MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 ML20077K2022020-03-17017 March 2020 NRC Form 536 Operator Licensing Examination Data ML19276D7052019-10-0303 October 2019 GFE Results, September 2019 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1412021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-5 ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1492021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-9 ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21193A2702021-07-22022 July 2021 Operator Licensing Examination Approval NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations ML20342A1932020-12-0707 December 2020 Confirmation of Initial License Examination ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20091M6252020-03-26026 March 2020 GFE Results, March 2020 IR 05000266/20193012019-09-17017 September 2019 NRC Initial License; Examination Report 05000266/2019301; 05000301/2019301 (DRS-R.Baker) ML22133A2392019-07-31031 July 2019 Form ES-201-3 ML22133A2442019-07-31031 July 2019 Form ES-401-9 ML22133A2302019-07-31031 July 2019 Form ES-201-1 2023-08-09
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Nuclear Plant U1/U2 Date of Examination: July 2021 Exam Level: RO SRO-I SRO-U Operating Test Number: 2021 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* Safety Function
- a. Control Rod Drive System / Perform Rod Exercise Test 001A3.05 (3.5/3.5)
Bank Rods exercised, overlap counter discrepancy corrected and returned A, D, P, S 1 to original position Previous 2017
- b. Chemical and Volume Control System / Shift Charging Pump Suction Between the VCT and RWST 004A3.01 (3.5/3.7)
A, D, S 2 Attempt normal boration to target load, end with charging pump suction to the RWST per RNO
- c. Emergency Core Cooling System / Adjust Accumulator Pressure 006A1.13 (3.5/3.7) D, EN, S 3 Lower accumulator pressure without to the target range
- d. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.5/3.1*)
D, EN, P, S 4P Perform a partial stroke test Previous 2019
- e. Containment Spray System / Align Containment Spray Pump for Containment Sump Recirc with Suction Supplied by the RHR Pump 026A4.01 (4.5/4.3)
A, D, EN, L, S 5 Align containment spray with Spray pump suction supplied from RHR and throttle RHR recirc to as high as possible and less than the limit (time critical)
- f. Emergency Diesel Generator / Island EDG Per 1-SOP-4KV-001 064A4.01 (4.0/4.3) D,S 6 Island G01, Emergency Diesel Generator to 1A-05, Safeguards Bus
- g. Nuclear Instrumentation System / Perform a partial flux map using N, S 7 incore instrumentation 015A3.01 (3.8/3.8) or 015A4.02 (3.9/3.9)
- h. Control Room Ventilation (Accidental Gaseous Radwaste Release) /
Shift Ventilation Lineups for Various Modes D, S 9 060AA1.02 (2.9/3.1)
Restore ventilation system from Mode 5 to Mode 1 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Service Water System / Determine SW Flow as a Function of Header DP 076A2.02 (2.7/3.1)
A, N 4S Record data and determine and take required actions to ensure required Service Water Flow
- j. Emergency Diesel Generator / Transfer Fuel Oil Between Day Tanks 064K1.03 (3.6/4.0)
D, P 6 Transfer fuel oil from T-175B to T-175A with Fuel Oil Transfer pump Previous 2017
- k. Spent Fuel Pool Cooling System / Respond to Loss of Spent Fuel Pool Cooling A, D, E, R 8 033A2.02 (2.7/3.0)
Restore SFP cooling by shifting to B train pump and heat exchanger
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Point Beach Nuclear Plant U1/U2 Date of Examination: July 2021 Exam Level: RO SRO-I SRO-U Operating Test Number: 2021 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code* Safety Function
- a. Control Rod Drive System / Perform Rod Exercise Test 001A3.05 (3.5/3.5)
Bank Rods exercised, overlap counter discrepancy corrected and returned A, D, P, S 1 to original position Previous 2017
- b. Chemical and Volume Control System / Shift Charging Pump Suction Between the VCT and RWST 004A3.01 (3.5/3.7)
A, D, S 2 Attempt normal boration to target load, end with charging pump suction to the RWST per RNO
- c. Emergency Core Cooling System / Adjust Accumulator Pressure 006A1.13 (3.5/3.7) D, EN, S 3 Lower accumulator pressure without to the target range
- d. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.5/3.1*)
D, EN, P, S 4P Perform a partial stroke test Previous 2019
- e. Containment Spray System / Align Containment Spray Pump for Containment Sump Recirc with Suction Supplied by the RHR Pump 026A4.01 (4.5/4.3)
A, D, EN, L, S 5 Align containment spray with Spray pump suction supplied from RHR and throttle RHR recirc to as high as possible and less than the limit (time critical) f.
- g. Nuclear Instrumentation System / Perform a partial flux map using N, S 7 incore instrumentation 015A3.01 (3.8/3.8) or 015A4.02 (3.9/3.9)
- h. Control Room Ventilation (Accidental Gaseous Radwaste Release) /
Shift Ventilation Lineups for Various Modes D, S 9 060AA1.02 (2.9/3.1)
Restore ventilation system from Mode 5 to Mode 1 In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i. Service Water System / Determine SW Flow as a Function of Header DP 076A2.02 (2.7/3.1)
A, N 4S Record data and determine and take required actions to ensure required Service Water Flow
- j. Emergency Diesel Generator / Transfer Fuel Oil Between Day Tanks 064K1.03 (3.6/4.0)
D, P 6 Transfer fuel oil from T-175B to T-175A with Fuel Oil Transfer pump Previous 2017
- k. Spent Fuel Pool Cooling System / Respond to Loss of Spent Fuel Pool Cooling A, D, E, R 8 033A2.02 (2.7/3.0)
Restore SFP cooling by shifting to B train pump and heat exchanger
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path 4-6/4-6 /2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature 1/ 1/ 1 (control room system)
(L)ow-Power/Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3/ 3/ 2 (randomly selected)
(R)CA 1/ 1/ 1 (S)imulator