Letter Sequence Approval |
---|
|
|
MONTHYEARML0229503862002-10-24024 October 2002 Federal Register Notice, Notice of Issuance of Amendments to Facility Operating License and Opportunity for a Hearing Re Extending the Use of Current Pressure and Temperature Limit Curves in Technical Specification 3.4.11 Project stage: Approval ML0230206162002-10-29029 October 2002 Request for Additional Information, Relocation of the Spent Fuel Crane TS Requirements Project stage: RAI ML0225201162002-12-0303 December 2002 Issuance of Amendments 146 & 142 to Licenses NPF-11 & NPF-18, Respectively, Extending the Use of Pressure & Temperature Limit Curves in Technical Specification 3.4.11 Project stage: Approval ML0404401112004-04-28028 April 2004 License Amendment, Relocation of Certain Technical Specifications Related to the Operation of the Spent Fuel and Cask Cranes to the UFSAR Project stage: Other ML0412502002004-04-28028 April 2004 Technical Specifications, Relocation of Certain TSs Related to the Operation of the Spent Fuel and Cask Cranes to the UFSAR Project stage: Other 2002-10-29
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis ML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 ML23181A1502023-06-30030 June 2023 Combined Response to Request for Additional Information and Supplemental Information in Support of LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel ML23171A9562023-06-12012 June 2023 Post Exam Ltr RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 ML23123A2202023-05-0303 May 2023 Relief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23121A1612023-05-0101 May 2023 Information Meeting (Open House) with a Question-and-Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ML23024A1372023-02-0303 February 2023 Request for Withholding Information from Public Disclosure for LaSalle County Station, Unit Nos. 1 and 2 ML23031A1972023-01-31031 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011 IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 2024-01-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22341A2222022-12-28028 December 2022 Issuance of Amendment Nos. 257 and 243 to Renewed Facility Operating Licenses New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies and Changes to Core Operating Limits Report ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21362A7212022-02-0404 February 2022 Issuance of Amendment Nos. 255 and 241 Revision to Technical Specifications to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21162A0692021-09-0707 September 2021 Issuance of Amendment Nos. Xxx and Yyy Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 ML21158A2282021-07-13013 July 2021 Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML21082A4222021-05-27027 May 2021 Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19121A5052019-06-24024 June 2019 Issuance of Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19025A2882019-02-14014 February 2019 Issuance of Amendments to Renewed Facility Operating Licenses Revision of Technical Specifications to Adopt TSTF-334-A ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18311A2652019-01-0202 January 2019 Issuance of Amendments Nos. 233 and 219 to Renewed Facility Operating Licenses License Amendment Request for Temporary Extensions to Technical Specifications ML18278A0302018-12-19019 December 2018 Issuance of Amendments 232, 218 to Renewed Facility Operating Licenses Request to Revise the Technical Specifications Surveillance Requirement to Revise the Lower Setpoint Tolerance for Safety/Relief Valves ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18226A2022018-10-15015 October 2018 Issuance of Amendments to Renewed Facility Operating Licenses Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18008A1232018-02-0606 February 2018 Issuance of Amendments to Renewed Facility Operating Licenses Revision to Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (CAC Nos. MG0211 and MG0212; EPID L-2017-LLA-0279) ML17283A0852017-11-16016 November 2017 Issuance of Amendment Nos. 226 and 212 - Revise Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Leak Rate Test Frequencies (CAC MF8700 and MF8701; L-2016-LLA-0021) ML17257A3042017-10-30030 October 2017 Non-Proprietary - Issuance of Amendments Request to Revise Suppression Pool Swell Design Analysis and the Facility Licensing Basis ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17037D2122017-02-16016 February 2017 Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors ML16320A1822016-11-18018 November 2016 Issuance of Amendments High Burnup Atrium-10 Partial Length Fuel Rods RS-16-193, License Amendment Request to Revise Suppression Pool Swell Design Analysis2016-10-27027 October 2016 License Amendment Request to Revise Suppression Pool Swell Design Analysis ML16239A1092016-10-19019 October 2016 Renewed FOL Draft 2016-08-24 to Concurrence ML16239A0842016-10-19019 October 2016 Renewed FOL Draft 2016-08-24 to Concurrence ML16155A1102016-08-23023 August 2016 Issuance of Amendments Reduction in the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15202A5782015-11-19019 November 2015 Issuance of Amendment to Revise the Ultimate Heat Sink Temperature Limits ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) 2023-05-01
[Table view] Category:Safety Evaluation
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report ML23262B4442023-09-26026 September 2023 Authorization and Safety Evaluation for Alternative Request No. I4R-14 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements ML22341A2222022-12-28028 December 2022 Issuance of Amendment Nos. 257 and 243 to Renewed Facility Operating Licenses New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies and Changes to Core Operating Limits Report ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9152022-07-15015 July 2022 Proposed Alternative I4-R13 for Repair of Recirculation Flow Control Valves ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21362A7212022-02-0404 February 2022 Issuance of Amendment Nos. 255 and 241 Revision to Technical Specifications to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21162A0692021-09-0707 September 2021 Issuance of Amendment Nos. Xxx and Yyy Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21188A0192021-07-28028 July 2021 Proposed Alternative I4R-12, Revision 2 from Code Surface Examinations Requirements of the ASME Code for Valves 2B33 F60A and 2B33 F60B Repairs ML21158A2282021-07-13013 July 2021 Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21082A4222021-05-27027 May 2021 Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19217A3062019-09-10010 September 2019 Relief Request RV-03, Relief from the Requirements of the ASME Code Related to Pressure Isolation Valve Testing Frequency ML19218A3652019-08-29029 August 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19121A5052019-06-24024 June 2019 Issuance of Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator ML19121A3172019-05-20020 May 2019 Relief Request 13R-15, Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&Pv) Code, Section X1, Rules for Inservice Inspection (EPID-L-2018-LLR-0123) ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements ML19025A2882019-02-14014 February 2019 Issuance of Amendments to Renewed Facility Operating Licenses Revision of Technical Specifications to Adopt TSTF-334-A ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18311A2652019-01-0202 January 2019 Issuance of Amendments Nos. 233 and 219 to Renewed Facility Operating Licenses License Amendment Request for Temporary Extensions to Technical Specifications ML18278A0302018-12-19019 December 2018 Issuance of Amendments 232, 218 to Renewed Facility Operating Licenses Request to Revise the Technical Specifications Surveillance Requirement to Revise the Lower Setpoint Tolerance for Safety/Relief Valves ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18226A2022018-10-15015 October 2018 Issuance of Amendments to Renewed Facility Operating Licenses Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control 2023-09-26
[Table view] |
Text
December 3, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS TO EXTEND THE USE OF PRESSURE AND TEMPERATURE LIMIT CURVES (TAC NOS. MB5657 AND MB5658)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 156 to Facility Operating License No. NPF-11 and Amendment No. 142 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively. The amendments are in response to your application dated July 19, 2002, as supplemented by letters dated October 21 and November 8, 2002.
The amendments extend the use of the current pressure and temperature (P/T) limit curves in Technical Specification (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," until December 15, 2004. The change will allow sufficient time for the incorporation of the General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," methodology into the P/T curves in TS 3.4.11.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
William A. Macon, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374
Enclosures:
- 1. Amendment No. 156 to NPF-11
- 2. Amendment No. 142 to NPF-18
- 3. Safety Evaluation cc w/encls: See next page
LaSalle County Station Units 1 and 2 cc:
Site Vice President - LaSalle Regional Administrator Exelon Generation Company, LLC U.S. NRC, Region III 2601 North 21st Road 801 Warrenville Road Marseilles, IL 61341-9757 Lisle, IL 60532-4351 LaSalle County Station Plant Manager Illinois Department of Nuclear Safety Exelon Generation Company, LLC Office of Nuclear Facility Safety 2601 North 21st Road 1035 Outer Park Drive Marseilles, IL 61341-9757 Springfield, IL 62704 Regulatory Assurance Manager - LaSalle Document Control Desk-Licensing Exelon Generation Company, LLC Exelon Generation Company, LLC 2601 North 21st Road 4300 Winfield Road Marseilles, IL 61341-9757 Warrenville, IL 60555 U.S. Nuclear Regulatory Commission Senior Vice President - Nuclear Services LaSalle Resident Inspectors Office Exelon Generation Company, LLC 2605 North 21st Road 4300 Winfield Road Marseilles, IL 61341-9756 Warrenville, IL 60555 Phillip P. Steptoe, Esquire Vice President Sidley and Austin Mid-West Operations Support One First National Plaza Exelon Generation Company, LLC Chicago, IL 60603 4300 Winfield Road Warrenville, IL 60555 Assistant Attorney General 100 W. Randolph St. Suite 12 Senior Vice President Chicago, IL 60601 Mid-West Regional Operating Group Exelon Generation Company, LLC Chairman 4300 Winfield Road LaSalle County Board Warrenville, IL 60555 707 Etna Road Ottawa, IL 61350 Vice President - Licensing and Regulatory Affairs Attorney General Exelon Generation Company, LLC 500 S. Second Street 4300 Winfield Road Springfield, IL 62701 Warrenville, IL 60555 Chairman Illinois Commerce Commission 527 E. Capitol Avenue, Leland Building Springfield, IL 62706 Robert Cushing, Chief, Public Utilities Division Illinois Attorney Generals Office 100 W. Randolph Street Chicago, IL 60601
LaSalle County Station Units 1 and 2 Director - Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager - Licensing -Clinton and LaSalle Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
December 3, 2002 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS TO EXTEND THE USE OF PRESSURE AND TEMPERATURE LIMIT CURVES (TAC NOS. MB5657 AND MB5658)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 156 to Facility Operating License No. NPF-11 and Amendment No. 142 to Facility Operating License No. NPF-18 for the LaSalle County Station, Units 1 and 2, respectively. The amendments are in response to your application dated July 19, 2002, as supplemented by letters dated October 21 and November 8, 2002.
