ML21264A129

From kanterella
Jump to navigation Jump to search
2021 Point Beach Initial License Exam Form ES-301-3
ML21264A129
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/2021
From: Chuck Zoia
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Zoia C
Shared Package
ML20139A041 List:
References
Download: ML21264A129 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilit : Point Beach Date of Examination: 26 Jul 2021 0 eratin Test Number: 2021

a.
b.

C.

d.
e.
1. General Criteria The operating test conforms to the previously approved outline; changes are consistent with samplin requirements e.., 10 CFR 55.45, operational importance, safe! function distribution.

There is no day-to-day repetition between this and other operating tests to be administered durin this examination.

The operatin test shall not duplicate items from the applicants' audit test s see Section O.1.a..

Overlap with the written examination and between different parts of the operating test is within acceptable limits.

It appears that the operating test will differentiate between competent and less-than-competent applicants at the desi nated license level.

2. Walkthrough Criteria
a.

Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b.

Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused l_i:le-1@

deviate from any of the acceptance criteria (e.g., item distribution, bank use, re ifion from th last two NRG examinations specified on those forms and Form E 01-2.

The associated simulator operating tests (scenario sets) have b en revi Form ES-301-4, and a cop is attached.

a.

Author

b.

Facility Reviewer(*)

c.

NRG Chief Examiner(#)

d.

NRG Supervisor

  • The facility licensee signature is not applicable for NRG-developed tests.
  1. The independent NRG reviewer initials items in column "c"; the chief examiner concurrence is required.

Initials a

b*

Charles D. Zoia Digitally signed by Charles D. Zoia Date: 2021.07.22 08:43:01 -05'00' Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2021.07.22 10:11:19 -05'00'