ML023250187

From kanterella
Revision as of 22:37, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Pilgrim Nuclear Power Station
ML023250187
Person / Time
Site: Pilgrim
Issue date: 11/14/2002
From: Riggs W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.02.101
Download: ML023250187 (3)


Text

Entergy Nuclear Operations, Inc.

SEn tergy Pilgnm Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment November 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 October 2002 Monthly Operating Report LETTER NUMBER: 2.02.101

Dear Sir or Madam:

In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.

Sincerely, JRH/dd

Attachment:

October 2002 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 202101

Attachment OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME: Pilgrim DATE: November 14, 2002 COMPLETED BY: J. R. Haley TELEPHONE: (508) 830-8143 Design Electrical Rating (MWe-Net): 655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD: October 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE

[1] Hours in Reporting Period 745.0 7,296.0 262,056.0

[2] Number of Hours the Reactor was Critical 745.0 7,296.0 181,771.8

[3] Number of Hours the Generator was On Line 745.0 7,296.0 176,551.8

[4] Unit Reserve Shutdown Hours 0.0 0.0 0.0

[5] Net Electrical Energy (MWH) 496,480.3 4,797,630.3 105,704,057.3 202101

DOCKET NO. 50-293 NAME: Pilgrim COMPLETED BY: J.R. Haley TELEPHONE: (508) 830-8143 REPORT MONTH: October 2002 OPERATIONAL

SUMMARY

The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP) where it was essentially maintained throughout the reporting period.

UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO. DATE TYPE DURATION REASON SHUTTING 1 (HOURS) 2 DOWN REACTOR 3

1 2 3 F- Forced A - Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3 - Auto Scram D - Regulatory Restriction 4 - Continuation E - Operator Training & 5 - Other License Examination F- Admin G - Operation Error H - Other 202101