Confirms Info Re Status of Emergency Operations Facility, Per 821203 Request.More Detailed Info Available in FSAR App 13.B,emergency Plan,Section 10
ML20028B920
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/03/1982
From: Wuller G
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
U-0582, U-582, NUDOCS 8212070229
Download: ML20028B920 (2)


Text

O

/LLINDIS POWER OOMPANY p 5 g32_g3y_s 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 December 3, 1982 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Clinton Power Station Unit 1 Docket No. 50-461 This letter is in response to the verbal request on December 3 of Mr. Harvey Abelson and confirms the informa-tion provided regarding the status of the Emergency Operations Facility (EOF) for the Clinton Power Station.

Primary EOF Location: in the CPS Construction Office Bui ding approx. 1000 feet east of the main control room.

Structure: rigid frame type with metal siding Protection Factor: >5 (actual calculated -6.5)

Construction Start: Existing building HEPA Filters: Yes; HEPA filters are to be provided Backup EOF Location: IP Electric and Gas Dispatch Center, Decatur, IL., approx. 21.7 miles from main control room Structure: Concrete and brick building with a basement and first floor goo r 8212070229 821203 PDRADOCK05000g F

L

U-0582 054-82(12-03)-6 December 3, 1982 Page 2 Backup EOF (continued)

Protection Factor: 21.7 mile location; no special radiation provisions are necessary.

Construction Start: Existing building Interim Primary EOF - not needed Interim Backup EOF - not needed Additional and more detailed information on the Clinton emergency facilities and equipment is provided in the CPS-FSAR Appendix 13.B, Emergency Plan, Section 10. Please let us hear if you need further information.

Sincerely,

. ESkL G. E. Wuller Supervisor-Licensing Nuclear Station Engineering GEW/lt cc: H. Abelson, NRC J. H. Williams , NRC Clinton Proj ect Manager H. H. Livermore, NRC Resident Inspector

, Illinois Department of Nuclear Safety I

1 k