MONTHYEARML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) ML22361A0792022-12-27027 December 2022 Notification of NRC Baseline Inspection and Request for Information (05000374/2023001) IR 05000373/20220052022-08-22022 August 2022 Updated Inspection Plan for Lasalle County Station (Report 05000373/2022005; 05000374/2022005) IR 05000373/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000373/2021006 and 05000374/2021006) ML21292A1782021-10-19019 October 2021 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000373/2022010 ML21286A5852021-10-13013 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Lasalle County Station, Units 1 and 2 IR 05000373/20210052021-09-0101 September 2021 Updated Inspection Plan for Lasalle County Station, Units 1 and 2; Report 05000373/2021005 and 05000374/2021005 IR 05000373/20200062021-03-0404 March 2021 Annual Assessment Letter for Lasalle County Station Units 1 and 2 (Report 05000373/2020006 and 05000374/2020006) ML21048A0432021-02-16016 February 2021 County Station - Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information - Inspection Report 05000373/2021011 and 05000374/2021011 ML20364A2452020-12-29029 December 2020 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2021002; 05000374/2021002 ML20330A1892020-11-25025 November 2020 Request for Information for an NRC Post-Approval Site Inspection for License Renewal; Inspection Report 05000374/2021010 ML20321A0852020-11-16016 November 2020 Notification of NRC Baseline Inspection and Request for Information (05000374/2021001) IR 05000373/20200052020-09-0101 September 2020 Updated Inspection Plan for Lasalle County Station, Units 1 and 2 (Report 05000373/2020005 and 05000374/2020005) IR 05000373/20190062020-03-0303 March 2020 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2019006 and 05000374/2019006) ML20037B2352020-02-0606 February 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000373/2020012 and 05000374/2020012 ML19337E2062019-12-0303 December 2019 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000373/2020001; 05000374/2020001 (DRS-J.Neurauter) ML19309F8232019-11-0505 November 2019 Request for Information for an NRC Post-Approval Site Inspection for License Renewal; Inspection Report 05000373/2020010 IR 05000373/20190052019-08-28028 August 2019 Updated Inspection Plan for LaSalle County Station, Units 1 and 2 (Report 05000373/2019005 and 05000374/2019005) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000373/20180062019-03-0404 March 2019 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2018006 and 05000374/2018006) IR 05000373/20180052018-08-28028 August 2018 Updated Inspection Plan for Lasalle County Station, Units 1 and 2 (Report 05000373/2018005 and 05000374/2018005) IR 05000373/20170062018-03-0202 March 2018 Annual Assessment Letter for LaSalle County Station, Units 1 and 2; Report 05000373/2017006; 05000374/2017006 IR 05000373/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000373/2017005 and 05000374/2017005) ML17088A6242017-03-29029 March 2017 Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000373/2017008; 05000374/2017008 IR 05000373/20160062017-03-0101 March 2017 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2016006 and 05000374/2016006) IR 05000373/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for LaSalle County Station Units 1 and 2 (Report 05000373/2016005; 05000374/2016005) IR 05000373/20150062016-03-0202 March 2016 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Inspection Report 05000373/2015006 and 05000374/2015006) ML15324A2832015-11-19019 November 2015 Notification of NRC Baseline Inspection and Request for Information (Txb) IR 05000373/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2015005; 05000374/2015005) ML15162A9852015-06-10010 June 2015 Ltr. 06/10/15 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC License Renewal Inspection 05000373/2015008; 05000374/2015008 (Sns) ML15065A3202015-03-0606 March 2015 Notification of an NRC Triennial Heat Sink Performance Inspection - Request for Information Inspection Report 05000373/2015002; 05000374/2015002 IR 05000373/20140012015-03-0404 March 2015 Annual Assessment Letter for LaSalle County Station, Units 1 and 2, (Report 05000373/2014001; 05000374/2014001) ML15058A4152015-02-27027 February 2015 Request for Information MOD 50.59 ML14245A2312014-09-0202 September 2014 Mid-Cycle Assessment Letter for LaSalle County Station, Units 1 and 2 IR 05000373/20130012014-03-0404 March 2014 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2013001; 05000374/2013001) ML13324A3662013-11-20020 November 2013 ISI Request for Information Msh ML13246A2362013-09-0303 September 2013 2013 LaSalle County Station Mid-Cycle Letter Combined IR 05000373/20120012013-03-0404 March 2013 Annual Assessment Letter for LaSalle County Station, Units 1 and 2, (Report 05000373-12-001, 05000374-12-001) ML12249A4332012-09-0404 September 2012 Mid-Cycle Assessment Letter for LaSalle County Station, Units 1 and 2 IR 05000373/20110072012-03-0505 March 2012 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373-11-007 & 05000374-11-007) IR 05000373/20110062011-09-0101 September 2011 Mid-Cycle Letter for LaSalle County Station, Units 1 and 2, 05000373/2011-006; 05000374/2011-006 IR 05000373/20110012011-03-0404 March 2011 Annual Assessment Letter for LaSalle County Station, Units 1 and 2, (Report 05000373-11-001 and 05000374-11-001) ML1024400602010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - LaSalle County Station, Units 1 and 2 ML1006103552010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924402812009-09-0101 September 2009 LaSalle - Mid-Cycle Performance Review and Inspection Plan IR 05000373/20090012009-03-0404 March 2009 Annual Assessment Letter - LaSalle (05000373-09-001; 05000374-09-001) ML0824602802008-09-0202 September 2008 LaSalle, Units 1 and 2 - Mid-Cycle Performance Review and Inspection Plan IR 05000373/20080012008-03-0303 March 2008 EOC Annual Assessment Letter (Report 05000373-08-001; 05000374-08-001) 2023-07-06
[Table view] Category:Letter
MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis ML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 ML23181A1502023-06-30030 June 2023 Combined Response to Request for Additional Information and Supplemental Information in Support of LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel ML23171A9562023-06-12012 June 2023 Post Exam Ltr RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 ML23123A2202023-05-0303 May 2023 Relief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23121A1612023-05-0101 May 2023 Information Meeting (Open House) with a Question-and-Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ML23024A1372023-02-0303 February 2023 Request for Withholding Information from Public Disclosure for LaSalle County Station, Unit Nos. 1 and 2 ML23031A1972023-01-31031 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011 IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 2024-01-05
[Table view] |
Text
March 4, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
ANNUAL ASSESSMENT LETTER - LASALLE NUCLEAR POWER STATION (REPORT 50-373/04-01; 50-374/04-01)
Dear Mr. Crane:
On February 11, 2004, the NRC staff completed its End-of-Cycle plant performance assessment of the LaSalle Nuclear Power Station. The End-of-Cycle review for the LaSalle Nuclear Power Station involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period January 1, 2003, through December 31, 2003. This letter is to inform you of our assessment of your safety performance during this period. In addition, we are providing our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Overall, LaSalle Nuclear Power Station operated in a manner that preserved public health and safety. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).
Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2005.
The enclosed inspection plan details the inspections scheduled through September 30, 2005.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle review meeting. As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of Order implementation combined with newly developed portions of the security baseline inspection program.
C. Crane In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9757 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce L. Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosure:
LaSalle Inspection/Activity Plan See Attached Distribution
C. Crane In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9757 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce L. Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosure:
LaSalle Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\Branch TSS\EOC Ltrs\eoc 030404\LaSalle EOC ltr 2004.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME GWright/co BBurgess DATE 02/26/04 02/26/04 OFFICIAL RECORD COPY
C. Crane cc w/encl: Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission P. Nelson, Grundy County Board Chairman The Honorable Robert Eschbach The Honorable Raymond Schmitt B. Trego, Interim City Manager, Streator J. Lutz, County Emergency Management Coordinator/Director The Honorable David Yeck The Honorable Shirley Gielow The Honorable John Rzasa T. Templeton, LaSalle County Sheriff G. Dougherty, LaSalle County Board Chairman E. Tidd, LaSalle County Emergency Preparedness Coordinator The Honorable Donald Bolatto The Honorable Jeff Snyder The Honorable Mark Harlow INPO
C. Crane ADAMS Distribution:
AJM DFT DMS6 DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 DEK DRPIII DRSIII PLB1 JRK1
Page 1 of 2 Lasalle 03/03/2004 14:59:16 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - EP EXERCISE & PI VERIFICATION 3 1, 2 IP 7111401 Exercise Evaluation 03/08/2004 03/12/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/08/2004 03/12/2004 Baseline Inspections REMP - REMP INSPECTION 1 1 IP 7112203 Radiological Environmental Monitoring Program 05/03/2004 05/07/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 05/03/2004 05/07/2004 Baseline Inspections INSTRU - RADIATION PROTECTION INSTRUMENTATION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/16/2004 08/20/2004 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/16/2004 08/20/2004 Baseline Inspections SG BASE - SG BASELINE 2004 2 1, 2 IP 7113001 Access Authorization 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 7113002 Access Control 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 7113008 Fitness For Duty Program 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/16/2004 08/20/2004 Baseline Inspections HT SNK B - HEAT SINK BIENNIAL (DRS) 1 1, 2 IP 7111107B Heat Sink Performance 12/06/2004 12/10/2004 Baseline Inspections ACCESS - ACCESS CONTROL/ALARA 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/13/2004 12/17/2004 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/13/2004 12/17/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/13/2004 12/17/2004 Baseline Inspections FY 2005 - LASALLE INIT PREP 02/2005 3 1 W90114 OL - INITIAL EXAM - LASALLE - JAN/FEB 2005 01/31/2005 02/04/2005 Not Applicable ISI - UNIT 2 ISI INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 02/14/2005 02/18/2005 Baseline Inspections FPI - FIRE PROTECTION TRIENNIAL 3 1, 2 IP 7111105T Fire Protection 03/07/2005 03/25/2005 Baseline Inspections INSPECT - ACCESS CONTROL AND ALARA 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/14/2005 02/18/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/14/2005 02/18/2005 Baseline Inspections FY 2005 - LASALLE INIT EXAM 03/2005 3 1 W90114 OL - INITIAL EXAM - LASALLE - JAN/FEB 2005 02/28/2005 03/04/2005 Not Applicable 71114 - BASELINE EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 03/28/2005 04/01/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/28/2005 04/01/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Lasalle 03/03/2004 14:59:16 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - BASELINE EP INSP 1 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/28/2005 04/01/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/28/2005 04/01/2005 Baseline Inspections MAINT - BIENNIAL MAINTENANCE RULE INSPECTION 1 1, 2 IP 7111112B Maintenance Effectiveness 05/16/2005 05/20/2005 Baseline Inspections INSPECT - RETS LIQUID AND GASEOUS EFFLUENTS 1 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/06/2005 06/10/2005 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/06/2005 06/10/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/06/2005 06/10/2005 Baseline Inspections SSDI - LASALLE SSDI, MOD, 50.59 INSPECTION 6 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/27/2005 07/15/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/27/2005 07/15/2005 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 06/27/2005 07/15/2005 Baseline Inspections FPI - TRIENNIAL FIRE PROTECTION INSPECTION 3 1, 2 IP 7111105T Fire Protection 08/29/2005 09/16/2005 Baseline Inspections INSPECT - RADWASTE AND TRANSPORTATION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/12/2005 09/16/2005 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/12/2005 09/16/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/12/2005 09/16/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.