IR 05000269/2020401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000269/2020401 and 05000270/2020401 and 05000287/2020401
ML20318A070
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/13/2020
From: James Shehee
Division of Reactor Safety II
To: Rasmey Robinson
Duke Energy Carolinas
References
IR 2020401
Download: ML20318A070 (8)


Text

November 13, 2020

SUBJECT:

OCONEE - SECURITY BASELINE INSPECTION REPORT 05000269/2020401 AND 05000270/2020401 AND 05000287/2020401

Dear Mr. Robinson:

On October 9, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Oconee and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Div of Reactor Safety

Docket Nos. 05000269 and 05000270 and 05000287 License Nos. DPR-38 and DPR-47 and DPR-55

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000269, 05000270 and 05000287

License Numbers:

DPR-38, DPR-47 and DPR-55

Report Numbers:

05000269/2020401, 05000270/2020401 and 05000287/2020401

Enterprise Identifier: I-2020-401-0036

Licensee:

Duke Energy Carolinas, LLC

Facility:

Oconee

Location:

Seneca, SC

Inspection Dates:

March 23-27, 2020 (Remote)

October 5-8, 2020 (Onsite)

Inspectors:

J. Brown, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

James C. Shehee, Chief

Plant Support Branch

Div of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Oconee, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspection.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1) Tier I: All Requirements Tier II: None Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I All requirements Tier II None Tier III 02.15 a, b

71130.07 - Security Training

Security Training (1 Sample)

(1) Tier I: all 16 requirements Tier II: None Tier III: 6 requirements 02.10, 02.12 (a), (b); 02.13 (a), (b), (c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revisions 30 to 31 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) The inspectors verified licensee performance indicators submittals listed below for the period from Oct 1, 2019, through Oct 1,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 9, 2020, the inspectors presented the security baseline inspection results to Rodney Robinson and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

260642

Time Out Alarm On CAD XXX

03/04/2019

71130.02

Corrective Action

Documents

262313

Prohibited item discovered during the search process

03/12/2019

71130.02

Corrective Action

Documents

266942

Improperly Labeled Medication

04/04/2019

71130.02

Procedures

SP/C/1503/O

Portal Alarm and Access Control System Loss/Degrade

Rev. 01

71130.02

Procedures

SP/C/1505/O

Search Equipment Loss/Degrade

Rev. 3

71130.02

Procedures

SP/E/1206/O

Security Search Equipment

Rev. 26

71130.02

Procedures

SP/E/1207/O

Security Barriers and Portals

Rev. 18

71130.02

Procedures

SP/O/1305/O

VBS Access Control & Search Requirement

Rev. 24

71130.02

Procedures

SP/O/1309/O

Keowee Hydro Station Security Program

Rev. 13

71130.02

Procedures

SP/O/1310/O

Containment Access Control

Rev. 3

71130.04

Corrective Action

Documents

260789

IRU XX locked in secondary tamper alarm

03/05/2019

71130.04

Corrective Action

Documents

261755

Loss of Multiple Security CCTV's

03/08/2019

71130.04

Procedures

SP/E/1202/O

Intrusion Detection System (IDS)

Rev. 13

71130.04

Procedures

SP/E/1203/O

Closed Circuit Television (CCTV) System

Rev. 18

71130.04

Procedures

SP/T/1402/O

Portal and Barrier Test/Inspection (PA, VA & KHS)

Rev. 14

71130.04

Procedures

SP/T/1404/O

Search Equipment Test/Inspection

Rev. 22

71130.04

Procedures

SP/T/1407/O

Security - Delay Barrier and Early Warning Device Testing

Rev. 9

71130.07

Corrective Action

Documents

264409

Responder Neutralization during ONS Annual FOF 2019-05

03/22/2019

71130.07

Corrective Action

Documents

264434

Response Strategy Implementation

03/22/2019

71130.07

Procedures

AD-SY-ALL-0510

Security Program Systematic Approach to Training

Rev. 4

71130.07

Procedures

AD-SY-ALL-0520

SECURITY TRAINING

Rev. 5

71130.07

Procedures

AD-SY-ALL-0524

SECURITY ON-THE-JOB TRAINING (OJT) AND TASK

PERFORMANCE EVALUATION (TPE)

Rev. 1

71130.07

Procedures

AD-SY-ALL-0540

SECURITY RANGE SAFETY AND CONTROL

Rev. 8

6