ML111680256

From kanterella
Revision as of 20:24, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2011 Point Beach Nuclear Plant Initial Examination Miscellaneous Correspondence
ML111680256
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/25/2011
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Shared Package
ML111640664 List:
References
Download: ML111680256 (23)


Text

2011 POINT BEACH NUCLEAR PLANT INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLtNlOlS60532-4352 April 20, 2011 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Meyer:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Point Beach Nuclear Plant.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Douglas Lauterbur, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC will administer the written examinations and operating tests in accordance with Revision 9,Supplement I, of NUREG-I021, Operator Licensing Examination Standards for Power Reactors, during the weeks of April 25 and May 2,201 1. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, 1 have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Dell R. McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination andlor operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents

L. Meyer Access and Management System (ADAMS), accessible from the NRC Web site at html (the Public Electronic Reading Room).

http://www.nrc.sov/readinq-rdadams.

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ

L. Meyer Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readina-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLp13-IResource RidsNrrPMPointBeach RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: POI M-11 DRS OL EXAM APPROVAL.DOCX Sensitive Non-Sensitive

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I l l 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 14,201 1 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Meyer:

In conversation on January 20,201 1, between Mr. R. Amundson and Mr. D. McNeil, arrangements were made for the administration of licensing examinations at the Point Beach Nuclear Power Plant during the weeks of April 25 and of May 2, 201 1. In addition, the NRC will make an examination validation visit to your facility the week of April 4, 201 1.

As agreed during the telephone conversation, the staff of the U. S. Nuclear Regulatory Commission (NRC) will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will be given the opportunity to review the examinations during the week of April 4, 201 1.

To meet the above schedule, it was necessary for your staff to furnish the reference materials identified in Attachment 3 to ES-201 by December 15, 2010. Your staff has provided the required reference material.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g. , system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090),medical certifications (OMB approval number 31550-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

L. Meyer This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlNPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.aov/readinq-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Amundson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 DISTRIBUTION:

See next page

L. Meyer This letter contains information collections that are subject to the Papenvork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.clov/readinn-rm/adams.html(the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Amundson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9707.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\POI 021411 DRS OL.docx OFFICE Rlll Rlll I NAME DMcNeil:co HPeterson DATE 02/14/11 02/14/11 OFFlClAL RECORD COPY

Letter to Larry Meyer from Hironori Peterson dated February 14, 201 1.

SUBJECT:

POINT BEACH NUCLEAR PLANT CONFIRMATION OF INITIAL LICENSE EXAMINATION cc: Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-I Resource RidsNrrPMPointBeach RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale

f UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

~

February 19,2010 Mr. Larry Meyer Site Vice-president NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

POINT BEACH NUCLEAR PLANT

Dear Mr. Meyer:

In a letter dated August 17,2009, (NRC 2009-0083), your staff responded to the NRCs Regulatory Issue Summary (RE) 2009-11, and requested we schedule initial operator license examinations in April 2011, May 2012, and in May 2013, at the Point Beach Nuclear Plant.

We have scheduled the examination requested to be conducted in April 2011 to begin the week of April 26, 2011. For the examination requested in May 2012, we have re-scheduled the examination you previously requested for February 2012 to an examination beginning the week of May 7, 2012. For the examination requested in May 2013, we have schedule the examination to begin the week of May 13, 2013. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We have discovered it will be necessary for the NRC examiners to develop the written and operating test to be administered during the April 2011 initial license examination. The NRC chief examiner assigned to that examination has already contacted your initial license operator training program supervisor and explained our need to develop the examination. We understand your staff will develop the examinations scheduled during 2012 and 2013. Each of the scheduled examinations was scheduled for two weeks because your letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of applicants declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Point Beach Nuclear Plants Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

I t L. Meyer In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.nov/readina-rm/adams.html (the Public Electronic Reading Room).

V Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ

L. Meyer In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-I Resource RidsNrrPMPointBeach RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak OFFICE RIII:DRS & RIII:DRS I \5 RIII:DRS IN I NAME JKweiser:co$oG DMcNeil HPeterson / A DATE 0243 /IO "' 021ts /I0 02+q / I O 7Jy

October 20, 2008 Mr. Larry Meyer Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFlCAT1ON OPERATOR LICENSE EXAMINATIONS: POINT BEACH NUCLEAR PLANT

Dear Mr. Meyer:

In a letter dated July 28, 2008 (NRC 2008-0055), your staff requested we schedule initial operator license examinations in May 2009 and in February 2012 at the Point Beach Nuclear Plant. We have scheduled the examination requested to be conducted in May 2009 to begin the week of May 4,2009. We have scheduled the examination requested for February 2012 to begin the week of February 13, 2012. Your staff also requested an examination be scheduled during February 201 1. This request is actually a change request to move a previously scheduled examination from May 201 1 to February 2011. Unfortunately, we are unable to accommodate the examination requested in February 2011 due to a heavy examination load.

After discussing available examination weeks, Mr. M. Durbin of your staff notified Mr. D. McNeil, NRC Senior Operations Engineer, that the proposed examination start week of March 21, 2011, would be acceptable examination start week. Therefore, an examination has been scheduled for the Point Beach Nuclear Plant beginning the week of March 21, 201 1. On-site validation of each of these examinations will occur approximately three weeks before the start of the examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examination unless we determine it is necessary for the NRC to write the examination. Each of the scheduled examinations was scheduled for two weeks because your letter indicated each examination has more than nine applicants taking the examinations. Please inform us if the number of candidates for an examination declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the Point Beach Nuclear Plants Training Department approximately 120 days prior to the initial examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program.

-~

L. Meyer We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111. I 1) for the week of August 31, 2009. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalificationtraining program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/reading-rm/adams.html.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: M.Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Executive Vice President, Nuclear and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney M. Warner, Vice President, Nuclear Plant Support M. Gettler, Vice President, New Nuclear Projects W. Maher, Licensing Director, New Nuclear Projects T. 0. Jones, Vice President, Nuclear Operations, Mid-West Region P. Wells, (Acting) Vice President, Nuclear Training and Performance improvement J. McCarthy, Vice President, Point Beach Recovery J. Bjorseth, Plant General Manager K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

L. Meyer We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.I1) for the week of August 31, 2009. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/readiniq-rm/adams.html.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Executive Vice President, Nuclear and Chief Nuclear Officer A. Khanpour, Vice President, Engineering Support Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney M. Warner, Vice President, Nuclear Plant Support M. Gettler, Vice President, New Nuclear Projects W. Maher, Licensing Director, New Nuclear Projects T. 0. Jones, Vice President, Nuclear Operations, Mid-West Region P. Wells, (Acting) Vice President, Nuclear Training and Performance Improvement J. McCarthy, Vice President, Point Beach Recovery J. Bjorseth, Plant General Manager K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer DISTRIBUTION See next page SEE PREVIOUS CONCURRENCES OFFICE RIII:DRS I RIII:DRS RIII:DRS I NAME JKweiser:cco DMcNeil HPeterson DATE 10/02/08 10/02/08 10/20/08

Letter to Larry Meyer from Hironori Peterson, dated October 20, 2008

SUBJECT:

CONFIRMATION OF INITIAL/REQUALIFlCAT1ON OPERATOR LICENSE EXAMINATIONS: POINT BEACH NUCLEAR PLANT DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMPointBeach RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak

/

tYA0 //

EN? POINT BEACH July 20, 2010 NRC 2010-0115 RIS 2010-08 US. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Renulatorv Information Summarv 2010-08, "PreDaration and Schedulinn of Operator Licensing Examinations" On June 28,2010, the NRC issued Regulatory Issue Summary (RIS)2010-08. RIS 2010-08 requests that each licensee provide an update of operator licensing examination information for calendar years 2011 through 2014.

The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units land 2.

During recent routine communications with representatives of the Region 111 Operator Licensing Branch regarding examination scheduling, it was requested that NextEra formalize the proposed changes. The changes are:

I . Release the May 2012 examination date Site Validation week of November 12, 2012 Examinations during the weeks of December 3 and 10,2012

2. Release the May 2013 examination date Site Validation week of October 28, 2013 Examine the weeks of November 18 and 25,2013 If there are questions associated with the content of the enclosures, please contact Mr. Douglas Lauterbur, Point Beach Nuclear Plant Training Manager, at 920R55-7791.

