February 2002 Monthly Operating Report for Susquehanna Units 1 & 2
ML020860460
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/13/2002
From: Shriver B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-05454, R41-2A
Download: ML020860460 (7)


Text

I Bryce L. Shrlver Vice President - Nuclear Site Operations PPL Susquehanna, LLC 707 Salem Boulevard P.O. Box 467 Berwkck, PA 18W03-0467 Tel.570.542.3120 Fax 570.542.1504 P TM blshrtver@pplweb.com March 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-05454 R41-2A The February 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, ryeL. Shriver YJH-/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. R. G. Schaaf Jýý;?Lf

OPERATING DATA REPORT DOCKET NO. 50-387 UNrr One DATE 3-12-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susquehanna Steam Electric Station (U1)
2. Reporting Period: February 2002
3. Design Electrical Rating (Net MWe): 1100
4. Maximum Dependable Capacity (Net MWe): 1090 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 672 1,416 164,185
6. Number of Hours Reactor Was Critical 672 1,416 135,718.2
7. Hours Generator On-Line 672 1,416 133,576.0
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 608,550 1,398,057 136,624,966 NOTES:

Page 1 of 1

I

° UNIT SHUTDOWNS DOCKETNO. 50-387 Ni~~I UNIT One DATE 3/12/02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH February 2002 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3

No shutdowns this month.

Summary: Unit 1 reached the end of full power capability for cycle 12, and began coast down on January 12, 2002. Unit I - 12 refueling outage will begin in early March. Unit I reduced power to 52% on February 16 for a Condenser Air In-Leakage test. The unit returned to 86% power on February 16.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 03-12-02 Completed by: 3.3. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 03-12-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Suspuehanna Steam Electric Station (U2)
2. Reporting Period: February 2002
3. Design Electrical Rating (Net MWe): 1117
4. Maximum Dependable Capacity (Net MWe): 1111 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 672 1,416 149,425
6. Number of Hours Reactor Was Critical 672 1,416 129,073.0
7. Hours Generator On-Line 672 1,416 127,182.7
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 755,708 1,589,296 132,394,126 NOTES:

Page I of I

1.

UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 03-12-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH February 2002 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No Shutdowns this month.

Summary: Unit 2 operated at 100% power all month.

I. 2. 3.

F. Forced Reason: Method:

S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: '50-388 Date: 03-12-02 Completed by: J.J.Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.