Email: (PA-LR) Entergy Nuclear Cultural Resources Protection Plan
ML063340227
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/02/2006
From: Buckley R
Entergy Nuclear
To: Emch R
Office of Nuclear Reactor Regulation
References
%dam200612, EN-EV-121, TAC MD2297
Download: ML063340227 (15)


Text

[ýRich,ý Emch- Entergy Nuclear Cultural R Paoe 111 From: "BUCKLE) , RICKY N" <RBUCKLE@entergy.com>

To: "Rich Emc h " <RLE@nrc.gov>

Date: 11/02/200E31:43:31 PM

Subject:

Entergy NLiclear Cultural Resources Protection Plan Rich, Attached is Entergy Nuclear's fleet procedure EN-EV-121 (Cultural Resources Protection Plan) that will be effective across the fleet on November 3, 2006, with the exception of Arkansas Nuclear One (ANO).

The procedure will be effective at ANO on January 1, 2007 to allow their site time to covert from an existing site procedure to this fleet procedure.

If you have any questions, please don't hesitate to call me.

Thanks, Rick Buckley, CHMM, REM Sr. Project Manager Entergy Nuclear 601-368-5372 (Office) 601-927-5132 (Cellular) 601-368-5799 (Fax) rbuckle@entergy.com CC: "YOUNG, GARRY G" <GYOUNG4@entergy.com>, "Metell, Mike"

<hmetell @entergy.com>, "Brochu, Jill" <JBroc94 @ entergy.com>, "DeWald, Lynn"

<Idewald @entergy.com>

1ýc:\tempr\GW)00001.TMP Page 111 c:\ternp\GW }OOOi .Tr'AP~ Page 1 Mail Envelope. Properties (454A3C3F.BOB : 4 6923)

Subject:

Entergy Nuclear Cultural Resources Protection Plan Creation Date 11/02/2006 1:42:21 PM From: "BUCKLEY, RICKY N" <RBUCKLE@entergy.com>

Created By: RBUCKLE@entergv.com Recipients nrc.gov OWGWPOO2.HQGWDO01 RLE (Richard Emch) entergy.com ldewald CC (Lynn DeWald)

JBroc94 CC (Jill Brochu) hmetell CC (Mike Metell)

GYOUNG4 CC (GARRY G YOUNG)

Post Office Route OWGWPO02.HQGWDO01 nrc.gov entergy.com Files Size Date & Time MESSAGE 609 11/02/2006 1:42:21 PM TEXT.htm 4405 EN-EV-121 _Cultural Resources_.pdf 43228 Mime.822 67578 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User

c:\temIp\GW}00001.TMP Page 2J Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Title:

Cultural Resources Protection Plan Procedure Owner: Rick N. Buckley / Corporate Environmental Chairman (Print Name / Title)

Approved: 11/01/06 (Procedure Owner Signature) (Date)

EN Common - 11/03/06 ANO 01/01/07 PNPS ENN Efeciv ECH RBS Effective ENS El

___Date Effective GGNS VY_

.Date Exception IPEC W3 JAF WPO Procedure Contains NMM REFLIB Forms: YES E. NO []

Basis Statement This procedure provides a mechanism for protecting historical and archaeological areas located on Entergy's nuclear site properties.

Site and NMM Procedures Cancelled or Superseded By This Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Program will be cancelled.

