Category:Inspection Plan
MONTHYEARIR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter IR 05000498/20220062023-03-0101 March 2023 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2022006 and 05000499/2022006) ML22343A1172022-12-12012 December 2022 Notification of an NRC Protection South Texas Project - Baseline Inspection (NRC Inspection Report) 05000498/2023010 and 05000499/2023010) and Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22230C9442022-08-23023 August 2022 Mid-Cycle Planning Letter- Final ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information IR 05000498/20210062022-03-0202 March 2022 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2021006 and 05000499/2021006) ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21230A3932021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21172A2852021-06-21021 June 2021 Information Request, Security IR 2021402 ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21161A1552021-06-0909 June 2021 Notification of Inspection and Request for Information South Texas Project Unit 1 IR 05000498/20200062021-03-0303 March 2021 Annual Assessment Letter (Report 05000498/2020006 and 05000499/2020006) IR 05000498/20200052020-09-0101 September 2020 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2020005 and 05000499/2020005) ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20055E1112020-03-0303 March 2020 STP 2019006 Annual Assessment Letter ML20056D6952020-02-25025 February 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2020002 and 05000499/2020002) and Request for Information ML19295C4822019-10-21021 October 2019 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2020011 and 05000499/2020011) and Request for Information ML19266A5972019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000498/2019004 and 05000499/2019004) and Request for Information IR 05000498/20190052019-08-30030 August 2019 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2, Report 05000498/2019005 and 05000499/2019005 IR 05000498/20180062019-03-0404 March 2019 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2018006 and 05000499/2018006) ML18344A5772018-12-10010 December 2018 Notification of NRC Design Bases Assurance Inspection (05000498/2019010 and 05000499/2019010) and Initial Request for Information IR 05000498/20180052018-09-10010 September 2018 Errata - Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) ML18234A4182018-08-31031 August 2018 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) IR 05000498/20170062018-03-0101 March 2018 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2017006 and 05000499/2017006) IR 05000498/20170052017-08-28028 August 2017 Updated Inspection Plan (Reports 05000498/2017005 and 05000499/2017005) IR 05000498/20160062017-03-0101 March 2017 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (05000498/2016006 and 05000499/2016006) IR 05000498/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2016401 and 05000499/2016401) ML16237A0602016-08-31031 August 2016 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005) IR 05000498/20150062016-03-0202 March 2016 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015006 and 05000499/2015006) ML16007A7372016-01-0707 January 2016 Notification of Design Bases Inspection (Programs) (Inspection Report 05000498/2016008 and 05000499/2016008) and Initial Request for Information IR 05000498/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2015401 and 05000499/2015401) IR 05000498/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015005 and 05000499/2015005) ML15196A5472015-07-15015 July 2015 Notification of Inspection (IR 05000498/2015004 and 2015004/05000499/2015004) and Request for Information ML15160A4112015-06-0808 June 2015 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2015003 and 05000499/2015003) and Request for Information ML15098A2842015-04-0707 April 2015 Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information IR 05000498/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402) IR 05000498/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2014006 and 05000499/2014006) ML14098A1722014-04-0808 April 2014 IR 05000498-14-008 and 05000499-14-008, South Texas Project Nuclear Power Plant, Units 1 & 2, Notification of an NRC Triennial Fire Protection Baseline and Request for Information IR 05000498/20130012014-03-0404 March 2014 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2013001 and 05000499/2013001) IR 05000498/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2013006 and 05000499/2013006) ML13127A1662013-05-0707 May 2013 IR 05000498-13-405, 05000499-13-405, on 07/09 to 07/10/2013, South Texas Project Electric Generating Station - Notification of TI-186 Inspection IR 05000498/20128012013-03-0404 March 2013 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 & 2 (IR 05000498-12-801 and 05000499-12-801) IR 05000498/20120062012-09-0404 September 2012 Mid-Cycle 2012 Report (IR 05000498-12-006 and 05000499-12-006) ML1124306422011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station - Unit 1 and 2 ML1106107322011-03-0404 March 2011 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 & 2 ML1024403912010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station 2024-01-18
[Table view] Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
See also: IR 05000498/2019004
Text
September 23, 2019
Mr. G. T. Powell
President and CEO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000498/2019004 AND 05000499/2019004) AND
REQUEST FOR INFORMATION
Dear Mr. Powell:
During the week of November 18, 2019, two inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at South Texas Project, Units 1 and 2, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. To minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into three groups:
- The first group (Section A of the enclosure) identifies information to be provided prior to
the inspection to ensure that the inspectors are adequately prepared.
- The second group (Section B of the enclosure) identifies the information the inspectors
will need upon arrival at the site.
- The third group (Section C of the enclosure) identifies the items which are necessary to
close out the inspection and are usually sent a few weeks after the inspectors have left
the site.
It is important that all these documents are up-to-date and complete to minimize the number of
additional documents requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Wendy Brost of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector Kelly Clayton, at (817) 200-1216
(Kelly.Clayton@nrc.gov).
G. Powell 2
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Clyde Osterholtz Acting for/
Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
Enclosure:
Initial Request for Information
Biennial Requalification Inspection
Initial Request for Information
Biennial Requalification Inspection
South Texas Project, Units 1 and 2
Inspection Report: 05000498/2019004 and 05000499/2019004
Inspection Dates: November 18-22, 2019
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector: Kelly Clayton, Senior Operations Engineer
A. The following information is requested to support inspection preparation activities.
These items are listed by section as they appear in the inspection module (i.e. 03.04a,
03.04b, etc.). Requested materials should be sent in an electronic format on CD/DVD
to arrive at the Region IV office no later than October 18, 2019.
