|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML24114A0532024-03-19019 March 2024 6 to Emergency Implementing Procedure EIP-ZZ-00201, Revision 56, Notifications ML24114A0562024-03-11011 March 2024 6 to EIP-ZZ-C0010 Addendum E, Logistics Support Coordinator Checklist ML24114A0522024-02-13013 February 2024 1 to Emergency Implementing Procedure EIP-ZZ-00102, Emergency Implementing Actions ML24086A3702024-01-0909 January 2024 EIP-ZZ-A0001, Rev. 24, Emergency Response Organization ML23354A1062023-12-20020 December 2023 Ameren Missouri - Procedure Review Form for EIP-ZZ-COO1O Addendum G, Rev. 11, Backup EOF Checklist ML23310A0522023-10-19019 October 2023 Procedure Review Form for EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document ML23262B0052023-08-29029 August 2023 EIP-ZZ-A0066, Rev. 29 - RERP Training Program ML24002A8192023-07-25025 July 2023 EtP-ZZ-COO10 Add D, Rev 22, Dose Assessment Coordinator (DAC) Checklist ML23227A1382023-07-12012 July 2023 Procedure Review Form for EIP-ZZ-03010 App B: Above Ground Oil Storage and Use Facilities (Revision 008) ML23227A1392023-06-0909 June 2023 EIP-ZZ-A0001, Rev 23, Emergency Response Organization ML23200A2132023-06-0101 June 2023 Procedure Review Form for EIP-ZZ-00201, Addendum a, Rev. 41, Control Room Notification Flowchart ML23150A1802023-05-30030 May 2023 EIP-ZZ-00201 Addendum a, Control Room Notification Flowchart Administrative Correction Revision 040 ML23150A1862023-05-30030 May 2023 EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist Administrative Correction ML23150A1812023-05-18018 May 2023 EIP-ZZ-00201 Addendum a, Revision 040, Control Room Notification Flowchart ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23131A3812023-04-26026 April 2023 EIP-ZZ-00240 Addendum E. Health Physics Coordinator (Hpc) Checklist, Minor Revision 26 ML23131A3842023-04-26026 April 2023 EIP-ZZ-COO1O, Addendum D, Dose Assessment Coordinator (DAC) Checklist, Minor Revision 21 ML23131A3872023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center ML23088A2862023-03-23023 March 2023 EIP-ZZ-00201, Addendum C, Revision 039, EOF Notification Package ML23102A1932023-03-0808 March 2023 Procedure Review Form (Prf), Summary of Changes and Analysis to Revision 55 ML19051A1412019-02-20020 February 2019 Attachment 5: EAL Matrix from EIP-ZZ-00101 Addendum 1, Emergency Action Level Classification Matrix, Proposed Revision 009 ML19051A1402019-02-20020 February 2019 Attachment 4: Affected Pages ofEIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Bases Document, Proposed Revision 016 ML19051A1392019-02-20020 February 2019 Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages ULNRC-06467, Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 0042018-10-31031 October 2018 Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 004 ULNRC-06424, Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes2018-03-29029 March 2018 Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ULNRC-06424, Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 0082018-03-29029 March 2018 Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3592018-03-29029 March 2018 EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ML18088B3602018-03-29029 March 2018 FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3612018-03-29029 March 2018 EIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Basis Document, Revision 008 ULNRC-06405, Submittal of Radiological Emergency Response Plan, Revision 502018-01-0202 January 2018 Submittal of Radiological Emergency Response Plan, Revision 50 ULNRC-05922, Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f).2012-10-30030 October 2012 Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f). ML0411403362004-04-17017 April 2004 EIP-ZZ-A0066, RERP Training Program, Revision 008 ML0410407332004-04-0808 April 2004 Transmittal of Revision 39 of Emergency Plan Implementing Procedure EIP-ZZ-00201, Notifications ML0407601082004-03-0505 March 2004 Revised Epips, Including Rev. 21 to EIP-ZZ-00213 and Rev. 9 to EIP-ZZ-00226 ML0405804812004-02-23023 February 2004 Revision 22 to EIP-ZZ-A0020, Maintaining Emergency Preparedness. ML0403407022004-01-23023 January 2004 