Very truly yours, NextEra Energy Point Beach, LLC d&d Licensing Manager zsnr Enclosure cc: Administrator, Region 111, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

I NRC FORM 536 U.S. NUCLEAR REGULATORYCOMMISSION APPROVED BY OMB: NO. 3150-0131 EWIRES: 10t311201' (lO-Zoo8)

Estimated burden per res onse to comply with thls voluntary Informatlo collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. h s InformeUon collection IS used to plan budgel end re50urcas for operator examlnatlons. Send comments re ardln burde OPERATOR LICENSING estlmate to the Recorda and FOlAlPrlvecy S e n h a Branch t - 5 F&), U.I Nuclear Re ulatory Commlsslon Washlngton DC 2055!5400 o r b Inlerni e-mail to Infocollects@nrc. ov And to the Disk OMcer OMca of lnronatlo EXAMINATION DATA and Regulato Affairs NE8B-!l0202 (3150-0131) Otiic'e of Mana ement an Budget, Washrnngton bC 20503. a means us& to impose an%formaUo collection does not display a currently valld OMB control number, the NRC ma not conduct or s onsor, and a person Is not required to respond to, th informationco~~ectpOn.

I NRC REGION Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 I11 Renewed License Nos. DPR-24 and DPR-27

[A. PROPOSED EXAMINATION PREPARATION SCHEDULE I PROPOSEDNUMBER I -

CY2011 1 -

cy2012 I -

cy2013 -

cy 2014 I

ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS II ' O ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 0 EXAMINATIONS

16. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER -

CY 2 0 1 1 - I CY2012 -

CY2013 -

CY2014 I NUMBER OF REACTOR OPERATORS I 5 4 1 6 6 I NUMBER OF SENIOR REACTOR OPERATORS INSTANT I 10 6 6 II NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I

I I

0 O I 0 0 I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I 0 0 I 0 0 I I I

PROPOSED DATES I DATE I 04/25/2011 12/03/2012 11/18/2013 10/27/2014 ALTERNATE DATE 05/09/2011 01/07/2013 I 12/02/2013 11/10/2014 IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2 0 1 1 CY 2012 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0 0 0. 12 0 0. 0 CANDIDATES NRC FORM 536 (lO-ZOaS) PRINTED ON RECYCLED PAPER

J August 17,2009 NRC 2009-0083 RIS 2009-11 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Resoonse to Regulatory Information Summary 2009-111.

PreDaration and Scheduling of Operator Licensina Examinations On July 16,2009, the NRC issued Regulatory Issue Summary (RIS) 2009-11. RIS 2009-11 requests that each licensee provide an update of operator licensing examination informationfor calendar years 2010 through 2013.

The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units land 2.

There are no new regulatory commitments or revisions to existing commitments contained in the enclosure of this letter.

If there are questions associated with the content of the enclosures,.pleasecontact Mr. Douglas Lautenbur, Point Beach Nuclear Plant Training Manager, at 920/755-7791.

Very truly yours, NextEra Energy Point Beach, LLC James Costedio Licensing Manager Enclosure cc: Administrator, Region 111, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, W I 54241 1 Ztic X E AUG 1 8 2009

I ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 RESPONSE TO REGULATORY INFORMATION

SUMMARY

2009-11, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS 1 page follows

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY O M 6 NO. 3150-0131 EXPIRES 101311201' (lo-2008) Estimated burden per res onse to comply wlth thls voluntary lnformatio collectlon request: f hour. ?his Information collectlon Is used to plan budge!

end resource8 for operator examlnations. Send comments re ardln burda OPERATOR LICENSING estlmate to the Records and FOlAlPrhracy Servlces Blanch k - 5 Fh), U.5 Nuclear Re ulatory Commlsslon Washington DC 20555-000 or b Internc e-mail to Infocollecls@nrc. ov And to the Disk Ofker, Offlce of InLrmaUo EXAMINATION DATA and Regulato Affairs, NE88A0202 (3150-0131), Office of Mana ement an Budget, Washrgton DC 20603. I)a means used to Impose anC/nformatlo collectlon does not display a currenUy valid OMB control number, the NRC ma not conduct or s onsor, and a person Is not requlred to respond to, th Information c o d & .

FACILITY NRC REGION I Point Beach Nuclear Plant Units 1 and 2 6610 Nuclear Road Two Rivers, WI 54241 A. PROPOSED EXAMINATION PREPARATION SCHEDULE

~~ ~ ~

m PROPOSED NUMBER c y 2010 c y 2011 c y 2012 c y 2013 ESTIMATEDNUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATEDNUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER -

c y 2010 c y 2011 c y 2012 c y 2013 NUMBER OF REACTOR 0 5 4 OPERATORS 6

NUMBEROF SENIOR REACTOR 0 13 6 6 OPERATORS INSTANT NUMBER OF SENIOR REACTOR OPERATORS UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/25/2011 05/07/2012 05/06/2013 ALTERNATE DATE 05/09/2011 05/14/2012 05/13/2013 IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFEI SCHEDULE c y 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 10 0 0 0 12 CANDIDATES NRC FORM 636 (10-2WS) PRINTED ON RECYCLED PAPER

August 10,2007 NRC 2007-0060 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 ResDonse to Reaulatow Information Summarv 2007-1, 5 Preparation and Schedulinq of Operator Licensing Examinations On July 12, the NRC issued Regulatory Issue Summary (RIS) 2007-17. RIS 2007-17 requests that each licensee provide an update of operator licensing examination information for calendar years 2008 through 201 1.

The enclosure to this letter provides the Nuclear Management Company, LLC (NMC) response for the Point Beach Nuclear Plant.

There are no new regulatory commitments or revisions to existing commitments contained in the enclosure of this letter.

If there are questions associated with the content of the enclosures, please contact oint Beach Nuclear Plant Training Manager, at 92017557791.

Site Vice-president, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Regional Administrator, USNRC, Region Ill 6610 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone 920.755.2321

ENCLOSURE 1 FORM NRC 536 OPERATOR LICENSING EXAMINATION DATA FOR POINT BEACH NUCLEAR PLANT UNITS 1 AND 2

RC FORM 536 US. NUCLEAR REGULATORY COMMISSION [APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per response to comply with this voluntary informatloi cdlection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budget and resources for operator examinations. Send comments r ardin burdei OPERATOR LICENSING estimate to the Records and FOINPrivacy Services Branch?-5 F!3), U.S Nuclear Re ulatory Commission Washington DC 2055SOOO or Interne e-mail to in?ocollects@nrc. w, i n d to the D&k Ofticer. Office of I~omauOi EXAMINATION DATA and Regulato Affairs, NE&-10202, (3150-0131). OMCa of Management ani Budget, Washmgton, DC 20503. If a means used to impose an lnfonnatb collection does not display a currently valld OMB control number. the NRC ma not conduct or sponsor. and a person Is not required to respond to, thi informationwlledlon.

4CILITY NRC REGION point Beach Nuclear Plant Units 1 and 2 5610 Nuclear Road, Two Rivers, WI 54241 111 Dockets 50-266 and 50-301I License Nos. DPR-24 and DPR-27

~

ESTIMATEDNUMBER OF LICENSEE-PREPARED EXAMINATIONS I 0 I 1 ----I 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS I 0 I 0 I 0 I 0

1. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER -

CY 2008 I -

CY2009 I - I CY2010 -

CY2011 NUMBER OF REACTOR OPERATORS 0

I 3 0

~ -1 8 NUMBER OF SENIOR REACTOR OPERATORS INSTANT I O I O I 8

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR I 0 I 1 I 0 I 0 OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/04/2009 05/02/2011 ALTERNATE DATE 0511812009 ow1w2011 CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 1 0 0 0 0 0 0 16 CANDlDATES NRC FORM 536 (%moS) PRINTEDON RECYCLED PAPER