MONTHYEARIR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000269/20234012023-04-14014 April 2023 Security Baseline Inspection Report 05000269 2023401 and 05000270 2023401 and 05000287 2023401 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 IR 05000269/20220052022-08-26026 August 2022 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005 IR 05000269/20224012022-08-26026 August 2022 Material Control and Accounting Program Inspection Report 05000269/2022401 and 05000270/2022401 and 05000287/2022401 (OUO Removed) IR 05000270/20220022022-07-29029 July 2022 Integrated Inspection Report 05000269/ 2022002 and 05000270/2022002 and 05000287/2022002 IR 05000269/20220102022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000269/2022010 and 05000270/2022010 and 05000287/2022010 IR 05000269/20224032022-05-0404 May 2022 Security Baseline Target Set Inspection Report 05000269/2022403 and 05000270/2022403 and 05000287/2022403 IR 05000269/20220012022-05-0404 May 2022 Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 IR 05000269/20224042022-04-27027 April 2022 Security Baseline Inspection Report 05000269/2022404 and 05000270/2022404 and 05000287/2022404 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20210062022-03-0202 March 2022 Annual Assessment Letter for Oconee Nuclear Station, Units 1, 2, and 3 (Report 05000269/2021006, 05000270/2021006, and 05000287/2021006) IR 05000269/20220122022-02-24024 February 2022 Safety Conscious Work Environment Issue of Concern Followup Report 05000269/2022012 and 05000270/2022012 and 05000287/2022012 IR 05000269/20224022022-02-16016 February 2022 Security Baseline Inspection Report 05000269/2022402 and 05000270/2022402 and 05000287/2022402 IR 05000269/20210042022-02-14014 February 2022 Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation IR 05000269/20210032021-10-28028 October 2021 Integrated Inspection Report 05000269/2021003 and 05000270/2021003 and 05000287/2021003 IR 05000269/20210102021-09-17017 September 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000269/2021010 and 05000270/2021010 and 05000287/2021010 IR 05000269/20210052021-08-26026 August 2021 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2021005, 05000270/2021005, and 05000287/2021005) IR 07200004/20210012021-08-26026 August 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200004/2021001 IR 05000269/20210022021-08-0404 August 2021 Integrated Inspection Report 05000269/2021002 and 05000270/2021002 and 05000287/2021002 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 IR 05000269/20210112021-06-0202 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000269/2021011 and 05000270/2021011 and 05000287/2021011 IR 05000269/20210012021-04-23023 April 2021 Integrated Inspection Report 05000269/2021001 and 05000270/2021001 and 05000287/2021001 IR 05000269/20214012021-04-22022 April 2021 Security Baseline Inspection Report 05000269/2021401, 05000270/2021401 and 05000287/2021401 (U) IR 05000269/20200062021-03-0303 March 2021 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006 IR 05000269/20200042021-02-22022 February 2021 Reissue- Oconee Nuclear Station Integrated Inspection Report 05000269/2020004, 05000270/2020004, 05000287/2020004 ML21036A0012021-02-0404 February 2021 Integrated Inspection Report 05000269/2020004 and 05000270/2020004 and 05000287/2020004 IR 05000269/20200102021-01-22022 January 2021 NRC Design Bases Assurance Inspection (Team) Report 05000269/2020010 and 05000270/2020010 and 05000287/2020010 and Notice of Violation IR 05000269/20204012020-11-13013 November 2020 Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401 IR 05000269/20200032020-11-0404 November 2020 Integrated Inspection Report 05000269/2020003, 05000270/2020003, 05000287/2020003, and 07200004/2020002 IR 05000269/20204202020-10-15015 October 2020 Security Inspection Report 05000269/2020420, 05000270/2020420 and 05000287/2020420 IR 05000269/20200052020-08-17017 August 2020 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2, and 3 (NRC Inspection Report 05000269/2020005, 05000270/2020005, and 05000287/2020005) IR 05000269/20200022020-08-11011 August 2020 Integrated Inspection Report 05000269/2020002 and 05000270/2020002 and 05000287/2020002 ML20192A3212020-07-13013 July 2020 Review of the Fall 2019 Steam Generator Tube Inspection Report IR 05000269/20203012020-06-0909 June 2020 Operator Licensing Operating Test Approval 05000269/2020301, 05000270/2020301 and 05000287/2020301 IR 05000269/20000082020-05-12012 May 2020 Final ASP Analysis - Oconee 1, 2, and 3 (IR 050002692000008) IR 05000287/20020152020-05-12012 May 2020 Final ASP Analysis - Oconee 3 (IR 050002872002015) IR 05000269/20000042020-05-12012 May 2020 Final ASP Analysis - Oconee 1, 2, and 3 (IR 050002692000004) 2024-01-11
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
See also: IR 05000269/2011013
Text
May 5, 2011
Mr. T. Preston Gillespie, Jr. Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
SUBJECT: OCONEE NUCLEAR STATION UNIT 1 - NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT 05000269/2011013
Dear Mr. Gillespie:
On April 14, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-Approval Site Inspection for License Renewal at your Oconee Nuclear Station, Unit 1. The enclosed report documents the inspection results, which were discussed on April 14, 2011, with members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Timothy L. Hoeg, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-269 License Nos. DPR-38
Enclosure:
NRC Inspection Report 05000269/2011013
w/Attachment:
