the vendor's facilities and records 1 for surveillance and/or audit to procurement documentation.
d. Review and approval of changes and revisions to procurement documents at least equivalent to those for the original document.
e. Control of procurement documents for spare and I replacement parts at least equivalent to that used

)

for the original equipment.

l

Title:

Section IV, Procurement Document Control Page: 3 of 3 l Rev. 1 28

l VANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION V. INSlRUCTION

S. PROCEDURE

S. AND ORAWINGS A. SCOPE This section cf the Operational Quality Assurance Program establishes the measures for prescribing and accomplishing activities. requiring quality assurance in accordance with approved drawings, instructions, or procedures.

'B. , RESPONSIBILITIES l W4 thin-Yankee-Neelear-Serv 4ees-04vis4ent Eeach d9epartment Director / Manager is responsible for establishing and complying with applicable procedures governing the activities affecting  !

quality.

l Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and  ;

drawings include appropriate quantitative or qualitative acceptance criteria for determining that activities have been satisfactorily accomplished; assuring that the applicable I criteria of 10CFR50 Appendix B and/or ANSI N18.7 are specified; and assuring that the documents are kept current. In addition, tte following departments have the distinct responsibilities delineated below.

l 1. The Nue4 ear-Serv 4ees-04v4s4en Quality Assurance Department l l shall be responsible for orecaration, review and approval l l of all Plant Quality Assurance Department procedures. The l OA Department also reviews and approves selected plant l orepared auality assurance procedures.

2. The Plant shall be responsible for the preparation, approval, maintenance, and implementation of all instructions and procedures associated with plant l activities, including selected 0A Procedures.

l

Title:

Section V, Instructions. Procedu'es, and Drawings Page: 1 of 2 l Rev. 1 28

(

l l

l YANKEE-ATOMIG-EEEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION l 3. The NueleaF-SeFvises-94Vis4en Engineering and/ee-Predeet l Departments shall be responsible for:

i

a. Preparation and approval of engineering drawings and instructions, welding and nondestructive examination proredures, and procedures for Engineering Design Control,
b. Updating and control of original drawings and distribution of copies thereof.
4. The Plant Operations Review Committee shall be responsible for reviewing procedures affecting nuclear safety prior to

[ their approval by the Plant Superintendent / Manager.

l 6r----The-Nueleae-Serv 4ees-04 vision-Plant-Suppset-Department l shall-be-responsible-foF-the-pFepaFabienr-appFevalv l maintenaneer-and-4mplementation-of-a14-instruet4 ens-and l preeedures-asseefated-with-Genstruetten-Serv 4ees l aetivities:

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l implementation of the Nuelear-Servises-94 vision-and/or l plant actions listed below:

I

a. Establishment of provisions which clearly delineate the sequence of actions to be accomplished in the j preparation. review, approval, and control of instructions, procedures, and drawings.
b. Review of inspection plans; test, calibration.

special process, maintenat.ce and repair procedures; drawings and speci fications: and changes thereto by the Quality Assurance Department or other personnel knowledgeable in quality assurance.

l l

Title:

Section V. Instructions. Procedures, and Drawings l Page: 2 of 2

l Rev. 1 28 l

l i

l l

l VANKEE-AT0HIG-ELEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION I VI. DOCUMENT CONTROL A. SCOPE This section of the Operatic..ol Quality Assurance Program ,

l establishes the measures for controlling the issuance of l l

documents including revisions thereto, which affect quality activities.

I i

B. RESPONSIBILITIES

1. All participating departments shall establish document control measures which provide for the following:
a. Identification of organizations responsible for  ;

preparation review, approval. and control of  ;

documents,

b. Identification of documentation to be used in performing the activity.
c. Coordination and control of interface documents,
d. Establishment of distribution lists.
e. Action to be taken for obsolete or superseded l documents. I I

In addition, the following organizations ha e the unique responsibilities delineated below.

2. The Plant shall be responsible for: l i
a. Controli..9 the issuance of plant operating, maintenance, repair, refueling, inspection and test, and change documents.

Title:

Section VI. Document Control i Page: 1 of 4 l Rev. 1 28

l 1

l VANKEE-ATOMIG-EbEGTRIG-60MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

b. Distribution and maintenance of all plant approved and/or revised documents assuring quality at the location where the activity is performed.
c. Review and distribution of drawings.

l 3. The Nue4eae-Servises-04v4 sten Engineering and/ee-Predest Departments shall be responsible for:

l l a. Controlling the maintenance and distribution issuanee of engineering drawings, specifications, welding and

! nondestructive examination documents.

b. Revision and distribution of welding and nondestructive examination documents.

l e. -Ha4ntenanee-and-d4ste4but4en-of-engineer 4ng l spee4f4eatiens-and-draw 4ngs-l 4. The Vice President ifs) Engineerina and-Hanager-ef l Operations and the4e staff shall be responsible for:

a, A system of review and approval of Plant drawings and specifications.

l b-----Gentee444ng-the-NueledF-SOFVises-94Visien-Operational l SuppeFt-qual 4ty-assuPanee-deeuments-l 5. The Exeeutive-Direeter-ef Quality Assurance Department l shall be responsible for establishing the means for the

[ oreparation. control ,and distribution of the VYNPC l Operational Quality Assurance Manual Pregram and Approved Vendors List and revisions thereto.

Title:

Section VI. Document Control Page: 2 of 4 l Rev. 1 28

1

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY ,

VERMONT YANKEE NUCLEAR POWER CORPORATI ON  !

C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the l 1mplementation of the Nuelear-Geev4ees-94v4sion-and/or l plant actions listed below:
a. Review and approval of document changes by the same organizations that performed the original review and approval or,by other responsible organizations delegated by the controlling authority.
b. Inclusion of approved changes in instructions.

drawings, and other applicable documents prior to placing the system in operating status.

c. Provision of availability of documents at the location where the activity is to be performed prior to commencing the work.
d. Establishment, revision, and distribution of a master list or equivalent to identify the current revision number of instructions specifications. drawings.

procurement documents, or other quality assuring documents.

e. Control of documents identified as follows:

l 1. Design documents (i.e.. Engineering / Plant Design Change Requests. Specifications.

Calculations. etc.):

2. Design, manufacturing, construction, and installation drawings:
3. Procurement documents:
4. Operational Quality Assurance Program, maintenance, and operating procedures:

Title:

Section VI. Document Control Page: 3 of 4 l Rev.- 1 28

!- l VANKEE-ATOMIG-EEECTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER ;ORPORATION l S. Manufacturing, inspection and test i instructions:

6. Test documents ,
7. Design chantes: and
8. Nonconformance reports.

l 9. Event reports fVerment-Vankeel.

f. Appendices to the Operational Quality Assurance .

1 Program are considered to be part of the Program and I are reviewed and approved in accordance with the Program.

l l

l

Title:

Section VI, Document Control Page: 4 of 4 l Rev. 1, 28

~ _ ~ _ . -- . - . . . - -

l VANKEE-ATOMIG-ELEGT316-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION Vll. CONTROL OF PURCHASED MATERIAL EQUIPMENT. AND SERVICES A, SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that purchased material, equipment and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents.

B. RESPONS1BILITIES 1

l 1. The-Nueleae-Serv 4ees-04visten-Quality Assurance Department shall be responsible for:

l

a. Audits and Commercial Surveys of vendor quality  ;

i assurance programs.

b. Surveillances of vendor activities.

l c. Maintenance of the Vankee-Atemte-E4eeteie-Company  :

Approved Vendors List.