Process Applicability Exclusion (ENN-LI-1 00) / Programmatic Exclusion (ENS-LI-1 01)

All Sites: Z Specific Sites: ANO F] GGNS El IPECLI JAF El PNPS-- RBS El VY El W3 El

TABLE OF CONTENTS Section Title Page 1.0 PUR PO SE ............................................................................. 3

2.0 REFERENCES

..................................................................... 3 3.0 DEFINITIONS ...................................................................... 4 4.0 RESPONSIBILITIES .............................................................. 5 5.0 D ETA ILS ...................................... ............................................ 5 5.1 Precautions and Limitations ..................................... 5 5.2 Land Disturbance of Undisturbed Areas .................... 5 5.3 Modification/Remodeling of Cultural Resource S tructures .............................................................. .. 6 5.4 Routine Surveillances .............................................. 7 5.5 Special Protection Measures ........................................ 8 5 .6 Re co rds ........................................ ...................... 8 6.0 INTERFACES ....................................................................... 9 7.0 RECO RDS ........................................................................... 9 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES ........................................................ 9 9.0 ATTACHMENTS ................................................................... 9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL) ....................................................................... 10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/

REMODELING REVIEW FORM (TYPICAL) ............................. 12

1.0 PURPOSE

[1] Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.

2.0 REFERENCES

[1] Regulatory References (a) National Historic Preservation Act (and amendments)

[2] Company References (a) NMM Procedure EN-EV-1 15. Environmental Reviews and Evaluations (b) NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities

[3] ANO References (a) FTN Letter No. 6045-061, "Cultural Resources Issues, ANO (b) Commitment 1CAN090005, Reference P-17051, "Develop an administrative level environmental procedure to provide additional control over future land disturbances at ANO site"

[4] JAF References (a) Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)

[5] PNPS References (a) Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)

[6] VYNPS References (a) 30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good

NUCLEAR NON-QUALITY RELATED EN-EV-121 REV.0

-En*tergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 4 OF 12 Cultural Resources Protection Plan 2.0 cont (b) Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)

[7] W3 References (a) W3 Cultural Resources Protection Plan 3.0 DEFINITIONS

[1] Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).

[2] Cultural Resources - Resources that include but are not limited to:

(a) Cemeteries, burial sites, funeral monuments, or other sites with human remains (b) Historic buildings, structures, or building remains (c) Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d) Ritual artifacts (e) Discarded materials (i.e. Indian mounds with shells and animal bones)

(f) Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.

(g) Traditional cultural properties.

[3] Land-Disturbing Activities - Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.

[4] Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site or during current operations, or if there is uncertainty at the site about the degree of disturbance.

4.0 RESPONSIBILITIES

[1] Entergy Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.

[2] Site Environmental Representatives - are responsible for:

(a) Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.

(b) Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SHPO, operating license conditions or site reporting procedures.

[3] Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.

[4] Contract Managers and Contractors - are responsible for complying with Sections 5.1 through 5.3 of this procedure.

5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS

[1] Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeological artifact and the SHPO notified for guidance prior to re-commencing land disturbing activities.

5.2 LAND DISTURBANCE OF UNDISTURBED. AREAS NOTE If the land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.

[1] Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:

5.2 cont (a) Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.

(b) Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c) Adhere to the management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.

[2] Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:

(a) Contact SHPO for activities that may affect existing or potentially existing cultural resources.

(b) Complete Section B of the Form and if applicable Section C.

(c) If approved, return a copy of the completed Form to the requester.

(d) If not approved, notify the requestor of the reasons for denying the approval.

(e) Maintain copies of the required documents on file.

(f) Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.

(g) Ensure that mitigation measures are implemented as appropriate.

5.3 MODFICATION/REMODELING OF CULTURAL RESOURCE STRUCTURES

[1] Site Departments, Contract Managers and Contractors, for activities involving modifications/remodeling to cultural resource structures are to:

(a) Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Remodeling Review Form) and forward to the Site Environmental Representative for review.

5.3 cont (b) Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c) If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Remodeling Review Form).

[2] Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Remodeling Review Form) is to:

(a) Contact SHPO to inform them of the activity.

(b) Complete Section B of the Form and if applicable Section C.

(c) If approved, return a copy of the completed Form to the requester.

(d) If not approved, notify the requestor of the reasons for denying the approval.

(e) Maintain copies of the required documents on file.

(f) Conduct periodic visual observations of the area to ensure that any management requirements imposed by SHPO are followed.

(g) Ensure that mitigation measures are implemented as appropriate.

