ML102670754

From kanterella
Revision as of 18:17, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

ME2139 - Kewaunee - ITS Conversion - State Consultation e-mail
ML102670754
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 09/23/2010
From: Feintuch K
Plant Licensing Branch III
To:
State of WI, Public Service Commission
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
TAC ME2139
Download: ML102670754 (2)


Text

From: Feintuch, Karl Sent: Thursday, September 23, 2010 8:04 PM To: 'jeff.kitsembel@psc.state.wi.us' Cc: Feintuch, Karl; Cusumano, Victor

Subject:

ME2139 (Kewaunee) ITS Conversion - 10CFR50.91(b) State Consultation September 23, 2010 To: State Liaison Official Jeff Kitsembel Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 jeff.kitsembel@psc.state.wi.us 608-266-9658 I am Karl Feintuch and am a Project Manager with the Division of Operating Reactor Licensing in the U.S. Nuclear Regulatory Commissions Office of Nuclear Reactor Regulation.

Specifically, I coordinate licensing actions for the Kewaunee Power Station. I acquired this assignment from my direct predecessor, Peter Tam, at the end of June of this year.

This message documents a call placed to you at approximately 3:00 PM, Central Time, on September 23, 2010, to advise you of a licensing action that we are processing. My communication to you is in accordance with 10CFR50.91(b), State Consultation. You need not respond to this message, but if you wish to comment or seek clarification of this message, please reply to this email or contact me at 301-415-3079.

My contact with you will be cited in the licensing and environmental assessment documents to be issued in support of the licensing action, an amendment to the Kewaunee Power Station license identified by the primary Task Assignment Control (TAC) No. ME2139 and subordinate TAC numbers, omitted here for conciseness, which will appear in the final documentation.

By letter dated Aug 24, 2009 (Agencywide Documents and Management System (ADAMS)

Accession No. ML092440398), as supplemented, Dominion Energy Kewaunee (DEK, the licensee) requested changes to the technical specifications (TS) for the Kewaunee Power Station (KPS). The proposed changes would revise the current technical specifications (CTS) to the improved technical specifications (ITS). We identify this type of licensing action as an ITS Conversion.

The issued documentation for TAC ME2139 will provide detailed information on the requirements, documents and processes that were reviewed and affected by the ITS Conversion at Kewaunee Power Station. NUREG 1431, Revision 3.0, Standard Technical Specifications - Westinghouse Plants., (accessible for review via ADAMS Accession No. ML062510073), as modified in the course of processing this licensing action, provides a comprehensive view of the breadth of affected requirements, systems and processes.

Further useful information can be obtained about ITS Conversions from the NRCs public web site: www.nrc.gov by entering the search term improved technical specifications (including quotation marks) into the Google Custom Search window at the upper right corner of the NRC home page.

Sincerely, Dr. Karl D. Feintuch Project Manager Licensing Branch LPL3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC E-mail Properties Mail Envelope Properties (26E42474DB238C408C94990815A02F0911C8E24F39)

Subject:

ME2139 (Kewaunee) ITS Conversion - 10CFR50.91(b) State Consultation Sent Date: 9/23/2010 8:03:30 PM Received Date: 9/23/2010 8:03:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:

jeff.kitsembel@psc.state.wi.us ('jeff.kitsembel@psc.state.wi.us')

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Victor.Cusumano@nrc.gov (Cusumano, Victor)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 12437 9/23/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: