ML023360147

From kanterella
Revision as of 06:14, 26 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - STP Nuclear Operating Company
ML023360147
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/02/2002
From: Troy Pruett
Plant Support Branch Region IV
To: Cottle W
South Texas
References
Download: ML023360147 (5)


Text

December 2, 2002 William T. Cottle, President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, Texas 77483

SUBJECT:

INSPECTION DATE FOR TEMPORARY INSTRUCTION 2515/148, INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES - STP NUCLEAR OPERATING COMPANY

Dear Mr. Cottle:

In the mid-cycle assessment letter transmitted on August 26, 2002, the NRC indicated that a follow-up letter would be needed to describe the dates for implementing the temporary instruction that would be used to verify compliance with the NRC Security Order issued on February 25, 2002.

Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued August 28, 2002. The NRC has scheduled an inspection using this temporary instruction, at your facility March 24-28, 2003.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have questions about this inspection, please contact me at 817/860-8182.

Sincerely,

/RA/

T. W. Pruett, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-498 50-499 Licenses: NPF-76 NPF-80

STP Nuclear Operating Company cc:

Tom Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P.O. Box 289 Wadsworth, Texas 77483 S. M. Head, Manager, Licensing Nuclear Quality & Licensing Department STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 Wadsworth, Texas 77483 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, Texas 78704 M. T. Hardt/W. C. Gunst City Public Service Board P.O. Box 1771 San Antonio, Texas 78296 D. G. Tees/R. L. Balcom Houston Lighting & Power Company P.O. Box 1700 Houston, Texas 77251 Jon C. Wood Matthews & Branscomb 112 E. Pecan, Suite 1100 San Antonio, Texas 78205 A. H. Gutterman, Esq.

Morgan, Lewis & Bockius 1111 Pennsylvania Avenue NW Washington, DC 20004 C. A. Johnson/R. P. Powers AEP - Central Power and Light Company P.O. Box 289, Mail Code: N5022 Wadsworth, Texas 77483 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957

STP Nuclear Operating Company Director, Division of Compliance

& Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, Texas 78756 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, Texas 78711-3189 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 G. R. Bynog, Program Manager/

Chief Inspector Texas Department of Licensing & Regulation Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122, P.O. Box 13087 Austin, Texas 78711-3087 Ted Enos 4200 South Hulen Suite 630 Fort Worth, Texas 76109

STP Nuclear Operating Company Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (NFO)

Branch Chief, DRP/A (WDJ)

Senior Project Engineer, DRP/A (CJP)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Scott Morris (SAM1)

STP Site Secretary (LAR)

DOCUMENT NAME: R:\_STP\2002\ICM-STP.WPD RIV:DRS\PSB C:PSB GPick:nlh TWPruett

/RA/ /RA/

11/29/02 11/29/02 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax