Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23286A260 | 8 November 2023 | Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program License Renewal |
ML23118A347 | 1 May 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 | |
ML23081A038 | 25 April 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Cyber Security Safeguards Contingency Plan |
ML22341A222 | 28 December 2022 | Issuance of Amendment Nos. 257 and 243 to Renewed Facility Operating Licenses New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies and Changes to Core Operating Limits Report | |
ML22090A086 | 29 April 2022 | Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position | Safe Shutdown Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Fire Protection Program |
ML21362A721 | 4 February 2022 | Issuance of Amendment Nos. 255 and 241 Revision to Technical Specifications to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology | Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
ML22031A276 | 1 February 2022 | Issuance of Indemnity Agreement Amendments-Enclosure 2 | |
ML22021B659 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) | |
ML22021B660 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
ML21347A038 | 13 January 2022 | Issuance of Amendments to Revise Reactor Coolant Leakage Requirements | Packing leak Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML21307A342 | 7 December 2021 | Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) | High Radiation Area Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fuel cladding Recently irradiated fuel Fire Protection Program |
ML21162A069 | 7 September 2021 | Issuance of Amendment Nos. Xxx and Yyy Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 | Safe Shutdown High winds High Radiation Area Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Flooding Focused Evaluation Earthquake Maintenance Rule Program Turbine Missile Offsite Circuit |
ML21158A228 | 13 July 2021 | Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Surveillance Frequency Control Program Earthquake |
ML21082A422 | 27 May 2021 | Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference FLEX Tornado-Generated Missile Fukushima Dai-Ichi Large early release frequency Flooding Focused Evaluation Earthquake Turbine Missile Very Early Warning Fire Detection |
ML21033A530 | 1 April 2021 | Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML21013A005 | 4 February 2021 | Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML20153A804 | 31 July 2020 | Co. - Issuance of Amendments Revising Emergency Action RA3 | |
ML20141L636 | 10 July 2020 | Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 | Time of Discovery High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Turbine Missile Fire Protection Program |
ML20134H940 | 8 July 2020 | Issuance of Amendments Revising the High Radiation Area Administrative Controls | High Radiation Area Offsite Dose Calculation Manual Cyber Security Annual Radioactive Effluent Release Report Process Control Program Safeguards Contingency Plan Deep Dose Equivalent Fire Protection Program Scaffolding |
ML20021A070 | 6 April 2020 | Issuance of Amendments to Delete License Conditions for Decommissioning Trusts | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Preemption Authority Fire Protection Program |
ML20034G546 | 12 March 2020 | Issuance of Amendments Revising Instrument Testing and Calibration Definitions | Shutdown Margin Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML19331A725 | 14 February 2020 | Issuance of Amendments Revising Emergency Action Levels | High winds Ultimate heat sink Earthquake Fuel cladding |
ML19266A527 | 8 October 2019 | Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications | Cyber Security Safeguards Contingency Plan Offsite Circuit Fire Protection Program |
ML19176A033 | 28 August 2019 | Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Fire Protection Program |
ML19121A505 | 24 June 2019 | Issuance of Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator | Safe Shutdown Anticipated operational occurrence |
RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | 14 June 2019 | Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Scram Discharge Volume Process Control Program |
ML19025A288 | 14 February 2019 | Issuance of Amendments to Renewed Facility Operating Licenses Revision of Technical Specifications to Adopt TSTF-334-A | Anticipated operational occurrence Hydrostatic Squib Surveillance Frequency Control Program Maintenance Rule Program |
ML18304A365 | 16 January 2019 | 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fuel cladding Fire Protection Program Power change |
ML18311A265 | 2 January 2019 | Issuance of Amendments Nos. 233 and 219 to Renewed Facility Operating Licenses License Amendment Request for Temporary Extensions to Technical Specifications | Safe Shutdown Ultimate heat sink Surveillance Frequency Control Program Offsite Circuit |
ML18278A030 | 19 December 2018 | Issuance of Amendments 232, 218 to Renewed Facility Operating Licenses Request to Revise the Technical Specifications Surveillance Requirement to Revise the Lower Setpoint Tolerance for Safety/Relief Valves | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence |
ML18254A367 | 29 October 2018 | County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers | Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Earthquake Fire Protection Program |
ML18226A202 | 15 October 2018 | Issuance of Amendments to Renewed Facility Operating Licenses Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Scram Discharge Volume Fuel cladding Pressure Boundary Leakage Offsite Circuit |
ML18206A282 | 2 August 2018 | Issuance of Amendments to Relocate the Staff Qualification Requirements | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML18113A045 | 29 May 2018 | Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment | Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel |
ML18008A123 | 6 February 2018 | Issuance of Amendments to Renewed Facility Operating Licenses Revision to Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (CAC Nos. MG0211 and MG0212; EPID L-2017-LLA-0279) | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML17283A085 | 16 November 2017 | Issuance of Amendment Nos. 226 and 212 - Revise Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Leak Rate Test Frequencies (CAC MF8700 and MF8701; L-2016-LLA-0021) | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Moisture barrier Grace period |
ML17257A304 | 30 October 2017 | Non-Proprietary - Issuance of Amendments Request to Revise Suppression Pool Swell Design Analysis and the Facility Licensing Basis | Hydrostatic |
ML17163A355 | 31 August 2017 | Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) | Safe Shutdown Time of Discovery Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML17073A067 | 26 May 2017 | Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) | Safe Shutdown Shutdown Margin Packing leak High Radiation Area Squib Cyber Security Incorporated by reference Missed surveillance Surveillance Frequency Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML17037D212 | 16 February 2017 | Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Maintenance Rule Program Recently irradiated fuel Fire Protection Program |
ML16320A182 | 18 November 2016 | Issuance of Amendments High Burnup Atrium-10 Partial Length Fuel Rods | Functionality Assessment |
RS-16-193, License Amendment Request to Revise Suppression Pool Swell Design Analysis | 27 October 2016 | License Amendment Request to Revise Suppression Pool Swell Design Analysis | Anticipated operational occurrence Hydrostatic MELLLA |
ML16239A109 | 19 October 2016 | Renewed FOL Draft 2016-08-24 to Concurrence | Safe Shutdown Fire Barrier Cyber Security Fire Protection Program |
ML16239A084 | 19 October 2016 | Renewed FOL Draft 2016-08-24 to Concurrence | Safe Shutdown Safety Limit Minimum Critical Power Ratio Fire Barrier Cyber Security Fire Protection Program |
ML16155A110 | 23 August 2016 | Issuance of Amendments Reduction in the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML15324A439 | 17 December 2015 | Issuance of Amendments (CAC Nos. MF5471-MF5476) | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Hydrostatic Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML15202A578 | 19 November 2015 | Issuance of Amendment to Revise the Ultimate Heat Sink Temperature Limits | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Time to boil Surveillance Frequency Control Program |
ML15153A282 | 30 July 2015 | Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML15141A058 | 28 July 2015 | Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) | Fuel cladding |