ML19331C781

From kanterella
Revision as of 13:31, 18 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 80-012/03L-0:on 800520,during Full Power Operation, Routine Testing Revealed Pressure Switch 5121B Setpoint at 700 Psi Above Tech Spec.Caused by Personnel Error.Setpoint Adjusted.Technician Instructed
ML19331C781
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/19/1980
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-80-012-03L, LER-80-12-3L, NUDOCS 8008190531
Download: ML19331C781 (1)


Text

-. _ _ . _ _ _ . . . _ - - _ _ -- --

i

! DOCUMENT NOT FILMED DUE TO POOR

! LEGIBILITY t

DOCUMENT MAY BE OBTAINED FROM HARD COPY FILES i

ccessio u ber of the Requested Document ,

Center d ovide e

";;"*L^&*M e";""**'

.