I 1 2. The Nuelear-Serv 4ees-04vis4en Quality Assurance and/or j l Engineering--and/er-Profeet Departments shall De i responsible for evaluating vendor manufacturing and technical capabilities upon request. J

3. The Plant shall be responsible for:
a. Receipt inspection and control of material and equipment.
b. Evaluation of purchased services during and/or after completion of the service.

l c. The Manager of Procurement Plant-Seevices/

l Admin 4steative-Department-at-the-Vankee-plant-and-the l Mater 4al-ManageF-at-Vermont-Vankee shall be

Title:

Section VII. Control of Purchased Material. Equipment, and Services Page: 1 of 4

-l Rev. 1 28

l YANKEE-AT0HIG-ELEGTRIG-GOMPANY ,

VERMONT YANKEE NUCLEAR POWER CORPORATION '

responsible for the control of purchased material, parts and components until issued for installation or use.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall Le assured through the l implementation of the Naelear-Servises-94vis4on-and/or l plant actions listed below:
a. Audits and Commercial Surveys of vendors based on one or more of the following. as appropriate to the scope of procurement activities:
1. When required in order to verify vendor capabilities to comply with the applicable criteria of 10CFR50, Appendix B. ANSI N18.7, or other quality program baselines. l
2. When required based on the results of review and evaluation of vendor performance history.
3. When required in order to observe vendor facilities / service activities to assure  !

conformance to purchase specifications.

b. Surveillances of vendors which provide for:
1. Specification of applicable quality controls, processes to be witnessed or verified, documentation required, and personnel responsible for performing the surveillance.
2. Verification that the vendor complies with the quality requirements specified in procurement documents by observation of in-process work.

l

Title:

Section VII. Control of Purchased Material Equipment, and Services Page: 2 of 4 l Rev 1 28 i

l VANKEE-A10M16-ELEGTRIG-G0HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

c. Transfer of the following records from the vendor to  :

the plant:  !

1. Documentation that identifies the purchased l material / services and compliance with the applicable procurement document requirements.

I

2. Documentation that identifies any deviation (s)  ;

from procurement requirements, including a description of those deviations dispositioned

" accept as is" or " repair" l

d. Review and acceptance of vendor documentation by a l responsible quality assurance individual. l l

l

e. Receipt inspections of vendor furnished material / services. in accordance with predetermined instructions, to assure:
1. Material is identified and conforms with 1 1

receiving documentation.

2. Material and documentation are determined acceptable prior to use.
3. Inspection records or certificates of conformance attesting to material acceptability are on-site prior to use.
4. Items are identified as to their inspection status prior to release for controlled storage, installation or further work. l l

l.

Title:

Section VII. Control of Purchased Material, Equipment, and Services Page: 3 of 4 l Rev. 1 28 l

t

l l YANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l 1

f. Evaluations of vendor effectiveness to control l quality is performed at intervals consistent with the

)

importance, complexity and quality of the item / services.

I l

l l

l l

1 l

l l

l l

i l 1

l l

l l

l l

Title:

Section Vil Control of Purchased Material. Equipment, and Services Page: 4 of 4 l Rev.- 1 28

] VANKEE-ATOMIG-ELEGTR4G-60MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION VIII. IDENTIFICATION AND CONTROL OF MATERIAL PARTS. AND COMPONENTS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for identification and control necessary to prevent the use of incorrect or defective material, parts, and components.

B. RESPONSIBILITIES l 1. The Nuelear-Serv 4ees-04v4ston Quality Assurance Department shall be responsible for review, evaluation. or verification (audit commercial survey or surveillance) of vendor quality controls and work processes for traceability of materials through the use of heat number, part number, or serial number either on the item or on records traceable to the items.

i

2. The Plant shall be responsible for:

i

a. Preparation and approval of documents for the  ;

identification and control of materials, parts, components and storage of lubricants and other l

consumable materials.

b. Maintenance of traceability of materials, parts, and components received, stored installed and used at the Plant. l l

l 3. The Nueleae-Services-94visien Engineering and/or-Predeet l l Departments and/or-the-Vermont-Vankee-staff shall be l responsible for assuring that enoineering specifications contain appropriate requirements for the identification and control of materials. parts, and components.

Title:

Section Vill. Identification and Control of l Materials. Parts, and Components Page: 1 of 2

} Rev. 1 28

l VANKEE-ATOMIG-ELEGIRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l 4. The Manager of Procurement Fee-VNS97-the-V4ee-President (s) l and-Manager-ef-Operations and the4e staff shall be responsible for providing review and approval of documentation for the purchase of materials, parts, and l components. Fee-Vermont-Vankeer-this-funet4en-4s-performed l by-the-Vermont-Vankee-staffy C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l implementation of the Nuelear-Services-Divis4en-and/ee l plant actions listed below:
a. Traceability of the identification of materials and parts to the appropriate documentation such as drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and Physical and Chemical Material Test Reports.
b. Identification of the item in a location and with a 1 method which does not affect its fit. function or quality.
c. Documented verification of correct identification of materials, parts, and components prior to release for use.

Title:

Section Vill. Identification and Control of Materials. Parts. and Components Page: 2 of 2 l Rev. 1 28

l VANKEE-ATGMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION IX. CONTROL OF SPECIAL PROCESSES A. SCOPE This section of the Operational Quality Assurance Program establishes the measures necessary to assure that special processes including welding, heat treating, and nondestructive testing. are controlled and accomplished by qualified personnel in accordance with applicable codes, standards, specifications, criteria and other special requirements.

B. RESPONSIBILITIES l 1. The Nueleae-Serv 4ees-94vis+en Quality Assurance Department shall be responsible for:

a. Surveillance of certain nondestructive tests in l accordance with IVankee-Atem4e-Eleetete-Gempany l Welding and Nondestructive Examination Proceduresi.
b. Review of special process documents, as requested.

l generated by the Nueleaf-Serv +ees-94v4s+0a l Engineering /Preseet Departments and vendors for use on-site and when otherwise specified.

l 2. The Nueleae-Serviees-Division Engineering and/or-Preseet Departments shall be responsible for:

a. Preparation of documents for welding. heat treating, filler metal control, and nondestructive examinations.

i

b. Review and approval of special process documents provided by the vendor for use on-site and when otherwise specified.

i l

l

Title:

Section IX. Control of Special Processes

. Page: 1 of 2 l Rev. 1 28 l

I l YANKEE-ATOMIG-ELEGTRIG- COMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l 3.4 . The Plant shall be responsible for:

a. Assurance that maintenance and change work involving special processes are performed by qualified personnel in accordance with approved documents,
b. Control of material used in special processes by plant personnel.

l 3. c. The-Plant-Suppeet-Department-skall-be-eespons4ble-fee l Ttraining, qualification, and requalification of personnel in nondestructive testing, such as liquid penetrant examination.

l 46. The Manager of Procurement Fee-YNS9;-the-V4ee-Peesident-and l Manager-ef-OpeFatten and staff shall be responsible for review and approval of purchase documentation for special l process material.--Fee-Vermont-Vankeer-this-funet4en-4s l perfeemed-by-the-Vermont-Vankee-staff C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l implementation of the Nueleae-Seeviees-Divis4en-and/or l plant actions listed below;
a. Completion of qualification records of documents, eqttipment, and personnel connected with special processes in accordance with applicable codes, standards, and specifications.
b. Performance of special processes accomplished in accordance with written process sheets or equivalent with recorded evidence of verification.
c. Maintenance and updating of qualification records of special process documents, equipment, and personnel.

l

Title:

Section IX. Control of Special Processes Page: 2 of 2

l Rev.* 1 28

s 4

J l

4- ,

't

.l '

VANKEE-A40M4G-ELEG4R4G-60MPANY

, l VERMONT YANKEE NUCLEAR POWER CORPORATION i X. INSPECTION A. SCOPE' 4

l This sect' ion of the Operational Quality Assurance Program 3 .. establishes measures for inspection of activities l requiring quality assurance to verify conformance with approved procedures.

drawings,' specifications and instructions.

~

B. - RESPONSIBILITIES j l 1. .The Nuelear-Servises-04v4sfen Quality Assurance Department )

shall be responsible for:

Auditina and Surveillance of Plant InsDection

'l a. j

  • 1 4 l activities, '
l. b,a . Surveillance of documentation pertinent to the l Inservice Inspection and Test Program-ffeP-Vefsent, )

l l- .Vankee-enly). l l

j '- c.b . Surveillance of' vendor inspection activities and personnel.

l

! .l ei -Rev4ew-ef-insta44at4en-and-Test-PFeeeduees-and l

.l Ma4ntenanee-Requests-te-aseertate-the-extent-ef-any

= l' eequ4eed-QA-sueve444anees-and-QG-4nspeettens-fVankee j l Plant-enly4r l i

-l dr----4Heerperatten-ef-mandatery-net 4ffeat4en/ held-pe4nts

.l fee-plant / vendee / serv 4ee-group-aetiv4ttes-4nte-the-GA

-l surve444anees-and-mandatery-held-pe4nts-fee i~ . -

ll~ 4nspeettens-fVankee-Plant-enly4r

'l er----WP4t4agr-Fevrew4ag-and-apprev4Hg-qua44ty-eenteel  ;

-l 4nspeetfea-eheekl4sts --fVankee-Plant-eR4y-4 4

Title:

Section X. Inspection Page: 1.of 3 l Rev.: 1 28' J

y)~ f -

, y w - . - > -

- . .~ _ _ .. _ . . .. __ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _

l l 4 l

l l l YANKEE-ATOMM-EtSCTRR-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION ,

( 'j l fr----perform-QG-4nspeet4on-aet4vit4es-to-assure-that predetermined-requirements-have-been-mety--(Yankee

{ j l l plant-enlyr) 2, The Plant shall be responsible for:

a. Writing and approving inspection instructions and check lists.
b. Assuring that activities requiring quality assurance j meet predeterminea requirements. I
c. Providing qualif 4ed personnel and necessary equipment )

i for inspections to assure quality work.

l

d. Perform inspection activities te assure that l predetermined requirements have'been met. l
e. Hold points incorporation where applicable.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l implementation of the NueleaF-6eFV460s-04V40 fen-and/OF l l plant actions listed below;
a. Independence of personnel performing the inspection from the personnel performing the activity being inspected.
b. Use of instructions or check lists which incorporate the details listed in Section XVil item C.I.a.
c. Use of necessary drawings and specifications when perforning inspection operations.

l l

Title:

Section X. Inspecticq Page: 2 of-3 i l Rev. j, 28 i

I l VANKEE-ATONIG-ELEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION

d. Inspection of repairs and replacements in accordance with the approved design and inspection requirements or acceptable alternatives.
e. Surveillance of processing methods, equipment, and personnel wher !irect inspection is not possible.
f. Qualification of inspectors in accordance with applicable codes, standards, and company training programs; and maintenance of qualifications and certifications.
g. Review of maintenance documents by qualified personnel knowledgeable in quality assurance to determine the need for inspection, identification of inspection personnel, and documenting inspection results.

Title:

Section V. Inspection Page: 3 of 3 l Rev., 1 28

l VANKEE-AT0HIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION XI. TEST CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a test program to demonstrate that structures, systems, and components will perform satisfactorily in service.

B. RESPONSIBillTIES l- 1. The Nueleae-Services-94visten Quality Assurance Department shall be responsible for:

a. Surveillance of vendor test program activities.
b. Surveillance of the documentation generated during the test program.

l 2. The Nuelear-Seev4ees-94visten Engineering /Preseet l Departments / Plants shall be responsible for:

a. Determination of when testing is required following plant changes.
b. Establishment of specifications, requirements, and acceptance criteria for testing follrwing plant changes.
c. Development of test documents, performance of tests.

and documentation, evaluation and approvul of test results.

d. Provision of qualified personnel and calibrated equipment for testing.
3. The Nuclear Safety Audit and Review Committee shall be responsible for reviewing nroposed tests or experiments

Title:

Section XI. Test Control Page: 1 of 3 l Rev.- 1 28

1 l

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION i which involve an unreviewed s6fety question as defined in 10CFR50.59.

4. The Plant Operations Review Committee shall be responsible for the review of all test documents and test results for special tests, l i

C. IMPLEMENTATION  :

l l

1. Satisfaction of this criterion shall be assured through the l l implementation of the NueleaP-SeFV4eeS-94V4S409-and/OP l plant actions listed below:
a. Assurance that changes. repairs, and replacements are tested in accordance with the approved design and l testing requirements or acceptable alternatives. I
b. Review of written test documents for incorporation or reference of the following:
1. Requirements and acceptance limits contained in applicable design and procurement documents.
2. Instructions for performing the test.

l

3. Test prerequisites such as:

l a) Calibrated instrumentation; b) Adequate and appropriate equipment:

c) Trained, qualified. and licensed / certified personnel:

d) Completeness of item to be tested; l'

l e) Suitable and controlled environmental conditions: and

Title:

Section XI. Test Control Page: 2 of 3 l Rev. 1 28 I

i l

l

VANKEE-ATGHIG-ELEGTRIG-G0HpANY VERMONT YANKEE NUCLEAR POWER CORPORATION f) Provisions for data collection and storage. )

4. Mandatory inspection hold points for witness by owner. contractor or inspector, when applicable.
5. Acceptance and rejection' criteria.

)

6. Method of documenting test data and results.  !

l

c. Procedures shall provide for specification of test equipment with suitable accuracy. The crite.ria for determining the accuracy requirements of test equipment shall be provided when identification of specific equipment is not practical.

l l

I i

Title:

Section XI. Test Control Page: 3 of 3 l Rev.- 1 28 l

l

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION XII. CONTROL 0F MEASURING AND TEST EQUIPMENT A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for the control, calibration and periodic adjustments of tools, gages, instruments, and other measuring and test devices used to verify conformance to established requirements.

B. RESPONSIBILITIES l 1. The Eaeh Plant Department shall be responsible for:

a. Development of the implementing documents.for control of measuring and test equipment including identification and calibration for equipmer.t under their control.
b. Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.
c. Maintenance of calibration records,
d. Preparation and review of specifications for measuring and test equipment. such that all applicable requirements are satisfied.

C. IMPLEMENTATION i 1. Satisfaction of this criterion shall be assured through the l implementation of the Nueleae-Se<4+ees-04v4sien-and/ee

! l plant actions listed below;

a. Identification and traceability of measuring and test equipment to the calibration test data.

Title:

Section XII. Control of Measuring and Test Equipment Page: 1 of 2 l Rev.. 1 28

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

b. Labeling or tagging of measuring and test equipment to indicate due date for calibration.
c. Calibration of measuring and test equipment at specified intervals based on required accuracy, purpose, degree of usage, stability characteristics.

and other conditions affecting the measurement.

d. Documentation of measures taken to determine the validity of previous inspections performed when measuring and test equipment is found to be out of calibration.
e. Use of calibration standards having an uncertainty (error) requirement of no more than 1/4 of the tolerance of the equipment being calibrated.

Calibration standards limited by the

" state-of-the-art" may have a greater acceptable uncertainty.

f. Documentation and maintenance of the status of all items under the calibration system.
g. Traceability of reference and transfer standards to nationally recognized stan'dards; or. documentation of the basis for calibration where national standards are nonexistent.

l l

l i

Title:

Section X11. Control of Measuring and Test Equipment Page: 2 of 2 l Rev.. 1 28

1 l VANKEE-ATOMIG-ELECTRIG-G0HpANY VERMONT YANKEE NUCLEAR POWER CORPORATION ,

XIll. HANDLING. STORAGE AND SHIPPING l A. SCOPE This section of the Operational Quality Assurance Program establishes measures to control the handling, storage, shipping, j cleaning and preservation of material and equipment to prevent damage or deterioration.

l l

B. RESPONSIBILITIES '

I 1. The Plant shall be responsible for:

a. Development of the implementing documents for handling, storage and shipping of materials and l

equipment. l

b. Provisions of suitable facilities and equipment for handling, storage. and shipping of materials.
c. Inspection and test of special handling tools and equipment. l C. IMPLEMENTATION 1

l l

l 1. Satisfaction of this criterion shall be assured through the l

l implementation of the NueledF-SeFV4ees-Ofv454eH-aHd/eP l l PlaHt actions listed below: 1 1

a. Specification and accomplishment of special. handling. l preservation, storage, cleaning, packaging, and shipping requirements by qualified individuals in l accordance with predetermined work and inspection instructions.
b. Preparation of instructions in accordance with design l and specification requirements which control the cleaning. handling, storage. packaging, shipping and

Title:

Section XIII. Handling. Storage, and Shipping Page: 1 of 2 l Rev. 1 28 i

i i

l VANKEE-AT0HfG-EEEGTRIG-60HPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l

preservation of safety classified materials, l components and systems to preclude damage. loss or deterioration by environmental conditions such as temperature or humidity.

i l-

Title:

Section XIII, Handling, Storage, and Shipping

Page
2 of 2

.l Rev.: 1 38

r l VANKEE-ATGHIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON XIV, INSPECTION. TEST AND OPERATING STATUS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for indicating the status of items undergoing inspections and tests (via tags labels, logs, data sheets, etc.). to prevent the unintentional bypass of required tests. In addition, this section establishes measures for indicating the operating status of components and systems to prevent their inadvertent operation.

B. RESPONSIBillTIES

1. The Plant shall be responsible for:
a. Ensuring indication of the status of operating equipment or systems to be removed from service for maintenance, test, inspection, repair or change. ,

l

b. Designation of personnel who are responsible for l directing the status change of equipment and systems.

