Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030213
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/31/2004
From: Legreve M
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030213 (3)


Text

RI' J(+

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 30,2004 Time: 1430 Preparer. Mike LeGreve U I R 28 NOTE: Refer to base procedureNP 10.3.6for safety assessmentchecklist KSF definitions.

NOTE: Irheneverfuel has been removedfrom the reactorvessel and refueling cavity, all key safetyfunctions are GREEN excevt spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration 2686 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 34
4. SR instrumentation operable (0-1) I 5 _~

Subtotal c 5 CORE COOLING Subtotal Condition

1. Number of SG available for DHR (& RCPs bumped) (0-2) 2 0-1 RED
2. Refueling cavity filled (0-1) 0 2 ORANGE
3. Number of trains RHR available (0-2) 2 3 -L V
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 CGREEN)

RCS Temperature = 95'F; 57 days shutdown RCS is solid, S/G tubes filled Subtotal = 5 RCS Time to Boil >7 hours (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-0I or G-02/A-05/B-03 available (0-1) I G-03 or G-04/A-061B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 fi above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 220 percent w/head on (& RCPs bumped) (0-1) 1 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 0 3
3. RCS level above REDUCED INVENTORY (0-1) 1 4 d m $
4. Makeup from VCT/BLENDER and'or RWST available (0-2) 2 Subtotal 4 wRron inRtS rd was com accrdnce vAth the Freedom of 1dfM a6f kIn PBF-1562 Acd exempb W

References:

NP 10.3.6 Revision 2 10/30/02 FOW, *'e) g - 'n 9 igPage I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.11.D) {Contaitunent 0 RED Operable) {ITS TS 3.6.1) set (Oor 4) 0 ORANGE
2. Containment Closure CL-IE maintained 2-3 and closure < time to boil (Oor 2) 2 4-5-6 <M5.
3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independentoffsltepower source duringperiods ofsingle X-03 orX-04 availability(*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-O1 via 28-32 (0-2) NA 3 YELLOW

.(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) NA

(*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

e Both RCP's have been sufficiently bumped to fill the Steam Generator tubes. This added two points for core cooling and one for inventory, making both GREEN.

PBF-I562

References:

NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 30, 2004 TIME: 1430 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EQUIPMENT:

COMMENTS:

References:

NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1