Discusses SER Confirmatory Issue 8, NSSS Pipe Break Analysis Using SRP Criteria. Piping Reanalyzed Using 2.4Sm Criteria.Analyses Revealed No Breaks.Matter Considered Closed
ML20052D768
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/30/1982
From: Wuller G
ILLINOIS POWER CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
U-0473, U-473, NUDOCS 8205070197
Download: ML20052D768 (1)


Text

_.

G '

U-0473

/LLIN0/S POWER 00MPANY t39_g2(o4_39y_s

.f y 500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 April 30, 1982 3 \ 9' ' '$

p , e 'C-

_ 4l,h- -

QS

^ #

Mr. James R. Miller, Chief { 6 Standardization & Special Proj ects Branch 8p%

. g Division of Licensing N

Office of Nuclear Reactor Regulation g U. S. Nuclear Regulatory Commission Washington, D.C. 20555

'qj'

Dear Mr. Miller:

Clinton Power Station Unit 1 Docket No. 50-461 With reference to CPS SER Confirmatory Issue #8, "NSSS Pipe Break Analysis Using SRP Criteria (3.6.2)",

General Electric Company has reanalyzed the piping in question using the 2.4Sm criteria as specified in the SRP. The analyses revealed that there were no more breaks using the 2.4Sm than there had been using 3.0Sm.

Therefore, we consider this matter closed for licensing purposes. t Sincerely,

~

E G. E. Wuller Supervisor-Licensing Nuclear Station Engineering r

CCW/lt cc: J. H. Williams , NRC Clinton Proj ect Manager H. H. Livermore, NRC Resident Inspector D. Terao, Mechanical Engineering Branch O001 9