C. IMPLEMENTATION _

1. Satisfaction of this criterion shall be assured through the l implementation of the Nue4eaf-Serv 4ees-94visten-and/ee l plant- actions listed below:
a. Notification of affected organizations for changes in the inspection, test and operating status of structures, systems, and components.
b. Procedural control of the bypassing of required inspections, tests and other critical operations with the concurrence of the Quality Assurance Department.

Title:

Section XIV, Inspection. Test, and Operating Status Page: 1 of 2 l Rev.. 1 28

l VANKEE-ATOMEG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

c. Procedural control of the application and removal of inspection and status indicators such as tags, markings, labels and stamps.

l I

1 l

l l

Title:

Section XIV, inspection, Test, and 0pecuting Status Page: 2 of 2 l Rev.* 1 28

7 _

1 l- :VANKEE-ATOMIG-ELEGTRIG-60HPANY .

VERMONT YANKEE NUCLEAR POWER CORPORATION l l

E XV. NONCONFORMING MATERIALS. PARTS. AND COMPONENTS  ;

A. SCOPE

This section of ine Operational Quality Assurance Program establishes the measures to. control materials, parts. components.  ;

.or-any other activities which do not conform to requirements, in order to prevent their' inadvertent use.

I B. . RESPONSIBILITIES l' 1. The Nuelear-Seev4ees-94v4s4en Quality Assurance Department shall be responsible for:

l 1

j: a. Rev4ew-ef-neneenfeemanee-eepeets-te-deteem+ne. ]

l- repet4t4ve-noneenfeem4ag-eendit4 ens-and-te-vee 4fy j U l Pesolut4en-ef-94994ffeant-send 4tiens-adveese-te l qual 4ty-te-preelude-eeeuerenee-4 fee-Vankee-Plant l' 'enly4-p l~ a,b . Review of Event Reports to verify resolution of q

. l' -significant conditions adverse to quality-fVerment

,l Vankee-en4:v4.

l b.e . Establishment of feedback system between plant Vankee

-l~ Atem4e-Eleetefe-Gempany and vendor representatives in regard to nonconforming material or services..

.l c,d . Initiation of neneenfeemanee-eepeets-fVankee-94 ant l and Event Reports fee-Veement-Vankee) when conditions are found which may adversely affect the quality of plant systems, structures, activities, or components.

l 2. The Nueleae-Serv 4ees-Divis4en Engineering and/or Plant

-l Peedest Departments *. hall be responsible for:

a. Review of nonconforming services or items which cannot be corrected by vendor action.

Title:

Section XV. Nonconforming Materials. Parts, and Components

.Page: 1 of 3 l Rev. 1 28

l VANKEE-ATOMIG-ELEGTRIG-GOMpANY VERMONT YANKEE NUCLEAR POWER CORPORATION

b. Preparation or approval of implementing documents for repair and/or rework of nonconforming items.
l. 3. The Director of Operations V4ee-presidentfs4 and the4e staff shall be responsible for the evaluation of significant plant-initiated nonconforming item, service, or activity dispositions.
4. The Plant shall be responsible for:
a. Writing implementation documents for the identification, documentation, and corrective action for services, material, installation, testing, operation, and/or surveillance nonconformances at the Plant.
b. Establishment of measures to provide for the documented control of nonconforming materials, parts, and components.
c. Establishment of feedback system between the plant and vendor representatives for the disposition of nonconforming services, materials, parts and components.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l implementation of the Neeleae-Serv 4ees-94visien-and/ee l plant actions listed below:
a. Identification. disposition, inspection and segregation of nonconforming items or activities.
b. Identification of those individuals or groups delegated the responsibility and authority for the disposition and written approval of nonconforming

< items or activities.

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 2 of 3 l Rev.. 1 28 l

l

l VANKEE-ATOMIG-E6EGTRIG-60MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION 1

c. Inspection and test of reworked or repaired items  ;

which require reinspection and retest to original methods or methods equivalent thereto. l

d. Inclusion of nonconformance reports dispositioned

" accept as is" or " repair" as part of the inspection records furnished to the plant.

I

e. Periodic analysis of nonconformance reports to show quality trends with the results reported to management for review and assessment.

l

~2. The identification, description, disposition, inspection i

and signature approval of the disposition for l nonconformance shall be documented in a nonconformance l report. l

Title:

Section XV. Nonconforming Materials. Parts, and Components Page: 3 of 3 l Rev. 1 28

l I

l l

I l VANKEE-ATOMIG-ELEGTRIG-GOMPANY j VERMONT YANKEE NUCLEAR POWER CORPORATI ON  !

l XVI. CORRECTIVE ACTION A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment are promptly identified and corrected. i B. R E S P0,1< ' B il. I T I E S l 1. The Naelear-Seeviees-94visten Quality Assurance Department ,

shall be responsible for review and/or audit of l recommendations to prevent recurrence of a significant I condition adverse to quality.

l l 2. The Director of Operations V4ee-Presidentfs4 and the4e staff shall be responsible for:

l

a. Review of significant adverse conditions reported by  !

the Plant including corrective actions taken.  !

1 l b. GeefdinatieH-ef-eemments-between-the-Nuelear-Serv 4ees j l 94vis4en-Pfefests-DepaFtments-and-the-Plant-ffer l Vankee-Plant-only4 ]

l

3. The Plant shall be responsible for: l l

l a -. Identification of causes of conditions adverse to quality.

b. Implementation of the corrective action.
c. Documentation of corrective action taken.

l

Title:

Section XVI. Corrective Action )

Page: 1 of 3 l Rev.. 1 28 l l

s l VANKEE-ATOMIG-EbEGTRIG-GGMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON l d. -Geord4natten-ef-semments-between-the-Nueleaf-Seev4ees l 94v4s4en-Predeets-Bepaetments-and-the-Plant-ffer l Veement-Vankee-enlyl-l 4. The Nueleae-Serv 4ees-04v4sien Engineering and/ee-Peedeet Departments shall be responsible for:

a. Review of conditions adverse to quality which involve design deficiencies to determine the cause of the condition.
b. Recommendations of corrective action to preclude repetition of design deficiencies.
5. The Plant Operations Review Committee shall be responsible for:
a. Review of significant conditions adverse to quality and recommending corrective action.
b. Recommendations involving repetition of signi ficant operating deficiencies.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the I implementation o' the Nuelear-Servises-04visien-and/ee l plant actions listed below:
a. Initiation of corrective action following the determination of a condition adverse to quality to I preclude recurrence.

l l

b.

Follow-up reviews to verify proper implementation of corrective actions and to close out the corrective action documentation.

Title:

Section XVI. Corrective Action Page: 2 of 3 l Rev. 1 28

l VANKEE-ATOMTG-EEEGTRTG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

c. Reporting of significant conditions adverse to quality the cause of the conditions, and the corrective action implemented to the cognizant levels of management for review and assessment, both "off-site" and "on-site" l

l l

l 1

i l

i i

i

Title:

Section XVI, Corrective Action Page: 3 of 3 l Rev.: 1 28

l VANKEE-AT0HIG-EL-EGTRIG-60MpANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON XVII. QUALITY ASSURANCE RECORDS A. SCOPE

1. This section of the Operational Quality Assurance Program establishes the measures for maintenance of records which provide documentary evidence of the quality of items and the activities affecting quality. Requirements shall be established for identification, transmittal, retrievability and retention of quality assurance records including duration, location, protection and assigned responsibility.
2. The quality assurance records shall include, but not be i limited to, plant history; operating logs; principal maintenance; design change activities; reportable <

occurrences; nonconformance reports; results of reviews. j inspections, tests, audits and material analyses;  ;

monitoring of work performance; qualification of personnel.  ;

documents and equipment: drawings; specifications: '

procurement documents: calibration documents and reports; and corrective action reports.

B. RESPONSIBILITIES l 1. The Nuelear-Serv 4ees-04visten Quality Assurance Department shall be responsible for:

a. Maintenance of qualification / certification records for Quality Assurance Department personnel.

i

b. Maintenance of audit, surveillance and inspection records of quality assurance activities generated by the Quality Assurance Department personnel or their designates.

l c. Preoaration, control, and distribution of the l Operational Quality Assurance Program and revisions

( l thereto.

