LER 80-031/03L-0:on 801015,pipe Support in Alternate Charging Header Found in Overstressed Condition Per IE Bulletin 79-14,Suppl 2.Caused by Faulty Installation. Modified Support & Returned Subsys to Svc
ML18139A828
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/13/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A827 List:
References
IEB-79-14, LER-80-031-03L-02, LER-80-31-3L-2, NUDOCS 8011180609
Download: ML18139A828 (2)


Text

e NRC°FORM 366 * . S. NUCLEAR REGULATORY COMMISSION r1-ni **

LICENSEE EVENT REPORT CONTROL BLOCK: .... I -----------~-----,,18 1 6 (PLEASE PRINT OR TYPE ALL REQUIRED INFORM.UJONl

[£Ii]

7 8 9 I vi AI s I PI s i 2 101 o Io I - Io Io Io Io Io I - Io Io 1014 11 11 111 11@1 I 10 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T ITEl 7 B

~~~~ Li©I oI s I o I o I o I 2 I s 11 !G)1 .1 I o I 1 I s I s I o 1©11 11 11 j 3 I s I o IG) 74 75 REPORT DATE 80 60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

[£ITI I With Unit 2 operating at 100% p:)wer, tili.e as built pipe support review by the

[£))] I Archit_ect .Engineer disclosed a pipe support in a .overs.tressed condition in the

~ alternate charging header.

[§JI) This event is re]?8rtable in accordance with I.E. Bulletin No. 79-14-Supplenent 2.

The health and safety of the p..lblic were not affecte::1.

[ffiJ 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

[ID] le IHI@ llu@ lsJ@) I s Iu I p IO I R I T 18 @_J@ LU@

7 *8 9 10 *11 12 13 18 19 20 SEQUENTIAL OCCUR REN CE REPORT REVISION 0.' LER/RO L-VE,NTYEAR REPORT NO. CODE TYPE NO.

\.!...:,J REPORT NUMBER 1 8 I o I Io I 3 11126 I/I Io I 3 29I ~ 1-l ~

. 21 22 23 24 27 28 30 31 32 ACTION TAKEN FUTURE ACTION EFFECT SHUTDOWN r.:;::;... ATTACH!,IENT 'I/PRD-4 PRIME COMP. COMPONE~'T ON PLANT METHOD HC:,URS ~ SuBMITTED

  • FORM $US .... SUPPLIER iltANUFACTUREF:

~@l-z.J@

.. ~ J4 w@

35 w l.QJ..Q; o, o, 36 37 40 LIJ@

41 142 N 1@ 1 43 A 1@ /D IO !1

. 4't J 4 47 l@

CAUSE DESCRIPTION A"ND CORRECTIVE ACTIONS @

I Pipe SJ.J:m;ort was not installe::1 as oer design resulting in . -;::rn overstressed condition.

ITID Isa] ate:3 the affecte::1 subsysteu ., -'1Tl()c'l_if i ro thP.

  • suorort and returned the ,affedtro J.,.

[ITIJ .I SJJbsvstATl to service.

ITITJ DTIJ 7 *8 9 80 FACILITY METHOD OF Q, STATUS  % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION d

.[}JI] u:J@ 11 ID ID '~~I~-~~-V_A~~~ lP_l@I...._c..z:u-c 12 44

__ hi_'t_ec_t_._En_g_m_*_ee_*_.r_Ana

__l_y_s_is _ _ _ _ ___,!

13 ~  % ~

. B ATIVJTY cci~TENT

  • RELEASED OF RELEASE AMOUNT OF ACTIVITY @ . LOCATION OF.RE.LEASE@

[2E ~@ W(§)I N/A N/A.

7 8 .S 10 . 11 44 45 BO

. PERSONNEL EXPOSURES ~

NUMBER (:;':;\ TYPE DESCRIPTION

[2TIJ *I O! 0 I O '~@...._________N_/_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _~

B 9 1] 12 13 80 PERSONNEL. INJURIES Q NUMBER DESCRIPTIONO

  • G:liJ I ol oI o11I.@ ' - , 2 - - - - - - - - - - - - -N/A 7 8 9 --------------------------6-'0 LOSS OF OR DAMAGE TO FACILITY '4:)\

TYPE DESCRIPTION V GTIJs s~@) ~ 1 0 : - - - - - - - - - - - - - - - -N/A -----------------------------' 60 PUBLICITY (:";;-\

ISSUEOQ DESCRIPTION~ 8 f) 1 NRC USE ONLY "'

IIITJe LNJe,l 9 . ' l 1 8 0~ N/A _ _ _ _ _ _ _ _ _ _ _ _....JsB 69I I I I 11 I I I -I I I I ~

1~0~--------------___;~o.!"--;...:..

. BO ;;

o.

0.

NAME OF P R E P A R E R - - - - - - - - - - - - - - - - - - PHONE:-------------

e ATTACHMEMT 1 SURRY POWER STATION, UNIT 2 DOCKET NO: 50-281 REPORT NO: 80-031/031-0 EVENT DATE: 10-15-80 TITLE OF REPORT: PIPE SUPPORT IMPROPERLY INSTALLED

1. DESCRIPTION OF EVENT:

With Unit 2 operating at 100% power, the final as-built review of supports in-stalled as -a result of IE Bulletin 79-14, showed an overstressed pipe -support in the alternate charging system (4-CH-389, FC-1298A). This event is reportable as per IE Bulletin No. 79-14-Supplement 2.

2. PROBABLE CONSEQUENCES AND.STATUS OF REDUNDANT SYSTEMS:

The overstressed support could.result in a pipe support failure, and pipe overstressed condition. Since this sub system (alternate charging system) was isolated upon notification *of a possible overstress condition, the health safety of the public were not affected.

3. CAUSE OF EVENT:

The pipe support was not ~nstalled as per.design requirements.

4. IMMEDIATE CORRECTIVE ACTION:

Isolated the alternate charging header by closing MOV':'"2287A, B, and C.

5. SUBSEQUENT CORRECTIVE ACTION:

Corrective action was taken to modify the supports in accordance with pre-liminary design drawings . .These modifications were completed within the same day as the notification of an overstressed condition.

  • The alternate charging header was returned to service after completing the modification.
6. ACTION TAKEN . TO PREVENT RECURRENCE:

None required.

7.
  • GENERIC IMPLICATIONS:

This is .part of a continuing effort as required by TE Bulletin 79-14.