ML21298A155
| ML21298A155 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/12/2021 |
| From: | Chuck Zoia NRC/RGN-III/DRS/OLB |
| To: | |
| Zoia C | |
| Shared Package | |
| ML20139A042 | List: |
| References | |
| Download: ML21298A155 (1) | |
Text
From:
Callaway, Gary To:
Zoia, Chuck
Subject:
Point Beach Outline review Date:
Friday, February 26, 2021 8:31:37 AM I completed the Point Beach outline review and I have two comments. I discussed these with Jeffrey.
The requirement changed in Rev. 10 of NUREG-1021. The table that lists ES-301 changes from Rev 9, says
Throughout: All references to Emergency Procedures/Plan have been changed to Emergency Plan.
Emergency procedures were specifically removed from the description of topic 4 of SRO admin JPMs.
I pointed this out to Jeffrey and he said he will replace this JPM.
- 2. I also asked Jeffrey to come up with good bounding conditions for critical tasks.
He will run the events with no action and see if some bad thing happens (e.g.
unnecessary E-Plan requirement, orange or red path, or complication to mitigation strategy). I told him to call me if nothing bad happens.
Gary W. Callaway Nuclear Regulatory Commission Senior Reactor Technology Instructor