Title:

Section XVII, Quality Assurance Records Page: 1 of 3 l Rev. 1 28 i

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

2. The Plant shall be responsible for:
a. Writing implementation documents for the establishment and maintenance of Plant Operational Quality Assurance records.
b. Designating individuals and establishing requirements for the control of plant design, procurement, and operational records involving quality assurance,
c. Provision of facilities to prevent deterioration or loss of documentation.
d. Provision of a system for the review, approval and retention of plant prepared documents such as reportable occurrences, technical reports, required records and the meeting minutes of official committees.  !

l 3. The Nueleae-Serv 4ees-94visten Engineering and/or Plant Pre;jeet Departments shall be responsible for establishing a system of review. approval and retention of documents relating to quality assurance for the operation of the departments.

l 4------T h e- E

  • ee u t 4 v e-94 r e e t e e-e f-Q u a li ty- A s s u r a n e e-s h al4 -b e l respons4ble-fee-eentrel-and-diste4but4en-of-the-Operettenal l Qua44ty-Assuranee-PFe9Fam-and-Fevisiens-thefete-C. IMPLEMENTATION
1. Satisfaction of this criterion shall be assured through the l implementation of the Nueleaf-Serv 4ees-94v4s4en-and/ef j, l plant-actions listed below:
a. Specifying the details required for inspections and test records including the following as applicable:

l

1) Description of the type of observation.

Title:

Section XVII, Quality Assurance Records Page: 2 of 3 l Rev. 1 28 l

I l

l VANKEG-ATOMIG JEEGTRIG-G0MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION

2) Evidence of completion and verification of manufacturing, inspection, or test operations.

l

3) The date and results of the inspection or test.
4) Information related to conditions adverse to  ;

quality. l l

5) Inspector or data recorder identification. I
6) Evidence as to the acceptability of the results.

l

7) Acceptance and rejection criteria.
8) Identification of required procedures, drawings, and specifications and revisions.

l

9) Specification of the necessary measuring and test equipment including accuracy requirements.
10) Spent fuel storage records.
b. Providing for record administration, receipt, storage, preservation, safekeeping, retrieval and final disposition,
c. Construction, location and security of record storage facilities to prevent destruction of the records by fire, flooding. theft and deterioration by environmental conditions such as temperature or humidity. Duplicate records shall be stored in a separate remote location when the type of document is not included in the record storage facility.

Title:

Section XVII. Quality Assurance Records l Page: 3 of 3

[ Rev. 1 28

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION XVIII. AUDITS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a comprehensive system of planned and documented audits and in-plant surveillances to verify compliance with all aspects of the Program and to assess the effectiveness of the Program.

B. RESPONSIBILITIES l 1. The Nuelear-Seev4ees-94visten Quality Assurance Department shall be responsible for:

a. Providing objective evidence for audits /surveillances of activities encompassed by tne 18 criteria of 10CFR50 Appendix B, and ANSI N10.7.

l

b. Training of audit and surveillance personnel,
c. Scheduling, coordinating, and implementing the formal In-Plant Audit / Surveillance Programs performed on activities covered in Sections Ill through XVII of this document.
d. Preparing information regarding the In-Plant Audit Program for review by the Nuclear Safety Audit and Review Committee.
e. Performing audits of vendors.

f following up of discrepancies discovered during audits / surveillance.

l 9 Mak4ng-feeemmendat4 ens-te-preelude-pess4ble l audit /sueveillanee-d4sefepaney-fepet4tien-ffee-the l Vankee-Plant-enly4-l

Title:

Section XVIII, Audits Page: 1 of 4 l Rev.. J.28

l l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l gh. Performing periodic audits of all VNSO-Departments having responsibilities under the Quality Assurance Program.

l 2. The Director of Operations V4ee-Presidentfs)-and-Hanager-ef l Operatiens and the4e staff shall be responsible for- )

l

a. Evaluate disposition of In-Plant Audits and prepares j concurrence directives to the plant.

l

3. The Plant shall be responsible for: i l a -- 90eumentat4en-ef-the-plant-posit 4en-seneern4ng-any l eutstanding-4 tem-Fesulting-ffem-an-dud 44-FequiFing-a l respense-ffee-the-Vankee-Plant-enly4-

]

l .a_b . Implementation of action to be taken as directed by l the V4ee-President-and-Manager Director of Operations.

l b_e . Disposition of any outstanding items resulting from l an audit-ffee-Vermont-Vankee-enly4.

l .c_d . Implementation of any corrective actions resultant l from audit identif ed Event Reports-4 fee-Verment l Vankee-enly4.

4. The Nuclear Safety Audit and Review Committee shall be responsible for:
a. Evaluation of the Operr.tional Quality Assurance Program to determine ils overall effectiveness.
b. Reporting results of Program reviews and recommendations resulting therefrom to the cognizant corporate of ficer.

l l

Title:

Section XVill, Audits Page: 2 of 4 l Rev. 1 28

I i

l l VANKEE-ATOMEG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION '

i l S. The-Nueleae-Servlees-94v4sien-9epartments-shall-be l respons4ble-fee +

l  !

l ar----Decumentat4en-ef-the-department-pos4t4en-senseening l any-outstanding-4 tem-resulting-from-an-audity l

1 l br----Implementatten-of-aetien-te-be-taken-te-eeeeeet l deffe4ene4es-revealed-by-an-audit-l C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the ,

I implementation of plant-and/ee-Nue4 ear-Seev4ees-9+v+s+en )

.l deeuments, i l

2. The implementing documents shall provide for the following:
a. Documentation of audit / surveillance results and ]

review with management having responsibility in the j area.

b. Necessary action to be taken by responsible j management to correct deficiencies revealed by the audit / surveillance.  !
c. Re-audit of deficient areas until corrections have been accomplished to preclude recurrence of the j l

deficiencies.

d. Inclusion of an objective evaluation of quality-related practices, procedures. Instructions and the effectiveness of implementation in the audit.
e. Inclusion of an cbjective evaluation of work areas, activities, processes and items and the review of documentation in the audit.

Title:

Section XVIII, Audits Page: 3 of 4 l Rev.. 1 28

l l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR F0WER CORPORATION

f. Performance of audits in the below listed areas where the requirements of Appendix B to 10CFR Part 50 and ANSI N18.7 are being implemented:
1) Operation, maintenance and repairs.
2) The preparation, review, approval._and control of designs, specifications, procurement documents, instructions, procedures, and drawings.
3) Receiving and plant inspections.
4) Indoctrination and training programs.
5) Implementation of operating and test procedures.
6) Calibration of measuring and test equipment.
g. Scheduling of audits regularly on the basis of the status and safety importance of the activities being performed.

l l

Title:

Section XVIII. Audits Page: 4 of 4 l Rev. 1 28

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX A n ent o ty ssura ce Management of Quality Assurance must meet the below listed qualification requirements:

A. EDUCATION:

Bachelor's degree in Science or Engineering, or the equivalent'in practical experience.

B. EXPERIENCE:

1. Four years experience in the field of Quality Assurance, or 2 .. Equivalent number of years of nuclear plant experience in a supervisory position preferably at an operating nuclear power plant or a combination of the two, a) At least one year of this four years experience shall be nuclear power plant experience in the implementation of the Quality Assurance Program, and b) Six months of the one year experience shall be obtained within a Quality Assurance organization.

I l

I I

I I

Title:

Appendix A Qualifications Requirements Page: 1 of 1 l l Rev. 1 28

1 l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B Excentions The sub-categories of this Appendix summarize the exceptions noted in l Section II of the Vermont Yankee Yankee-Atemte-Eleete+e-Gempany Operational Quality Assurance Manual.

Appendix B

'Sub-Cateaory Standard / Guide Title i

I. ANSI N45.2.3-1973 Housekeeping During the Construction Phase of Nuclear Power Plants

11. ANSI N45.2.9-1974 Requirements for Collection.

Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants-III. ANSI N45.2.10-1973 Quality Assurance Terms and Definitions IV. R.G. 1.64. Rev. 2 Quality Assurance Requirements for the Design of Nuclear Power Plants !

V. ANSI N45.2.2-1972 Packaging, Shipping, Receiving.

Storage and Handling of Items for Nuclear Power Plants  ;

1 VI. ANSI N45.2.6-1978 Qualification of Inspection.

Examination and Testing Personnel for the Construction Phase of Nuclear Power Plants l VII. R.G. 1.26. Rev. 3 Quality Group Classifications and Standards for Water , Steam- and Radioactive-Waste-Containing Components of Nuclear Power Plants VIII. R.G. 1.29, Rev. 3 Seismic Design Classification

Title:

Appendix B Exceptions Page: 1 of 26 l Rev. 1 28

l l

l VANKEE-ATOMIG-EEEGIRIG-GOMPANV VERMONT YANKEE NUCLEAR POWER CORPORATION ,

1 APPENDIX B (continued) l Appendix B

'- Sub-Cateoory Standard / Guide Title 1

IX. ANSI N18.7-1976 Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power ,

Plants X. R.G. 1,33. Rev. 2 Quality Assurance Program Requirements (Operations) l l

l 1

l l

l I

l l

Title:

Appendix B, Exceptions Page: 2 of 26 l Rev.- 1 28

l VANKEE-ATOMIG-EEEGTRIG-GOMFANY VERMONT YANKEE NUCLEAR POWER CORPORATION I

APPENDIX B (continued)

I. ANSI N45.2.3 - 1973. Housekeepino During the Construction Phase of Nuclear Power Plants A. EXCEPTION:

Subsection 2.1 - Plannina I r

l The Yankee-and Vermont Yankee plants takes exception to the five-zone requirements specified in the subject standard.

ALTERNATIVE:

l l The Vankee-and Vermont Yankee plants shall establish as a minimum l a three zone program as follows: i l

Zone III Zone III criteria shall be applied to major portions of the i reactor coolant system which are opened for inspection.

maintenance or repair.  ;

1. Access control over personnel shall be required.  ;
2. Cleanliness shall be maintained, commensurate with the work being performed, so as to prechade the entry of foreign material to the Reactor Coolant System.
3. A documented cleanliness inspection shall be performed immediately prior to closure.

Note: The Zone III requirements may be expanded for certain maintenance repair activities if deemed appropriate by plant management. In such instances applicable sections of Zones I & Il shall be specified.

Title:

Appendix B. Exceptions Page: 3 of 26 l Rev.: 1 28

1 l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON A" PEN 0lX 1 .

(continued) l l

l Zone IV I i

Zone IV criteria shall be applied to the radiation control areas )

of the plant. l

1. Standard ,1anitorial and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping Plant and Personnel Safety and Fire Protection.

l l

2. Additional housekeeping requirements shall be implemented as J required for the control of radioactive contamination, i l
3. Smoking and aating shall be controlled consistent with good health physics practices and to maintain cleanliness.

I 70 n e 'i I Zone V criteria shall be applied to the remainder of the plant.

I

1. Standard janitorial and work practices shall be utilized to i maintain a level of pleanliness commensurate with company 1 policy in the areas of Housekeeping. Plant and Personnel Safety and Fire Protection.

l

8. EXCEPTION: i Subsection 3.2 - Control of Facilities 1

l The Yankee-and Vermont Yankee plants takel exception to the control of tools, equipment, materials and supplies used in Zone ill.

ALTERNATIVE:

i l

Title:

Appendix B. Exceptions Page: 4 of 26 i l Rev. 1 28

1 1

l l YANKEE-ATONIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

[ The Yankee-and Vermont Yankee plants.shall verify control for Zone III as indicated in Exception A of this sub-category. l l

l

.l l

1

Title:

Appendix B. Exceptions Page: ~5 of 26 l ' Rev . - 1 28 l

l VANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

11. ANSI N45.2.9 - 1974, Reauirements for Collection. Storage. and Maintenance of Quality Assurance Records for Nuclear Power Plants A. EXCEPTION: ,

Subsection 5.6(3) Facility l

l l The Yankee-and Vermont Yankee plants takes exception to l

" structures, doors. frames, and hardware should be Class A fire rated with a recommended four hour minimum rating."

ALTERNATIVE:

" Doors, structures, frames, and hardware shall be designed to comply with the requirements of a minimum two (2) hour fire rating meeting NFPA No. 232 guidelines."

JUSTIFICATION:

The two (2) hour rating has been endorsed by the NRC Standard Review Plan NUREG-0800, Revision 2. dated July 1981.

l

Title:

Appendix B. Exceptions Page: 6 of 26 l Rev. 1 28 l

. . . - . _ _ - . . . _ . _-- . . _ ...... - .. ~ - . _ _ - _ - - . . _ . . - _ . . _ - - _ _ .

_ .- . . q i

^

g

.l VANKEE-ATOMIG-ELEGTRIG-G0MPANY l

' ~

VERMONT YANKEE NUCLEAR POWER CORPORATION i 1

l. . .

j L APPENDIX B  ;

l (continued)- .!

III. ANSI'N45.2'.10'-c19735 Quality' Assurance Terms and Definitions ~

1 A; EXCEPTION: ,

1 J

Subsection 2 Terms and Definitions i

l : ..The Yankee-and Vermont' Yankee plantsa t'ker exception to'the- ,

definitions' of " Certificate of Conformance" and " Certificate of j u

. Compliance". j -

ALTERNATIVE. ,

1 1

The Yankee-and Vermont' Yankee plants shall reverse the ' definitions l

of the above terms so our Program will be in compliance with the i implied definitions in the ASME B&PV Code and Yankee l

specifications.

~l l ..

L

)

l: #

j l

r l

i.

l l

n I-

Title:

Appendix B. Exceptions. ,

.Page: 7 of 26 l l Rev.. .J_ 28 l

l VANKE5-ATOMIG-5b5ffRIG-60MPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

JV. Regulatory Guide 1.64 Revision 2. " Quality Assurance Reauirements for ,

the Desian of Nuclear Power Plants" A. EXCEPTION:

Subsection c.2 l

l The Vankee-and Vermont Yankee plants takes exception to the j regulatory guide position on the exclusion of supervisors performing design verification.

ALTERNATIVE:

l The Vankee-and Vermont Yankee plants will continue the accepted practices for independent design verification in accordance with the provisions of ANSI N45.2.11-1974, Section 6.1. l l

JUSTIFICATION:

The exclusion of line supervision to perform design verification has proven to be an unnecessary burden on the resources within the engineering organizations of the company and counterproductive during heightened periods of engineering activities. ANSI N45.2.11 contains specific limitations on the situations in which a supervisor is permitted to perform design verification. The standard states, "This verification may be performed by the originator *s supervisor provided the supervisor did not specify a singular design approach, or rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual in the organization competent to perform the verification." This control was developed through realistic evaluation of the practicable limits that restrictions impose on engineering organizations by the working group that developed ANSI N45.2.11.

Title:

Appendix B. Exceptions Page: 8 of 26 l Rev.. 1 28 l

l VANKEE-AT0HIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON APPENDIX B (continued)

V. ANSI N45.2.2 - 1972. Packaging. ShioDino, Receivina. Storage & Handling of Items for Nuclear Power Plants A. EXCEPTION:

Subsection 3.7.1 & A3.7.1 - Containers l The Yankee-and Vermont Yankee plants takes exception to the specific requirements for containers.

ALTERNATIVE:

Containers shall be of suitable construction to assure material is received undamaged.

JUSTIFICATION:

Containers shipped by closed carrier, stored inside and not subjected to a wet environment do not require weather resistant fiberboard, therefore, this is an unnecessary expense.

Additionally numerous vendors utilize shipping containers that do not comply with the specific requirements of this section, i.e.,

flaps overlap. The acceptance criteria for a shipping container should be established based on the capability of the container to maintain the component material in a safe condition. Technology )

has advanced beyond the standard.

1 B. EXCEPTION:

Subsection 3.7.2 - Crates and Skids l The Yankee-andVermont Yankee plants takel exception to the requirement that skids and runners shall be used on boxes with a gross weight of 100 pounds or more.

l

Title:

Appendix B. Exceptions Page: 9 of 26 l Rev. 1 28

E

(

i l VANKEG-ATOMIG-ELEGTRIG-GOMPANY l VERMONT YANKEE NUCLEAR POWER CORPORATION l APPENDIX B

! (continued)

ALTERNATIVE:

l Skids or runners shall be used on boxes with a gross weight of 100 pounds or more if practical .

JUSTIFICATION:

Storage methods and container design frequently are such that runners or skida are not feasible.

C. EXCEPTION:

Subsection 5.2.1 - Shippino Damage Inspection l The Yankee-and Vermont Yankee plants takes exception to the requirement that a preliminary visual inspection or examination be performed prior to unloading.