The amendments extend the use of the current pressure and temperature (P/T) limit curves in Technical Specification (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," until December 15, 2004. The change will allow sufficient time for the incorporation of the General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," methodology into the P/T curves in TS 3.4.11.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
William A. Macon, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374
Enclosures:
- 1. Amendment No. 156 to NPF-11
- 2. Amendment No. 142 to NPF-18
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
Public AMendiola WMacon CRosenberg PD3-2 r/f OGC, O15B18 ACRS. T2E26 LLois GHill (4), T5C3 RDennig BBurgess, RIII PKG.: ML023440398 ADAMS Accession Number: ML022520116 TS: ML023440216 OFFICE PM:LPD3-2 LA:LPD3-2 SC:SRXB OGC SC:LPD3-2 NAME WMacon, Jr. CRosenberg FAkstulewicz DGauch LRaghavan for AMendiola DATE 11/12/02 11/12/02 11/12/02 11/15 /02 12/2/02 OFFICIAL RECORD COPY
EXELON GENERATION COMPANY, LLC DOCKET NO. 50-373 LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 156 License No. NPF-11
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by the Exelon Generation Company, LLC (the licensee), dated July 19, 2002, as supplemented by letters dated October 21 and November 8, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-11 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 156, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance until December 15, 2004, and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by LRaghavan for/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 3, 2002
EXELON GENERATION COMPANY, LLC DOCKET NO. 50-374 LASALLE COUNTY STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 142 License No. NPF-18
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by the Exelon Generation Company, LLC (the licensee), dated July 19, 2002, as supplemented by letters dated October 21 and November 8, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the enclosure to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-11 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 142, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance until December 15, 2004, and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by LRaghavan for/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 3, 2002
ATTACHMENT TO LICENSE AMENDMENT NOS. 156 & 142 FACILITY OPERATING LICENSE NO. NPF-11 AND NPF-18 DOCKET NOS. 50-373 AND 50-374 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
Remove Pages Insert Pages 3.4.11-6 3.4.11-6 3.4.11-7 3.4.11-7 3.4.11-8 3.4.11-8 3.4.11-9 3.4.11-9 3.4.11-10 3.4.11-10 3.4.11-11 3.4.11-11
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 156 TO FACILITY OPERATING LICENSE NO. NPF-11 AND AMENDMENT NO. 142 TO FACILITY OPERATING LICENSE NO. NPF-18 EXELON GENERATION COMPANY, LLC LASALLE COUNTY STATION, UNITS 1 AND 2 DOCKET NOS. 50-373 AND 50-374
1.0 INTRODUCTION
By application dated July 19, 2002, as supplemented by letters dated October 21 and November 8, 2002, Exelon Generation Company (Exelon, the licensee) requested changes to the Technical Specifications (TS) for the LaSalle County Station, Units 1 and 2. The supplements dated October 21, 2002, and November 8, 2002, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on October 30, 2002 (67 FR 66170).
The proposed change would extend the use of the current pressure and temperature (P/T) limit curves in TS 3.4.11, "RCS Pressure and Temperature (P/T) Limits," until December 15, 2004.