Supplemental Information cc w/encl: See page 2 DEC 2 cc w/encl: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 David A. Baxter Vice President, Nuclear Engineering Duke Energy Carolinas, LLC Electronic Mail Distribution Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Scott L. Batson Station Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Oconee Nuclear Station U.S. Nuclear Regulatory Commission 7812B Rochester Hwy Seneca, SC 29672 Terry L. Patterson Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Charles Brinkman Director Washington Operations Westinghouse Electric Company, LLC Electronic Mail Distribution Tom D. Ray Engineering Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution County Supervisor of Oconee County 415 S. Pine Street Walhalla, SC 29691-2145 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution May 5, 2011 Mr. T. Preston Gillespie, Jr. Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION UNIT 1 - NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT 05000269/2011013 Dear M
SUMMARY OF FINDINGS
IR 05000269/2011013; April 11 - 14, 2011; Oconee Nuclear Station Unit 1; Post Approval Site Inspection for License Renewal The report covers an inspection conducted by regional inspectors in accordance with NRC Manual Chapter 2516 and NRC Inspection Procedure 71003.
Based on the sample selected for review, the inspectors determined that commitments, license conditions, and regulatory requirements associated with the renewed facility operating license were either being met or, where commitment actions had not been completed, that the licensee had administrative controls in place to ensure completion before the period of extended operation.
The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Other Activities
.1 Post-Approval Site Inspection for License Renewal - IP 71003 (Phase 1)
a. Inspection Scope
(1) Implementation of License Conditions and Commitments, including Aging Management Programs The inspectors reviewed a sample of license renewal activities scheduled for the spring 2011 refueling outage, which was the second to last outage prior to the period of extended operation (PEO). The inspectors conducted this inspection in order to maximize observations of the actual implementation of license conditions, commitments, and Aging Management Programs (AMPs) before the PEO (February 6, 2013). The inspection's objective was to verify that the licensee completed the necessary actions to: (a) comply with the conditions stipulated in the renewed facility operating license; (b) meet the license renewal commitments described in NUREG-1723, "Safety Evaluation Report (SER) Related to the License Renewal of Oconee Nuclear Station; and (c) meet the future activities, including AMPs, described in the Updated Final Safety Analysis Report (UFSAR) supplement submitted pursuant to 10 CFR 54.21(d). A summary of the license renewal commitments for Oconee Nuclear Station is also available in an NRC Memorandum dated March 6, 2007 (ML070640041).
Specifically, the inspectors verified that the licensee met the commitments associated with the one-time Pressurizer examinations described in NUREG-1723 and the UFSAR supplement. For those Pressurizer examination items that were not completed at the time of this inspection, the inspectors verified that there was reasonable assurance that such examination items would be completed prior to the PEO.
The inspection sample for the selected commitment item is described below. Specific documents reviewed are listed in the report attachment. Commitment Item 5 - Pressurizer Examinations Commitment Item 5 in the NRC Memorandum dated March 6, 2007, specified that Pressurizer examinations would be performed prior to the end of the initial operating license term. NUREG-1723 and the UFSAR supplement for license renewal described the planned visual examinations of the internal cladding, spray line, spray head, and heater bundle penetration welds. The examination of the Pressurizer internal cladding, spray line, and spray head would consist of a one-time visual examination (VT-3) in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The examination would cover the internal spray line, the spray head, and the fasteners that are used to attach the spray line to the internal surface of the Pressurizer. The clad examination would cover 100 percent of the Pressurizer internal surfaces with emphasis on the cladding adjacent to the heater bundles based on existing operating experience.
4 Enclosure The examination of the Pressurizer heater bundle penetration welds would consist of: (a) a surface exam of 16 peripheral welds on the first removed heater bundle; (b) a VT-3 examination (or equivalent) of the remaining welds of the heater bundle; (c) an inspection of the heater bundle welds to ASME examination category B-E welds during the fifth in-service inspection interval; and (d) an inspection of both the heater-sheath-to-sleeve plate structural weld and the heater-sleeve-to-bundle diaphragm plane structural weld in Unit 1 only. These examination activities were not scheduled for the spring 2011 refueling outage. However, the licensee scheduled these activities for the outage where the heater bundles are scheduled for removal as stated in NUREG-1723. The inspectors reviewed the licensing basis, implementing procedures, engineering evaluations, personnel qualifications, and non-destructive examination plans to verify that the Pressurizer examinations performed during the spring 2011 outage were implemented as stated in the commitment. Additionally, the inspectors observed (either by direct observation or video review) the sample listed below for portions of the visual examinations to verify that essential attributes such as calibration, equipment configuration, and disposition of indications were performed in accordance with the license renewal commitment.