ALTERNATIVE:

[ The Yankee-and Vermont Yankee plants shall perform those required inspections after unloading. In special instances, preunloading inspections shall be performed.

JUSTIFICATION:

Post unloading inspection is adequate to determine any damage that I

may have been incurred during shipping and handling.

l

Title:

Appendix B. Exceptions Page: 10 of 26

[ Re v .. 1 28 l

I l

l I s

[ l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l

APPENDIX B I' (continued)

D. EXCEPTION:

Subsection 5.2.2 - Item Inspection l The Yankee-and Vermont Yankee plants takes exception to the requirement 'that "The inspections shall be performed in an area equivalent to the level of storage requirements for the item."

ALTERNATIVE:

l The Yankee-and Vermont Yankee plants shall perform receiving inspection in a manner and in an environment which do not endanger the requisite quality of the item; however, receiving area I environmental controls may be less stringent than storage j environmental controls for that item. When inspections are performed in receiving areas with environmental controls less stringent than storage area environmental controls. a time limit shall be established on a case basis for retention of items in the receiving area. Retention time shall be such that deterioration j is prevented and applicable manufacturer recommendations are addressed.

JUSTIFICATION:

Receipt inspection activities are for a much shorter duration and therefore should not be subjected to the same stringent requirements as required for storage.

E. EXCEPTION: l 1

Subsection 5.2.3 - Soecial Inspection l The Vankee-and Vermont Yankee plants takes exception to attaching  !

special inspection procedures to the item or container.  !

l

Title:

Appendix B. Exceptions  !

Page: 11 of 26 j c l Rev. 1 28 1

l

l VANKEE-ATOMIG-ELEGTRIG-G0HpANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

ALTERNATIVE:

Special inspection procedures shall be readily available to personnel performing inspections. l I

JUSTIFICATION:

Procedures are subject to less abuse and more stringent controls j when maintained on file and not attached to the item. Inspection status is maintained by tagging and procedure control. ]

j F. EXCEPTION:

Subsection 6.1.2 - Levels of Storace l The Yankee-and Vermont Yankee plants takejL exception to two specific requirements associat'ed with fuel storage (classified Level A).

ALTERNATIVE:

l The Yankee-andVermont Yankee plants shall meet the requirements of Level A storage for new fuel with the exception of special air filtering: and temperature and humidity controls.

JUSTIFICATION:

l The existing storage conditions at the Vermont Yankee operating l plants are consistent with the protection provided to the fuel while in storage at the manufacturer (vendor) and/or while in transit to the plant site and are judged to provide adequate protection to the fuel assembly structure which is of highly corrosion resistant materials. We believe that the above listed requirements are intended for application at the manufacturing

Title:

Appendix B. Exceptions Page: 12 of 26 l

l Rev. 1 28

l VANKEG-ATOMEG-EEEGTRIG-G0HpANY

- VERMONT YANKEE NUCLEAR POWER CORPORATI ON APPENDIX B (continued) facility (vendor) where the uranium pellets may be exposed to the atmosphere and not in its fully encapsulated, and therefore. fully protected form in a completed fuel assembly.

G. EXCEPTION:

Appendix A-3 Subsection A3.5.1(1) - Caos & Pluas l The Yankee-and Vermont Yankee plants takes exception to the requirement that nonmetallic plugs and caps shall be brightly colored.

ALTERNATIVE:

Nonmetallic plugs and caps shall be of a contrasting color.

JUSTIFICATION: J The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in j By using plugs and caps of a operating components or systems.

contrasting color this objective can be achieved.

1 H. EXCEPTION:

Appendix A-3 Subsection A3.9(1) - Second Group. Markings ,

i l The Yankee-and Vermont Yankee plants takel exception to the requirement that container markings shall appear on a minimum of two sides.

ALTFRNATIVE:

l l

i

Title:

Appendix B Exceptions Page: 13 of 26 l Rev. 1 28

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

Containers shall be adequately marked to provide identification and retrievability.

JUSTIFICATION:

Containers are tagged to provide identification and inspection status. Employment of two tags on small containers adds bulk and confusion and does not provide for better identification or traceability.

I. EXCEPTION:

Appendix A-3. Subsection A.3.9(4) - Second Group. Markina l The Yankee-and Vermont Yankee plants takes exception to the requirement that container markings shall be no less than 3/4" high, container permitting.

ALTERNATIVE:

I Container markings shall be of a size which permits easy recognition. l l

JUSTIFICATION I

I Markings were intended to provide identification and instructions.

The criteria should be that the markings clearly provide the same.

J. EXCEPTION:

1 Apoendix A-3 Subsection A.3.9(6) - Second Group. Markinq l l The Yankee-and Vermont Yankee plants takes exception to the information required for container marking.

-Title: Appendix B Exceptions Page: 14 of 26 l Rev.- 1 28

l YANKEE-ATOMIG-EEECTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

ALTERNATIVE:

Marking shall be adequate in each case to provide identification, traceability and instructions for special handling, as applicable.

JUSTIFICATION:

The information required is excessive. Cluttering a container with excessive markings only reduces the main objectives, maintaining identification and establishing special controls.

i 1

I I

l l

Title:

Appendix B. Exceptions Page: 15 of 26 l Rev.. 1 28

l l

l VANKEE-ATOMIG-EEEGTRIG-GOMpANV l VERMONT YANKEE NUCLEAR POWER CORPORATI ON APPENDIX B (continued)

VI. ANSI N45.2.6 1976. Qualification of insoection. Examination and l Testino Personnel for Nuclear Power Plants A. EXCEPTION:

.l The Yankee-and Vermont Yankee plants takes exception to the l application of the Standard to all Vankee-and Vermont Yankee personnel performing inspection, examination and testing.

ALTERNATIVE:

l Vankee-and Vermont Yankee personnel identified in ANSI N18.1-1971 who perform inspection, examination and testing will be qualified to ANSI N18.1-1971.

l Vankee-and Vermont Yankee personnel not identified in ANSI N18.1-1971 who perform inspection, examination and testing will be qualified to ANSI N45.2.6-1978.

l

Title:

Appendix B. Exceptions Page: 16 of 26 l Rev.: 1 28

I i

l I

l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON APPENDIX B (continued) 1 VII. Regulatory Guide 1.26, Rev. 3 (2/76). Quality Group Classifications and Standards for Water . Steam- and Radioactive-Waste-Containino Components I

of Nuclear Power Plants '

A. EXCEPTION:

l l The Yankee-and Vermont Yankee plants takel er.ception to the Regulatory Guide in its entirety. l l

ALTERNATIVES: i l

1 l Vankee  ;

I ,

l Vankee-sha44-eent49ue-to-elass4fy-steuetuFes7-sempenents-and j systems-4n-aeeoedanee-w4th-ANSI-Standard-N18-27-January-1973r

,l INueleae-Safety-Geiterta-for-the-Ges499-of-Stat 4enary-Pressue42ed l Watee-Reaetoe-Plantsi--as-in-the-past- )

l Vermont-Vankee  !

Vermont Yankee shall continue to classify structures, components and systems in accordance with ANS-22. Draft No. 4 Rev. 1. j May 1973, " Nuclear Safety Criteria for the Design of Stationary j Boiling Water Reactor Plants," as in the past.

1 i

Title:

Appendix B. Exceptions Page: 17 of 26 l Rev. 1 28

'l VANKEE-ATOMfG-EEEGTRIG-GOMPANY

l. VERMONT YANKEE NUCLEAR POWER CORPORATION l APPENDIX B

! (continued)

VIII. Regulatory Guide 1.29. Rev. 3. (9/78). Seismic Desian Classification A. EXCEPTION:

[ The Yankee-and Vermont Yankee plants takes exception to the application of Regulatory Guide 1.29. Rev. 3. (9/78).

ALTERNATIVES:

l Vankee l

l Vankee-shall-apply-Regulatory-Gu4de-1 297-Rev--37-49/78);-te-these l streeturesr-systems-and-eemponents-as-determined-by-the-USNRG l System-Evaluat4en-Program:

Vermont Yankee The seismic design classification of. structures, systems, and components at Vermont Yankee shall be as defined in the Vermont Yankee FSAR. l l

1 l

l 1

l i

I

Title:

Appendix 8. Exceptions l Page: 18 of 26 l Rev. 1 28

l YANKEE-AT0HIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

IX. ANSI N18 .7-1976. Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants A. EXCEPTION Subsection 4.5 - Audit Procram l The Vankee-and-the Vermont Yankee Plants takes exception to the requirement that audits of all safety-related functions shall be completed within a period of two (2) years.

