PLA-0055, December 2002 Monthly Operating Report for Susquehanna
ML030230724 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 01/13/2003 |
From: | Richard Anderson Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
PLA-005578, R41-2A | |
Download: ML030230724 (7) | |
Text
p. j Richard L. Anderson PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542 3883 Fax 570 542 1504 'TM RLAnderson @pplweb com January 13, 2003 U. S. Nuclear Regulatory Commission Attn. Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005578 R41-2A The December 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJHncmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas
I OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 0111312003 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 1. Unit Name: Susquehanna Steam Electric Station (U I)
- 2. Reporting Period: December 2002
- 3. Design Electrical Rating (Net MWe): 1115
- 4. Maximum Dependable Capacity (Net MWe): 1105 This Month Yr.-to-Date Cumulative 744 8760 171,529
- 5. Hours in Reporting Period 7562.3 141,864.5 744
- 6. Number of Hours Reactor Was Critical 7493.8 139,653.8 744
- 7. Hours Generator On-Line 0 0 0
- 8. Unit Reserve Shutdown Hours 8,026,620 143,253,529 831,887
- 9. Net Electrical Energy Generated (MWH)
NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO. 50-387 UNIT One DATE 01/13/03 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH December 2002 No. Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
- 1. 2. 3.
Reason: Method:
F. Forced A - Equipment Failure (Explain) 1 - Manual S. Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 01/13/03 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 01/13/03 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 1. Unit Name: Susquehanna Steam Electric Station (U2)
- 2. Reporting Period: December 2002
- 3. Design Electrical Rating (Net MWe): 1117
- 4. Maximum Dependable Capacity (Net MWe): 1111 This Month Yr.-to-Date Cumulative 744 8760 156,769
- 5. Hours in Reporting Period 744 8,492.4 136,149.4
- 6. Number of Hours Reactor Was Critical 744 8,440.0 134,206.7
- 7. Hours Generator On-Line 0 0 0
- 8. Unit Reserve Shutdown Hours 827,061 9,306,164 140,110,994
- 9. Net Electrical Energy Generated (MWH)
NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 01/13/03 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH December 2002 No. Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
Summary: Power reductions of approximately 10% were conducted for control rod adjustments on 12/7 and 12/14.
drive HCU's on Maintenance was also performed at approximately 90% power on Turbine/EHC (12/14) and-control rod frequent control rod 12/20. An additional control rod adjustment was performed on 12/21 at 78% power. More power capacity for fuel cycle 11.
adjustments are required because the core is nearing the end of its full
- 2. 3.
1.
Reason: Method:
F. Forced 1 - Manual S. Scheduled A - Equipment Failure (Explain)
B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 01/13/03 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challen2es to Main Steam Safety Relief Valves None.