Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030213
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/31/2004
From: Legreve M
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030213 (3)


Text

RI' J(+

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 30,2004 Time:

1430 Preparer.

Mike LeGreve U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Irheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN excevt spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration 2686 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE

_~

(0-1) 1 (0-2) 2 (0-1) 1 (0-1)

I 0-1 2

34 5

Subtotal c 5

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (& RCPs bumped)

(0-2) 2 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

-L V

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 CGREEN)

RCS Temperature = 95'F; 57 days shutdown RCS is solid, S/G tubes filled Subtotal =

5 RCS Time to Boil

>7 hours (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0I or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 fi above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (& RCPs bumped)

(0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

d m

4.

Makeup from VCT/BLENDER and'or RWST available (0-2) 2 Subtotal 4

wRr on in RtS rd was com kIn accrdnce vAth the Freedom of 1dfM a6f Acd exempb W

10/30/02 FOW, *'e)

- 'n g

9 igPage I of 9

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.11.D) {Contaitunent Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE

<M5.

(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsltepower source during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-O1 via 28-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

(*)

an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-2)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

e Both RCP's have been sufficiently bumped to fill the Steam Generator tubes. This added two points for core cooling and one for inventory, making both GREEN.

PBF-I562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 30, 2004 TIME:

1430 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9