Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 30,2004 Time:
1430 Preparer.
Mike LeGreve U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
Irheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN excevt spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration 2686 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE
_~
(0-1) 1 (0-2) 2 (0-1) 1 (0-1)
I 0-1 2
34 5
Subtotal c 5
CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (& RCPs bumped)
(0-2) 2 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
-L V
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 CGREEN)
RCS Temperature = 95'F; 57 days shutdown RCS is solid, S/G tubes filled Subtotal =
>7 hours (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-0I or G-02/A-05/B-03 available (0-1)
I G-03 or G-04/A-061B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 fi above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal 4
INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent w/head on (& RCPs bumped)
(0-1) 1 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
d m
- 4.
Makeup from VCT/BLENDER and'or RWST available (0-2) 2 Subtotal 4
wRr on in RtS rd was com kIn accrdnce vAth the Freedom of 1dfM a6f Acd exempb W
10/30/02 FOW, *'e)
- 'n g
9 igPage I of 9
References:
NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.11.D) {Contaitunent Operable) {ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0
2-3 4-5-6 Condition RED ORANGE
<M5.
(0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsltepower source during periods of single X-03 orX-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-O1 via 28-32
.(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
(*)
an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-2)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA SFP Temperatures:
NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =
NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
e Both RCP's have been sufficiently bumped to fill the Steam Generator tubes. This added two points for core cooling and one for inventory, making both GREEN.
PBF-I562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
May 30, 2004 TIME:
1430 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:
COMMENTS:
- RCS Time to Boil is >7 hours PBF-1562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 Page 5 of 9