ML20062N090

From kanterella
Revision as of 00:44, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
First Interim Deficiency Rept Re Atlas 811013-16 QA Documentation for Auxiliary Fuel Bldg Structural Steel, Initially Reported on 811113 & 1204.Independent Steel Evaluation Underway.Next Rept Due by 820520
ML20062N090
Person / Time
Site: Hartsville, Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 12/10/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8112180398
Download: ML20062N090 (3)


Text

.

~

2- , I TENNESSEE VALLEY AUTHORITY -

f CH ATTANOOGA. TENNESSEE 374ot REGlpN::

400 Chestnut Street Tower II

~

< CtORG!A December 10, 1981 gl 4g HTRD-50-518/81-29, -519/81-22,

-520/81-28, -521/81-23 PBRD-50-553/81-31, -554/81-24 g Mr. James P. O'Reilly, Director Office of lnspection and Enforcement N

( pg 4

-U.S. Nuclear Regulatory Commission Region II - Suite 3100 h-t O@ED .g 101 Marietta Street DECI'7IOOIA Atlanta, Georgia 30303  ;" gI$![i [g;:a S Daar Mr. O'Reilly: Vx .,a'h"

/ /y N .\ \

HARTSVILLE AND PHIPPS BEND NUCLEAR PLANTS - REPORTABLE DEFI -

ATLAS QA DOCUMENTATION FOR AUXILIARY AND FUEL BUILDINGS' STRUCTURAL STEEL - HTRD-50-518/81-29, -519/81-22, -520/81-28, -521/81 PBRD-50-553/81-31, -554/81-24 The subject deficiency was initially reported to NRC-0IE, Region II,

-Inspector P. A. Taylor on November 13, 1981 as NCR HTA CEB 8102 and on December 4, 1981 as NCR's HTB CEB 8103 and PBN CEB 8101. In accordance with paragraph 57.55(e) of 10 CFR Part 50, we are -

enclosing our first interim report on the subject. deficiency. We consider 10 CFR Part 21 applicable to this nonconformance. TVA anticipates transmitting the next report on or before May 20, 1982.

If you have any questions, please call Jim Domer at FTS 858-2725.

Very truly yours,

' TENNESSEE VALLEY AUTHORITY

% h5 '

. M. ills, Manager Nuclear Regulation and Safety

  • Enclosure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

phh 8112180398 811210 -

PDR ADOCK.05000 g 3[ gf "

' An Equal Opportunity Employer .

u > .

, ENCLOSURE HARTSVILLE NUCLEAR PLANTS A AND B AND PHIPPS BEND NUCLEAR PLANI ATLAS QA DOCUMENTATION ON AUXILIARY BUILDING AND FUEL BUILDING I STRUCTURAL STEEL

$ _10CFR50.55(e) REPORT NO. 1 (INTERIM)

HTRD-50-518/81-29, -519/81-22, -520/81-28, -521/81-23 PBRD-50-553/81-31, -554/81-24 -

Description of Deficiency A QA audit was performed at Atlas Machine and Iron Works on October 13 through 16, 1981, for the purpose of verifying the quality and acceptability of the subject material fabricated under TVA contracts 81K71-821398 and 81K72-821399. Since approximately 75 percent of this material had been shipped and material fabrication for Hartsville Plant A was essentially 99 percent complete, the audit was limited to performing a detailed review of hardware identification and manufacturing records on a selection of pieces determined to be representative of the work

. performed. An examination of these records indicated that the quality of the material supplied on the contracts could not be verified from the manufacturer's records. The deficiencies observed and supported by the evidence examined included various inconsistencies in recording information on shop travelers and failure to provide adequate traceability of welding documentation on items, particularly where multiple wald joints were involved. The following itens are examples observed during the audit which indicate the unacceptable implementation of the basic requirement of preparing sufficient records as work is performed in order to furnish documentary evidence of quality assurance.

1. Numerous undocumented changes to shop travelers in the form of write-overs and opaqued dates with other data recorded in place without recording the date of the change and identification of the person making the change. Examples of data items changed included heat codes, purchase order numbers, heat numbers, dates and initials of personnel performing and verifying operations, types and lot numbers of welding consumables, and procedure numbers.
2. Magnetic Particle Test Reports with errors, insufficient data, and omissions. Examples observed included procedure or procedure-revision level not recorded, interpreter's signature missing, serial number of MT machine used not recorded, and in some cases QC inspector's signature was copied (preprinted). Also, in one example reviewed, the MT inspection repcet was dated prior to the joint weld ~

date.

3 Magnetic Particle Inspection Reports showed weld repairs reinspected; however, traveler did not document repair procedure, repair welder, nor welf consumables used.

4. Changes were made to travelers and additional data was added up to three years after the work was performed.

,