- CD/DVD to: US Nuclear Regulatory Commission, Region IV
ATTN: Kelly Clayton
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
- List of licensed operators (SRO & RO) by crew (operating & staff)
- Training and Operations Department organization charts (with qualified LOR
evaluators identified)
- Procedures that identify process for revising and maintaining LOR continuing training
program up-to-date
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR
program since last BRQ
- Audits and/or self-assessment reports addressing the licensed operator
requalification training program
- Last 2 years of Simulator Review Committee (or equivalent) meeting minutes
- Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
- A summary report of all condition reports related to operator actions/errors in the
control room
Enclosure
- Any revised requalification training that was based on licensed operator performance
issues
03.04a: Biennial Requalification Written Examinations
- The current and approved biennial written examination schedule
- The current requalification cycle written examination results for both SRO & RO that
have already been administered up to the week prior to the inspectors arrival onsite.
- All written examinations that have been approved for administration up to and
including the week before the inspectors are onsite. This will need to have adequate
password protection or double envelope protection if mailed via regular mail per
NUREG-1021.
- The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
- The schedule for the operating tests (JPMs & scenarios) to be given the week of
November 18, 2019 (week inspectors are onsite)
- The operating tests (JPMs & scenarios) (password protected and provide separately
via telephone at later date) to be given the week of November 18, 2019.
- Current requalification cycle operating tests (SRO & RO) and results up to the week
prior to the inspection inspectors arrival onsite
- All 2018 NRC required annual operating tests
- Current requalification cycle operating test methodology (sample plan)
03.04c: Administration of an Annual Requalification Operating Test
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
- Submit any tracking tools that you use to prevent excessive overlap on the written
examinations and meet the intent of sampling all required topics on a periodic basis.
- Submit any tracking tools that you use to prevent excessive overlap on the operating
tests and meet the intent of sampling all required malfunctions (including major
events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
2
- All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
- List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
03.04e: Remedial Training and Re-Examinations
- List of remedial training conducted or planned since last requalification exam
(includes training provided to operators to enable passing requalification exam and
training provided to correct generic or individual weaknesses observed during
previous requalification exam cycle)
- Remediation plans (lesson plans, reference materials, and attendance
documentation)
03.04f: Operator License Conditions
- All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
03.04g: Control Room Simulator
- All simulator management and configuration procedures if not already provided
- Simulator discrepancy report summary list for all open discrepancy reports and
summary list for those items closed since October 20, 2017
- Primary parameters tested to verify core physics parameters (such as moderator
temperature coefficient, integral rod worth). The applicable reference graphs from
the plant physics data book (electronic or other means as available) should also be
included as well as the test procedures used and the acceptance criteria with results.
- All simulator modification packages that are on hold, delayed, or not completed in the
last 2 years
- A list of simulator modification packages completed in the last two-year window
3
B. The following information is requested to support the onsite inspection activities.
Requested materials should be available to the inspectors, either electronically or
hardcopy, upon site arrival on November 18, 2019.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
Exam and Annual Requalification Operating Tests Quality
- All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
onsite week, if available
- All results up to the day the inspectors leave the site
03.04f: Conformance with Operator License Conditions
- Access to licensed operators records (operating and staff crews)
- Access to licensed operators training attendance records
- Access to licensed operators medical records
03.04g: Control Room Simulator Performance
- Simulator discrepancies from October 20, 2017, to November 18, 2019. This should
include all open and closed simulator discrepancy reports, including the
documentation/justification for closure.
- Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant
- All current model deficiencies, including FSAR vs design differences in the simulator
(any documentation on this)
- Summary list of modifications from October 20, 2017
- Plant modifications (both hardware and software) completed on the simulator by due
date from October 20, 2017, to November 18, 2019
- Simulator differences lesson plan used in training (current to November 18, 2019)
- The complete book of all simulator annual performance test packages (usually in a
single book but may be electronic or in single test packages), complete with all
transient tests, steady state tests, and malfunction tests. This should also include
the test procedures for each test, the acceptance criteria, and results. For each
transient test, the reference chart should be included or an equivalent subject matter
expert review versus the simulator results with a write-up for any differences beyond
the ANSI standard requirements.
- All test packages used to verify core physics parameters (such as moderator
temperature coefficient and integral rod worth). The applicable reference graphs
4
from the plant physics data book (electronic or other means as available) should also
be included as well as the test procedures used and the acceptance criteria with
results.
- All simulator tests, configuration management, and related documents available in
the room for inspectors to review. This includes training needs analysis packages,
Simulator Review Committee meeting minutes, etc.
- Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. The South Texas Project, Units 1 and 2, is required to send the final results summary
(see Table 1 below) and any remaining exams and operating tests that have not been
reviewed to the regional office lead inspector for this inspection for final review and
comparison against the Significance Determination Tools to communicate the exit
results for the inspection.
TABLE 1: EXAMINATION RESULTS
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification
examination required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator
scenario failures).
4. Divide line 3 by line 2 to obtain the individual requalification
examination failure rate. Line 3/Line 2. %
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a).
6. Number of crews who performed unsatisfactorily on the
simulator scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario
failure rate. Line 6/Line 5. %
5
ML19266A597
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: KDC Yes No Publicly Available Sensitive NRC-002
OFFICE SOE:DRS/OB BC:DRS/OB
NAME KClayton GWerner
SIGNATURE /RA/ /RA CCO for/
DATE 09/18/2019 09/23/2019