Interim Deficiency Rept Requesting Extension of Reporting Date for 10CFR50.55(e) Reportable Condition 73 Re Concrete & Grouting Work,Initially Reported 811120.Final Rept Will Be Submitted by 820205
ML20038C787
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/25/1981
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, G2-81-491, GO2-81-491, NUDOCS 8112140129
Download: ML20038C787 (1)


Text

J g Docket No. 50-397

$0 55(e) g g Gashington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland,WashingtonS9352 509)372-5000 November 25,19810tC -(2 /JI JD f r ~

G02-81-491 Docket No. 50-397 ESC y p' Mr. R. H. Engelken -

U.S. Nuclear Regulatory Commission dpg Region V /[.-[.? ,9 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 N

g[L/{

IY 9

~

Dear Mr. Engelken:

, N. O .

% [k p

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT N0. 2 G '

-REQUEST FOR EXTENSION OF 10CFR50.55(e) REPORTABLE C '

CONDITION #73 CONCRETE AND GROUTING WORK

Reference:

Telecon dated November 20, 1981, R. T. Johnson to J. Elin,

~

same subject.

Per the referenced telephone conversation between R. T. Johnson, WNP-2 Project QA Manager and Mr. John Elin of your office, the Supply System requested and was granted an extension of the reporting date for 10CFR50.55(e) Reportable Condition #73.

The reason for the extension request is that the microcoring testing program currently being conducted consists of several lengthy steps and the coring of the specimens is required before any evaluation can be made. At this time, it is anticipated that the pouring and curing proc 3ss will be completed December 18, 1981. Additionally, it is anticipated that testing (which follows pouring and curing) will be completed by January 15, 1982. The Architect Engineer has indicated that final evaluation of test data and preparation of a response will require two weeks.

For these reasons, a Final Report will be submitted to the NRC by February 5, 1982.

Should you have any questions regarding this letter, please contact R. T. Johnson, (509) 377-2501, extension 2712.

Very truly yours,

. 8

/J.

b4Ls

. hat ock Pr ram Director, WNP-2 RGM/RLH/kd cc: W.S. Chin, BPA - Site R.A. Feil, NRC Resident Inspector, WNP-2 A. Forrest, Burns and Roe - HAPO N.D. Lewis, NRC - Olympia J. Flunkett, NUS Corp. - Clearwater, FL R.E. Snaith, Burns and Roe - NY V. Stello, NRC - Washington, DC WNP-2 Files 2140129 e11125 S:

S ADOCK 05000397 PDR Q)- M O