Revision 30 to EIP-ZZ-C0010, Revision 32 to EIP-ZZ-00102, and Revision 33 to EIP-ZZ-00240 ML0402107922004-01-15015 January 2004 Revision 22 to Procedure EIP-ZZ-00211, Field Monitoring. ML0336404862003-12-19019 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0066, RERP Training Program, Revision 007 ML0335105492003-12-11011 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Emergency Response Organization, Revision 8 ML0335105532003-12-10010 December 2003 Revision 123 to EIP-ZZ-A0001, Appendix 1 ML0334905662003-12-0808 December 2003 Revision 0387 to EIP-ZZ-00201, Notifications, and Revision 013 to EIP-ZZ-00260, Event Closeout/Plant Recovery. ML0333700622003-11-25025 November 2003 Revision 016 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings ML0331600392003-11-0303 November 2003 Transmittal of Revisions to Emergency Plan Implementing Procedures for Callaway Plant ML0330001062003-10-17017 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-A0066, Rev. 6 ML0328804452003-10-0303 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-03010, Rev 103 ML0323406572003-08-15015 August 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-PR020, Revision 19 ML0323103442003-08-13013 August 2003 Revision 083 to EIP-ZZ-A0001 App 1 ML0320604792003-07-18018 July 2003 Transmittal of Emergency Plan Implementing Procedure, EIP-ZZ-A0020 ML0318201592003-06-20020 June 2003 Transmittal of Callaway Emergency Plan Implementing Procedure, EIP-ZZ-00226 ML0316401482003-06-0606 June 2003 Transmittal of Emergency Plan Implementing Procedure Revision 2024-03-19
[Table view] |
Text
DATE: 01/15/04 AMEREk/UE PAGE: 43 TIME: 08:18:44 DOCUMENT CONTROL SYSTEM ARDC8801 DOCUMENT TRANSMITTAL TRANSMITTAL NUMBER: 521818 RETURN ACKNOWLEDGED TRANSMITTAL AND TO CONTROL NUMBER: 338U SUPERSEDED DOCUMENTS (IF APPLICABLE) TO:
TITLE: OTHER ADMINISTRATION RECORDS DEPT: NUCLEAR REGULATORY COMM. AMEREN/UE LOCATION: USNRC - WASH DC CALLAWAY PLANT TRANSMITTAL DATE: 20040115 P.O. BOX 620 FULTON, MO 65251 TRAN DOC RET ALT ALT CODE TYPE DOCUMENT NUMBER REV REV MED COPY MED COPY AFFECTED DOCUMENT A PROC 04-0009 022 C 1 EIP-ZZ-00211 ACKNOWLEDGED BY: DATE:
45
A190.0001/A190.00021A190.0035 Procedure Review Form A210.0062/A210.0069 1.0 Initiation e Initiator: W M R. , Date- DepartDent: Ext M X 4 (Current efor Temp. Change) Leel ofUse Multiple 0 Document #: 6 P 9 Z 0 0 II Rev. # or date: 6)a Continuous 0 Periodic 0 Reference r
Title:
Fi*\& MOO Pb. 'oI6 Is this a Temporary Procedure? 0 Yes Does Document use computerized Ch&Ulist(s)? 0 Yes [larTo If yes, Expiration Date:
2.0 Reason for Change: (List commitments, CARS, OEFs Plant Mods etc. and record numbers here.)
fIt% a¢V,; ia;As jG&,
maj ce 4 t C-? fD St )v ra &A CF 90 2o R it Continued: [
3.0 Description f Change:
S~a? t 5 dl AQ.5 taejtH FMT tlAs au p36 IIDC. 9- GOF0 AQ, I;7 A~4k~ lp.Q 2.,g eL^.8. -6 JOCAf Fo7T ;}Is ;,n E1oif !-Rao. 7 Continued: n 4.0. Document Disposition J .Temp Change 0 New Document E Major Revision 0 Minor Revision 0 Cancellation 0 Administrative Correction Designated Approval Authority (Print/Sign/Date)
AdinitstrativeCorrectionApproval on 5.0 Interim Approval ffemyorary Shange Chg # oQ-006 11,4 m 4U '( %//oYa'-M Dp f S ( tSiate)
Co nizant Supesvisor ( t/Si ae 7
Continued:
7.0 Reviews and Signatures Tvve Required DeDt - PriName Stgn A Date CA0139 Attached Preparer 3.eePL¶dTaP 14U/3X 1/ 0-4 N/A Eeer .Y . DYes 0 No
[j Tcchnical Review cP 51+120- = . _ llel Ycs; NNo 0 Cross Discipline _ U -_-_.___'__ O Yes ONo E Cross Discipline _ . Yes 0 No O Additional Reviews (See Attached CA0139 forms). Number of additional CA0139:
O Validation YPE COORDINATOR j l Yes ONo Is Training required? 0 Yes O No I Is Training required prior tq e m $ 'UYes 0 No 50.59 Review Attached O CA2510 0 CA2511 0 CA2512 C0N/A (inaccordmcc with 1b .59 Resource Manual) 8.0 Approval JAN 1 2004 O Recommend for Plant Manager Approval (APA & ElIPrequired.)
o Department Head Final Review and Approval ORC Meetin aa:
Date:
Dept Head or Designated Approver Signature/Date Plant ger Signature/Date 9.0 Effective Date i -i) {4 Administrative Input Only45g ¶ t6 Note: Page2 provides instructionsto complete thisfiorm and may be discarded.
