ML21256A175

From kanterella
Jump to navigation Jump to search
2021 Point Beach Initial License Exam Forms ES-301-2
ML21256A175
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/2021
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML20139A040 List:
References
Download: ML21256A175 (4)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Nuclear Plant U1/U2 Date of Examination: July 2021 Exam Level: RO SRO-I SRO-U Operating Test Number: 2021 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* Safety Function

a. Control Rod Drive System / Perform Rod Exercise Test 001A3.05 (3.5/3.5)

Bank Rods exercised, overlap counter discrepancy corrected and returned A, D, P, S 1 to original position Previous 2017

b. Chemical and Volume Control System / Shift Charging Pump Suction Between the VCT and RWST 004A3.01 (3.5/3.7)

A, D, S 2 Attempt normal boration to target load, end with charging pump suction to the RWST per RNO

c. Emergency Core Cooling System / Adjust Accumulator Pressure 006A1.13 (3.5/3.7) D, EN, S 3 Lower accumulator pressure without to the target range
d. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.5/3.1*)

D, EN, P, S 4P Perform a partial stroke test Previous 2019

e. Containment Spray System / Align Containment Spray Pump for Containment Sump Recirc with Suction Supplied by the RHR Pump 026A4.01 (4.5/4.3)

A, D, EN, L, S 5 Align containment spray with Spray pump suction supplied from RHR and throttle RHR recirc to as high as possible and less than the limit (time critical)

f. Emergency Diesel Generator / Island EDG Per 1-SOP-4KV-001 064A4.01 (4.0/4.3) D,S 6 Island G01, Emergency Diesel Generator to 1A-05, Safeguards Bus
g. Nuclear Instrumentation System / Perform a partial flux map using N, S 7 incore instrumentation 015A3.01 (3.8/3.8) or 015A4.02 (3.9/3.9)
h. Control Room Ventilation (Accidental Gaseous Radwaste Release) /

Shift Ventilation Lineups for Various Modes D, S 9 060AA1.02 (2.9/3.1)

Restore ventilation system from Mode 5 to Mode 1 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Service Water System / Determine SW Flow as a Function of Header DP 076A2.02 (2.7/3.1)

A, N 4S Record data and determine and take required actions to ensure required Service Water Flow

j. Emergency Diesel Generator / Transfer Fuel Oil Between Day Tanks 064K1.03 (3.6/4.0)

D, P 6 Transfer fuel oil from T-175B to T-175A with Fuel Oil Transfer pump Previous 2017

k. Spent Fuel Pool Cooling System / Respond to Loss of Spent Fuel Pool Cooling A, D, E, R 8 033A2.02 (2.7/3.0)

Restore SFP cooling by shifting to B train pump and heat exchanger

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)

(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Nuclear Plant U1/U2 Date of Examination: July 2021 Exam Level: RO SRO-I SRO-U Operating Test Number: 2021 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* Safety Function

a. Control Rod Drive System / Perform Rod Exercise Test 001A3.05 (3.5/3.5)

Bank Rods exercised, overlap counter discrepancy corrected and returned A, D, P, S 1 to original position Previous 2017

b. Chemical and Volume Control System / Shift Charging Pump Suction Between the VCT and RWST 004A3.01 (3.5/3.7)

A, D, S 2 Attempt normal boration to target load, end with charging pump suction to the RWST per RNO

c. Emergency Core Cooling System / Adjust Accumulator Pressure 006A1.13 (3.5/3.7) D, EN, S 3 Lower accumulator pressure without to the target range
d. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.5/3.1*)

D, EN, P, S 4P Perform a partial stroke test Previous 2019

e. Containment Spray System / Align Containment Spray Pump for Containment Sump Recirc with Suction Supplied by the RHR Pump 026A4.01 (4.5/4.3)

A, D, EN, L, S 5 Align containment spray with Spray pump suction supplied from RHR and throttle RHR recirc to as high as possible and less than the limit (time critical) f.

g. Nuclear Instrumentation System / Perform a partial flux map using N, S 7 incore instrumentation 015A3.01 (3.8/3.8) or 015A4.02 (3.9/3.9)
h. Control Room Ventilation (Accidental Gaseous Radwaste Release) /

Shift Ventilation Lineups for Various Modes D, S 9 060AA1.02 (2.9/3.1)

Restore ventilation system from Mode 5 to Mode 1 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Service Water System / Determine SW Flow as a Function of Header DP 076A2.02 (2.7/3.1)

A, N 4S Record data and determine and take required actions to ensure required Service Water Flow

j. Emergency Diesel Generator / Transfer Fuel Oil Between Day Tanks 064K1.03 (3.6/4.0)

D, P 6 Transfer fuel oil from T-175B to T-175A with Fuel Oil Transfer pump Previous 2017

k. Spent Fuel Pool Cooling System / Respond to Loss of Spent Fuel Pool Cooling A, D, E, R 8 033A2.02 (2.7/3.0)

Restore SFP cooling by shifting to B train pump and heat exchanger

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)

(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator