ML19312D591

From kanterella
Revision as of 18:34, 21 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC 791227 Ltr Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20,& 50-493/79-20.Corrective Actions:Samples Taken,Nonconforming Item Report Written & Computer Tickler Sys Implemented
ML19312D591
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 01/22/1980
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19312D585 List:
References
NUDOCS 8003250040
Download: ML19312D591 (1)


Text

. .

I e

h DUIm Po VI:It C O 3tI'A N Y

$ f? ..

1 Cisfridi, Ilox 33189. CH Ani.orrn. N. C.

2m242 L. C DAIL "M EE"*

?9 JM125 All : 23 Janua'y 22, 1980 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission l'J1 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Cherokee Nuclear Station IE:II:JJL Inspection Reports: 50-491/79-20, 50-492/79-20, and 50-493/79-20*

Duke File CK-1412. ll-1

Dear Mr. O'Reilly:

Q In Mr. Lenahan's inspection reports referenced above, he identified a deficiency entitled " Sampling and Testing of Concrete Aggregate" and requested a report be filed within twenty (20) days of receipt of these reports.

Duke Power Company's interim response is as follows:

1) The subject samples have been taken and a Nonconforming Item Report (NCI) written to document and resolve the problem.
2) A formal, computerized " Tickler" system has been implemented to prevent reoccurrence.

i

3) The sample results will be obtained and the NCI resolved by February 15, 1980 at which time Duke will file a final report.

Very truly yours, L. C. Dail JEB/fch 80032500h 2009 WW

OiHAL (o7V L