Page 1 of 2 CA0033 10/20/03 0 JAN 2004 prITurnM
'5
EIP-ZZ-0021 1 Rev. 022 4 PROCEDURE .
4.1 TEAM FORMATION ..
4.1.1 The HPC designates a FMT Leader from the available Support Area Personnel.
4.1.2 The HPC obtains FMT Drivers from the Ops Support Area, Engineering or Rad Chem Department.
4.1.2.1 The HPC provides vehicle keys (located in HPC Packet) to the FMTs.
4.1.3 The PMT Leader will determine current Meteorological conditions and record the information on Attachment 1,Section I, Team Formation.
4.2 EOUIPMENT CHECKOUT 4.2.1 The FMT Leader chooses an available RERP vehicle.
4.2.2 The FMT Leader circles the Team Designator (Blue, Green, Red, White).
associated with that vehicle on FMT Checklist.
0s,0, 4.2.3 FMT Leader and Driver proceed to the Cz=al .'ro -b-Bn (C to
,IC checkout FMT equipment. Record equipment checks on Attachment 1,Section II, Equipment Checkout. FMT equipment lockers are located in the w;hole body count #11O2.
70 wit tA\ Sloan; ta I 'oa . Ia7, NOTE: The following steps of Equipnent Checkout may be performed in any order.
4.2A The FMT Driver should assist the Team Leader as directed.
NOTE: Instrument Check Sources assigned to the FMT Instrument Locker are Custodial Sources. Use of the Source Checkout/Movement Tracking Sheet (CA-#385) is not required during RERP field exercises or declared emergencies.
4.2.5 Response check all survey instruments, applicable operating procedures are located in a binder stored on the outside of the FMT equipment locker.
4.2.6 Load instruments, Immediate Field Monitoring Kit, check source, and any additional equipment into the RERP vehicle.
4.2.7 Check the Global Positioning System (GPS) for proper operation. Te operator aid is in the FT procedure binder.
WORKING COPY ISSUED 01/14/04 15:056 RS
,5n ,_
EIP-ZZ-0021 1 Rev. 022 IL EOUIPMENT CHECKOUT COMN 42536 Field Monitoring Kits: CoftLAon. Al - " 1 Remarks:
Kits located i CP~AF,_ tofn1 Inventory Kit Osotnecessay Veal &intact)
O Kit inventory (sat)
Pre-operatlonal Check Survey Instruments:
(Procedure bindcr in rack mounted on outside of FMT locker)
O3 Airsamper(Sat) HTP-ZZ-04121 O Count rateeter (St)HwTPZiZ 8 o Ion chambernmeyrmeter(Sat) HTP-ZV04102 O GMsurvey meter (at)HTP-ZZ-04106 Load equipment In vehicle:
o ImmediateFMTK O Recovey FT Kit (ocated at EOFequtp room tfneeded9 Q3 Airsampler 0 GMswr meter (Uv Infi r seatofWvehicl with theaudible Indicatoron andprobewindow opf aching upJ O Ion chambersurv weter C Procedures(locatedon side of locker)
O Maps o Energency lght O Check source Other Equipment:
GPS Ssteni (Operatoraidin FMT Kit).
O3 Check GPS operational with vehicle parked at the CPF.
(OPS is SAT if it reads N38-45.6 to 4S.8' W91047.0'to 472 or See precaution conerning Plume Direction)
Airsampler o Prepare sample head. (Install filter and cartridge.)
O Check samplers air flow within calibrated range.
RP Vehicle NOTE: Tbe crtecr switch location Is identified by a label stating "Power Inverter Switch".
oDC to AC inverter operational (air sampler chekd Sat)
O Fuel greater than full CARS 99802506 (mfteat tank locn red at Sorcs 1. Pump key on vehlcde key-,Isg)
HQTE: If fuel is needed In the field, contact The DAC to obtain the Logistcs Support Coord.
credit card number.
Routing: Original-FMT Page 2 of 5 ._ AITACHMMIT 1 File K171.0010 CA-#1547 WORKING COPY ISSUED 01/14/04 15:00:56 HRS