ML041130038

From kanterella
Revision as of 08:53, 18 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of the 15 April, 2004, Annual Assessment Meeting with Amergen for Oyster Creek Station
ML041130038
Person / Time
Site: Oyster Creek
Issue date: 04/21/2004
From: Eselgroth P
NRC/RGN-I/DRP/PB7
To:
Shared Package
ML040640839 List:
References
Download: ML041130038 (2)


Text

21 April 2004 MEETING

SUMMARY

LICENSEE: AMERGEN ENERGY COMPANY, LLC FACILITY: OYSTER CREEK NUCLEAR GENERATING STATION

SUBJECT:

SUMMARY

OF THE APRIL 15, 2004, ANNUAL ASSESSMENT MEETING WITH AMERGEN On April 15, 2004, at 7:00 p.m., an Annual Assessment Meeting was conducted at the Lacey Township Municipal Building in Forked River, NJ, between the Nuclear Regulatory Commission (NRC) and AmerGen. The NRC requested the meeting with AmerGen management to discuss the NRCs assessment of the safety performance of the Oyster Creek Nuclear Generating Station for calendar year 2003.

The NRC presented and discussed its assessment of the safety performance of Oyster Creek for the period between January 1 through December 31, 2003, as documented in our letter dated March 2, 2004. The NRC presentation included background on the Reactor Oversight Process (ROP), performance assessment results, an overview of calendar year 2004 planned inspections and oversight, and an overview of NRC Region I perspectives on industry deregulation. As part of this regulatory performance meeting, AmerGen stated they agreed with the NRC assessment of their performance at Oyster Creek and discussed planned areas for improvement.

Local officials, the press and numerous members of the public observed this public meeting and communicated with the NRC regarding AmerGens performance and the role of the agency in ensuring safe plant operations at the end of the meeting. The question and answer session with the public ran 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to accommodate all 22 individuals who desired to speak or ask questions after the meeting.

Sincerely,

/RA/

Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects

2 DOCUMENT NAME:C:\ORPCheckout\FileNET\ML041130038.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME RBarkley/PWE for PEselgroth/PWE DATE 04/21/04 04/21/04 04/ /04 04/ /04 04/ /04 OFFICIAL RECORD COPY