Alternative:

Audits of selected aspects of operational phase activities shall be performed with a frequency commensurate with their safety significance and in such a manner as to assure that an audit of l all safety-related functions-is completed at least once within a l three (3) vear period ef-no-less-than-three-034-years- based upon the results of an annual Functional Area Assessment.

The Annual Functional Area Assessment is a documented analysis of functional areas important to safety. The purpose is to identify  :

I strengths and weaknesses (if applicable) to determine the level and focus of independent oversight activities for the upcoming ,

year. The basis for the assessment shall include the results of l QA Audits and Surveillance, NRC Inspections Event Reports. l Nonconformance Reports. Corrective Action Reports, and Self-Assessments. Other indicators such as Personnel Changes.

change / increase in functional area responsibilities. Industry Findings, and INP0 evaluations will also be considered. Each area will be assigned a rating with a comparison to previous years.

Title:

Appendix B, Exceptions Page: 19 of-26 l Rev. 1 28

l J

l  ;

i I l VANKEE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l APPENDIX B (continued)

This assessment will be reviewed and approved by QA and Plant Management, This document is considered a QA record and will be available for NRC review. ,

1 I

Justification: 1 1

1 To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not l ensured that the frequency, scope and associated resources are l based on the risk associated with the audit area.

[ Vankee-and Vermont Yankee' proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements involving activities important to safety.

B. EXCEPTION:

Subsection 5.2.15 - Review. Approval and Control of Procedures I

{ Vankee-Atem4s-Gleete4e-Gempany-and-the-Vermont Yankee Operating l l Plant takes exception to the following paragraph:

" Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable" 1

Title:

Appendix B. Exceptions Page: 20 of 26 l Rev. 1 28

____ ~ _ _ __ _ _ ~ __. -_.

l VANKEE-AT0HIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION l

APPENDIX B (continued) l l

Alternative:

Plant procedures will be periodically reviewed in accordance with administrative controls. These controls will establish a schedule for these periodic reviews. All applicable plant procedures will be reviewed following an unusual incident, unexpected transient.

operator error, or equipment failure (malfunction). and following a modification to a system.

Nonroutine procedures such as Emergency Operating Procedures.

Emergency Plan Implementing Procedures, or other procedures whose use may be event driven, will be reviewed every two years.

However, if a nonroutine procedure is fully exercised and there is a detailed scrutiny of the entire procedure as part of a documented training program, this may serve as the biennial review of the procedure used. l l

At least every two years, the Quality Assurance (or other l i

l independent) organization shall audit a representative sample of routine plant procedures that are used more frequently than every two years. The audit is to ensure the acceptability of the procedures and verify that the procedure review and revision program is being implemented effectively. The root cause of l i

significant deficiencies is to be determined und corrected.

Routine plant procedures that have not been used for two years will be reviewed before use to determine if changes are necessary or desirable.

L i

l

Title:

Appendix B. Exceptions Page: 21 of 26 l Rev. 1 28

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATI ON APPENDIX B (continued)

Justification:

The current requirement to review each safety-related procedure on a biennial cycle results in the expenditure of significant technical and administrative resources. Programmatic controls and practices are in place to provide adequate reviews, including the following:

. The plant modification processes require that procedures affected by the modification be identified during the design change preparation, and revised prior to closure of the modification package.

. The Operating Experience Program involves the review of USNRC, INPO, and vendor supplied information for applicability and determination of further action. This review includes an evaluation of applicable documents such as procedures and the initiation of required changes.

l

. Administrative controls currently exist requiring that if a '

procedure cannot be performed as written, a procedure change l must be completed prior to continuation of the procedure.

. Temporary changes are occasionally generated during, or prior to procedure use. Current administrative controls require that those changes that are permanent shall be incorporated into the procedure via the procedure revision process.

. As part of the audit and surveillance process, procedures are evaluated as to adequacy, ease of use, proper technical content and compliance with applicable plans and programs.

l

Title:

Appendix B, Exceptions Page: 22 of 26 l Rev. 1 28

l VANKFE-ATOMIG-ELEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued) 1

. The corrective action process (Event Reports) requires that a root cause analysis be performed for events, violations and nonconforming conditions. Where identified as contributing factors. procedure changes are initiated. 1

= Changes to Technical Specifications and the FSAR are )

reviewed for potential impact on, and initiation of changes i to plant procedures. I l

l

. Plant procedures are approved by appropriate personnel prior )

to initial use. Current administrative controls also

)

require pre-job briefings for procedures identified as l infrequent. ,

1 This modification meets the intent of published regulatory requirements involving activities important to safety.

l C. EXCEPTION:-fVerment-Vankee-Plant-only)

Subsection 5.3.9 l The Vermont Yankee OpeFat4Rg-EldHD takes exception to the requirements that detail Emergency Procedures be in accordance with Paragraph 5.3.9.

Alternative:

Vermont Yankee Emergency Operating Procedures are written in accordance with the Symptom / Function-Based Guidelines developed by the BWR Owners Group and accepted by the NRC. These Symptom / Function Based Procedures. mandated by the NRC in NUREG-0737, have format and content different from the Event-Oriented Emergency Procedures described in ANSI N18.7-1976.

I

Title:

Appendix B. Exceptions Page: 23 of 26 l Rev. 1 28 i

l l

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)  ;

r Justification:

NUREG 0737 supersedes ANSI N18.7-1976 in the area of Emergency Operating Procedures. Changes to procedure format are required in ,

order to develop Symptom / Function-Based Procedures, i

i I

I i

Title:

Appendix B, Exceptions l Page: 24 of 26 l l Rev. 1 28 l

1

l VANKEE-ATOMIG-EbEGTRIG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued)

X. Reaulatory Guide 1.33. Revision 2. Quality Assurance Requirements (Operational)

A. EXCEPTION:

Subsection 4.5 - Audit Program l The Yankee-and-the Vermont Yankee Plants takes exception to the following:

. Section 4.5 states that "all audits of safety related functions are completed within a two (2) year period".

  • Paragraph 4.a. "The results of actions taken to correct deficiencies that affect nuclear safety and occur in facility equipment, structures. systems. or method of operations - shall be audited at least once per 6 months"
  • Paragraph 4.b. "The conformance of facility operation to provisions contained within the technical specifications and applicable license conditions - shall be audited at least once per 12 months."

. Paragraph 4.c. "The performance, training, and qualifications of the facility staff - shall be audited at least once per 12 months."

Alternative:

Audits of selected aspects of the functional areas listed above.

shall be performed within a frequency commensurate with their i l safety significance and will be completed at least once within a l three (3) year period of-ne-less-than-three-434-years- based upon the results of an annual functional area assessment.

Title:

Appendix B. Exceptions Page: 25 of 26 l Rev. 1 28

l VANKEE-ATOMIG-ELEGTRIG-GOMpANY i VERMONT YANKEE NUCLEAR POWER CORPORATION APPENDIX B (continued) i l

Justification:

To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequency, scope and associated resources are based on the risk associated with the audit area.

l Vankee-and Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits i of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements involving activities important to safety, j i

l l

l l

Title:

Appendix B. Exceptions 26 of 26 Page:

l Rev. 1 28 l

. - - . . - . . ~ . .

1 1

l l

l VANKEE-ATOMIG-EEEGTRIG-GOMPANY  !

VERMONT YANKEE NUCLEAR POWER CORPORATION 1

APPENDIX C i

i Vermont Yankee I l

Classification of Structures. Components, and Systems i l

i NOTE: A comprehensive. listing is in the Vermont Yankee Safety Classification l

Hanual. '

1 l

l l

l l

I

Title:

Appendix C. Vermont Yankee Classification Page: 1 of 1 l l Rev.- 1 28-

x) l l

l [ VANNEE-ATOMIG-EEEGTMG-GOMPANY VERMONT YANKEE NUCLEAR POWER CORPORATION APPEN91X-9

^

van ke,e_

-Glass &fieatien-of-Steuetures--Gemeenents -and-Syst?ms NOTE +--A-eemprehensive-14 sting-4s-4n-the-Vankee-Safety-Glass 4ffeat4en of-Systems-Hanuale r<

l i

I T4tle+--Append 4*-D--Yankee-Glassvfieat4en Page+---l-of-1 l Rev-+---J_-28 )

t i

L .