- VT-3 examination on zone 4, Pressurizer upper dome cladding (Direct observation)
- VT-3 examination of the Pressurizer spray line welds and supports (Direct observation)
- VT-3 examination of Pressurizer upper head features, nozzle 1-RC-67 (Video)
- VT-3 examination of Pressurizer upper head features from penetration 1-RC-67, zone 3 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation 0 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -6 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -12 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -15 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -18 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -30 inches, zone 1 (Video)
- VT-3 examination of Pressurizer vessel barrel, elevation -36 inches, zone 1 (Video)
- Calibration for VT-3 examination of Pressurizer vessel barrel zone 1, elevations 0 to -36 inches (Video)
- Calibration for VT-3 examination of Pressurizer upper head features, nozzle 1-RC-67 (Video) (2) Review of License Renewal Commitment Changes The inspectors reviewed license renewal commitment change documents to verify the licensee followed the guidance in Nuclear Energy Institute (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," for any change to Commitment Item 5. The inspectors verified that the licensee properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. Specifically, the inspectors reviewed the change to the implementation schedule for the VT-3 examination of the Pressurizer internal clad surfaces in the area adjacent to the heater bundles. The inspectors did not identify any examples where commitment changes were not consistent with the guidance in NEI 99-04. The review of remaining license renewal 5 Enclosure commitment changes is scheduled to be completed during the Phase 2 implementation of inspection procedure 71003. (3) Review of Newly Identified SSCs This inspection requirement is scheduled to be completed during the Phase 2 implementation of inspection procedure 71003.
(4) Review of the Description of AMPs and Time-Limited Aging Analyses (TLAAs) in the UFSAR Supplement The review of the description of AMPs and TLAAs in the UFSAR supplement submitted pursuant 10 CFR 54.21(d) is scheduled to be completed during the Phase 2 implementation of inspection procedure 71003.
b. Findings and Observations
No findings or observations were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary On April 14, 2011, the inspectors presented the inspection results to members of the licensee management staff.
The licensee acknowledged the inspection results. The inspectors confirmed that all proprietary information reviewed during the inspection was returned to the licensee and that none of the potential report input discussed was considered proprietary. ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Cruz, Engineering
- D. Peltola, Principal Engineer
- E. Swanson, Engineering
- J. Smith, Licensing
- L. Hekking, License Renewal Fleet Program Owner
LIST OF REPORT ITEMS
None
LIST OF DOCUMENTS REVIEWED
03-9155982, Oconee PZR Internals Inspection Operating Instruction, Revision 1 03-9157102, Oconee PZR Internals Inspection Plan, Revision 1 54-ISI-365-02, Visual Inspection of Pressure Vessel Internals, Attachments and Internal
- Surfaces, Revision 2
- AR 00308431, Determine if a License Amendment Request is Required to Change Section
- 18.2.5.1 of the UFSAR to Allow an Extension of the Completion Date for a Portion of the
- Pressurizer
- VT-3 Examinations of the Internal Clad Surfaces.
- DWG 129252E, Unit 1 Pressurizer Vessel Sub-Assembly, Revision D12
- DWG 129254E, Pressurizer Upper Head Assembly and Details, Revision D9
- DWG 129266, Pressurizer Vessel Supports and Miscellaneous Details, Revision E6
- DWG 24893F, Unit 1 Pressurizer General Arrangement, Revision D16 Nuclear System Directive 214, Regulatory Commitment Management Program, Revision 8
- NUREG-1723, "Safety Evaluation Report (SER) Related to the License Renewal of Oconee
- Nuclear Station Oconee Nuclear Station Updated Final Safety Analysis Report, Chapter 18, Revision 18 Personnel Qualification Records for
- VT-3 examiners SAA Short Form 268, PRA Analysis of ONS Pressurizer Wall Thickness in Corroded Condition (40 vs. 41.72 years) in Support of a 50.59 Evaluation, 07/22/2010 Safety Document Change Notice 30-9158876-000, Visual Inspection of Pressure Vessel Internals, Attachments and Internal Surfaces (54-ISI-365-02) TM/1/A/1165/005, Controlling Procedure for Inspection of Unit 1 Pressurizer Internals by
- Vendor, Revision 0