5.4 ROUTINE SURVEILLANCES

[1] The Site Environmental Representative should:

(a) Conduct periodic environmental rounds to ensure that no unauthorized activities occur that could damage existing or potentially existing culturally protected resources.

(b) Notify the SHPO and the NRC if ground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SHPO or site reporting requirements.

(c) Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.

5.5 SPECIAL PROTECTION PROCEDURES

[1] Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPO or site procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:

" A description of the proposed activity.

" Description for the need for the activity.

" A map showing the location of the planned activity in relation the culturally protected areas.

" A demonstration for the'need to perform the activity within the culturally protected area.

[2] The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.

5.6 RECORDS NOTE If the cultural resources review is performed as a result of an EN-EV-1 15 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.

[1] Site Environmental Representative should maintain the following documents on file:

(a) Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).

(b) Completed Cultural Resource Structure Modification/Remodeling Review Forms (Attachment 9.2 to this procedure).

(c) Conversation and correspondence records involving the State Historic Preservation Office and/or NRC.

(d) Records of modification/remodeling activities associated with cultural resource structures.

6.0 INTERFACES

[1] NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities

[2] NMM Procedure EN-EV-1 15, Environmental Reviews and Evaluations 7.0 RECORDS None 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1 OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2 SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3 SITE SPECIFIC COMMITMENTS Step Site Document Commitment Number or Reference

[1] ANO 1CAN090005 P-17051 9.0 ATTACHMENTS

. 9.1 Land Disturbance Environmental Review Form (Typical) 9.2 Cultural Resource Structure Modification/Remodeling Review Form (Typical)

SEnteyA ENUCLEAR NON-QUALITY RELATED EN-EV-121 REV.0

- Etery MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 1 of 2 A. Land Disturbance Activity

1. Brief Description of Activity:
2. Amount of Land Involved:

<1 Acre 1 - 5 Acres

>5 Acres

3. Location of Affected Land Area (attach map also):
4. Expected Duration of Activity:

B. Environmental Review

1. Consultation with the State Historic Preservation Office Required: LI Yes [] No
2. SHPO Protection Measures Imposed: F] Yes E] No LI Not Applicable
3. Existing historical or archaeological sites: LI Yes LI No
4. Visual Walk-down of Land Area Required: LI Yes LI No
5. Date(s) of Visual Walk-down:
6. Potential historical or archaeological site(s) Identified during Walk-down:

EL Yes LI No El Not Applicable

ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 2 of 2 C. Required Management Practices Management Practice(s) Yes No NA Stop the activity if a potential historical or archaeological ED El EL site is discovered or if an existing site is damaged.

Notify the Site Environmental Representative El El EL immediately in the event that a potential historical or archaeological site is discovered during the land disturbance activity.

In the event that a potential historical or archaeological LI El LI artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.

Place a protective barrier around existing historic or LI EL E]

archaeological site(s).

Notify the Site Environmental Representative LI LI LI immediately in the event that an existing historical or archaeological site is damaged during the land disturbance activity.

Remarks: Potential evidence that a historical or archaeoloqical site may exist would be the presence of Pottery, qlass, arrowhead, bones, tools, weaponry, wooden or metal structures, flakes, brick, mortar or plaster.

SHPO Protective Measures:

Approved By: I Date Signature Date

NUCLEAR NON-QUALITY RELATED EN-EV-121 REV.0 Entergy

- MANAGEMENT MANUAL INFORMATIONAL USE PAGE 12 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/REMODELING REVIEW FORM (TYPICAL)

SHEET 1 of 1 A. Modification/Remodeling Activity

1. Description of Activity:

.2. Expected Duration of Activity:

B. Environmental Review

1. SHPO Contacted: F-1 Yes El No
2. Date SHPO Contacted:
3. SHPO Protective Measures Imposed: [] Yes El No C. SHPO Protective Measures (if applicable)

Approved By: I Signature Date