NRC 2007-0060, Response to Regulatory Information Summary 2007-15, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
(Redirected from NRC 2007-0060)
Jump to navigation Jump to search
Response to Regulatory Information Summary 2007-15, Preparation and Scheduling of Operator Licensing Examinations.
ML072260377
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/10/2007
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2007-0060, RIS-07-015
Download: ML072260377 (3)


Text

Commrtted to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC August 10,2007 NRC 2007-0060 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Response to Reaulatow Information Summaw 2007-15, "Preparation and Scheduling of Operator Licensing Examinations" On July 12, the NRC issued Regulatory Issue Summary (RIS) 2007-17. RIS 2007-17 requests that each licensee provide an update of operator licensing examination information for calendar years 2008 through 201 1.

The enclosure to this letter provides the Nuclear Management Company, LLC (NMC) response for the Point Beach Nuclear Plant.

There are no new regulatory commitments or revisions to existing commitments contained in the enclosure of this letter.

If there are questions associated with the content of the enclosures, please contact Mr. C h a r l e m r e , Point Beach Nuclear Plant Training Manager, at 9201755-7791.

$ewt;rthy for enni Site Vice-President, Point Beach ~ u c l e aPlant r Nuclear Management Company, LLC Enclosure cc: Regional Administrator, USNRC, Region Ill 6610 Nuclear Road Two Rivers, Wisconsin 54241 Telephone 920.755.2321

ENCLOSURE I FORM NRC 536 OPERATOR LICENSING EXAMINATION DATA FOR POINT BEACH NUCLEAR PLANT UNITS 1 AND 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch (T-5 F53), U.S.

Nuclear Re ulatory Commission, Washington, DC 20555-0001, or b internet EXAMINATION DATA e-mail and Regulatory to in?oco~lect~@nrc.

Affalrs, NE~B-10202, ov, and to(3150-0131),

the Desk Officer.

OfficeOffice of Management of lnrormation and Budget. Washlngton. DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Point Beach Nuclear Plant Units 1 and 2 6610 Nuclear Road, Two Rivers, WI 54241 111 Dockets 50-266 and 50-301 1License Nos. DPR-24 and DPR-27 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 C y 2009 cy- 2010 cy- 201 1 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS

6. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER -

CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 0 3 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 0 7 8 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE 05/04/2009 05/02/2011 ALTERNATE DATE 0511812009 0511612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 1 0 0 0 0 0 0 16 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER