Text
FPL Evsesgy Point Beach Nuclear Plant July 28, 2008 FPL Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 NRC 2008-0055 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Regulatory Information Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-1 6. RIS 2008-1 6 requests that each licensee provide an update of operator licensing examination information for calendar years 2009 through 2012.
The enclosure to this letter provides the FPL Energy Point Beach, LLC, response for the Point Beach Nuclear Plant.
There are no new regulatory commitments or revisions to existing commitments contained in the enclosure of this letter.
If there are questions associated with the content of the enclosures, please contact Mr. Charles Sizemore, Point Beach Nuclear Plant Training Manager, at 9201755-7791.
Very truly yours, FPL Energy Point Beach, LLC Larry Meyer Site Vice President Enclosure An FPL Group company
ENCLOSURE FPL ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 RESPONSE TO REGULATORY INFORMATION
SUMMARY
2008-16, "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" 1 page follows
NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOINPrivacy Services Branch (T-5 F53). U.S.
Nuclear Regulatory Commission. Washington. DC 20555-0001, or by internet e-mail to infocollects@nrc. ov, and to the Desk Officer, Office of Information and Regulatory Affairs. NE~B-10202. (3150-0131), Ofice of Management and Budget, Washington, DC 20503.
If a means used to Impose an ~nformatlon collection does not display a currently valid OM6 control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY Point Beach Nuclear Plant, Units 1 and 2 661 0 Nuclear Road Two Rivers, WI 54241 NRC REGION Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 201 2 -
1 0
cy 201 1 -
1 0
cy 201 0 -
0 0
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2009 -
1 0
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE CY2011 -
5 12 0
0 0211 41201 1 0212 1 I20 1 1 CY2012 -
4 6
0 0
0211 31201 2 02/20/2012 CY 2009 -
2 7
1 0
05/04/2009 0511 812009 C. PROPOSED GENERIC FUNDAMENTALS EXAMlNATlON (GFE) SCHEDULE CY2010 -
0 0
0 0
PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2010 MARCH 0
CY 2009 JUNE 0
DECEMBER 0
MARCH 0
SEPTEMBER 10 JUNE 0
DECEMBER 0
SEPTEMBER 17