EE~ie e,E n jtiT*fi ef
- 'V4101i2004 20:22 Pumpe
'a1
.Swing 0410112004 20:44 Comm Device greater with re (Flre 13 0410112004 20:5T Unit 1, 3.6.6.A W01/2004 21:06 ANNOTATION On Uni Spray.'
GREEI 16))sti - E3 tMeiNTpe-r 04/0112004 21:24 PC 23 part I Unit 2.
Swing 0410112004 21:24 Unit 2.
Device Station 0410112004 21i'30 Unit 1, rnet du Train A meet LI to Oper 04W0112004 21:39 ANNOTATION This Is Randy
.Kd'D,5jnie..
'En fiTyp >'.l,g.
0410112004 21:41 Unit 1, 3.6.6.A 0410112004 21:42 Unit 1, met dur Train B meet LI to Oper 04/0112004 21:44 0-TS-RE-001 Unit I Review James t~;iEat<e S,E
':lT
- t' 04/0112004 21:45 0-TS-RE-001 Unt r
J.
0410112004 21:51 Unit 1. I 3.6.6A 04101/2004 21:56 DSS Midnight Entry Transle large nu Fire Zor (due to hourly f 0410112004 22:00 PC 23 part I Unit 2, c Log - Si 0410112004 22 22 Unit 2, 1 Station 0410112004 22:26 Comnic Swing S Log Entries Report b0 id U-2 facade sump to the Waste Holdup Tank. [13aumann, Steve - PAB (FireBrigade) - Station Log -
Shift]
enced TS-4A Unit 2 Turbine Trip Test (Monthly). Unit 2 Turbine Unit 2. Mechanical Overspeed declared Inoperable IAW TS-4A. TLCO 3.7.6 Turbine Overspeed Protection not met due to Unit 2
- than 1518.5 MW thermal. Entering TLCO 3.7.6A-Mechanical overspeed trip system inoperable quired action A.1 to reduce reactor power to 1518.5 or less within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. [Beltz, Boyd - OS rigade) - Station Log -Swing Shiftl]
IT-540C complete on Cont. Spray \\ Spray Add. Train B. LCO 3.6.6 and 3.6.7 are met exiting TSAC A and 3.6.7.A [Pond. Dan - Unit 1 CO - Station Log - Swing Shift) e Safety Monitor has been updated for completion of IT-540C. LRPM Test of Unit 1 Containment System with RCS Temp >350 F. Unit I Core Damage Frequency returns to 3.30E-5 which Is a I risk status. [Schlelf, James - STA - Station Log -Swing Shift]
- a R
.W~.
t%;.2EnT1gTx n
I j
W commence PC-58 Seal Oil System Test. [Hastings. Randy - DOS (Fire Brigade) - Station Log -
Shift]
Completed TS-4A Unit 2 Turbine Trip Test (Monthly) satisfactorily. Turbine Mechanical Overspeed dedared operable IAW TS-4A. TLCO 3.7.6 now met. [Beltr, Boyd - OS (Fire Brigade) -
Log - Swing Shift]
LCO 3.6.6.Contalnment Spray and Coollng Systems and LCO 3.6.7. Spray Additive System not a to performing IT-05, Cont. Spray Pumps and Valves TesL Entering TSAC 3.6.6A for Cont. Spray
,OOS. RA A.1, Restore train to Operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> from discovery of failure to CO. Entering TSAC 3.6.7.A for the A Train Spray Add. Flow path OOS. RA A.1. Restore flow path
-able within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. tPond. Dan - Unit I CO - Station Log - Swing Shift]
a partial performance of IT-5 to test 1SI-870A. iSI-871A. ISI-8708 and ISI-871B only. [FHastings,
- DOS (Fire Brigade) - Station Log - Swing Shift)
IT-05 complete on ConL SprayA Spray Add. Train A. LCO 3.6.6 and 3.6.7 are met, exiltng TSAC and 3.6.7A [Pond, Dan - Unit 1 CO - Station Log. Swing Shift]
LCO 3.6.6,Contalnment Spray and Cooling Systems and LCO 3.6.7. Spray Additive System not e to perfornming IT-05, Cont. Spray Pumps and Valves Test. Entering TSAC 3.6.6A for Cont. Spray OOS. RA A.1, Restore train to Operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> from discovery of failure to
.O. Entering TSAC 3.6.7A for the B Train SprayAdd. Flow path OOS. RA A.1, Restore flow path
-able within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. [Pond. Dan - Unit 1 CO - Station Log - Swing Shift]
of TS-9. Control Room Heating and Ventilation System Monthly Checks Is complete - SAT. [SchleHf.
- STA - Station Loa - Swing Shlft]
67Ar5PRVF'wF
.i,-r 7U1RFi W6
-0*1.5* "I
-W IT-05 complete on Cont. Spray I Spray Add. Train B. LCO 3.6.6 and 3.6.7 are met. exiling TSAC and 3.6.7A. IT 05 Completed SAT. [Pond, Dan - Unit I CO - Station Log - Swing Shift]
nt Combustibles In the AFW Pump Room (Fire Zone 304) have retumed to a nominal amount. The umnber of transient combusUbles due to AFW Pump Room wall construcUon are no longer staged In ie 304. Based on discussion with the FPC. determined that hourly fire rounds In Fire Zone 304 the large number of transient combustibles In the area) are no longer required. Secured from Ire rounds. Security notified. ISchlelf. James - STA - Station Log -Swing Shift]
completed SAT PC-58 Seal Oil System Test [Hastings, Randy - DOS (Fire Brigade) - Station ding Shift]
Commenced TS-34 (Contalnment Fan Testng Monthly) [Beltz. Boyd - OS (Fire Brigade) -
Log - Swing Shift]
on, Started P-32A SW Pump to support TS-34. [Beltz. Boyd - OS (Fire Brigade) - Station Log -
hIftJ
-i
.lnioirm atln in ths reord was deleted in accordance with t Freedom of Information Act, et mptions 2 fO iA/f 2EA<