The proposed change will allow sufficient time for the incorporation of the results of the General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," methodology into the P/T curves in TS 3.4.11. The staff previously approved the current interim P/T limits based on estimated conservatism at the time of their applicability. The original limits were calculated for 32 effective full power years (EFPY);
however, the methodology used was not acceptable to the staff. The current interim limits are valid for about 16 EFPY and their approval was based on a factor of 2 conservatism in the period of validity. The staff approved the current interim limits to give the licensee time to use a staff approved methodology to recalculate the peak vessel fluence to the end of the current license.
2.0 REGULATORY EVALUATION
The staff finds that the licensee in Section 4.0 of Attachment 2 of its October 21, 2002, submittal identified the applicable regulatory requirements. The regulatory requirements for which the staff based its acceptance are 10 CFR 50.36(c)(2)(ii)(B), "Criterion 2," which requires that a process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier, must be included in a licensee's TS.
Additionally, Regulatory Guide (RG) 1.190, published in March 2001, describes fluence calculational methods acceptable to the staff (Reference 1). Therefore, this review seeks to
establish that the methodology used followed the guidance in RG 1.190, that it was applied correctly, and that the available EFPY are adequate for the extension requested.
3.0 TECHNICAL EVALUATION
The staff has reviewed the licensees regulatory and technical analyses in support of its proposed license amendment which are described in Sections 5.0 and 6.0 of Attachment 2 of the licensees October 21, 2002, submittal. The detailed evaluation below will support the conclusion that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
On November 8, 2000, the staff approved the current P/T limits in Amendment 144 for Unit 1 and Amendment 130 for Unit 2. In the issuance of these amendments, the staff limited the use of the P/T curves to an interim period not to exceed December 15, 2002. The staff approved this interim period on the basis of a factor of 2 conservatism between the 32 EFPY of the original calculation and the 16 EFPY of the interim period of approval. (Note: the current P/T limit curves are common to both Units, because they assumed the same fluence and the same limiting beltline element.)
The licensee submitted the plant specific report GE-NE-0000-0002-5244-02 (Reference 2) that details the calculational method and the assumptions and inputs for the peak vessel fluence evaluation. The staff confirmed that the calculational method adheres to the guidance in RG 1.190 and that the licensee used the staff approved method described in NEDC-32983PA (Reference 3). The licensee used cross sections based on the ENDF/B-VI data file as stated in RG 1.190. The calculation assumes a power level of 3489 MWt from initiation of reactor operation. The assumed power level is conservative in that it assumes the uprated power for the entire operating history of the plant.
The licensee calculated the peak vessel inside surface fluence values for both Units 1 and 2.
The calculated values for 32 EFPY are: 1.02x1018 n/cm2 and 1.09x1018 n/cm2 , respectively.
These values are considerably higher than the values used in the development of the current P-T limits of 5.0x1017 n/cm2 for Unit 1 and 6.03x1017 n/cm2 for Unit 2. At the present power level, the calculated peak fluence values are estimated to occur at 15.7 EFPY for Unit 1 and 17.7 EFPY for Unit 2. As of June 2002, Unit 1 had accumulated 11.6 EFPY and Unit 2 had accumulated 11.0 EFPY. The licensee calculated, and the staff agrees, that Unit 1 could operate for another 4.1 EFPY and Unit 2 for another 6.7 EFPY before they would reach the fluence limit of the current P/T curves. Unit 1 is expected to reach its value first. Assuming that Unit 1 operates at 100 percent load factor, it will not reach this value until after June 2006.
The staff reviewed the information submitted by the licensee in support of their request for continued use of the current P/T curves to allow time for preparation of new P/T limit curves.
The licensee recalculated the peak vessel fluence using a staff approved methodology which satisfies the guidance in RG 1.190. The staff concluded that the new values indicate that the current P-T curves are acceptable and will remain valid until June 2006. Therefore, the staff has approved the requested change for the continued use of the current limits for an interim period not to exceed December 15, 2004.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Illinois State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (67 FR 66170). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. RG 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, U.S. Nuclear Regulatory Commission, March 2001.
- 2. GE-NE-0000-0002-5244-02, LaSalle 1 and 2 Neutron Flux Evaluation, by Tang Wu, General Electric, June 2002.
- 3. NEDC-32983PA, Rev. 0, Licensing Topical Report, General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluations, December 2001.
Principal Contributor: L. Lois Date: December 3, 2002