Report in Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.3
ML12353A242
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/27/2012
From: Heacock D
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-205H
Download: ML12353A242 (636)


Text

{{#Wiki_filter:Dominion Nuclear Connecticut, Inc. j 5000 Dominion Boulevard, Glen Allen, VA 23060 om inion Web Address: www.dom.com November 27, 2012 U.S. Nuclear Regulatory Commission Serial No. 12-205H Attention: Document Control Desk NL&OS/WDC RO Washington, DC 20555 Docket Nos. 50-336/423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT. INC. MILLSTONE POWER STATION UNITS 2 AND 3 REPORT IN RESPONSE TO MARCH 12, 2012 INFORMATION REQUEST REGARDING SEISMIC ASPECTS OF RECOMMENDATION 2.3 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," to all power reactor licensees and holders of construction permits in active or deferred status. Seismic Recommendation 2.3 requires licensees to conduct seismic walkdowns at their plants to identify and address plant specific degraded, nonconforming, or unanalyzed conditions such that the nuclear power plant can respond to external events. For Seismic Recommendation 2.3, Enclosure 3 of the letter states that within 180 days of the NRC's endorsement of the walkdown process, each licensee will submit its final response. The response should include a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the walkdowns will be completed. In a letter dated May 31, 2012, the NRC endorsed EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," which Dominion Nuclear Connecticut, Inc. (DNC) used to conduct its seismic walkdowns for Millstone Power Station (MPS) Units 2 and 3. Attachments 1 and 2, on the attached compact disc, provide the walkdown reports as DNC's response to Seismic Recommendation 2.3 for MPS2 and MPS3, respectively. Attachment 3 provides a list of items for which inspections could not be completed due to inaccessibility and a schedule of when the walkdowns for these items will be completed. A supplemental submittal will be provided to the NRC with the results of the deferred seismic walkdowns for MPS2 and MPS3 by August 30, 2014.

Serial No. 12-205H Docket Nos. 50-336/423 Page 2 of 3 If you have any questions regarding this information, please contact Wanda Craft at (804) 273-4687. Sincerely,

                                                                        - - -      -   dhoMbsAwdlim David A. Heacock                                                         VICKI L.HULL Nmtary Public President and Chief Nuclear Officer                                 Coumowelnlth ol Virginli Dominion Nuclear Connecticut, Inc.                                          140542 My Commission Expires May 31, 2014
                                                                - -w -w  -

COMMONWEALTH OF VIRGINIA )

                                           )

COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Heacock, who is President and Chief Nuclear Officer of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this 2 fday of Lk I'r*i'*r", 2012. My Commission Expires: L_____ Notary Public Commitments made in this letter:

1. Seismic walkdowns that could not be completed due to inaccessibility will be completed as indicated in Attachment 3, Table 3-1 and Table 3-2 and a supplemental submittal will be provided to the NRC for MPS2 and MPS3 by August 30, 2014.

Attachments:

1. Millstone Power Station Unit 2 Seismic Walkdown Summary Report
2. Millstone Power Station Unit 3 Seismic Walkdown Summary Report
3. List of Inaccessible Items

Serial No. 12-205H Docket Nos. 50-336/423 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 J. S. Kim Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No. 12-205H Docket Nos. 50-336/423 ATTACHMENTS 1 and 2 (See attached compact disc) MILLSTONE POWER STATION UNITS 2 AND 3 MILLSTONE SEISMIC WALKDOWN

SUMMARY

REPORT DOMINION NUCLEAR CONNECTICUT, INC. MILLSTONE POWER STATION UNITS 2 AND 3

Serial No. 12-205H Docket Nos. 50-336/423 ATTACHMENT 3 LIST OF INACCESSIBLE ITEMS DOMINION NUCLEAR CONNECTICUT, INC. MILLSTONE POWER STATION UNITS 2 AND 3

Serial No. 12-205H Docket Nos. 50-336/423 Response to Seismic for Recommendation 2.3 Attachment 3, Page 1 of 2 Table 3-1: MPS2 Deferred Walkdown Items Inspection ID Number Description Location Completion Schedule A SERVICE WATER PUMP M2C58A* DISCH STRAINER CONTROL Intake Structure Spring outage 2014 PANEL L1A EAST D.C. SWITCHGEAR East DC Switchgear M2FLP-5* ROOM HALON FIRE SYSTEM Room Spring outage 2014 PANEL M2F22B-PNL* B CONTROL ROOM A/C Control Room H&V Spring outage 2014 COMPRESSOR PANEL Room M2F22A-PNL* A CONTROL ROOM A/C Control Room H&V Spring outage 2014 M2F22A-PNL* COMPRESSOR PANEL Room Springoutage_201 M2C70A* FIRE SHUTDOWN BOTTLE East Switchgear Room Spring outage 2014 _____________UPPANEL_ _ _ _ _ _ _ _ _ Walkdown inspection complete with the exception of access to electrical cabinet internally mounted items. Table 3-2: MPS3 Deferred Walkdown Items Inspection ID Number Description Location Completion Schedule 480 VOLT LOAD CENTER . M332Y 32Y Auxiliary Building Spring outage 2013 M33CHS*RV8121 SEAL RETURN LINE INLET Containment Spring outage 2013 CONTAINMENT RELIEF M33RCS*PCV455A POWER OPERATED Containment Spring outage 2013 RELIEF VALVE M33CHS*MV8112 SEAL WATER RETURN Containment Spring outage 2013 CTMT ISOL M33SIL*MV8808A SI ACCUMULATOR TANK 1 Containment Spring outage 2013 OUTLET ISOL M332-1R 1 480V AC MOTOR CONTROL CENTER Auxiliary Building Spring outage 2013 480V MCC 32-1 U (EMERG) 'B' Diesel Generator Spring outage 2013 M332-1Ul EMERGENCY Room GENERATOR 480 VOLT MCC 32-M332-2R 1 2R(EMERG) ROD Auxiliary Building Spring outage 2013 CONTROL

Serial No. 12-205H Docket Nos. 50-336/423 Response to Seismic for Recommendation 2.3 Attachment 3, Page 2 of 2 Inspection ID Number Description Location Completion Schedule M332-1W 1 480 VOLT MCC 32-1W(EMERG) AUX BLDG. Auxiliary Building Spring outage 2013 M332-4T 1 480V MCC ESF Building Spring outage 2013 480 VOLT MCC 32- Circulating Water M332-5T 1 5T(EMERG) CIRC WATER Puan Wate Spring outage 2013 PUMP HOUSE Pump House M332-2U1 480 VOLT MCC32-2U Auxiliary Building Spring outage 2013 M33BYS*PNL2l BATTERY BUS 2 (301 B-i) Control Building Spring outage 2013 M33BYS*PNL11 BATTERY BUS 1 (301A-1) Control Building Spring outage 2013 M33VBA*XRC_2' VIAC-2 ALTERNATE Control Building Spring outage 2013 SOURCE TRANSFORMER M33LAC*EXL2Pl 3LAC*PNL3C2P LIGHTING Control Building Spring outage 2013 TRANSFORMER AC DIST PANEL M33SCV*XD5Pl TRANSFORMER Auxiliary Building Spring outage 2013 AUXILIARY M33SCV*XD1O0 240V/120V STEP DOWN Spring outage 2013 XFMR ORANGE Control Building M33CES*PNLTSB1 B TRAIN TRANSFER Control Building Spring outage 2013 SWITCH PANEL M33BYS*HGR1(301 BATTERY HARGER 1 Control Building Spring outage 2013 BATTERY CHARGER o M33BYS*CHGR-3' Control Building Spring outage 2013 (301 A-2) M33VBA*INV1l INVERTER 1 Control Building Spring outage 2013 M33VBA*INV3l INVERTER 3 Control Building Spring outage 2013 CHG HDR FLOW CNTRL M33CHS*ZT19OB' VLV 3CHS*HCV190B ELEC Auxiliary Building Spring outage 2013 CNTR MOD Walkdown inspection complete with the exception of access to electrical cabinet internally mounted items.

Dominion Nuclear Connecticut, Inc. Millstone Power Station Unit 2 Seismic Walkdown Summary Report Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic November, 2012

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Executive Summary On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff issued requests for information pursuant to 10 CFR 50.54(f) related to the Near Term Task Force (NTTF) recommendations. Enclosure 3 of the NRCs 50.54(f) letter requested utilities to provide information related to NTTF Recommendation 2.3: Seismic, as amended by the Staff Requirements Memoranda (SRM) associated with SECY-11-0124 and SECY-11-0137. The nuclear power industry and the NRC cooperatively developed guidelines and procedures to perform the seismic walkdowns. The resulting EPRI Report No. 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic (EPRI 1025286) provides guidance and procedures for performing the seismic walkdowns. Dominion followed the EPRI 1025286 guidance in developing the Seismic Walkdown Equipment List (SWEL), performing the Millstone Power Station (MPS) Unit 2 seismic walkdowns and developing the submittal report. Seismic walkdowns of accessible items have been completed. Some items included on the SWEL were not sufficiently accessible to complete the walkdown inspection. Walkdowns for these items are planned to be completed by the end of the next scheduled refueling outage (Spring 2014). A revised Summary Report will be issued following completion of the seismic walkdowns. By completing and documenting the requested seismic walkdowns for MPS Unit 2, Dominion has met the objectives of the NRC request for information related to NTTF Recommendation 2.3: Seismic. Potentially adverse conditions identified during the completed seismic walkdowns and area walk-bys were submitted as Condition Reports (CRs) in the MPS Unit 2 corrective action program (CAP). To date, no significant issues that challenged the MPS Unit 2 seismic licensing or design basis have been identified as a result of the walkdowns. ii

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Millstone Power Station Unit 2 Seismic Walkdown Summary Report Table of Contents SECTION PAGE Executive Sum m ary ...................................................................................................................... ii Background .................................................................................................................................. iv 1.0 Seism ic Licensing Basis Sum m ary ................................................................................. 1-1 2.0 Personnel Qualifications Sum m ary ................................................................................. 2-1 2.1 Equipm ent Selection .................................................................................................... 2-1 2.2 Seism ic W alkdowns ..................................................................................................... 2-1 2.3 Licensing Basis Evaluations ........................................................................................ 2-1 2.4 IPEEE Review ............................................................................................................. 2-1 2.5 Peer Review ............................................................................................................... 2-1 3.0 SSC Selection ................................................................................................................. 3-1 3.1 Purpose ....................................................................................................................... 3-1 3.2 Methodology ................................................................................................................ 3-1 3.3 Results ......................................................................................................................... 3-3 3.4 Inaccessible Item s ....................................................................................................... 3-5 4.0 Seism ic W alkdow ns and Area W alk-Bys ........................................................................ 4-1 5.0 Licensing Basis Evaluation ............................................................................................. 5-1 5.1 Sum m ary of Evaluations .............................................................................................. 5-1 5.2 Plant M odifications ...................................................................................................... 5-1 6.0 IPEEE Vulnerabilities ...................................................................................................... 6-1 7.0 Peer Review Sum m ary ................................................................................................... 7-1 8.0 References ...................................................................................................................... 8-1 Appendix A - Personnel Qualifications Appendix B - Seismic Walkdown Equipment List (SWEL) and Area Walk-by List Appendix C - Seismic Walkdown Checklists (SWC) Appendix D - Area Walk-by Checklists (AWC) iii

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

Background

Following the accident at the Fukushima Daiichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established the Near Term Task Force (NTTF) in response to Commission direction. The NTTF was tasked with conducting a review of NRC regulations and processes and determining if the NRC should make additional improvements. A set of recommendations made by the task force was included in a report provided to the Commission. Although the NRC concluded that continued plant operation did not pose an imminent risk to public health and safety, the Commission directed the NRC staff (in the Staff Requirements Memorandum (SRM) to SECY-1 1-0093) to determine those recommendations that should be implemented without unnecessary delay. In SECY-1"1-0124, the NRC staff identified the NTTF recommendations that should be implemented without delay, including the development of information requests to be made under 10 CFR 50.54(f). The NRC issued the requests for information pursuant to 10 CFR 50.54(f) on March 12, 2012 related to the following NTTF recommendations (Reference 1):

  • Recommendation 2.1: Seismic
    "   Recommendation      2.1: Flooding
    "   Recommendation      2.3: Seismic
    "   Recommendation      2.3: Flooding
  • Recommendation 9.3: Emergency Preparedness Enclosure 3 of the NRC's 50.54(f) letter addressed providing information related to NTTF Recommendation 2.3: Seismic, as amended by the SRMs associated with SECY-11-0124 and SECY-1 1-0137. Enclosure 3 requested that licensees:
1. Develop a methodology and acceptance criteria for seismic walkdowns to be endorsed by the NRC staff,
2. Perform seismic walkdowns using the NRC-endorsed walkdown methodology,
3. Identify and address degraded, nonconforming, or unanalyzed conditions through a corrective action program, and
4. Verify the adequacy of licensee monitoring and maintenance procedures.

The nuclear power industry and the NRC agreed to cooperate in the development of guidelines and procedures to perform the seismic walkdowns. The resulting EPRI Report No. 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic (EPRI 1025286) (Reference 2) provides guidance and procedures for performing the seismic walkdowns. The guidance addresses selection of personnel, selection of a sample of structures, systems, and components (SSCs) that represent a diversity of component types and ensures inclusion of components from critical systems and functions as described in the NRCs 50.54(f) letter, conduct of the walkdowns, evaluations against the plant seismic licensing basis, and reporting requirements. EPRI 1025286 also includes checklists to be used by the seismic walkdown engineers for seismic evaluations. The guidance contained in EPRI 1025286 was developed to meet NRC's objectives, and in a letter dated May 31, 2012 (Reference 3), the NRC confirmed that the EPRI 1025286 guidance iv

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report directs licensees to perform walkdowns in a manner that will address Requested Information Items 1.a through 1.g in the 50.54(f) letter. The NRC staff also confirmed that Section 8, "Submittal Report," of the EPRI 1025286 guidance outlines the appropriate information to be submitted in response to Requested Information Items 2.a through 2.f. of Enclosure 3 of the 50.54(f) letter. Dominion used the EPRI 1025286 guidance in developing and performing the seismic walkdowns at Millstone Power Station (MPS) Unit 2 in response to the NRC's 50.54(f) letter. In addition, Dominion followed the EPRI 1025286 Section 8 guidance for the development of this report. V

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 1.0 Seismic Licensing Basis Summary The seismic licensing basis for MPS Unit 2 is documented in the Final Safety Analysis Report (FSAR) (Reference 4). The FSAR describes the design basis earthquake (DBE) loads and their application to structures and components. The seismic design basis functions are in FSAR Chapter 5, Structures. FSAR Section 5.2.2.1.5 states that structural function is ensured to the DBE, which has a peak horizontal ground acceleration of 0.17g and vertical ground acceleration of 0.1 g. Earthquake loads are predicated upon an operating basis earthquake (OBE) at the site having a horizontal ground acceleration of 0.09g and a vertical acceleration of 0.06g. FSAR Chapter 5 contains commitments to the General Design Criteria (GDC) in Appendix A of 10 CFR Part 50. The DBE is defined as the maximum credible earthquake at the plant site that can reasonably be predicted from geologic and seismic evidence. The Nuclear Steam Supply System (NSSS) is designed to withstand the loads imposed by the maximum hypothetical accident and the maximum seismic disturbance without loss of functions required for safe reactor shutdown and emergency core cooling. Category I structures are designed to withstand appropriate seismic and other applicable loads without loss of function, which could result in a release of radioactivity to the site boundary in excess of the 10 CFR 100 guidelines. The design philosophy for equipment component seismic design has been subject to significant changes since issuance of the original operating license. The seismic design basis was verified during the design phase by analyzing lumped-mass stick models for each of the buildings. Once built, IEEE 344-1971 provided direction for analysis and testing procedures which demonstrated that equipment could meet performance requirements in the event of a DBE. Subsequent to the original plant design, MPS Unit 2 implemented several plant systems upgrades with commitments to IEEE 344-1975 as the seismic design basis. MPS Unit 2 seismic qualification was reviewed through two programs in the late 1980's and early 1990's. In 1987, the NRC issued Generic Letter (GL) 87-02 to provide guidance to licensees for Unresolved Safety Issue (USI) A-46 "Seismic Qualification of Equipment in Operating Plants." In 1991, the NRC issued GL 88-20, Supplement 4, requesting licensees to perform an Individual Plant Examination of External Events (IPEEEE) for severe accident vulnerabilities in accordance with the guidelines provided in NUREG-1407. The MPS Unit 2 IPEEE and USI A-46 programs were integrated to perform seismic walkdowns of SSCs. Seismic review teams conducted walkdowns following the Seismic Qualification Utility Group (SQUG) Generic Implementation Procedure (GIP) and procedures detailed in EPRI NP-6041. A summary report of the results of the MPS Unit 2 IPEEE program was submitted to the NRC in 1995 (Reference 5) followed by the USI A-46 walkdown summary report in 1996 (Reference 6). Following the USI A-46 program, MPS Unit 2 modified the FSAR to allow the use of SQUG GIP methodology as an alternative to the existing FSAR methods for the seismic design and verification of modified, new, and replacement equipment. Lastly, MPS Unit 2 modified the FSAR to allow the use of the EPRI STERI (Seismic Technical Evaluation of Replacement Items TR-104871) process to demonstrate that seismically rugged or insensitive replacement items exhibit seismic performance equivalent to original items. Codes, standards, and methods related to the definition of the DBE and the design of structures and components for MPS Unit 2 can be found in FSAR Sections 2.6, 4.5.2, and Chapter 5. 1-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 2.0 Personnel Qualifications Summary A summary of the personnel requirements, as outlined in EPRI 1025286 (Reference 2), for different seismic walkdown activities is provided as follows. 2.1 Equipment Selection Personnel responsible for equipment selection should have knowledge of plant operations, plant documentation, and associated SSCs. They should have the capability to select a broad distribution of SSCs for the Seismic Walkdown Equipment List (SWEL). The Equipment Selection Personnel should also have knowledge of the IPEEE program. Equipment Selection Personnel: James A. Petrosky, supported by licensed plant operators, and design and system engineering personnel. 2.2 Seismic Walkdowns The seismic walkdown engineers (SWEs) should have a degree in mechanical or civil/structural engineering, or equivalent; and experience in seismic engineering as it applies to nuclear power plants. In addition, the SWEs must successfully complete one of the following two training courses: NTTF 2.3 Seismic Walkdown Training Course or SQUG Walkdown Training Course. SWEs: William Price, Louis J. DiLuna Jr., James A. Petrosky, James McKinney, Stephen F. Superson, Sombat Pornprasert, and Thomas Steahr. 2.3 Licensing Basis Evaluations All potentially adverse seismic conditions were documented and evaluated within the corrective action program (CAP); no licensing basis evaluations of potentially adverse seismic conditions were performed outside of the corrective action program defined by plant procedures. 2.4 IPEEE Review Reviewers should have adequate engineering experience to review and understand the results of the IPEEE program. IPEEE Reviewer: James A. Petrosky 2.5 Peer Review The peer review team should consist of a minimum of two individuals, one of whom has seismic engineering experience as it applies to nuclear power plants. Peer Reviewers: Marc Hotchkiss and Leo Nadeau. Appendix A provides the qualifications of the personnel involved in performing the seismic walkdown activities at MPS Unit 2. 2-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 3.0 SSC Selection 3.1 Purpose This section describes the process used to develop the seismic walkdown equipment list (SWEL) and documents the resulting SWEL and Area Walk-by list in response to NRC's 10 CFR 50.54(f) letter dated March 12, 2012 (Reference 1). The SWEL was developed using the guidance provided in EPRI 1025286 (Reference 2) and defines the scope of the seismic walkdowns. 3.2 Methodology EPRI 1025286, Section 3, Selection of SSCs, describes the process used to identify items to be included in the SWEL. In general, the SWEL is comprised of two groups of items. The first is a sample of components from the seismic safe shutdown equipment list (SSEL). The other is a sample of components associated with the spent fuel pool. These lists are designated as SWEL 1 and SWEL 2, respectively. SWEL 1 and SWEL 2 are combined to form the SWEL, which defines the overall scope of equipment used as input to the seismic walkdowns. Additional information regarding the process used to develop the SWEL is provided below. SWEL 1 Development The base equipment list used as a starting point for development of the SWEL 1 list was the SSEL developed to address NRC Generic Letter 87-02, Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46. The development of the SSEL included consideration of the following four safety functions:

  • Reactor reactivity control
  • Reactor coolant pressure control
  • Reactor coolant inventory control
  • Decay heat removal Consistent with the guidance in EPRI 1025286, the SSEL was reviewed for items that support the following safety function:
  • Containment function SWEL 1 was developed by applying the following five sample selection attributes, defined in EPRI 1025286, to the SSEL. The required sample size for SWEL 1 was at between 90 and 120 items. The method of application for each attribute is summarized below:
1. A variety of types of systems. Sample items were selected to represent a broad range of frontline and support systems included on the SSEL.
2. Major new and replacement equipment. A review of the equipment on the SSEL was performed by experienced system engineers, design engineers, and plant operators to identify major new or replacement equipment installed within the last 15 years, consistent with EPRI 1025286 guidance. These items were identified for inclusion in the selection of the samples for SWEL 1.

3-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

3. A variety of types of equipment. At least one item from each of the classes of equipment listed in EPRI 1025286, Appendix B, Classes of Equipment was included on SWEL 1 to provide a sample selection of a variety of equipment types. Where no items were listed on the SSEL for a specific class of equipment, no items in that equipment class were selected for SWEL 1.
4. A variety of environments. Sample items were selected from different locations in the plant to include various environments (hot, cold, dry, wet) and inside and outside installations.
5. Equipment enhanced due to vulnerabilities identified durinq the IPEEE pro ram. The USI A-46 and IPEEE program documentation was reviewed to determine equipment that had been modified or otherwise enhanced to reduce USI A-46 and IPEEE vulnerabilities.

These items were identified for inclusion in the selection of the sample for SWEL 1. For each item on SWEL 1, the applicable supported safety function(s) were determined as a confirmation that the five safety functions are adequately represented. In addition, risk significant items on the SWEL 1 list are identified as confirmation that risk insights are adequately considered in the development of SWEL 1. SWEL 2 Development SWEL 2 was developed based on a review of systems associated with the spent fuel pool (SFP) that are Seismic Category I or components whose failure could result in a rapid drain-down of the water level in the SFP to less than ten feet above the fuel. For Seismic Category I systems associated with the SFP, a sample of components was identified using selection criteria similar to that described for SWEL 1. Any components whose failure could result in rapid drain-down of the SEP were to be identified and evaluated for addition to SWEL 2. Identified components that met the criteria for inclusion in the seismic walkdowns were to be added to SWEL 2. If no component failures were identified that could result in rapid drain-down of the SFP, no components were added to SWEL 2, and the basis for this conclusion was described. SWEL The SWEL was developed by combining the items on SWEL 1 and SWEL 2. The items on the SWEL were reviewed to determine the population of items with anchorage, and at least 50% of those items were selected for a configuration verification of the installed anchorage during the associated seismic walkdown. The SWEL serves as the input to the seismic walkdowns conducted in accordance with EPRI 1025286 Section 4, Seismic Walkdowns and Area Walk-Bys. A walk-by area is defined as the room containing SWEL item(s), or in the case of a large open space, the area within a 35 foot radius around a SWEL item. Walk-by areas are defined to ensure that all items on the SWEL are included within a walk-by area. 3-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 3.3 Results The methodology described in Section 3.2 was applied to develop the SWEL and the Area Walk-by list. The results of the implementation of this methodology are provided below. The SWEL was developed by personnel meeting the qualifications for equipment selection personnel described in Section 2.1. Qualifications of personnel involved in the development of the SWEL are identified in Appendix A. SWEL 1 The SSEL developed to address USI A-46 was the starting point (termed Base List 1 in EPRI 1025286) for development of the SWEL 1. The SSEL was submitted to the NRC in Reference 6. The five sample selection attributes, described in Section 3.1, were then applied to the SSEL. The results are summarized for each attribute below:

1. A variety of types of systems. Sample items were selected to represent a broad range of frontline and support systems included on the SSEL. The number of selected items associated with each of the represented systems is provided in Appendix B.
2. Major new and replacement equipment. A review of the equipment on the SSEL was performed by experienced system engineers, design engineers, and plant operators to identify major new or replacement equipment installed within the last 15 years. The review was based on plant design change records, maintenance history, and reviewer experience. A sample of these items is included in SWEL 1.
3. A variety of types of equipment. At least one item from each of the classes of equipment listed in EPRI 1025286, Appendix B: Classes of Equipment was included in SWEL 1 to provide a sample selection of a variety of equipment types. The number of items from each of the equipment classes is identified in Appendix B. There were no items listed on the SSEL for equipment classes 12 and 13.
4. A variety of environments. Sample items were selected from different locations in the plant to include various environments (hot, cold, dry, wet). The installed location is identified for each of the SWEL 1 items, which provides an indication of the operating environment for the item.
5. Equipment enhanced due to vulnerabilities identified durinq the IPEEE program. The USI A-46 program documentation was reviewed to determine equipment that had been modified or otherwise enhanced to reduce seismic vulnerabilities. 17 of these items are included on the SWEL 1 list.

The resulting sample size of the equipment for the SWEL 1 list was 99 items. For each item on the list, the applicable supported safety function(s), listed below, were identified and indicated:

  • Reactor reactivity control
  • Reactor coolant pressure control
    "    Reactor coolant inventory control
    "    Decay heat removal
    "    Containment function 3-3

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report SWEL 2 SWEL 2 was developed based on a review of systems associated with the spent fuel pool (SFP) that are Seismic Category I or components whose failure could result in a rapid drain-down of the water in the SFP to less than ten feet above the top of the fuel. The review was supported by a licensed operator and knowledgeable system engineers. The following Seismic Category I system associated with the SFP was identified:

  • Spent Fuel Pool Cooling System The system was reviewed using the walkdown item sample selection criteria similar to that used for SWEL 1, consistent with the guidance in EPRI 1025286. The following components were selected for inclusion on the MPS Unit 2 SWEL 2:
    -   M2PI13A Spent Fuel Pool Cooling Pump A
    -   M2X20A Spent Fuel Pool Heat Exchanger A Note: M2X20A Spent Fuel Pool Heat Exchanger A was also selected for SWEL 1 since this item was on the seismic SSEL (Base List 1).

Base List 2 and the items identified for inclusion on SWEL 2 are identified in Appendix B. Rapid Drain-down Systems interfacing with the SFP were reviewed to identify any components that could, upon failure, result in rapid drain-down of the SFP water level to below ten feet above the top of the fuel. As described in MPS Unit 2 FSAR Section 9.5 (Reference 4), the SFP has been designed to prevent cooling water inventory loss. All connections penetrate theý wall near the normal operating level so the pool cannot be gravity drained by leaking pumps, valves, or other equipment. Additionally, the cooling water return piping, which extends to the pool bottom, is provided with anti-siphon features. The piping configuration and siphon breaks combine to preclude inadvertent draining of the SFP due to leaks in interfacing piping and equipment. Therefore, there are no components that could, upon failure, result in rapid drain-down of the SFP water level to below ten feet above the top of the fuel and no components have been added to SWEL 2 for this criterion. SWEL The SWEL was developed by combining the items on SWEL 1 and SWEL 2. The SWEL is provided in Appendix B. All items on the list are from SWEL 1 except those items indicated by footnote as originating from SWEL 2. The items on the SWEL were reviewed to identify those that included anchorage (i.e., items that were not line-mounted equipment, such as valves). 58 of the 67 items that included anchorage (86%) were selected for confirmation that the as-installed equipment anchorage is consistent with plant documentation of the anchorage design. The anchorage items selected for confirmation are indicated by a note on the SWEL. 3-4

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report In addition, risk significant items on the SWEL were identified. This information was reviewed by the PRA subject matter expert as confirmation that risk insights were adequately considered in the development of the SWEL. As a result, 68 of the 100 items on the SWEL were identified as being risk significant. This list is the input to the seismic walkdowns conducted in accordance with EPRI 1025286, Section 4, Seismic Walkdowns and Area Walk-Bys. Walk-by areas were identified to include all of the items on the SWEL and are listed in Appendix B. 3.4 Inaccessible Items In the process of selecting SSCs to be included on the SWEL, items that were accessible and have visible anchorage were selected wherever possible. However, there were 5 items included on the SWEL that were not sufficiently accessible to complete the walkdown inspection. These items are listed in Table 3-1 below and indicated by a footnote on the SWEL (Appendix B). The walkdowns for these items are planned to be completed by the end of the next scheduled refueling outage (Spring 2014). Table 3-1: Deferred Walkdown Items Inspection ID Number Description Location Completion Schedule A SERVICE WATER PUMP M2C58A* DISCH STRAINER CONTROL Intake Structure Spring 2014 RFO PANEL L1A EAST D.C. SWITCHGEAR East DC Switchgear M2FLP-5* ROOM HALON FIRE SYSTEM Room Spring 2014 RFO PANEL M2F22B-PNL* CONTROL ROOM BCOMPRESSOR A/C PANEL ControlRoom Room H&V Spring 2014 RFO M2F22A-PNL* A CONTROL ROOM COMPRESSOR A/C PANEL ControlRoom Room H&V Spring 2014 RFO M2C70A* FIRE SHUTDOWN BOTTLE East Switchgear Room Spring 2014 RFO UP PANELI

  • Walkdown inspection complete with the exception of access to electrical cabinet internally mounted items.

3-5

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 4.0 Seismic Walkdowns and Area Walk-Bys The seismic walkdowns and area walk-bys were performed consistent with the guidance provided in EPRI 1025286 (Reference 2). A site-specific procedure was developed to implement the EPRI 1025286 seismic walkdown guidance for conducting and documenting the seismic walkdowns. A walkdown package was prepared for each component listed on the SWEL and for each area walk-by to be performed. Each package included a seismic walkdown checklist (SWC) or an area walk-by checklist (AWC), and the drawing(s) showing equipment location, plant documentation showing the anchorage details for each SWEL item requiring anchorage configuration verification, and documents from prior seismic walkdowns (e.g., Seismic Evaluation Work Sheets (SEWS) from USI A-46 walkdowns), as applicable. A hardcopy of the package was available for the SWEs during performance of the equipment walkdown or area walk-by. The seismic walkdowns and area walk-bys were performed by walkdown teams, which consisted of at least two (2) qualified SWEs. For the seismic walkdowns, the SWEs focused on the following adverse seismic conditions associated with each item of equipment as described in the EPRI 1025286 guidance:

  • adverse anchorage conditions,
  • adverse seismic spatial interactions, and
    " other adverse seismic conditions.

The purpose of the area walk-bys was to identify potentially adverse seismic conditions associated with other SSCs located in the vicinity of the SWEL items. For the area walk-bys, SWEs focused on the following potentially adverse seismic conditions as described in the EPRI 1025286 guidance:

    " anchorage conditions (if visible without opening equipment),
    " significantly degraded equipment in the area,
  • condition of cable/conduit raceways, including condition of supports or fill conditions, and HVAC ducting,
    " potential adverse seismic interactions including those that could cause flooding, spray, or a fire in the area, and
    " housekeeping items that could cause adverse seismic interactions.

During the walkdown or walk-by, the walkdown teams discussed conditions and/or any findings in the field, reached agreement on the results of the walkdown, and documented results of the seismic walkdowns and area walk-bys on the checklists. The results of the completed seismic walkdowns are documented on SWCs, which are included as Appendix C. The results of the completed area walk-bys are documented on AWCs, which are included as Appendix D. For electrical cabinet internal inspection of motor control centers (MCC) that included several breaker cubicles (buckets), a sample of the breaker cubicles were inspected as described on the applicable SWC for the item. The use of a sample inspection for these items is consistent with the overall sampling approach applied to the NTTF 2.3 Seismic walkdowns, and provides reasonable assurance that visibly accessible internal components mountings are adequate. Inspecting a sample of MCC breaker cubicles adequately confirmed the condition of internal component mountings since the fastenings for components within MCCs are not subject to 4-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report significant environmentally-induced degradation based on their installed location and the maintenance on these items is controlled by station procedures. The SWEL includes 100 items to be walked down and 36 area walk-bys were defined. Of these, 95 walkdowns and 36 area walk-bys have been completed. The remaining 5 walkdowns have been deferred because the component was not sufficiently accessible to complete the walkdown inspection and walkdown checklists are not included in this report for those items. The schedule for completion of these deferred seismic walkdowns is described in Section 3.4. Table 4-1 lists potentially adverse seismic conditions identified during the completed seismic walkdowns and area walk-bys. The items listed in Table 4-1 were submitted as Condition Reports (CRs) in the station corrective action program (CAP). Table 4-1 summarizes the potentially adverse seismic conditions, describes how the condition has been addressed, and provides the current status of the resolution. A low threshold was used to identify and document potential adverse conditions. In addition to items listed in Table 4-1, non-seismic related potentially adverse conditions, such as various housekeeping and material condition items, were identified by the walkdown teams and addressed through the CAP. No significant issues that challenged the MPS Unit 2 seismic licensing or design basis were identified as a result of the walkdowns completed to date. As indicated in Table 4-1, no planned or newly installed changes to the plant are required to resolve the items identified during the walkdowns. 4-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Table 4-1: Potentially Adverse Seismic Conditions Equipment SWC / AWC ID CAP Description Resolution Status MP2-WD- RWST T-41 CR484025 RWST T-41 anchor bolts corroded. The condition was previously Work Order initiated SWEL-095 Several RWST tank T-41 anchor identified and the reduction of bolt to clean and recoat bolts were observed to have minor area was determined to be the corroded bolting. to moderate surface corrosion. structurally not significant. The Affected anchor bolts were currently observed corrosion on the observed on the West side insufficiently coated bolts does not (outside) and the south side of the affect the structural integrity of the tank in the metal enclosure. The bolts. The surface corrosion on the tank anchor bolts appear to have uncoated portion of the bolts has been recently coated with a not created a significant reduction galvanic paint; however several of bolt area. Given the very small bolts were not adequately coated. reduction in area of the five affected bolts and the large number of bolts for the tank anchorage (96), the anchorage is considered acceptable. Bolts with incomplete coating should be cleaned and coated to arrest any further degradation. MP2-WB-022 MP2 SWP CR484290 The Service Water Pump Motor The frame enclosing the tank is The Service Water Motor Protection Tank was found to not restrained at one point, at the Pump Motor Protection be restrained in accordance with base. Although no safety-related Protection Tank has TK Seismic Housekeeping procedure. equipment is in the fall zone, been properly additional or alternate restraint is secured in needed to prevent toppling in a accordance with the seismic event. Seismic Housekeeping Procedure - CLOSED. 4-3

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Table 4-1: Potentially Adverse Seismic Conditions Equipment SWC / AWC ID CAP Description Resolution Status MP2-WB-028 Valve 2- CR484379 Identified a vertical run of fire The vital chilled water pumps Evaluation FIRE-476 protection piping that is laterally nearby are resistant to spray and assignment to unsupported near valve 2-FIRE- would not be rendered inoperable if Design Engineering 476 and is in close proximity to the they were to be sprayed by this to address vertical column E-19 flange. There is a hypothetical fire suppression leak. run of fire protection potential that without lateral In addition, the column that the piping to hose restraint the FP piping could sway, suppression system may impact is station # 205 impacting the column flange and fire coated. This coating would support issue. causing a water spray condition. provide some cushion to mitigate any impact MP2-WD- M22-SW- CR484417 The overhead panels of the This installation was previously Corrective action SWEL-041 3.2A & B security fence enclosure for evaluated and determined to be initiated to evaluate TBCCW Stop Valves M22-SW- acceptable. the as-installed 3.2A & B potentially insufficiently condition for supported. potential enhancement of the support configuration. MP2-WD- M2F52 CR484940 East 480V Room Supply Fan The existing support is acceptable Design Engineering SWEL-053 (M2F52) support configuration based on the SEWS and visual corrective action does not match the drawing of inspection. There are no operability initiated to evaluate record. The USI A46 Screening concerns, the as-built support Evaluation Work sheet (SEWS) configuration for number F52, Rev. 0, dated documentation 2/14/92, is consistent with the update. actual support configuration. I 4-4

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 5.0 Licensing Basis Evaluation The station CAP was used to document the evaluation of potentially adverse seismic conditions identified in Section 4.0. 5.1 Summary of Evaluations There were no conditions identified during the seismic walkdowns completed to date that challenge the validity of the current plant seismic licensing or design basis. 5.2 Plant Modifications There are no planned or newly installed changes to the plant as a result of implementation of the seismic walkdowns and area walk-bys completed to date. As identified in Table 4-1, actions planned as a result of seismic walkdown findings include documentation updates, maintenance items, and engineering evaluations to document as-found conditions. 5-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 6.0 IPEEE Vulnerabilities On June 28, 1991, the NRC issued Generic Letter (GL) 88-20, Supplement 4 (with NUREG-1407, Procedural and Submittal Guidance) requesting each licensee to perform an individual plant examination of external events (IPEEE) to examine the plant-specific relationship of external events to severe accidents, identify any severe accident vulnerabilities, and to report the results to the Commission together with any licensee-determined improvements and corrective actions. The results of the IPEEE Program for MPS Unit 2 were submitted in the Millstone Unit 2 IPEEE Summary Report dated December 1995 (Reference 5), which indicated that MPS Unit 2 had a relatively low risk from external events. Table 7.1-1, Opportunities for Safety Enhancements, of the MPS Unit 2 IPEEE Summary Report provides the equipment outliers identified during walkdown evaluations for the IPEEE review. Table 7.1-1 indicated the items that remained unresolved at the time of the report submittal. An updated status of the items in the IPEEE Report Table 7.1-1 was provided in a letter dated December 31, 1998 (Reference 7). Table 6-1 provides the current status of the seismic-related items from IPEEE Report Table 7.1-1 that were indicated as OPEN in the update provided in Reference 7. The MPS Unit 2 configuration management program has maintained the equipment modifications and programmatic changes implemented to eliminate or reduce the seismic vulnerabilities identified during the IPEEE program. 6-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Table 6-1 Status of IPEEE Outliers Open / Item # Closed Outlier Description Status 8 Closed The enclosure expansion anchorage was found to be limiting Closed. for RSST Feeder Breaker's 22S3-2-2 enclosure. As a result of a plant modification related to the RSST, breaker

References:

22S3-2-2 enclosure is no longer in service. Therefore, the MP2 IPEEE, Section 3.2.4.13 and Table 3.2-3 enclosure anchorage is no longer considered an IPEEE outlier. 9 Closed Tank Anchorage was found to be limiting for the Chilled Water See letter dated August 13, 2004 Surge Tank, T98. (Reference 8) for closure information.

Reference:

MP2 IPEEE, Table 3.2-3 10 Closed The block wall adjacent to INV-5 is not considered "Safety Closed based on the Related" and was assumed to be unreinforced. determination that component INV-5 is not risk significant.

References:

MP2 IPEEE, Section 3.2.4.15 and Table 3.2-3 12 Closed The seismic capacity of Millstone Point Unit No. 1 diesel fire See letter dated August 13, 2004 pump fuel tank may not be adequate. MP2 relies on MP1 fire (Reference 8) for closure suppression system for fire protection, information. Fires generated as a result of earthquakes are common. Fire pumps driven using offsite power cannot be relied upon since most earthquakes will result in loss of offsite power.

Reference:

MP2 IPEEE, Section 4.11.3.3 13 Closed A long run of fire water header system piping along the Turbine See letter dated August 13, 2004 Building's north wall appears to have very low seismic capacity. (Reference 8) for closure information.

Reference:

MP2 IPEEE, Section 4.11.3.3 14 Closed The block wall construction of the fire pump house (shared by See letter dated August 13, 2004 MP1 and MP2) may not provide adequate seismic ruggedness. (Reference 8) for closure information.

Reference:

MP2 IPEEE, Section 4.11.3.3 6-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 7.0 Peer Review Summary The Peer Review Team function and required activities are delineated in EPRI 1025286, Section 6, PeerReview. The Peer Review Team provided an overview of the following seismic walkdown activities, as defined in EPRI 1025286:

1. Selection of the SSCs included on the SWEL
2. Checklists prepared for the seismic walkdowns and area walk-bys
3. Licensing basis evaluations
4. Decisions for entering the potentially adverse seismic conditions into the CAP process
5. Submittal report Peer Review activities were performed during the preparation and performance of the seismic walkdowns. The Peer Review Team members were:
  • Marc Hotchkiss, Dominion, Peer Review Team Lead
  • Leo Nadeau, Bechtel Power A summary of the results of the Peer Review is provided below:
1. Selection of SSCs The Peer Review Team performed a comprehensive review of the SWEL. The SWEL was compared to the requirements of EPRI 1025286, Section 3, Selection of SSC utilizing Appendix F, Peer Review Checklist and was found to appropriately apply the EPRI 1025286 guidance including:
  • Selection of SWEL 1 SSCs
  • Use of sample selection attributes
  • Adequate representation of the five safety functions
  • Consideration of risk insights
  • Selection of spent fuel pool related items All peer review comments were minor and were adequately resolved.

1

2. Sample of Seismic Walkdown Checklist (SWC) and Area Walkdown Checklist (AWC)

The Peer Review Team reviewed a sample of walkdown results and concluded that the SWCs and AWCs were completed in accordance with the EPRI 1025286 guidance.

a. Packages - The Peer Review Team reviewed a sample of the seismic walkdown documentation packages prepared before walkdowns were performed. These walkdown packages were reviewed to ensure the seismic walkdown checklist and related documentation (e.g., Screening Evaluation Work Sheet (SEWS), anchorage details) were included. The packages were determined to be adequate to support the walkdowns.
b. SWC/AWC - There are 100 SWC documentation packages. 47 SWCs were peer reviewed representing 47% of the total SWCs. This exceeds the EPRI 1025286 requirement for a 10 - 25 % sample. 16 AWCs from a total of 36 were peer reviewed 7-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report representing 44% of the total. Overall, the SWC and AWC were determined to be appropriately detailed and complete.

c. Seismic Walkdown Engineers (SWEs) were interviewed by the Peer Review Team Lead to verify that they understood and followed the Guidance in EPRI 1025286, Section 4, Seismic Walkdowns and Area Walk-Bys. Results of the interviews indicated that each team understood and followed the EPRI guidance.

All peer review comments were minor and were adequately resolved.

3. Review of Licensing Basis Evaluations All potentially adverse seismic conditions identified during the walkdowns were entered into the CAP consistent with plant procedure. There were no Licensing Basis Evaluations, as defined in EPRI 1025286, performed that were in addition to the CAP reviews.
4. Review of Conditions Entered into CAP The threshold level at which field-identified conditions were entered in CAP was considered to be appropriate to ensure that potential licensing basis issues were documented and reviewed by Engineering and the Operations Shift Manager for operability concerns.

Appropriate functional organizations (e.g., Operations, Maintenance, and Site Engineering) were routinely consulted and engaged in the evaluation of potentially adverse seismic conditions.

5. Review of Submittal Report A review of the submittal report was performed by members of the Peer Review Team and it was determined that the objectives and requirements of the 50.54(f) L.etter were met.

7-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report 8.0 References

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(0 Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of the Insights from the Fukushima Daiichi Accident, dated March 12, 2012 (ML12056A046).
2. EPRI Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, June 2012.
3. NRC letter, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 (ML12145A529).
4. Millstone Power Station Unit 2 Final Safety Analysis Report, Revision 28.1.
5. Letter B15481, D. B. Miller Jr. to NRC Document Control Desk, Generic Letter 88-20, Supplements 4 & 5, Individual Plant Examination of External Events - Summary Report, dated December 29, 1995.
6. Letter B15469, E. A. DeBarba to NRC Document Control Desk, USI A-46 Walkdown Summary Report and Proposed Expansion of Licensing Basis for Verification of Equipment Seismic Adequacy, dated January 22, 1996.
7. Letter B17558, D. B. Amerine to NRC Document Control Desk, Millstone Unit No. 2 Response to Request for Additional Information Relating to the Individual Plant Examination of External Events (IPEEE), dated December 31, 1998.
8. Letter 04-398, L. N. Hartz to NRC Document Control Desk, Millstone Units 2 and 3 Response to Request for Additional Information License Renewal Applications, dated August 13, 2004.

8-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix A Personnel Qualifications A-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Louis J. DiLuna Jr. Summary of Background and Experience:

  • Completed 5-day SQUG walkdown training course
  • BS Civil Engineering
  • MS Structural Engineering
  • PE, Massachusetts and New York
  • 36 years of experience in seismic evaluation of components and supports Marc Hotchkiss Summary of Background and Experience:

0 Completed EPRI SWE training course (2012)

  • BS Mechanical Engineering
  • PE, Virginia
  • 29 years of commercial nuclear power plant experience including: plant and system engineering; plant modifications; project management; nuclear control room shift operations (SRO); shift technical advisor; and new plant licensing; 3 years of nuclear plant seismic engineering-related experience James McKinney Summary of Background and Experience:

0 Completed EPRI SWE training course (2012) 0 BS Mechanical/Structural Engineering

  • 36 years of nuclear seismic experience including: preparation and implementation of civil/structural plant modifications; civil/structural calculations; generating pipe stress and support calculations Leo Nadeau Summary of Background and Experience:

a Completed EPRI SWE training course (2012) 0 BS Mechanical Engineering, MS Mechanical Engineering

  • 25 years of experience in project management and engineering activities related to nuclear power plant. projects including: engineering and construction experience with refueling outages in operating facilities; performing new construction and refurbishment of nuclear power plants; 15 years of seismic engineering experience A-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report James A. Petrosky Summary of Background and Experience: 0 Completed 5-day SQUG walkdown training course (2001); Seismic Capability Engineer (2001) 0 BS Civil Engineering

  • MS Mechanical Engineering
  • PE, Connecticut and Rhode Island
  • 25 years of experience in nuclear seismic engineering including: preparation and implementation of civil/structural plant modifications; civil/structural calculations; equipment qualification using SQUG methodology Sombat Pornprasert Summary of Background and Experience:
  • Completed 5-day SQUG training course (1994); Completed EPRI Add-On Seismic IPE training course (1994); Completed SQUG NARE training course (1994);
  • BS Mechanical Engineering Technology
  • 10 years of construction experience in nuclear power plant decommissioning and over 18 years of engineering and design experience within the power generation industry including: review of seismic documentation of components to ensure compliance with plant FSAR, specifications, and industry standards; seismic documentation package preparation for valves, pumps, heat exchangers, and electrical panels; equipment qualification using the SQUG GIP methodology and seismic margin analysis
  • SQUG representative for Northeast Utilities (1993-1995)

William Price Summary of Background and Experience: 0 Completed 5-day SQUG walkdown training course (2012) 0 AS Architectural Engineering

  • 31 years of Civil/Structural Engineering/Design Engineering experience at Millstone Nuclear Power station including: 20 years of experience performing design improvements for Millstone Units 1, 2, and 3; 10 years of experience as Engineering Design Supervisor for Civil/Mechanical Engineering Design at Millstone Nuclear Power Station A-3

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Thomas Steahr Summary of Background and Experience:

  • Completed 5-day SQUG training (2000); Seismic Capability Engineer (2001) 0 BS Mechanical Engineering 0 10 years of nuclear seismic engineering experience including: preparation and implementation of civil/structural plant modifications; civil/structural calculations Stephen F. Superson Summary of Background and Experience:

0 Completed EPRI SWE training course (2012) a BS Civil Engineering

  • 30 years of experience in Structural Engineering including: seismic design and analysis of safety-related components, building steel, and structures; coordination and implementation of nuclear plant modifications; lead engineering direction A-4

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix B Seismic Walkdown Equipment List (SWEL) and Area Walk-by List

1. SWEL (Combined SWEL 1 and SWEL 2)
2. Base List 2/SWEL 2
3. Summary Tables
4. Area Walk-by List B-1

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

1. SWEL (Combined SWEL I and SWEL 2)

Seismic Walkdown Equipment List (SWEL) Risk New or Safety EnhancedE, Item # Class ID Equipment Description System Bldg Elev Significant Replaced Functions a (Y/N) A-46 Nates M22-HV- F112A (BATTERY ROOMS) ROOF 1 0 EXHAUSTER BACKDRAFT AXV YD 14-6 N 1,2,3,4,5 035 DAMPER M22-HV- "B" CONTROL ROOM A/C UNIT 2 0 204B FAN DISCHARGE STOP FIRE ACR AB 36-6 N 1,2,3,4,5 013 DAMPER 3 0 M22-HV- "B" DIESEL GENERATOR ROOM DGV AB 14-6 Y 12,3,4,5 001 0 2558 EXHAUST DAMPER VITAL SWITCHGEAR 4 0 M22-HV-261 VENTILATION SYSTEM ESV TB 45 N 1,2,3,4,5 026 RECIRCULATION FIRE DAMPER VITAL SWITCHGEAR 5 0 M22-HV-265 VENTILATION SYSTEM ESV TB 36-6 N 1,2,3,4,5 030 DISCHARGE FIRE DAMPER F52 DISCHARGE TO EAST 480V 6 0 M22-HV-333 SWGR RM FIRE DAMPER AXV TB 36-6 N 1,2,3,4,5 031 7 0 M2T49D "B" DIESEL ENGINE STARTING DGN AB 14-6 Y 1,2,3,4,5 001 2,3 0 M2T49D AIR TANK "D" 8 0 M2T98 CHILLED WATER SURGE TANK CWD TB 54-6 Y 1,2,3,4,5 032 2,3 9 1 M222E 480V BUS 22E (B05) MCC Section ESO AB 36-6 Y 1,2,3,4,5 Y 015 2,3 10 1 M2B51 480VMOTORCONTROLCENTER MCC AB 14-6 Y 1,2,3,4,5 009 2,3 BUS 851 11 1 M2B62 480V MOTORBVTRSC CONTROL CENTER DaTRlCENTER MCC AB 38-6 Y 1,2,3,4,5 017 2,3 12 2 M2201A DC BATTERY BUS 201A EDC AB 14-6 Y 1,2,3,4,5 007 2 13 2 M222E 480V BUS 22E (805) ESO AB 36-6 Y 1,2,3,4,5 Y 015 2,3 14 3 M224C 4.16KV EMERGENCY BUS 24C ES4 TB 31-6 Y 1,2,3,4,5 029 2 15 4 M2UAC3 REGULATING TRANSFORMER ENV AB 14-6 N Y 1,2,3,4,5 007 2,3 1 UAC3 IMAB46 Y0 1,5 16 1 M21361 480V MOTOR CONTROL CENTER MCC AB 14-6 Y 1,2,3,4,5 Y 009 2,3 1BUS 861 I__IIIIII B-2

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk Enhanced Item # Class ID Equipment Description System Bldg Elev Significant New or Safety for IPEEE, Area (Y/N) Replaced Functions A-46 Walkby 17 5 17 __5 M2P11A M2P11A "A" (MTR RBCCW HTRPUMP BKR ASSEMBLY OCR ABB 6 Y 44_016 010 2,3 LH51-5) CR 26 2,3 18 5 M2P13A A SPENT FUEL POOL COOLING SFC AB -5 N 4 004 2,3,4 PUMP ASSEMBLY 19 5 M2P18A "A CHARGING PUMP ASSEMBLY CVC AB 6 Y Partial 1,2,3 011 2,3 _____ ~~~(MTRHTR BKR LH51-8) __ __ ___ __ 20 5 M2P19A "A" BORIC ACID PUMP ASSEMBLY BAS AB -5 Y 1 002 2,3 21 5 M2P4 TERRY TURBINE FEEDWATER PUMPAUXILIARY ASSEMBLY AFW TB 1-6 Y 2,3,4 027 2,3 "A" HIGH PRESSURE SAFETY 22 5 M2P41A INJECTION PUMP ASSY (MTR HTR HPI AB -5 Y 1,2,3,4 018 2,3 BKR LH51-2)

                                        "A" AUXILIARY FEEDWATER 23       5          M2P9A    PUMP ASSEMBLY (MTR HTR BKR        AFW     TB    1-6      Y                  2,3,4                 027   2,3 LH51-6)
                                       "A" DC SWITCHGEAR ROOM 24       6        M2P122A     CHILLER  P (X169A) CHILL WATER   ESV     TB   14-6      Y                1,2,3,4,5               028 PUMP ASSEMBLY
                                       'A' LOW PRESSURE SAFETY 25       6         M2P42A   INJECTION PUMP ASSY (MTR HTR        LPI    AB  6      Y                 1,2,3,4                018   2,3 BKR LH51-3)
                                        "A" SERVICE WATER PUMP 26       6          M2P5A    ASSEMBLY (MTR HTR BKR LH52-       SWS     CW   14-6      Y                1,2,3,4,5               022   2,3 7) 27       7         M22-CH-       DILUTION CONTROL VALVE        CVC     AB    -5       N                  1,2,3                 002 210X                 ASSEMBLY             CC      A      -       N12                                      002 VOLUME CONTROL TANK 28       7       M22-CH-512       MAKEUP CONTROL VALVE         BAS     AB    -5       N                  1,2,3                 002 ASSEMBLY M22-CHW-        CHILLED WATER SUPPLY 29       7            11      HEADER CROSS TIE CONTROL         CWD     TB   14-6      Y                1,2,3,4,5       Y       028 VALVE ASSEMBLY M22-CHW-    CHILL WATER RETURN HEADER 30       7            13       CROSS TIE CONTROL VALVE         CWD     TB   14-6      Y                1,2,3,4,5               028 ASSEMBLY B-3

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk Enhanced Area Notes Item # Class ID Equipment Description System Bldg Elev Significant New or Safety for IPEEE, Walkby (Y/N) Replaced Functions A-46 M22-FW- #1 STEAM GENERATOR AUX 31 7 43A FEEDWATER REGULATING VALVE FWS TB 14-6 Y 2,3,4 028 ASSEMBLY

                                  #2 S/G MAIN FEED SUPPLY AIR-32      7     M22-FW-5B ASSIST CHECK VALVE ASSEMBLY      FWS      EB   38-6       Y                       4,5                025 PEN #16 M22-MS-         #2 STEAM GENERATOR 33       7                ATMOSPHERIC DUMP CONTROL        STG      EB   38-6       Y                        4                 025 VALVE ASSEMBLY PEN #12 34       7      M22-MS-   #2 STEAM GENERATOR SAFETY       STG      EB    60        Y                        4                 023 239               RELIEF VALVE 35       7      M22-MS-    #2 S/G MAIN STEAM ISOLATION    STG      EB   38-6       Y                       4,5                025 64B              VALVE PEN #20         STB386                   Y4,_2 M22-RB-    "A" SHUTDOWN COOLING HEAT 36       7                   EXCHANGER OUTLET STOP        CCR     AB   6       Y                        4                 018 VALVE ASSEMBLY M22-RB-    RBCCW HEAT EXCHANGER 18A 37       7                   HEADER "B"OUTLET VALVE       CCR     AB   6       Y                    1,2,3,4,5             010 ASSEMBLY PRESSURIZER POWER 38       7     M22-RC-402      OPERATED RELIEF VALVE      PZR      CE   38-6       Y                      2,3,4               021 ASSEMBLY 39       7     M22-SI-306    SHUTDOWNSCC                           AB  6       Y                        4                 018 CONTROL VALVE ASSEMBLY B' D/G HEAT EXCHANGER 40       7        231B    SERVICE WATER BYPASS VALVE      SWS      AB   14-6       Y                    1,2,3,4,5             001 ASSEMBLY M22-SW-     "B" SERVICE WVATER HEADER 41       7        3.2A    SUPPLY TO TBCCW STOP VALVE      SWS      TB   14-6       Y                   1,2,3,4,5              028 M22-SW-       "A" SERVICE WATER PUMP 42       7         90A      DISCHARGE STRAINER FLUSH      SWS     CW    14-6       Y                    1,2,3,4,5             022 VALVE ASSEMBLY M22-SW-       "B" SERVICE WATER PUMP 43       7         97A       DISCHARGE TO "A" SERVCE      SWS     CW    14-6       Y                   1,2,3,4,5              022 WATER HEADER VOLUME CONTROL TANK TO 44       8     M22-CH-501    CHARGING SYSTEM OUTLET       CVC     AB   6       N                      1,2,3               012 VALVE ASSEMBLY               I            I            I          I B-4

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk New or Safety Enhanced Item # Class ID Equipment Description System Bldg Elev Significant Ned Fcty for IPEEE, Walkby Notes (Y/N) epa A-46 "A" BORIC ACID STORAGE TANK 45 8 M22-CH-509 OUTLET GRAVITY FEED VALVE AB -5___1002 ___ BORIC ACID PUMPS "A"/"B" TO 46 8 M22-CH-514 CHARGING PUMP SUCTION CVC AB -5 Y 1 002 VALVE ASSEMBLY TERRY TURBINE AUXILIARY 47 8 2-MS-464 FEEDWATER PUMP STEAM STG YD 40914 Y 2,3,4 027 SUPPLY M22-HV- "b" REFRIGERATION CYCLE CLG 48 8 215A COIL (X42A) INLET VALVE ACR AB 36-6 N 1,2,3,4,5 013 ASSEMBLY 49 8 M22-SI-614 #1 SAFETY INJECTION TANK LPI CE 14-6 Y 1,2,3,4 020 OUTLET VALVE ASSEMBLY LP__CE 14-6_Y 1,2,3,4_020 "A" HPSI HEADER STOP VALVE 50 8 M22-SI-656 ASSEMBLY HPI AB 6 Y 1,2,3,4,5 018 51 9 M2F1 12B "B" DC BATTERY ROOM EXHAUST AXV YD 14-6 N 1,2,3,4,5 035 FAN ASSEMBLY AV D 14-6 N1,2,3, 035 52 9 M2F38B "B" DIESEL GENERATOR VENT FAN ASSEMBLY ROOM DGV D AB 14-6 Y 1,2,3,4,5 Y 001 A -,4 Y EAST 480 VOLT ROOM SUPPLY 53 9 M2F52 FAN ASSEMBLY (MTR HTR BKR ESV TB 56-6 N 1,2,3,4,5 Y 033 2 LH61-6) 1 54 10 M2F133 UPPER 4160 VOLTFAN ROOM COOLING SWITCHGEAR ASSEMBLY TBV TB 56-6 N 1,2,3,4,5 030 2,3 55 10 M2F14C "C"CTMTAIR RECIRC COOLING CAR CE -3 Y 5 36 2 UNIT FAN ASSY "B" CONTROL ROOM A/C SYSTEM --- 3'AB N ' ',, 013 UNIT FAN ASSEMBLY ,r¶ -,." .... 57 10 M2F54B "B" DC ROOM AIR CONDITIONING DCV AB 14-6 Y 1,2,3,4,5 008 2,3 UNIT FAN ASSEMBLY 58 10 M2X181A "A" WEST ROOM480V LOAD COIL COOLING CENTER ESV AB 36-6 Y 1,2,3,4,5 015 2,3 59 11"A" WASTE GAS COMPRESSOR GRW AB 6 N 3 Y 012 2,3 ASSEMBLY "B" CONTROL ROOM AIR 60 11 M2F22B CONDITIONING COMPRESSOR ACR AB 36-6 N 1,2,3,4,5 013 2 ASSEMBLY I I B-5

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk Enhanced Area Item # Class ID Equipment Description System Bldg Elev Significant New or Safety for IPEEE, Aa (Y/N) Replaced Functions A-46 Walkby 61 14 M2C58A A SERVICE CONTROL STRAINER WATER PUMP PANELDISCH LIA S S C' C 14-6 4642 Y 4 022 1,2,3 62 14 M2D1 1 125 VOLT DC DISTRIBUTION EDC AB 14-6 N 1,2,3,4,5 Y 007 2,3 PANEL 201A-1 (FAC,1) EDC AB _14- N__234,_ __7_ 2,3 63 14 M2D12 125 VOLT DC DISTRIBUTION EDC AB 14-6 N 1,2,3,4,5 Y 007 2,3 PANEL 201A-2 (FAC.1) EDC AB __14- N_,234,_ 007_ 2,3 64 14 M2DV10 125 VOLT DISTRIBUTION PANEL EDC AB 14-6 Y 1,2,3,4,5 007 2,3 65 14 M2FLP-5 EAST D.C. SWITCHGEAR ROOM FIR AB 14-6 N 1,2,3,4,5 007 1,2,3 65_____ 14 _M2FLP-5 HALON FIRE SYSTEM PANEL FI__1-_ 1,2,3,4,5_007 1,2,3 66 14 M2VR11 DISTRIBUTION PANEL EVI AB 14-6 N Partial 1,2,3,4,5 Y 007 2,3 M2DB1-67 15 201-A "A" VOLT DC STATION BATTERY EDC AB 14-6 Y 1,2,3,4,5 Y 006 2,3 68 16 M2DC1 "A" BATTERY CHARGERTO EDC AB 14-6 Y 1,2,3,4,5 007 2,3 ______ _____ BATTERY BUS 201A _______ 1___

      '69              16      M21NV1              INVERTER #1             EVI      AB  14-6        Y                   1,2,3,4,5                 006         2,3 70              17      M2H-1713     "B" EMERGENCY DIESEL          DGN       AB  14-6        Y                   1,2,3,4,5                 001         2,3 GENERATOR ASSEMBLY 71              18     M2C172            INSTRUMENT RACK           MSC       CE  14-6        Y                   1,2,3,4,5                 020         2,3 72              18    M2LT-3001   RWST LEVEL ESAS CHANNEL A        RSS       YD  14-6        Y                   1,2,3,4,5                 034         2,3 73              18    M2LT-3003      RWST LEVEL CHANNEL C          RSS       YD  14-6        Y                   1,2,3,4,5                 034         2,3 74              18    M21-T-5282  CONDENSATE STORAGE TANK          CST           14-6        N                     2,3,4                   035         2,3 4

18 M2LT-5282 LEVEL XMTR 7M2PDC- SERVICE WAE PUP- W52 75 18 6475 PRESS DIFF SWITCH SWS CW 14-6 Y 4 022 2,3 76 76_____ 18 18 M2PDC-6488 SERVICE FILTER WATER DIFF PRESSURE PUMPSWITCH P5C SWS CW 14-6 Y 4 022 2,3 77 18 M2PT-8113 CTMT PRESSURE XMTR, CAR AB -5 Y 5 003 2,3 CHANNEL "A" RPS/ESAS 78 18 M2PT-8115 CTMT PRESSURE XMTR, CAR AB -5 Y 5 005 2,3 CHANNEL "C" RPS/ESAS 79 18 18 M2C126 M2C126 RACK C126 FOR TANK BORIC ACID LEVEL MSC I AB 5 N I I 1 002 2,3 B-6

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk New or Safety Enhanced Item # Class ID Equipment Description System Bldg Elev Significant Replaced Functions for IPEEE, Aa Notes (Y/N) A-46 Walkby SHUTDOWN COOLING SAFETY 80 19 M2TE-351Y INJECTION PUMP DISCHARGE SCC AB 6 N 4 011 TEMP RTD 81 20 M2ACT-5 ESAS ACTUATION CABINET'5' ESA CB 36-6 Y 1,2,3,4,5 Y 019 2,3 (RC02B) 82 20 M2CO8R C08R MAIN CONTROL BOARD MCB CB 36-6 N 1,2,3,4,5 019 2 83 20 M2RC02D4 ESAS ACTUATION CABINET ESA CB 36-6 Y 1,2,3,4,5 019 2,3 84 20 M2CO1X ESF STATUS LIGHT PANEL ANN CB 36-6 N 1,2,3,4,5 Y 019 2,3 85 20 M2F22B- B CONTROL ROOM A/C ACR AB 36-6 N 1,2,3,4,5 013 1,2,3 PNL COMPRESSOR PANEL 86 20 M2C10 FIRE SHUTDOWN PANEL (SPEC NSS TB 54-6 N 1,2,3,4,5 030 2,3 200) 87 20 M2C25A CONTROL ROOM VENT CONTROL ACR CB 36-6 N 1,2,3,4,5 Y 019 2 CABINETS 88 20 M2F22A- ACOMPRESSOR CONTROL ROOM A/C ACR AB 36-6 N Partial 1,2,3,4,5 013 1,2,3 PNL PANEL 89 20 M2C70A FIRE SHUTDOWN BOTTLE UP NSS AB 36-6 N 1,2,3,4,5 014 1,2,3 PANEL VITAL SWITCHGEAR 90 20 M2C80 VENTILATION CONTROL CABINET ESV CB 36-6 Y 1,2,3,4,5 Y 019 2,3 91 20 M2RC30A-1 SPEC-200 CABINET RC-30A-1 NSS CB 36-6 N 1,2,3,4,5 019 2,3 AB 14-6 Y 1,2,3,4,5 001 2 92 20 M2T041 DIESELAND TERMINAL H7B GENERATOR BOXRELAY DGN 93 21 M2T3 RBCCW SURGE TANK CCR EB 71 Y 4 Y n94 9,3 94 21 M2T40 CONDENSATE STORAGE TANK CST YD 14-6 Y 2,3,4 035 2,3 95 21 M2T41 REFUELING WATER STORAGE RSS YD 14-6 Y 1,2,3,4,5 034 2,3 TANK 96 21 M2T48B "B" DIESEL ENGINE FUEL OIL DFS AB 38-6 Y 1,2,3,4,5 Y 016 2,3 SUPPLY DAY TANK 97 21 M2X169A "A" DC SWITCHGEAR ROOM CWD TB 14-6 Y 1,2,3,4,5 028 2,3 CHILLER (VITAL CHILLER) I 98 21 M2X18A "A" RBCCW HEAT EXCHANGER CCR AB 25-6 Y 4 010 2,3 B-7

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) Risk New or Safety Enhanced Area Notes Item # Class ID Equipment Description System Bldg Elev Significant Ned Functy for IPEEE, Walkby (Y/N) Replaced Functions A-46 99 21 M2X20A "A" SPENT FUEL POOL COOLING SFC AB -5 N 4 004 2,3,4 HEAT EXCHANGER A -40 ___ , 100 21 M2X23A A" SHUTDOWN COOLING HEAT SCC AB 6 Y 4 018 2,3 EXCHANGER Notes:

1. Not sufficiently accessible to complete the walkdown inspection. To be inspected when accessible.
2. Has anchorage
3. Detailed anchorage inspection
4. SWEL 2 item, all other items SWEL 1 Safety Functions
1. Reactivity Control
2. Reactor Coolant Pressure Control
3. Reactor Coolant Inventory Control
4. Decay Heat Removal
5. Containment Function B-8

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

2. Base List 2 / SWEL 2 ID Equipment Description SWEL 2 M2FE-7088 SPENT FUEL POOL COOLING HEADER FLOW ELEMENT M2FI-7088A SFP COOLING WATER FLOW INDICATOR, VALVING AND TUBING M2FIS-7088 SFP TBNCOOLING WATER FLOW INSTRUMENT, VALVING AND TUBING M2P13A "A" SPENT FUEL POOL COOLING PUMP ASSEMBLY X M2P13B "B" SPENT FUEL POOL COOLING PUMP ASSEMBLY M2PI-7044 SFP COOLING PUMP 13A DICHARGE PRESSURE M2PI-7045 SFP COOLING PUMP 18B M2PI-7436 SPENT IDCTR____FUEL COOLING PUMP P13A SUCTION PRESSURE INDICATOR M2PI-7662 SFP P13B SUCTION PRESSURE M2TW-7033 SPENT WEL_____FUEL POOL HEAT EXCHANGER 'A' OUTLET THERMO WELL M2TW-7316 SPENT FUEL POOL HEAT EXCHANGER 'B' OUTLET THERMO WELL M2TW-7426 SPENT FUEL POOL INLET THERMO WELL M2X20A "A" SPENT FUEL POOL COOLING HEAT EXCHANGER X M2X20B "B" SPENT FUEL POOL COOLING HEAT EXCHANGER B-9

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

3. Summary Tables: Equipment Classes and Systems SWEL Equipment Class Summary GIP Equipment Class Title Equipment Count Class 0 Miscellaneous 8 1 Motor Control Centers 4 2 Low Voltage Switchgear 2 3 Medium Voltage Switchgear 1 4 Transformers 1 5 Horizontal Pumps 7 6 Vertical Pumps 3 7 Fluid Operated Valves 17 8 Motor Operated Valves, Solenoid Operated Valves 7 9 Fans 3 10 Air Handlers 5 11 Chillers 2 12 Air Compressors 0 13 Motor Generators 0 14 Distribution Panels 6 15 Batteries on Racks 1 16 Battery Chargers and Inverters 2 17 Engine Generators 1 18 Instruments on Racks 9 19 Temperature Sensors 1 20 Instrumentation and Control Panels and Racks 12 21 Tanks and Heat Exchangers (GIP Section 7) 8 TOTAL 100 B-1 0

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report SWEL System Summary Local Equipment SSystem ystem Description Count 2301 Reactor Coolant 1 2305 Spent Fuel Pool Cooling and Purification 2 2306 Safety Injection Tanks 1 2307 Low Pressure Safety Injection 1 2308 High Pressure Safety Injection 2 2310 Shutdown Cooling 3 2316 Main Steam 4 2321 Main Feedwater 1 2322 Auxiliary Feedwater 3 2337 Gaseous Radioactive Waste 1 2341 Fire Protection and Deluge 1 2343 Station Electrical 4160V 1 2350 Refueling Water Storage Tank 3 2391 Instrumentation 2 2405 Emergency Safeguards Actuation 4 2414 Main Control Panels 5 2304A Chemical Volume and Control 2 2304C Boric Acid 5 2313A Containment Air Recirc and Cooling 1 2315A Control Room Air Conditioning 8 2315B Non Radwaste Ventilation 2 2315D Vital Switchgear Emergency Cooling 8 2315E Diesel Rooms Ventilation 2 2319B Condensate Storage and Transfer 2 2326A Service Water 8 2330A Reactor Plant Component Cooling Water 5 2330C Chilled Water 5 2344A Load Centers 480V 2 2344B Motor Control 480V 3 2345A Nonvital Regulated Instrument 120V 1 2345B Vital Regulated Instrument 120V 1

            .2345C     DC 125V                                                     6 2346A     Emergency Diesel Generator Mechanical                       3 2346B     Emergency Diesel Generator Fuel                             1 TOTAL        100 B-11

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report

4. Area Walk-by List MPS Unit 2 AWC AWC # MPS Unit 2 Plant Area Description Count MP2-WB-001 Aux Bldg 14'6" B EDG Room 6 MP2-WB-002 Aux Bldg -5' BAST Area 6 MP2-WB-003 Aux Bldg -5' East Pen 1 MP2-WB-004 Aux Bldg -5' SFP Cooling Area 2 MP2-WB-005 Aux Bldg -5' West Pen 1 MP2-WB-006 Aux Bldg 14'6" A Battery Room 2 MP2-WB-007 Aux Bldg 14'6" East DC Switchgear 8 MP2-WB-008 Aux Bldg 14'6" Hallway 1 MP2-WB-009 Aux Bldg 14'6" B51 and B61 Rooms 2 MP2-WB-010 Aux Bldg -25'6" RBCCW HX Area 3 MP2-WB-011 Aux Bldg -25'6" CHS Pump Area 2 MP2-WB-012 Aux Bldg -25'6" Degasifier Area 2 MP2-WB-013 Aux Bldg 36'6" Control Room H&V Room 6 MP2-WB-014 Aux Bldg 36'6" East 480v Switchgear Room 1 MP2-WB-015 Aux Bldg 36'6"West 480v Switchgear Room 3 MP2-WB-016 Aux Bldg 38'6" DG Day Tank Room (B) 1 MP2-WB-017 Aux Bldg 38'6" Main Exhaust Fan Room 1 MP2-WB-018 Aux Bldg -45'6" A Safeguards Room 6 MP2-WB-019 Control Bldg 36'6" Control Room 7 MP2-WB-020 Containment 14'6" 2 MP2-WB-021 Containment 38'6" 1 MP2-WB-022 Intake Structure 14'6" 6 MP2-WB-023 Enclosure Bldg 60' West Pen Room 1 MP2-WB-024 Enclosure Bldg 71' East Pen RBCCW Surge 1 MP2-WB-025 Enclosure Bldg 68'6" East Pen Room 3 MP2-WB-026 Turbine Bldg Cable Vault 45' 1 MP2-WB-027 Turbine Bldg AFW Rooms 1'6" 3 MP2-WB-028 Turbine Bldg Misc 14'6" 6 MP2-WB-029 Turbine Bldg Lower 4.16kv Swgr 31'6" 1 MP2-WB-030 Turbine Bldg Upper 4.16kv Swgr 54'6" 3 MP2-WB-031 Turbine Bldg East 480v Swgr 36'6" 1 MP2-WB-032 Turbine Bldg Misc 54'6" 1 MP2-WB-033 Turbine Bldg 6.9kv Swgr 54'6" 1 MP2-WB-034 Yard RWST Area 3 MP2-WB-035 Yard CST Area 4 MP2-WB-036 Containment -3' Elev: F14C Area 1 B-12

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C Seismic Walkdown Checklists (SWC) (190 pages) C-1

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-001 AWC # MP2-WB-035 Status YO NEI UE-Equipment ID No. M22-HV-139-A Equip. Class 0 Equipment Description F112A (BatteryRoom) ROOF EXHA USTER BACKDRAIFTDAMPER Location: Bldg. YD Floor El. 14"-6" Room, Area OUTSIDE NEAR F112 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AN
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UD N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UF] N/AN
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-2

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-001 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[@ NEI UE" N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UE- N/AlZ
10. Based on the above seismic interaction evaluations, is equipment free YN NE U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[* NEi UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr Date: 08-06-2012 Evaluated by: Stephen F. Superson Date: 08-06-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-3

Page 1 of 2

                                   .Seismic Walkdown Checklist (SWC)

SWC # MP2-WD-SWEL-002 AWC # MP2-WB-013 Status YO NEI U-] Equipment ID No. M22-HV-204B Equip. Class 0 Equipment Description "B" ControlRoom A/C Unit Fan DischargeStop FireDamper Location: Bldg. AB Floor El. 36'-6" Room, Area ControlRoom H&VRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yt] NI] UtI N/A0
3. Is the anchorage free of corrosion that is more than mild surface YI- NEI Ut] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI- NEI Ut] N/A[0
5. Is the anchorage configuration consistent with plant documentation? Yt] NE] Ut] N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Damper is mounted in-line and does not have any external moving parts. SEWS 2-HV-204B, Rev. 0 DrawingNo. 25203-24062forfire damper installation. DrawingNo. 25203-24003for damper location.

6. Based on the above anchorage evaluations, is the anchorage free of YO NO UEI potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-4

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-002 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI UL N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE N/AOl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UD N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprasert A~4-~ 4% Date: 08-15-2012 Evaluated by: Thomas A. Steahr Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-5

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-003 AWC # MP2-WB-001 Status YO NEI UI1 Equipment ID No. M22-HV-255B Equip. Class 0 Equipment Description "B" Diesel GeneratorRoom ExhaustDamper Location: Bldg. AB Floor El. 14 '-6" Room, Area "B" D/G Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE- NED of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE! NEI UE! N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE! N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE! NEI UE1 N/AZ
5. Is the anchorage configuration consistent with plant documentation? YE! NEI UE! N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line damper, no anchorage.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE! UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-6

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-003 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UEI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UlE N/AUl
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI Ul' adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-14-2012 Evaluated by: Stenhen Surerson

                                                  /

r / Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-7

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-004 AWC # MP2-WB-026 Status Y[Z NEI U-] Equipment ID No. M22-HV-261/262 Equip. Class 0 Equipment Description Vital Switchgear Ventilation System RecirculationFire Damper Location: Bldg. TB Floor El. 45' Room, Area East and West Cable Vault El. 45 '-0 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI] N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI- NEI UI1 N/A[O
3. Is the anchorage free of corrosion that is more than mild surface YI] NE] UI] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI- NI] UI] N/A0
5. Is the anchorage configuration consistent with plant documentation? Y-I NEI UI] N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YO NEUI'-]

potentially adverse seismic conditions? In-line damper. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-8

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-004 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y9 NEI U1 N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI] NEI U[ N/AlE and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NE ULE N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y10 NE U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None i i - - i. Evaluated by: William Price Date: 08-15-2012 Evaluated by: Stephen F. Superson Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-9

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-005 AWC # MP2-WB-030 Status YE NEI UE] Equipment ID No. M22-HV-265 Equip. Class 0 Equipment Description Vital Switchgear Ventilation System Discharge FireDamper Location: Bldg. TB Floor El. 36-6" Room, Area Upper 4160VSwitchgear Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y!] NED of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NO] U! N/AZ
3. Is the anchorage free of corrosion that is more than mild surface Y-] NEI U!] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI- NO] U!] N/AZ
5. Is the anchorage configuration consistent with plant documentation? Y-] NO] U!1 N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y NO U-]

potentially adverse seismic conditions? In-line damper. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-10

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-005 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE] ULI N/AD]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YlZ NEI UI" N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y[ NE] Ul- N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YM N- UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] U-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: William Price Date: 08-15-2012 Evaluated by: Stephen F. Superson Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-11

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-006 AWC # MP2-WB-031 Status YNI N] UQ-] Equipment ID No. M22-HV-333 Equip. Class 0 Equipment Description F52 Dischargeto East 480V SwGR Room Fire Damper Location: Bldg. TB Floor El. 36'-6" Room, Area East 480VRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YED NEI UE- N/Au
3. Is the anchorage free of corrosion that is more than mild surface YE NE UL- N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEr NEI Ur1 N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI NE U[ N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE-1 potentially adverse seismic conditions?

In line damper. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-12

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2 -WD-SWEL-006 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UL- N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI U11 N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y! NEI U[D N/AD1
10. Based on the above seismic interaction evaluations, is equipment free YN ND UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Date: 08-15-2012 Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-13

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # M2 -WD-SWEL-007 AWC # M1P2-WB-001 Status YN NEI UF" Equipment ID No. M2T49D Equip. Class 0 Equipment Description "B " DieselEngine StartingAir Tank "D" Location: Bldg. AB Floor El. 14"-6" Room, Area "B"D/GRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NJ-] U-I N/AL]
3. Is the anchorage free of corrosion that is more than mild surface YN NE] UD] N/ALI oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI U[] N/AL]
5. Is the anchorage configuration consistent with plant documentation? YI@ NI] U-] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS report, T49D (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] U[]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-14

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Mt2 -WD-SWEL-007 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U-1 N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UL- N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UL] N/ALl
10. Based on the above seismic interaction evaluations, is equipment free YZ NEL UI1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEl ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-14-2012 Evaluated by: Stephen Superson ~L * ~4w-~ Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-15

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-008 AWC # [N2-WB-032 Status YM NEI U[] Equipment ID No. M2T98 Equip. Class 0 Equipment Description Chilled Water Stag'e Tank Location: Bldg. TB Floor El. 54'-6" Room, Area Chill Exp Tank Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEE NI] UI- N/AE
3. Is the anchorage free of corrosion that is more than mild surface YO NI] UI-1 N/AI-1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NI] UI' N/AE3
5. Is the anchorage configuration consistent with plant documentation? YO NiO UI1 N/A-1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS T98 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YONINI U1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-16

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-008 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NOI UI N/AZ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE U- N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NOi U- N/AO
10. Based on the above seismic interaction evaluations, is equipment free YZ NO uO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI Ui adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson Date: 08-14-2012 Evaluated by: William Price 1AiQ~~* Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-17

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-009 AWC # MP2-WB-015 Status YZ NI] U[] Equipment ID No. M222E-MCC Equip. Class 1 Equipment Description 480V BUS 22E (B05) MCC Section Location: Bldg. AB Floor El. 36'-6" Room, Area West 480VSWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchoraige

1. Is the anchorage configuration verification required (i.e., is the item one YONIEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NI] UE1 N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YO NIl UD N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NI] UD] N/AI]
5. Is the anchorage configuration consistent with plant documentation? Y0D NI] UI] N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS 22E-MCC (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YNINEUI-1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-18

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-009 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO N- UE- N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UE1 N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UE- N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE-adversely affect the safety functions of the equipment?

MCC( &.3(LL-57 Occ(L) > . F rwt P% sfzn,-v~hj A sA-t~ee i3ftr513.

     -W       e49V               rrbf\            ~    h-.%F~rf                .       ~     ~     L.          .'~      L.

T- - S nFAN /ý' f" 1.1q, /I z Comments (Additional pages may be added as necessary) None. Evaluated by:, Date: 08-10-2012 Evaluated by:. Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-19

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2 -WD-SWEL-O1O AWC # MP2-WB-009 Status YO NE UJE] Equipment ID No. B51 Equip. Class 1 Equipment Description 480VMCC BUS B51(22-1E) Location: Bldg. AB Floor El. 14'-6" Room, Area B51 Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE- N/A
3. Is the anchorage free of corrosion that is more than mild surface YJZ NEI UE- N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE UE[ N/AE-
5. Is the anchorage configuration consistent with plant documentation? YO NE-- UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Weld anchorageconsistent with SEWS B51 (Caic. MP2 SEIS.RPT)

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UE[

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-20

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-010 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UW N/AW1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UW' N/AWI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE UO N/AEW Cables to seismic Trays are OK.
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE]

of potentially adverse seismic interaction effects? No adverse interactionsidentified. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI. UW adversely affect the safety functions of the equipment?

MeCome (Adin Opes maybe Cts addedf asnecessary) Om / -

  -    jJo      cz aAOk ev         "t(r'fAs~vmL   Cc, PJO i ,- t-5   rz0                                              1,1 Comments (Additional pages may be added as necessary)

Evaluated by: James PetroskvLŽ? ý Date: 09-05-2012 Evaluated by: Tom Steahr/ Date: 09-05-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-21

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-011 AWC # MP2-WB-017 Status YE NOi ULI Equipment ID No. M2B62 Equip. Class 14 Equipment Description 480 Volt MCC BUS B62 (22-2F) Location: Bldg. AB FloorEl. 34'-6" Room, Area CRHVACRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO ND of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NDI U[] N/AD
3. Is the anchorage free of corrosion that is more than mild surface YO NE UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UD N/ADl
5. Is the anchorage configuration consistent with plant documentation? YED ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS B62 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-22

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-011 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[D NEI U[] N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UEI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE U[L N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NE Ur-]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI U[-

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-10-2012 Evaluated by: Stephen Superson ~~1 -. Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-23

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-012 AWC # MP2-WB-007 Status YO NEI ULD Equipment ID No. M2201A Equip. Equipment Description DCBatteryBus 201A Location: Bldg. AB Floor El. 14'-6" Room, Area EastDCSwitchgear Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UL N/AD
3. Is the anchorage free of corrosion that is more than mild surface YO NiO Ui] N/AUl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NI] UI" N/All
5. Is the anchorage configuration consistent with plant documentation? Y0 NI] UI1 N/AlU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS DO] (201A) Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YN NI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-24

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-012 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NI] UI- N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI- UI1 N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEIl UI- N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YNIEI UE" of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI- ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Internalsinspection of batteiy bus cubicles D0102, D0103, and D0107 - verified anchorage, adjacentcabinets bolted together, and internalscondition, . Evaluated by: James Pefrosky Date: 10-16-2012 Evaluated by: Thomas Steahr Date: 10-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-25

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-013 AWC # M1T2-WB-015 Status YO N[] Uli] Equipment ID No. M222E Equip. Class 2 Equipment Description 480VBUS 22E (B05) Location: Bldg. AB Floor El. 36'-6" Room, Area West 480VSWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SW-EL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UM N/AOl
3. Is the anchorage free of corrosion that is more than mild surface YN NEI U-1 N/A[l oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI U- N/AO
5. Is the anchorage configuration consistent with plant documentation? YIE NW U- N/AFl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS 22E (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YEE N- U" potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-26

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-013 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI U[I N/AVI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UI1 N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ N[-] UEI N/AZl
10. Based on the above seismic interaction evaluations, is equipment free Y10 NEI UM of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI U1I adversely affect the safety functions of the equipment?

57s et- 13"ý5'5 b (t Q- 2

                                                                                    ~   -    ZXJ1~

S r r Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson 57 Date: 08-10-2012

                                                                    /

Evaluated by: William Price Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-27

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # M.P2-WI)-SIVEL-014 AWC # MP2-WB-029 Status YO NEI Ui' Equipment ID No. M224C Equip. Class 3 Equipment Description 4.16 kVEniergjencv Bus 24C Location: Bldg. TB Floor El. 31 "-6" Room, Area East DC Switchgear Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIZ NE UO N/ADl
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UO N/At]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YID Nt] U-1 N/At]
5. Is the anchorage configuration consistent with plant documentation? YI NO Ut] N/At]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

SEWS 24C (Cal .MP2-SEJS.RPT Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YI 'NEI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-28

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWVE1L-014 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIZ NE UE N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE- N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE UE N/ACI
10. Based on the above seismic interaction evaluations, is equipment free YO NEI Ur-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. I-lave you looked for and found no other seismic conditions that could YO NE UEl adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Internals inspection ofcabinetA302 ofbus 24C with breakerremoved: -verified anchorage, adjacentcabinets bolted together, and internalscondition, Evaluated by: James Petroskyv ___"_-_________-Date: 10-16-2012 Evaluated by: Thomas Steahr Date: 10-16-2012. 7 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-29

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-015 AWC # MP2-WB-007 Status YE Nt] Ut1 Equipment ID No. M2UAC3 Equip. Class Equipment Description Regulating Transformer UAC3 Location: Bldg. AB Floor El. 14'-6" Room, Area DCEguipmentRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI Ut] N/At]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI Ut] N/At]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NtI Ut] N/At]
5. Is the anchorage configuration consistent with plant documentation? YN NtI Ut] N/At]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Cabinet was replacedper Design Change DCR M2-02009. Base Anchoragejustifiedper CalculationNo. 02-ENG-03148C2Rev. 2.1

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U--

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-30

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-015 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UL1 N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE1 N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEl UE] N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YO NO- U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[@ NE] Ul3 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. A Evaluated by: William Price Date: 08-10-2012 Evaluated by: Stephen Superson ~4ptz~ F: Date: 08-10-2012

                                                                /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-31

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-016 AWC # MP2-WB-009 Status YO NE UM Equipment ID No. B61 Equip. Class 1 Equipment Description 480VMCC Bus B61(22-1F) Location: Bldg. AB Floor El. 14'-6" Room, Area B61 Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE UO N/AE
3. Is the anchorage free of corrosion that is more than mild surface YO] NEI Uf1 N/A-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE UE N/AU1
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE1 N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Welded anchorageconsistent with SEWS B61 (Calc. MP2 SEIS.RPT)

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-32

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-016 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE] N/A[[
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UEI N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NI UI-] N/AZ-1 Cables to seismic trays are OK.
10. Based on the above seismic interaction evaluations, is equipment free YN NO U--

of potentially adverse seismic interaction effects? No adverse interactionsidentified. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NO U-adversely affect the safety functions of the equipment?

MCL~ Cc0.- ~ ~ i OvL.S C-ept-e ~'49 F'-r( ~ ~ A Sf~P P VEA") " 9 E-19 I t>~ ~ 4V C-rC- 17 jc0 f ~~" ~m, i. I-. S TVVI-H el Comments (Additional pages may be added as necessary) 524C4-- Evaluated by: James Petroski Date: 09-05-2012 Evaluated by: Tom Steahr Date: 09-05-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-33

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-017 AWC # MP2-WB-010 Status YN NDI UE Equipment IDeNo M2P"IA" n Equip. Class 5 Equipment Description "A" RBCCWfunipAssembl1y Location: Bldg. AB Floor El. -25'-6"' Room, Area RBCCWPump/ HeatExchangerArea Manufacturer, Model, Etc. (optional but recommended) I-R 200 HP Instructions for Completing Checldist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NDI UD- N/AD
3. Is the anchorage free of corrosion that is more than mild surface YO NDI U[I N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y21 NDI U-- N/AD Small (less than Y4",) cracks on SEWS sheets 4-10 which have no adverse effect on anchorage.
5. Is the anchorage configuration consistent with plant documentation? Y0 ND UDJ N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage consistent with SEWS sheets 5-10.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UD potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-34

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MM2WD-SWEL-017 lateraction Effects 7, Are soft targets free ftom impact by nearby equipment or structures? 'YI NEI U[ N/AIJ 8, Are overhead equipment, distribution systems, ceiling tiles and lighting, YT NIq U[ N/AUI and masonry block walls not likely to collapse onto the equipment? 9, Do attached lines have adequate flexibility to avoid damage? Y.( NEI UE N/AU1

10. Based on the above seismic interaction evaluations, is equipment free YO NEI UO[

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NElI UO adversely affect the safety functions of the equipment?

Comments.(Additional pages may be added as necessary)

References:

SEWS PJ1A (Rev. 0) SH. 1-10 Drawing25203-2 7019 Rev. lB Drawing25203-29009 SH. 1-4 V-- Evaluated by.: Jamey Pe "os Date: 08-07-2012, Evaluated by: Jack DiLuna Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-35

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-018 AWC # MP2-WB-004 Status YZ NiE Uil Equipment IDNo. M2P13A Equip. Class 5 Equipment Description "A " SFP Pump Assembly Location: Bldg. AB Floor El. -5'-6" Room, Area SFPPump Area Manufacturer, Model, Etc. (optional but recommended) Gould 3196 "MT" Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Watkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI Ul N/ALl
3. Is the anchorage free of corrosion that is more than mild surface YZ N[i Ul N/A[Z oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE- N/All
5. Is the anchorage configuration consistent with plant documentation? YZ N[! Ul N/All (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage bolt configurationandsize consistentwith VTMNo. 25203-3 08-003 using layout and hole size.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEl U--

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-36

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # NR2YWD-SWFL-0i18 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NO" UI- N/AlI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI Ul] N/AU and masonry block walls not likely to collapse onto the equipment?

Overheadlightingfixtures are hung by -l " diameterconduitfiom ceiling, light andfixtures have no significant weight andhave no adverse interactionwith pump.

9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UU N/A[U
10. Based on the above seismic interaction evaluations, is equipment free YZ ND UOl of potentially adverse seismic interaction effects?

Ladders storednear tool crib door are securedper 0A8 and will have no adverse interactionwith pump. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NI] UO adversely affect the safety ftumtions of the equipment?
.Comments(Additional pages may be added as necessary)

References:

TM No. 25203-308-003 Drawing25203-29010 SH.3 Evaluated by: JamesPetromlM Date: 08-07-2012 'Rvnanfitepd he' .Tairk Dihitna - ----- - -. 1 1 - - Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-37

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-019 AWC # MP2-WB-011 Status YO NEI U[] Equipment ID No. M2P18A Equip. Class 5 Equipment Description "A " ChargingPump Assembly (MTR HTR BKR LH51-8) Location: Bldg. AB Floor El. -25 '-6" Room, Area ChargingPump Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE1 N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YIE NEI UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YIO NE] UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS ID P18A (rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-38

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-019 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI U- N/A--
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI ULI N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI U-- N/AI-
10. Based on the above seismic interaction evaluations, is equipment free YN NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YI* NWI UW1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr (~ Date: 08-09-2012 Evaluated by: Stephen Superson 1'. - Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-39

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-020 AWC # MP2-WB-002 Status YNl NI] UE] Equipment ID No. M2P 19A Equip. Equipment Description "A" Boric Acid Pump Assembly Location: Bldg. AB Floor El. -5' Room, Area BA Storage Tank Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YONIEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI U"I N/AE
3. Is the anchorage free of corrosion that is more than mild surface YZ NI] U[] N/A[]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UI] N/A[]
5. Is the anchorage configuration consistent with plant documentation? YO* NEI U-1 N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS ID P19A Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of YE NE] UD1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-40

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E2-WD-SWEL-020 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UI- N/A[1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YNI NEI UE1 N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NW U["] N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NWI UW adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr iIknE-- Date: 08-09-2012 Evaluated by: Stephen Superson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-41

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-021 AWC # MP2-WB-027 Status YE NE] U[- Equipment ID No. M2P4 Equip. Class 5 Equipment Description Terry Turbine Aux FeedwaterPump Assembly Location: Bldg. TB Floor El. 1 '-6" Room, Area Terrv Turbine Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UE] NWAD]
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YN NO] UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Drawing#25203-11063 and SEWS for ID #P4Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of YO NO] UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-42

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # NP2-WD-SWEL-021 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEN NEI UL] N/AZ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO] NO- UEl N/AZJ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UZ N/A[
10. Based on the above seismic interaction evaluations, is equipment free YO NEI U[-

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[E U[]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)

                                                      --        - F Evaluated by: James McKinne.                                                              Date: 08-06-2012 UJ Evaluated by: William Price                                                               Date: 08-06-2012 A4I~

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-43

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-022 AWC # MP2-WB-018 Status YN NEI UE] Equipment ID No. M2P41A Equip. Class 5 Equipment Description "A " High PressureSafety Injection Pump Assembly (MtrHtr Bkr LH51-2) Location: Bldg. AB Floor El. -45' Room, Area "A" Safeguards Room Manufacturer, Model, Etc. (optional but recommended) Allis Chalmers400 HP Type RG Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NI]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YV NEI UI] N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YE NI] UI] N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO* NI] U-I N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE NEI U'] N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) SEWSP41A (Rev.0) uses a conservative anchor bolt configurationfor evaluation; all bolting was inspectedandfound to be acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NI] U-]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-44

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-022 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UI1 N/AE!
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEO ULi N/AE!

and masonry block walls not likely to collapse onto the equipment? Lightfixtures supportedby conduit, has no adverse effect on the pump. Duct above the pump is well supported and will have no adverse interactionwith the pump

9. Do attached lines have adequate flexibility to avoid damage? YZ NO- UE[ N/AE-
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) SEWS P41A (Rev. 0) sheets 1-11 Dwg. 25203-27020 Dwg. 25203-11085 Evaluated by: James Petroskv Date: 08-09-2012 Evaluated by: Jack DiLuna Ilk *,w %,J * - *

  • j" Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-45

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-023 AWC # MP2-WB-027 Status YZ N--] U[] Equipment ID No. M2P9A Equip. Equipment Description "A "Aux FeedwaterPump Assembly (MTR HTR BKR L151-6) Location: Bldg. TB Floor El. 1 '-6" Room, Area Elec. Aux. FeedPumpRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checldist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YNINE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UI] N/AI
3. Is the anchorage free of corrosion that is more than mild surface YZ NI] UI1 N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UI- N/AI]
5. Is the anchorage configuration consistent with plant documentation? YOJ NI- U-1 N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference drawing # 25203-11063 and the Screening Evaluation WorkSheet (SEWS)for ID #P9A Rev. 1

6. Based on the above anchorage evaluations, is the anchorage free of YNNIEUI--1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-46

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-023 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U[] N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UL] N/A[]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UL] N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[:] Uli adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: William Price ja--x Date: 08-06-2012 Evaluated by: James McKinnev Date: 08-06-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-47

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-024 AWC # MP2-WB-028 Status YZ NIO U-I Equipment ID No. M2P122A Equip. Class 6 Equipment Description "A "DC Switch-gear Room Chiller(X169A) Chill Water PumpAssembly Location: Bldg. TB Floor El. 14'-6" Room, Area ChillersArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one YI- NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NI] UI- N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YZ NI] U-I N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NI] UFI N/AI]
5. Is the anchorage configuration consistent with plant documentation? Y-I NI] UI] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YONIEUI-'E potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-48

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-024 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U-- N/AF-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 N[] UL N/AL[

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI U- N/AL
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Jim McKinney Date: 08-09-2012 Evaluated by: William Price Date: 08-09-2012 Millstone Power Station Unit 2 NT-TF 2.3 Seismic Walkdown Summary Report Appendix C C-49

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-025 AWC # MP2-WB-018 Status YZ NI-] UI-] Equipment ID No. M2P42A Equip. Class 6 Equipment Description "A"Low PressureSafety Injection Pump Assembly (MtrHtr Bkr LH51-3) Location: Bldg. AB Floor El. -45'-6" Room, Area "A4" Safeguards Room Manufacturer, Model, Etc. (optional but recommended) Ingersoll Rand 400 HP Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one Y NiO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI U-] N/A-I
3. Is the anchorage free of corrosion that is more than mild surface YN NI] UI] N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NI] UL] N/AL]
5. Is the anchorage configuration consistent with plant documentation? YO NI] ULI N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) SEWS P42A (Rev.0) refers to P42B (Rev. O)for anchor Bolt evaluation, which very conservatively considers the 4 main support columns only and not the lateral bracing. All bolting inspectedandfound to be acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 NEUI--!

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-50

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-025 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UE] N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE] UL- N/A--

and masonry block walls not likely to collapse onto the equipment? Lightfixtures supportedby conduit have no adverse effect on the pump.

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] UI] N/AU
10. Based on the above seismic interaction evaluations, is equipment free YZ N['] UE" of potentially adverse seismic interaction effects?

Tool box stored near the pump is restrainedby pump support and will have no adverse interactionwith the pump. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NI] U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) SEWS P42A (Rev. 0) sheets 1-5 SEWS P42B (Rev. 0) sheets 1-8 Dwg. 25203-27020 Dwg. 25203-11085 Evaluated by: James Petroskv 1)ýý ý?4 - Date: 08-09-2012 Evaluated by: Jack Diluna e t ý 0 - Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-51

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-026 AWC # MP2-WB-022 Status YE NE] U[] Equipment ID No. M2P5A Equip. Class 6 Equipment Description 'A' Service Water Pump Location: Bldg. CW Floor El. 14"-6" Room, Area SWPump/lntake Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YOI NEI U[] N/A!]
3. Is the anchorage free of corrosion that is more than mild surface YM NEI UE" N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE] N/A!]
5. Is the anchorage configuration consistent with plant documentation? YO NEI U!] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) See SEWS P5A (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U[-

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-52

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-026 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UL N/AEr
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI ULI N/AE1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NE Ur- N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UL of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEi ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr a,' Date: 08-07-2012 Evaluated by: Stephen Superson Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-53

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-027 AWC # MP2-WB-002 Status YZ NEI UE] Equipment ID No. M22-CH-210X Equip. I Equipment Description Dilution Control Valve Ass emblv Location: Bldg. AB Floor El. -5' Room, Area BA Storage Tank Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE-I N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UE- N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE! NEI UE! N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE! N/A0
5. Is the anchorage configuration consistent with plant documentation? YE! NEI UEI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UE!

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-54

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2-WD-SWEL-027 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YER NE UL N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ N[] ULI N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI U-- N/AZI
10. Based on the above seismic interaction evaluations, is equipment free YN NE UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI U[L adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Reference SEWS ID 2-CH-21OX Rev. 0. Evaluated by: Thomas Steahr Date: 08-09-2012 Evaluated by: Stephen Superson Date: 08-09-2012 I Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-55

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-028 AWC # MP2-WB-002 Status YO Ni] UE] Equipment ID No, M22-CH-512 Equip. Class 7 Equipment Description Volume Control Tank Makeup Control Valve Assembly Location: Bldg. AB Floor El. -5' Room, Area Boric Acid Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE N/AN
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE N/AS
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NOl U potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-56

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # ME2-WD-SWEL-028 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NO U-1 N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NDl UEI N/A[D and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDl UD1 N/ADl
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UDl of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN ND-1 UD-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Manufacturedby BETTS. Valve stem is vertically oriented, (not 15) off vertical). Evaluated by: Thomas Steahr Date: 08-09-2012 Evaluated by: Stenhen Sunerson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-57

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-029 AWC # MP2-WB-028 Status YO NEI U-] Equipment ID No. M22-CHW-11 Equip. Class 7 Equipment Description Chilled Water Supply Header Cross Tie Control Valve Assembly Location: Bldg. TB Floor El. 14'-6" Room, Area ChillersArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEl UE- N/A2
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE' N/A oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NE UF- N/AS
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U-potentially adverse seismic conditions?

Valve operatorhas U-bolt support below hand wheel, no drawings in package. 4 Bolt Baseplate and Tube steel structure is significantly stiff therefore adequate. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-58

Page 2 of 2 Seismic Walkdown Checklist (SWC) SSWC # MP2-WD-SWEL-029 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UEi N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE1 N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NO U[- N/AU
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UU1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE UEU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Jim McKinney Date: 08-09-2012 Evaluated by: William Price Ud b4\"n Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-59

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-030 AWC # MP2-WB-028 Status YED NEI UD Equipment ID No. M22-CHW-13 Equip. I Equipment Description Chilled Water Return Header Cross Tie Control Valve Assembly Location: Bldg. TB Floor El. 14-6" Room, Area TBCCWPump &H[X Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEl UE1 N/A0
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE-1 N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE N/A[9
5. Is the anchorage configuration consistent with plant documentation? YE NE UE N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE potentially adverse seismic conditions?

No anchorage. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-60

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-030 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO U- N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UEL N/AE and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NO UE N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UiL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinney ýQý- Date: 08-09-2012 Evaluated by: William Price Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-61

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-031 AWC # MiP2-WB-028 Status Y91 NEI U[] Equipment ID No. M22-FWA-43A Equip. Class 7 Equipment Description #1 Steam GeneratorAux FeedwaterRegulating Valve AssemblY Location: Bldg. TB Floor El. 14'-6" Room, Area Aux Feed Valve Station Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE] UE1 N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/A0 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UD N/AS
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UI- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-62

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-031 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO UE3 N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] UE" N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI U- N/AEI
10. Based on the above seismic interaction evaluations, is equipment free Yi NE UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UIZ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinney" Date: 08-09-2012 Evaluated by: William Price Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-63

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-032 AWC # MF2-WB-025 Status YZ Nil U[E Equipment ID No. M22-FW-5B Equip. Class 7 Equipment Description #2 S/G Main Feed Supply Air-Assist Check Valve Assembly Pen #16 Location: Bldg. EB Floor El. 38'-6" Room, Area West Pipe PenetrationRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI Nil U[] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE1 N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UEi N/AN
5. Is the anchorage configuration consistent with plant documentation? YEI NE UE N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line valve. DrawingsNo. 25203-29046 SH 1, Rev. 7 and drawing no. 25203-20150 SH 514, Rev. 14

6. Based on the above anchorage evaluations, is the anchorage free of YO NEUI U potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-64

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # NUP2 -WD-SWEL-032 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UL1 N/AUl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NEI UEI N/AZl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE1 N/AEZ
10. Based on the above seismic interaction evaluations, is equipment free YO Nl UI-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[I NEI UEl adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Detailclearance is largerthan the clearancenoted in SEWS 2-FWSB, Rev. 0. Evaluated by: Sombat Pornprasert Date: 08-14-2012 Evaluated by: Thomas Steahr Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-65

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-033 AWC # MP2-WB-025 Status YE NEI UE-Equipment ID No. M22-MS-190B Equip. Class 7 Equipment Description #2 S/G Main ATOMSPHERIC Dump Control Valve Assembly Pen 2 Location: Bldg. EB Floor El. 38'-6" Room, Area West Pipe PenetrationRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI] NEI UEI N/AI
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE1 N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line valve DrawingNo.25203-29087 Sht.1, Rev. 14. SOV externally mounted on containment wall on rigidsupport.

6. Based on the above anchorage evaluations, is the anchorage free of YN NE] UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-66

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-033 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U[- N/A[[
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI Ui- N/A[l and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UL] N/AL]
10. Based on the above seismic interaction evaluations, is equipment free YZ NEIUE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UL-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprasert -<,--L A-Ph", - /c4-- Date: 08-14-2012 Evaluated by: Thomas A. Steahr Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-67

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-034 AWC # MP2-WB-023 Status YZ NE U[] Equipment ID No. 2-MS-239 Equip. Class 7 Equipment Description "#2 Steam GeneratorSafety Relief Valve Location: Bldg. EB Floor El. 60' Room, Area West PenetrationRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[-] UE N/AO
3. Is the anchorage free of corrosion that is more than mild surface YLI N[1 UL N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE- NEI UEI N/AE
5. Is the anchorage configuration consistent with plant documentation? YE NE UE- N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line valve drawingNo. 25203-29059-00012A (Rev. 3). Iso. Drawing25203-20150-00503(Rev. 20).

6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-68

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-034 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] UE- N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NE UD N/AEI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NO UD N/AO
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE1 adversely affect the safety fumctions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert J 'po/- . - Date: 08-14-2012

                                     'A/              /'

Evaluated by: Thomas Stearhr / Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-69

Page l of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-035 AWC # MP2-WB-025 Status YO NO UE] Equipment ID No. M22-MS-64B Equip. Class 7 Equipment Description #2 S/G Main Isolation Valve Pen #20 Location: Bldg. EB Floor El. 38 '-6" Room, Area West Pipe PenetrationRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YD NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YD NEI UD- N/AZ
3. Is the anchorage free of corrosion that is more than mild surface Y-I NDI UD- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE- NDl UD1 N/AZ
5. Is the anchorage configuration consistent with plant documentation? YD NI U- N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line valve. DrawingNo. 25203-29052 SHi, Rev. 13. ISO DrawingNo. 25203-20150 SH 501, Rev. 18

6. Based on the above anchorage evaluations, is the anchorage free of YN ND UD-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-70

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-035 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO UEi N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEi N/AEr and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI U[E N/AEI
10. Based on the above seismic interaction evaluations, is equipment free YN NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UEJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None k 6'~-~ ~J>< sz.-N.- k (FO , -- A-Evaluated by: Sombat Pornprasert Date: 08-14-2012 Evaluated by: Thomas A. Steahr ' *7 ( . -- Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-71

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-036 AWC # MP2-WB-018 Status YZ NE] UE] EquipmentIDNo. M22-RB-13.lA Equip. Equipment Description "A " Shutdown Cooling Heat Exchanger Outlet Stop Valve Assembly Location: Bldg. AB Floor El. -45'-6" Room, Area "A" SafeguardsRoom Manufacturer, Model, Etc. (optional but recommended) 18" 150 lb. Allis-Chalmerswafer valve Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?

In-line component (valve)

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE] N/A9 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/AO
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-72

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-036 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE UDi N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE"1 UL N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NO UE N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NO UU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE UUI adversely affect the safety functions of the equipment?

The shake space between tubing on the operatorand adjacentitem is approximately2" minimum, which is evaluated as acceptable. Comments (Additional pages may be added as necessary)

References:

Sews 2-RB-13.1A (rev. 0) sheets 1-3 DWG. 25203-20150 sheet 25 DWG 25203-29054 sheet 13 Evaluated by: James Petroslw -ýýP- 4 Date: 08-09-2012 Evaluated by: Jack DiLuna 4lAD&'b9 Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-73

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-037 AWC # MP2-WB-010 Status YZ NEI UM Equipment ID No. M22-RB-4.lB Equip. Class 7 Equipment Description RBCCWHeat Exchanger 18A HeaderB Outlet Valve Location: Bldg. AB Floor El. -25'-6" Room, Area RBCCWHX. Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NE of the 50% of SWEL items requiring such verification)?

In-line valve.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE UE" N/A0
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE] N/AN oxidation?
4. Is the anchorage free of visible cracksin the concrete near the anchors? YEI NEI UE N/Au
5. Is the anchorage configuration consistent with plant documentation? YE- NEI U-I N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NO U" potentially adverse seismic conditions?

N/A. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-74

Page 2 of 2 Seismic Walkdown Checklist (SWC). SWC # i2-WD-SWEL-037 Inieraction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NO2 UD N/AU
8. Are overhead equipment, distribution systems, ceiling files and lighting, YN NO UEJ N/AU and masonry block walls riot likely to collapse onto the equipment?

Lightfixture -2feet from valve actuatorhas no significantweight, and there is an interveningsupport element, thus no adverse seismic interaction.Small bore airlineIn overhead is adequately s.tpportedand will have no adverse interaction,

9. Do attached.lines have adequate flexibility to avoid damage? YO NEI UO N/ADl
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE of potentially adverse seismic interaction effects?

,OterAdverse Condilons

11. Have you looked for and found no other seismic conditions that could YO NO U-adversely-affect the safety functions of the equipment?

Comments (Additional pages.may be added as necessary)

References:

SEWS 2RB-4. lB (Rev. 0) Sheets 1-4. Evaluated by: James Petroskv Date: 08-07-2012 Evaluated by; JackDiLuna Date: 08-07-2012

                 , Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report  Appendix C C-75

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-038 AWC # MP2-WB-021 Status Y[N NE-I Ur Equipment ID No. M22-RC-402 Equip. Class 7 Equipment Description PressurizerPower OperatedRelief Valve Assembly Location: Bldg. CE Floor El. 38'-6" Room, Area Top of Pressurizer Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE]NED of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/Az oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/AO
5. Is the anchorage configuration consistent with plant documentation? YEl NEI UE1 N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y1 NEI UE1 potentially adverse seismic conditions?

In-line valve, no anchorage. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-76

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-038 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO* NE] ULI N/AU1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI U- N/AEU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NU UU N/AU
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y21 NE] UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) No adverse conditions on interactionsin vicinity of2-RC-402 or 2-RC-404 in pressurizercubicle. Evaluated by: James McKinney Date: 08-16-2012 U ý>5ý Evaluated by: James PetroslR PA- Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-77

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-039 AWC # MP2-WB-018 Status YED NEI UI1 Equipment ID No. M22-SI-306 Equip. Class 7 Equipment Description Shutdown CoolingFlow Control Valve Assembly Location: Bldg. AB Floor El. -45'-6" Room, Area "A " Safeguards Room Manufacturer, Model, Etc. (optional but recommended) Fisherw/Bettis Robotarm. 10" Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

In-line component (valve).

2. Is the anchorage free of bent, broken, missing or loose hardware? YDI NEI U-I N/A[D
3. Is the anchorage free of corrosion that is more than mild surface YI] NI] UI] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI- NEI UI] N/AZ
5. Is the anchorage configuration consistent with plant documentation? Y[I NEI U-I N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-78

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-039 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NEI UFI N/AF]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI U[I N/AL]

and masonry block walls not likely to collapse onto the equipment? Light Fixtures supported by conduit has no adverse effect on the valve.

9. Do attached lines have adequate flexibility to avoid damage? YM NEI UI- N/AL]
10. Based on the above seismic interaction evaluations, is equipment free YM NEI U-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE] NEI UL]

adversely affect the safety functions of the equipment? Shake space between this valve and SI-657 is approximately 1 "- 2" minimum. Lines are well supportedand the shake space is acceptable thus no adverse seismic interaction. Comments (Additional pages may be added as necessary) SEWS 2-SI-306 (Rev. 0) sheets I to 4 Dwg. 25203-29053 sht. 18 Evaluated by: James Petrosig Date: 08-09-2012 Evaluated~~~by6aeUtok ae:0-921 Evaluated by: Jack DiLuna Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-79

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-040 AWC # MP2-WB-001 Status YO NEI UI-Equipment ID No. M22-SW-231B Equip. Class 7 Equipment Description "B" D/G Heat Exchanger Service Water Bvvass ValvezAssembly Location: Bldg. AB Floor El. 14'-6" Room, Area "B "DIG Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UEI N/AO
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE- N/A oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UE N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In-line valve, no anchorage.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U[-E potentially adverse seismic conditions?

Miflstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-80

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2-WD-SWEL-040 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NO' UL N/AL]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI U-] N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEL Ur- N/AL]
10. Based on the above seismic interaction evaluations, is equipment free YN Nl Ur]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YIZ NEI U-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: William Price J"rvbC"-\ Date: 08-14-2012 Evaluated by: Stephen Superson 11- . -- r -- Date: 08-14-2012 I I Millstone Power Station Unit 2 NTIFF 2.3 Seismic Walkdown Summary Report Appendix C C-81

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-041 AWC # MP2-WB-028 Status YO N[] UE1 Equipment ID No. M22-SW-3.2A Equip. ( Equipment Description "B "Service Water HeaderSupuly to TBCCW Stop Valve Location: Bldg. TB Floor El. 14'-6" Room, Area TBCCWILVArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE] N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE-] N/A oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI NE] UE] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE] UE]

potentially adverse seismic conditions? No anchorage. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-82

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-041 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI Ul] N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N[-] UE1 N/AL]

and masonry block walls not likely to collapse onto the equipment? Security cage roofhas several sections which appearto be held in place by a single cage member. CR 484417 The supervisor walked down this areawith the initiator(a qualifiedseismic engineer) and another qualifiedseismic engineer. While the supportsfor the top of thefenced enclosure could certainly use enhancement, they are not, nor are they intended to be, safety grade components. However, they are consideredseismic 2 over 1, in that they need to be able to prevent thefencingfrom falling duringa seismic event and impacting the safety relatedequipment below. In examining the entire arrangementand additionalprotectionprovided by other members of this structure,allpartiesconcluded that there would be no impact on safety related equipment during a seismic event. This is an enhancement.

9. Do attached lines have adequate flexibility to avoid damage? YNl NEI UD] N/AUl
10. Based on the above seismic interaction evaluations, is equipment free YEE NIl UL of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YI Nil UiL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Refer to CR 484417. I-Evaluated by: James McKinnev Date: 08-09-2012 Evaluated by: William Price I1AkQ~r\~~ Date: 08-09-2012 Millstone Power Station Unit 2 "F2.3 Seismic Walkdown Summary Report Appendix C C-83

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-042 AWC # MIP2-WB-022 Status YN NE] URE Equipment ID No. M22-SW-90A Equip. Class 7 Equipment Description 'A'Service Water Pump DischargeStrainerFlush Valve Location: Bldg. CW Floor El. 14'-6" Room, Area Intake Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE- NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UE] N/A[
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE1 N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-84

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-042 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE- N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yl* NEI UE] N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y-I NEI U-] N/AI
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) SEWS 2-SW-90A (rev. 0) indicates a clearanceof 2.75" between the actuatorand adjacentpipe. The actual clearance is 0. 625" which is still consideredacceptable. Evaluated by: Thomas Steahr A t- .- ','"4/(L-., Date: 08-07-2012 Evaluated by: Stephen Superson Jr~3/4~ Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-85

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-043 AWC # MiP2-WB-022 Status YZ NEI UI1 Equipment ID No. M22-SW-97A Equip. Class 7 Equipment Description Service Water Pump HeaderX-Tie Control Valve Location: Bldg. CW Floor El. 14' Room, Area SWPump Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NO UE" N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NE UE1 N/A:E
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-86

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-043 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NI] UI- N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI U-i N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NiO UI- N/AZ
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UZI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NI] UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Valve shown in SEWS 2SW-97A (Rev. 0) has been replaced in accordancewith DCNNo. DM2-00-0343-08 Evaluated by: Thomas Steahr Date: 08-07-2012 Evaluated by: Stephen Superson 17 *'> t'- > - Date: 08-07-2012 I

                                                              /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-87

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-044 AWC # MP2-WB-012 Status YO NE UE Equipment ID No. M22-CH-501 Equip. Class 8 Equipment Description Volume Control Tank To ChargingS stem Outlet Valve Assembly Location: Bldg. AB Floor El. -25'6" Room, Area Degasifierroom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one YFJ NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YrI NEI UEr N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE- NEI UE- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UEr N/AO
5. Is the anchorage configuration consistent with plant documentation? YE- NE UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-88

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2-WD-SWEL-044 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI UED N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI N/AUl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI U N/AM
10. Based on the above seismic interaction evaluations, is equipment free YO NO UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[9 NEI U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Reference SEWS 2-CH-501 (Rev. 0). Evaluated by: Thomas Steahr Date: 08-09-2012 Evaluated by: Stephen Superson w i* w Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-89

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-045 AWC # MP2-WB-002 Status YED NEI UEj Equipment ID No. M22-CH-509 Equip. Class 8 Equipment Description "A "BoricAcid Storage Tank Outlet Gravit Feed Valve Location: Bldg. AB Floor El. -5' Room, Area BASTArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE- N/A0
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UEI N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NO ULI N/AS
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UrI N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-90

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-045 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NI] UE N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI ULI N/A'-

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YE NI] U[] N/AU
10. Based on the above seismic interaction evaluations, is equipment free YNIN U-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Reference SEWS ID 2-CH-509 Rev. 0. Evaluated by: Thomas Steahr 7,/407-(- A26* Date: 08-09-2012 7 Evaluated by: Stephen Superson Date: 08-09-2012

                                                                 /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-91

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-046 AWC # MP2-WB-002 Status Y19 NI] Ui] Equipment ID No. M22-CH-514 Equip. Class 8 Equipment Description Boric Acid Pumps "A "/"B" to ChargingPump Suction Valve Assembly Location: Bldg. AB Floor El. -5' Room, Area BASTArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI" NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI] NI] Ui] N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UI1 N/AS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y-I NI] UIl N/AE
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UI1 N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NI] UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-92

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-046 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UEI N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U-I N/AFl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/A0l
10. Based on the above seismic interaction evaluations, is equipment free YN NEI U--

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NO UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Reference SEWS ID 2-CH-514 Rev. 0. Evaluated by: Thomas Steahr . /,A, , Date: 08-09-2012 Evaluated by: Stephen Superson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-93

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-047 AWC # MlP2-WB-027 Status YN NI] UE] Equipment ID No. M22-MS-464 (SV- Equip. Class 8 4188 Equipment Description Terry Turbine Aux Feed Pump Steam SupplX Location: Bldg. TB Floor El. 1 '-6" Room, Area TDAFWPunp Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchoragie

1. Is the anchorage configuration verification required (i.e., is the item one YO NM of the 50% of SWEL items requiring such verification)?

In-line MOV

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NEI U!] N/AN
3. Is the anchorage free of corrosion that is more than mild surface YI] NEI UI] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI U!] N/AZ
5. Is the anchorage configuration consistent with plant documentation? YI] NI UI] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-]

potentially adverse seismic conditions? Non-anchored, in-line component. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-94

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-047 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE UEI N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN N[1 UI-I N/AE and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UE' N/A[-

Flex conduits attached.

10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE7 of potentially adverse seismic interaction effects?

No interactionsidentified Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could . YZ NEI UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) GIP ID SV-4188 Evaluated by: James Petroskv Date: 09-05-2012 Evaluated by: Tom Steahr i, Date: 09-05-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-95

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-048 AWC # MP2-WB-013 Status YO NE] ULI Equipment ID No. M22HV-215A Equip. Class 8 Equipment Description "B " Refrigeration Cycle Clg Coil (X42B) Inlet Valve Assembly Location: Bldg. AB Floor El. 36"-6" Room, Area ControlRoom H&VRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UI7 N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE] N/Au oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UI] N/AZ
5. Is the anchorage configuration consistent with plant documentation? YLI NEI UI] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SOV is mounted in-line on 5/8"piping. Reference ISO Drawing 25203-20135 SH 13, Rev. 1

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-96

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-048 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UEZ N/AZ]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UEI N/AZ-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI ULI N/AZ
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI U' of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ Nn U-'

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprasert Date: 08-15-2012 Evaluated by: Thomas. A Steahr Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-97

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-049 AWC # MP2-WB-020 Status YO NE] U[] Equipment ID No. M22-SI-614 Equip. I Equipment Description #1 Safety Injection Tank Outlet Valve Assembly Location: Bldg. CE Floor El. 14 '-6" Room, Area NorthEast Corner Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI] N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE] UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/A0
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] UE]

potentially adverse seismic conditions? In-line valve, no anchorage. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-98

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-049 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YJO NE UEI N/AZ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NEI UEI1 N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UZ1 N/AZl
10. Based on the above seismic interaction evaluations, is equipment free YO NI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) No interactionsor adverse conditions. Evaluated by: James McKinnev " . 61{c Date: 08-16-2012 C) & Evaluated by: James Petrosky Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-99

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-050 AWC # MP2-WB-018 Status YO NE] U[1 Equipment ID No. M22-SI-656 Equip. Class 8 Equipment Description "A " HPSI HeaderStop Valve Assembly Location: Bldg. AB Floor El. -45 '-6" Room, Area "A" Safeguards Room Manufacturer, Model, Etc. (optional but recommended) 6" Velan Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record Ihe results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] UE] N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/AZ
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS2-SI-656 (Rev. 0) did not credit supportattached to operator (No. 507004). Anchorage of support shows no adverse conditions.

6. Based on the above anchorage evaluations, is the anchorage free of YO Ni U]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-100

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-050 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UEi N/AUI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI U[] N/AUI and masonry block walls not likely to collapse onto the equipment?

Lightfixtures supportedby conduit have no adverse effect on valve. Cable trays in overhead have no adverse effect on valve.

9. Do attached lines have adequate flexibility to avoid damage? YE NEI UE N/AE1
10. Based on the above seismic interaction evaluations, is equipment free YM NI UEU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) SEWS 2-SI-656 (Rev. 0) sheets 1-3 Evaluated by: James Petroskv Date: 08-09-2012 Evaluated by: Jack DiLuna 6Aa Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-101

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-051 AWC # MP2-WB-035 Status YO NI] U-] Equipment ID No. M2Fll2B Equip. Class 9 Equipment Description "B " DC Battery Room Exhaust FanAssembly Location: Bldg. YD Floor El. 14'-6" Room, Area Outside Between U1 and U2 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NI] UI] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YI] NEI UI] N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI1 NI] UI0 N/AE
5. Is the anchorage configuration consistent with plant documentation? YI] NI] UI] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YONIN UI-]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-102

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-051 i Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NEI UE- N/Afl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NO U- N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ Nil U-- N/A-l
10. Based on the above seismic interaction evaluations, is equipment free YM NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YIE NEI UFE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Fan is an in-line component. No anchor evaluation required. Fan support structure is cantilevered from Aux. building. See Sews FJ12BRev.0 Evaluated by: Thomas Steahr " ",/-4K C,

                                                         >                             Date: 08-14-2012 Evaluated by: Sombat Pornprasert                        ?0 12:0-                        Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C  C-103

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-052 AWC # MP2-WB-001 Status YO NI] UF-] Equipment ID No. M2F38B Equip. Class 9 Equipment Description "B" D/G Room Vent Fan Assembly Location: Bldg. AB Floor El. 14'-6" Room, Area "B "D/G Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI- N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI- NEI UI1 N/AS
3. Is the anchorage free of corrosion that is more than mild surface YIO NEI UI] N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI- NI] U[] N/AM
5. Is the anchorage configuration consistent with plant documentation? YI1 NI] UI] N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NI U[]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-104

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-052 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UEI N/AE-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NEI U[- N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI U[I N/Al
10. Based on the above seismic interaction evaluations, is equipment free Y* NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Reference SEWS F38B (Rev. 0). Evaluated by: William Price CCUA~w\ Date: 08-14-2012 K) Evaluated by: Stephen Superson Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-105

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-053 AWC # MP2-WB-033 Status YO Nn] U-I Equipment ID No. M2F52 Equip. Class 9 Equipment Description East 480 Volt Room Supply Fan Assembly (MTR HTR BKR LH61-6) Location: Bldg. TB Floor El. 56'-6" Room, Area 6.9kv Switchgear Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checldist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE1 N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YI NE] UI' N/AI-
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ N- UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-106

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # M~P2-WD-SWEL-053 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI Ur- N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting.

YED NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YE NEI ULI N/AD[
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NEI UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Initiated CR 484940for drawing update. DrawingNo. 25203-51093 does not matchfan F52 support configuration. SEWS F52, Rev. 0 is consistent with actualfieldconditions, therefore acceptableas indicatedabove. Evaluated by: William Price Date: 08-15-2012 Evaluated by: Stephen F. Superson Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-107

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-054 AWC # MP2-WB-030 Status YN NI U-] Equipment ID No. M2F133 Equip. Class 10 Equipment Description Upper 4160 volt SwitchgearRoom Cooling FanAssembly Location: Bldg. TB Floor El. 56'-6" Room, Area Upper 4160v Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record 1he results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UOI N/A-
3. Is the anchorage free of corrosion that is more than mild surface YE NO UW N/All oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U- N/AZ
5. Is the anchorage configuration consistent with plant documentation? YE NEI UL- N/Al (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS F133 (Rev. 0)

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UD potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summar. Report Appendix C C-108

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-054 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NE] ULI N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UI1 N/A-I and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO N*I UL] N/Al]
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] U--

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None N Evaluated by: William Price 1 Date: 08-15-12 Evaluated by: Stephen F. Superson Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-109

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-055 AWC # MP2-WB-036 Status YO NE U-] Equipment ID No. M2F14 C Equip. Class 10 Equipment Description CTMT Air Recirc Cooling Unit FanAssembly Location: Bldg. CE Floor El. -3 '-6" Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[- NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NHI UH- N/AH See comments.
3. Is the anchorage free of corrosion that is more than mild surface YO NH U- N/AH oxidation?

See comments.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NH UH N/AH See comments.
5. Is the anchorage configuration consistent with plant documentation? YO NH UH- N/AH (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See comments.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-1 potentially adverse seismic conditions?

See comments. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-110

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E2-WD-SWEL-055 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NEI UI-I N/AZI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] UE] N/A]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/AZl
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE" of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE] UFI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Anchorage offan motor to concrete slab not visible (see reference DrawingNo. 25203-29123, SH

          ]A). However,flanged connections to ductwork was visible and in good condition. Associated air cooler and structuralsteel mounting was in good condition.

Evaluated by: James McKinney 4- Date: 08-16-2012 Evaluated by: James Petroskv Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summar/ Report Appendix C C-111

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-056 AWC # MP2-WB-013 Status YZ NEI- U-] Equipment ID No. M22F21B Equip. Class 10 Equipment Description "B" Control Room A/C System FanAssembly Location: Bldg. AB Floor El. 36'-6" Room, Area ControlRoom H&VRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one .YE NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI NEI UE' N/AE3
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UI] N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UI- N/AE
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE' N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

DrawingNo. 25203-51091, Rev. Ofor base pad. DrawingNo. 25203-2 7015, Rev. 25for location. SEWS F21B, Rev. 0

6. Based on the above anchorage evaluations, is the anchorage free of YN NE UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-112

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-056 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NE UI- N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI7 N/AEI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UI- N/AM
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UIE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprart ý VA- P. Date: 08-15-2012 p Evaluated by: Thomas A. Steahr flu-17ZI114 4t!ýS- Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-113

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-057 AWC # MP2-WB-008 Status Y1 NO UI] Equipment ID No. M2F54B Equip. Class 10 Equipment Description "B "DC Room Air Conditioning Unit FanAssemblN Location: Bldg. AB Floor El. 14'-6" Room, Area Hallway Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE- N/AE
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE- N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE N/AE
5. Is the anchorage configuration consistent with plant documentation? YOI NO UE- N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS F54B, Rev. 0 DrawingNo. 25203-24007 DrawingNo. 25203-28017

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UEF potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-114

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-057 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NEI UlJ N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI UU N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NE UE N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y[ NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI UL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None eltl"4 kt;z. ,J~, d~*~-4 Evaluated by: Thomas A. Steahr Date: 08-14-2012 Evaluated by: Sombat Pornprasert .- 47 Po-..-,_. _*7- Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-1 15

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-058 AWC # MP2-WB-015 Status YO NEI U] Equipment ID No. M2X181A Equip. Class 10 Equipment Description "A4" West 480V Load Center Room Cooling Coil Location: Bldg. AB Floor El. 36'-6" Room, Area West 480V Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE] NO UE] N/A[3 oxidation'?

Surface corrosion on one of the fourfoundation legs, previously identified and elevated as not affecting designfinction. Reference CR47969, Baseplate Corrosionon Northwest Baseplate.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE] Ui N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS X181A (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-1 16

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # i2 -WD-SWEL-058 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO UI1 N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UI N/A0-
10. Based on the above seismic interaction evaluations, is equipment free YN NOl U of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson s F! 5k-,a Date: 08-10-2012 Evaluated by:. Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-117

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC #- M[P2-WD-SWEL-059 AWC # MP2-WB-012 Status YZ NEI UEl Equipment ID No. M2F1A Equip. Class 11 Equipment Description "A " Waste Gas CompressorAssembly Location: Bldg. AB Floor El. -25'6" Room, Area WG Compressorroom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UI- N/Al]
3. Is the anchorage free of corrosion that is more than mild surface YED NEI UOI N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YS NO- UI- N/AOl
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UI- N/Al-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS FIA (rev. 0)

6. Based on the above anchorage evaluations, is the anchorage free of Y NE-I U-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-118

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Mt2-WD-SWEL-059 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UI- N/AL!
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE! UE' N/AE!

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NE] UI- N/AL!
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE!

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NEI U[:]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Thomas A. Steahr 61* 4 ,y Date: 08-09-2012 Evaluated by: Stephen F. Superson ~Lffl SýA-X-I Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-119

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-060 AWC # MP2-WB-013 Status YO NI] ULD Equipment I11No. M22F22B Equip. Class 11 Equipment Description "B" ControlRoom A/C System CompressorAssembly Location: Bldg. AB Floor El. 36'-6" Room, Area Control Room H&VRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UI] N/AU
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NiO UI] N/AI]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UI] N/AU-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

DrawingNo. 25203-24003 for location. DrawingNo. 25203-11113 Rev. 4for slab. DrawingNo. 25203-11919 SH 764 for pad and bolt design.

6. Based on the above anchorage evaluations, is the anchorage free of YM NI u]E potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-120

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-060 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[I N/AE-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO* NEI ULI N/AZl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE1 N/AZ1
10. Based on the above seismic interaction evaluations, is equipment free YN]NEI UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE' adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Plan DrawingNo. 25203-11113, Rev. 4 references DrawingNo. 25203-11919 SH 764, which shows (4) 314"Wej-its. This is consistent with as-installedconfiguration and existing SEWS F22B, Rev. 0 (References SEWS F22A, Rev. 0) Evaluated by: Sombat Pornprasert ' (i -,_ Date: 08-15-2012 Evaluated by: Thomas A. Steahr 4 A l Date: 08-15-2012 k;aý_ Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-121

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-062 AWC # MP2-WB-007 Status YO N[] U[] Equipment ID No. M2D I Equip. Class 14 Equipment Description 125 Volt DC DistributionPanel 201A-1 (FAC 1) Location: Bldg. AB Floor El. 14'-6" Room, Area East DC SWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NO U-] N/A!]
3. Is the anchorage free of corrosion that is more than mild surface YED NEI U!] N/A[l oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN Ni: U!] N/A!]
5. Is the anchorage configuration consistent with plant documentation? YNI NE U!] N/A!I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation96-ENG-1502M2 and SEWS DlI (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U!1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C 0-122

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-062 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NO U[-] N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NO ULi N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NO UO N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NE UU-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NEI U--

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: William Price U Date: 08-10-2012 Evaluated by: Stephen Superson z Q -x// I Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-123

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MEP2 -WD-SWEL-063 AWC # MP2-WB-007 Status Y0 NEI UE Equipment ID No. M2D12 Equip. Equipment Description 125 Volt DC DistributionPanel201A-2 (FAC 1) Location: Bldg. AB Floor El. 14'-6" Room, Area East DC SWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UL N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE UEZ N/AU
5. Is the anchorage configuration consistent with plant documentation? YZ NE UE1 N/AUl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation 96-ENG-1502M2 and SEWS D12 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YE NO UO potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-124

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-063 Interaction Effects

7. Are soft targets *free from impact by nearby equipment or structures? YN NEI U[I] N/AUI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE[ N/AL!

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YN NE] U-] N/AU1
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UZi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NL! UL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. A -- Evaluated by: William Price UHIAA-1^ Date: 08-10-2012

                                                 -U Evaluated by: Stephen Superson                           i~                             Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report  Appendix C  C-125

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-064 AWC # MP2-WB-007 Status YO NEI UE Equipment ID No. M2DV10 Equip. Class 14 Equipment Description 125 Volt DC DistributionPanel Location: Bldg. AB FloorEl. 14'-6" Room, Area East DC SWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YER NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIN NE UE N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YI NEI UE-1 N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE N/AE3
5. Is the anchorage configuration consistent with plant documentation? YO NEI UEI N/A[]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS DV20 (Rev. 0). And Drawing25203-34308-00014 (Rev. 2).

6. Based on the above anchorage evaluations, is the anchorage free of YO NE UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-126

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-064 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE1 N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UE] N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NE-] U[-] N/AU
10. Based on the above seismic interaction evaluations, is equipment free YN NE] U[-

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] U-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson Date: 08-17-2012 Evaluated by: William Price Date: 08-17-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-127

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-066 AWC # MP2-WB-007 Status Y[ NO] U-] Equipment ID No. M2VR1 1 Equil. Class 14 Equipment Description Distribution Panel Location: Bldg. AB Floor El. 14'-6" Room, Area EastDCSWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE1 N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YO NE] U'] N/AL oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE NE-] UE1 N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Calculation96-ENG-1502M2 and SEWS VR 1I (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-128

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-066 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NE UE N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YIZ NE UEJ N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NE UE N/AEl
10. Based on the above seismic interaction evaluations, is equipment free Y[J NEI UL of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated Date: 08-10-2012 Evaluated by: Stephen Superson Date: 08-10-2012

                                                               /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-129

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-067 AWC # MP2-WB-006 Status YO NE] U'] Equipment ID No. M2DB1-201A Equip. , Equipment Description "A " Volt DC Station Batter Location: Bldg. AB Floor El. 14'-6" Room, Area "A " DC Battery Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NEI UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI U-] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UL- N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI U- N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS DBI (Rev, 0) andDCNDM2-S-0628-96.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-130

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-067 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] U-] N/AFl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YIZ NE- UD] N/AUl and masonry block walls not likely to collapse onto the equipment?

Lights swivel, therefore no seismic concerns.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI U[" N/Al]
10. Based on the above seismic interaction evaluations, is equipment free Y[R NEI U[-

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE N[-] ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson c~+zff 2 iK If

                                                 .. Icy w v    .

I

                                                                      §                      Date: 08-10-2012 Evaluated by: William Price                                                                   Date: 08-10-2012 Millstone Power Station Unit 2       NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-131

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2 -WD-SWEL-068 AWC # MP2-WB-007 Status YZ NEI U[- Equipment ID No. M2DC1 Equip. Class 16 Equipment Description "A "Battery Chargerto Battery Bus 201A Location: Bldg. AB Floor El. 14'-6" Room, Area East DC SWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UD1 N/AD1
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI- N/AD1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NO UD- N/AD1
5. Is the anchorage configuration consistent with plant documentation? YN NEI UD- N/A[]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Calculation 88-049-452D2 and SEWS DCO (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-132

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP2 -WD-SWEL-068 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI U[-] N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO* NEI UE N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YE NE UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NO UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-10-2012 Evaluated by: Stephen Superson U) Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-133

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-069 AWC # MIP2-WB-006 Status YE NE UL Equipment lID No. M2INV1 Equip. Class 16 Equipment Description Inverter #1 Location: Bldg. AB Floor El. 14'-6" Room, Area "A "Battery Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE UE N/A-
3. Is the anchorage free of corrosion that is more than mild surface YED NE UM N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE N/AE
5. Is the anchorage configuration consistent with plant documentation? YE NE UE N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Calculation89-031-102D2 and SEWS VIP] (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NO UM potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTITF 2.3 Seismic Walkdown Summary Report Appendix C C-134

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # M[P2-WD-SWEL-069 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NI] ULI N/A'
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YIN N[-] UI-- N/AEI and masonry block walls not likely to collapse onto the equipment?

Y Ni] UI-- N/A~l

9. Do attached lines have adequate flexibility to avoid damage? YS NI] UI- N/A
10. Based on the above seismic interaction evaluations, is equipment free YZ NEIUEW of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NI] UI-adversely affect the safety functions of the equipment?

Sc-u 7 A-C-ctý3t (3t L rrY 7/19 Comments (Additional pages may be added as necessary) IJ- 5~4-w..M *173I /7J7(z None. Evaluated by: William Price Date: 08-10-2012 Evaluated by: Stephen Superson Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-135

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-070 AWC # MP2-WB-001 Status Y[D N[] UE] Equipment ID No. M2H7B Equip. Class 17 Equipment Description "B " Emergency Diesel GeneratorAssembly Location: Bldg. AB Floor El. 14 '-6" Room, Area "B" DIG Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO N[-

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEl UL- N/A[3
3. Is the anchorage free of corrosion that is more than mild surface YZ NCI UEU N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U-i N/ADl
5. Is the anchorage configuration consistent with plant documentation? YO NEI U-] N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS H7B (Rev. 0) and Drawing 25203-11105 (Rev. 10).

6. Based on the above anchorage evaluations, is the anchorage free of YO N(1 UL1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-136

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-070 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UE" N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UL' N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/AU
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI U'*

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-14-2012 Evaluated by: Steve Superson Date: 08-14-2012 I / Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-137

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-71 AWC # MP2-WB-020 Status YN NE ULI Equipment ID No. M2C172 Equip., Equipment Description InstrumentRack Location: Bldg. CE Floor El. 14'-6" Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y NOi of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NI] U-] N/AEi
3. Is the anchorage free of corrosion that is more than mild surface YN NE U-I N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U- N/A~l
5. Is the anchorage configuration consistent with plant documentation? YZ NE- ULI N/AE!

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS C1 72 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YE NE UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-138

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-71 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI Ut] N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO N[] U] N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UI- N/Al-
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI Ul]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Anchorage andframe very robust relative to mass of attached instrumentation. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-139

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-072 AWC # MP2-WB-034 Status Y0 NEI UD] Equipment ID No. M2LT-3001 Equip. Class 18 Equipment Description RWSTLEVEL ESAS CHANNEL A Location: Bldg. YD FloorEl. 14'-6" Room, Area NORTH SIDE OF RWST Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YED NE UE- N/AE
3. Is the anchorage free of corrosion that is more than mild surface YED NEI UE1 N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y9* NE UE N/AU
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE1 N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS LT-3001 (Rev. 1).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-140

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # EP2-WD-SWEL-072 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UI- N/A[]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE1 N/AEI and masonry block walls not likely to collapse onto the equipment?

See SEWS LT-3001 (Rev. 1).

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE] N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YM NEI U[

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr &lu I ý I/,/Ik

                                               -'ý                                      Date: 08-06-2012 Evaluated by: Stephen Superson                   Cýýt I
                                                        --:5/ I 4"                      Date: 08-06-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-141

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-073 AWC # MP2-WB-034 Status YM NElI U-] Equipment ID No. M2LT-3003 Equip. Class 18 Equipment Description RWST LEVEL CHANNEL C Location: Bldg. YD Floor El. 14'-6" Room, Area NVORTHEAST SIDE OFRWST Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N- U- N/Afl
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UE-1 N/A-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U[- N/AOl
5. Is the anchorage configuration consistent with plant documentation? YE NO U- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS LT-3003 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UL potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-142

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-073 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO ND3 U- N/All
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ ND Ur- N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NDI UD- N/AD
10. Based on the above seismic interaction evaluations, is equipment free YO ND UDI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NDI UrI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr YJ./ *-1 // . - Date: 08-06-2012 Evaluated by: Stephen Superson 5ý Date: 08-06-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-143

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-074 AWC # MP2-WB-035 Status YZ NE] UE] Equipment ID No. M2LT-5282 Equip. Class 18 Equipment Description CondensateStorage Tank Level XMTR Location: Bldg. YD FloorEl. 14'-6" Room, Area INCSTSHNACK Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NI]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NI] U-- N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YO NI- UI] N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YS NOI UI] N/AI]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UI] N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) See SEWS LT-5282 (Rev. 1) and DrawingNo. 25203-34308-00014.

6. Based on the above anchorage evaluations, is the anchorage free of YONIEuI]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C 0-144

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-074 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE1 N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO Nil UI N/AEI and masonry block walls not likely to collapse onto the equipment?

Reference SEWS LT-5282 (Rev. 1)

9. Do attached lines have adequate flexibility to avoid damage? YO NE] UE] N/AUl
10. Based on the above seismic interaction evaluations, is equipment free YO NEl UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[-] ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas A. Steahr 1677 Date: 08-07-21012 Evaluated by: Stephen F Superson 5u-,i 1*S-.t ° Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-145

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-075 AWC # MP2-WB-022 Status YO* NEI U-] Equipment ID No. M2PDC-6475 Equip. Class 18 Equipment Description SW StrainerA Diff Pressure Controller Location: Bldg. CW Floor El. 14' Room, Area SWPump/ Intake Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YM NEI UEI N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YZ NO U- N/A[]

oxidation? Anchor Bolts & Baseplate coated with black epoxy.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UL- N/AZl
5. Is the anchorage configuration consistent with plant documentation? YO NEI UL- N/AZ1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS PDC-6475 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YM NEI U]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-146

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # nP2-Ef-SWEL-075 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UIZ N/AEJ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI ULi N/ADl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NE UE- N/AE
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas A. Steahr Date: 08-07-21012

                                                                            -    7 Evaluated by: Stephen F. Superson                                                       Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-147

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-076 AWC # MP2-WB-022 Status YiD Ni] ULI Equipment ID No. M2PDC-6488 Equip. Class Equipment Description SW StrainerC Diff PressureCo Location: Bldg. CW Floor El. 14' Room, Area SWPump /lntake Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YER Nl ULI N/AE[
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE1 N/AO oxidation?

Anchor Bolts & Baseplate coated with black epoxy.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UI N/AE
5. Is the anchorage configuration consistent with plant documentation? YS NEI UE N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS PDC-6488 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 , NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-148

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # EM2-WD-SWEL-076 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NEI U'I N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI U- N/AE!

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE' N/AE1
10. Based on the above seismic interaction evaluations, is equipment free Yi NEI UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas A. Steahr Asý- A Date: 08-07-21012 Evaluated by: Stephen F. Superson Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-149

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-077 AWC # MP2-WB-003 Status YZ NEI U[- Equipment ID No. M2PT-8113 Equip. Class 18 Equipment Description CTMT PressureXmtr, Channel "A "RPS/ESAS Location: Bldg. AB Floor El. -5 Room, Area E Penet CTMT Wall-E Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI U-- N/A[
3. Is the anchorage free of corrosion that is more than mild surface YN NEl UI- N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEl UU- N/AFl
5. Is the anchorage configuration consistent with plant documentation? YZ NEl UI1 N/Al]

(Note: This question only applies if the item is one of the 50%/o for which an anchorage configuration verification is required.) Component replacedand support configurationchanged since SEWS PT-8113, Rev. 0 was completed. The modification was done under DCR no. M2-99016, Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of YO NO1 UU potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-150

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-077 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI UEI N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UrL N/AZl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE: UEI N/AZ
10. Based on the above seismic interaction evaluations, is equipment free YO NO U11 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprasert Date: 08-14-2012 Evaluated by: Thomas A. SteahrK Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-151

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-078 AWC # MP2-WB-005 Status YE NEI UE1 Equipment ID No. M2PT-8115 Equip. Class 18 Equipment Description CTMT PressureXmtr. Channel "C "RPS/ESAS Location: Bldg. AB Floor El. -5 Room, Area WPenet CTMT Wall-E Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y NOl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y0 NEI U- N/AU
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U[:- N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UO N/AU
5. Is the anchorage configuration consistent with plant documentation? YS NE U- N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Component replaced and support configurationchangedsince SEWS PT-8115, Rev. 0 was completed. The modification was done under DCR No. M2-99016, Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of YM NI UD potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-152

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-078 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI ULJ N/A[]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE] ULI N/AE]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] UI] N/Al
10. Based on the above seismic interaction evaluations, is equipment free YO NEI U of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] UI1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Sombat Pornprasert . (j_-. .., A' Date: 08-14-2012 Evaluated by: Thomas A. Steahr (L Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summar. Report Appendix C C-153

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-079 AWC # MP2-WB-002 Status YO NiO UI-I Equipment ID No. C126 Equip. Class 18 Equipment Description Rack C126 for Boric Acid Tank Level Location: Bldg. AB Floor El. -5' Room, Area BASTArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorag-e

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YER NEI UEI N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE3 N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NI] UF' N/AZl
5. Is the anchorage configuration consistent with plant documentation? YO NEI UL N/All (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Consistent with SEWS evaluation. (SEWS C126 in Caic. MP2SEIS.RPT)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-154

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-079 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO UE1 N/AE]

Non-seismic piping in overhead, but adequately restrained.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UEI N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NE UEr N/AZI Rigid conduit connections, but supportedwith U-bolt clamps and unistrut as evaluated in SEWS.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UEJ of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[9 NE] U[-

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Rack is designated as non-safety relatedseismic in MEL and on A46 SSEL. Evaluated by: James Petroslk >-ý >,V-ý ý Date: 09-05-2012 Evaluated by: Tom Steahr fA-A Date: 09-05-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-155

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-080 AWC # MP2-WB-011 Status YI[ No U[] Equipment ID No. M2TE-351Y Equip. Class 19 Equipment Description Shutdown CoolingSafety Injection Pump Discharge Temp RTD Location: Bldg. AB Floor El. -25"-6" Room, Area "B'" ChargingPump Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NM of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UEI N/A[D
3. Is the anchorage free of corrosion that is more than mild surface YEr NE UEI N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE- N/A[9
5. Is the anchorage configuration consistent with plant documentation? YEI NE UEr N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-156

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-080 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] Ut] N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI- N/AEI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NE Ut] N/At]
10. Based on the above seismic interaction evaluations, is equipment free Y NEI U[]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEi Ut1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Reference SEWS TE-351 Y (Rev. 0). Evaluated by: Thomas Steahr '. q'&'-/-i--- Date: 08-09-2012 Evaluated by: Stephen Superson Date: 08-09-2012 I/ Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summar' Report Appendix C C-157

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-081 AWC # MP2-WB-019 Status YO NEI U[] Equipment ID No. M2ACT-5 / RC02B Equip. Class 20 Equipment Description ESAS Actuation Cabinet 5 Location: Bldg. CB Floor El. 36'-6" Room, Area ControlRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE UE N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YZ NE] UE1 N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE UE N/AE]
5. Is the anchorage configuration consistent with plant documentation? YZ NE] UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS RCO2B (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NE] UED potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-158

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-081 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM N[I UI' N/AFI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UL N/ADl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UUI N/AE-I
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI ULI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEl UE1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson Date: 08-16-2012 Evaluated by: William Price k Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-159

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-082 AWC # MP2-VB-019 Status YZ NEI Ut-Equipment ID No. M2CO8R Equip. Class 20 Equipment Description C08R main control board Location: Bldg. CB Floor El. 36'-6" Room, Area Control Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YF NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO] Ut] N/At3
3. Is the anchorage free of corrosion that is more than mild surface YE NEI Ut1 N/At]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN Nt] Ut1 N/At]
5. Is the anchorage configuration consistent with plant documentation? Yti Nt] Ut] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NL1 Uil potentially adverse seismic conditions?

This walkdown does not credit a detailed anchorageinspection because access to C08R was limited to what could be inspectedfrom the access door. Verification ofAnchor welds consistentwith SEWS C08R (MP2-SEIS.RPT), CalculationNo. MP2CRANC and drawing No. 25203-29097 SH. 38 were confirmed. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-160

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-082 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YS NEI UE1 N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0D NEI UI N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI U-1 N/ADl
10. Based on the above seismic interaction evaluations, is equipment free YED NE UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) C08R was selected because anchoragewas visible, not covered with fire foam in floor, as is the case with other Main ControlBoardpanels. Evaluated by: James Petrosla i Date: 09-11-2012 Evaluated by: Tom Steahr r Date: 09-11-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-161

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-083 AWC # MW2-WB-019 Status YO NE UE[ Equipment ID No. M2RC02D4 Equip. Class 20 Equipment Description ESAS Actuation Cabinet Location: Bldg. CB Floor El. 36'-6" Room, Area Control Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checidist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[9 NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE UE- N/AE
3. Is the anchorage free of corrosion that is more than mild surface YN NE UE[ N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UE N/AE
5. Is the anchorage configuration consistent with plant documentation? YO NE UE] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Consistent with SEWS RCO2D4 (MP2-SEIS.RPT)which referenced SEWS RCO2A1 for welded anchoragedetail.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTITF 2.3 Seismic Walkdown Summary Report Appendix C C-162

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-083 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI Ul N/An
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N[] UE] N/All and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NO- U-I N/A[l
10. Based on the above seismic interaction evaluations, is equipment free YE NF1 UF of potentially adverse seismic interaction effects?

Cabinets modifiec by MMOD M2-96569, anjacent cabinets bolted together to prevent seismic interaction. Implementation ofMMOD resolved outlier issuefrom A-46 walkdowns. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NO UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James PetroslOL ý!M' P-R-- Date: 09-11-2012 Evaluated by: Tom Steahr Date: 09-11-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-163

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-084 AWC # MP2-WB-019 Status YN NEI U[] Equipment ID No. M2CO0X Equip. Class 20 Equipment Description ESF status light panel Location: Bldg. CB Floor El. 36'-6" Room, Area ControlRoom Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UI] N/AE3
3. Is the anchorage free of corrosion that is more than mild surface YO NE] UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE] U"] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UE] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS CO0X (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-164

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-084 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UO N/AZ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE- N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UE] N/A-
10. Based on the above seismic interaction evaluations, is equipment free Y] NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by:, Date: 08-16-2012 Evaluated by: Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-165

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-086 AWC # MP2-WB-030 Status YZ Ni] UL-Equipment ID No. M2C10 Equip. Class Equipment Description Fire Shutdown Panel (Spec 200) Location: Bldg. TB Floor El. 54'-6" Room, Area 416OVSWGR (Upper) Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NI]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? Y2 NEI U'I N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YS NI-] UI] N/A[-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NI] UI] N/AI]
5. Is the anchorage configuration consistent with plant documentation? YEI NI] UI1 N/A[]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS CIO (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of Y NE] U[--]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-166

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-086 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE] U"] N/ADl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NEI U-1 N/AD]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YN NEI U-- N/Al]
10. Based on the above seismic interaction evaluations, is equipment free Y[ NEl UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO N[i ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson *', V-' - Date: 08-17-2012 Evaluated by: Date: 08-17-2012 Millstone Power Station Unit 2 NT-TF 2.3 Seismic Walkdown Summary Report Appendix C C-167

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-087 AWC # MP2-WB-019 Status YO NEI U"] Equipment ID No. M2C25A Equip. Class 20 Equipment Description ControlRoom Vent Control Cabinets Location: Bldg. CB Floor El. 36'-6" Room, Area Control Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE UE- N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE- NEI UE- N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UEi N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NO UE potentially adverse seismic conditions?

Detailedanchorageverification not performed, however validation of visible attributes of anchoragewas completed. Visual inspection performed through inspection holes in metal skirtprovided in DCN DM2-00-1372-96. Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-168

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-087 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UF- N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UEI N/AE3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UI- N/A[:l
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI U[3 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Verified that cabinets C25A, C25B, C80 and C26 bolted togetherper MMOD M2-96569 to selve seismic interactionoutlier identified in SEWS. Evaluated by: James Petrosky ý>ý- ý)-t Date: 09-11-2012 Evaluated by: Tom Steahr _ _-_ _ Date: 09-11-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-169

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-090 AWC # MP2-WB-019 Status YM NE UE Equipment ID No. M2C80 Equip. Class 20 Equipment Description Control room vent control cabinets Location: Bldg. CB Floor El. 36'-6" Room, Area Control Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE N/AU
3. Is the anchorage free of corrosion that is more than mild surface YZ NE ULI N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE UE- N/AU
5. Is the anchorage configuration consistent with plant documentation? Y0 NEI UE N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference SEWS C80 (rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YE NO U-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-170

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-090 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YOI NEI UE] N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NFI U-1 N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NO] U-- N/A0
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NE] UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Date: 08-16-2012 Evaluated by: Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-171

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-091 AWC # MiP2-WB-019 Status YO NI] UI] Equipment ID No. M2RC30A-1 Equip. Class 20 Equipment Description Spee-200 CabinetRC-30A-1 Location: Bldg. CB Floor El. 36'-6" Room, Area Behind CO0R Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NI] UI N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YM NI] UI] N/AI]

oxidation'?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UrI N/AI]
5. Is the anchorage configuration consistent with plant documentation? YZ NI] UI] N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS RC3OA-1 (Rev. 0).

6. Based on the above anchorage evaluations, is the anchorage free of YZ N] U[]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-172

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-091 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? I YO NEI UE- N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NO! U-] N/AEU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI U-I N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson /sý Date: 08-17-2012 Evaluated by: William Price -AQI-ý Date: 08-17-2012 Q Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-173

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # M[P-WD-SWEL-092 AWC # MIP2-WB-001 Status YO NEI UE' Equipment ID No. M2T041 Equip. Class 20 Equipment Description Diesel GeneratorH7B Relay and Terminal Box Location: Bldg. AB Floor El. 14'-6" Room, Area "B" D/G Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE- NEI UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE- N/A0 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE N/A9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NO UO potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-174

Page 2 of 2 Seismic:Walkdown Checklist (SWC) SWC # MP-WD-SWEL-092 Interaction Effects

7. Are soft targets free from impact by nearby equipment Or structures? YN N[-- UI1 N/A[]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE N[- UiI N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UI- N/ALI
10. Based on the above seismic interaction evaluations, is equipment free YMNil UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI U[E adversely affect the safety functions of the equipment?
                 ~~NL~~~~JVL9~~~~~
                          ~ e~J-h          výf~       ~-4                        p9' r    U-5 Tcjt fut-5(ý Z-Comments (,Additional pages may be added as necessary)
                                                                                     -S  -Fa-wteH d    y            /-Iip/

Reference SeWS T041 (Rev. 0). Evaluated by: Date: 08-14-2012 Evaluated by: Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-175

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-093 AWC # WP2-WB-024 Status YM NI] UE] Equipment ID No. M2T3 Equip. Class 21 Equipment Description RBCCW Surge Tank Location: Bldg. EB Floor El. 71' Room, Area RBCCWSurge Tank Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NIl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI Ui] N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YZ NI] UI1 N/AD]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UI] N/AI-]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI U-I N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS-T3Rev. 0 DrawingNo. 25203-11134, Rev. 1

6. Based on the above anchorage evaluations, is the anchorage free of YN NI] U[-]

potentially adverse seismic conditions? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-176

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2 -WD-SWEL-093 - Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UEJ N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI" N/AE]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YN NEI Ul N/AEI
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[D NO UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornpraset SAAA- P0 ,- - Date: 08-14-2012 Evaluated by: Thomas Steahr Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-177

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-094 AWC # MP2-WB-035 Status YN NEI UE] Equipment ID No. M2T40 Equip. I Equipment Description Condensate Storage TANK Location: Bldg. YD Floor El. 14 '-6" Room, Area CST and HXAREA Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEl of the 50% of SWEL items requiring such verification)?

See SEWS T40 (Rev. 0).

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI ULI N/A[]
3. Is the anchorage free of corrosion that is more than mild surface YN NE] UiL N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U[] N/Al]
5. Is the anchorage configuration consistent with plant documentation? YO NEI U[] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) No anchoragedrawing available.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-178

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-094 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE UE N/AL]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YEI NEI UE" N/AN and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YED NEI UE" N/AE
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI UE[

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) 3 of 18 lower anchor bolt chairsshow minor light surface corrosion. 9 of 18 upper anchor chairsaccessiblefor inspection without scaffolding. Upper chairs coated with black epoxy on lower portion of chairand anchor bolts. Evaluated by: Thomas Steahr Date: 08-07-2012 Evaluated by: Stephen Superson i7Z tL . >

                                                            "                          Date: 08-07-2012 V
                                                               /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-179

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-095 AWC # MP2-WB-034 Status YO NEl U0" Equipment ID No. M2T41 Equip. Class 21 Equipment Description REFUELING WATER STORAGE TANK Location: Bldg. YD Floor El. 14'-6" Room, Area RWSTandHXAREA Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE" N/AEI
3. Is the anchorage free of corrosion that is more than mild surface YEI NO UEI N/AE oxidation?

Five anchors exhibited a 10-15% reduction in cross-sectionalarea due to active corrosion. CR484025 issued to track correction of corroded anchor bolts. Given the small reduction of area and the large number of anchor bolts (96) versus number of bolts ofconcern (5), the tank anchorage is consideredacceptable. In addition,prior CR-08-08209 had been issued to dispositionpreviously identified bolting corrosion

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE] N/AE
5. Is the anchorage configuration consistent with plant documentation? YO NEI UE- N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS T41 (Rev. 0)

6. Based on the above anchorage evaluations, is the anchorage free of YO NE UEI potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-180

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-095 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NE] UO N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UUI N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YED NE] UI- N/AO
10. Based on the above seismic interaction evaluations, is equipment free YE NI UOI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NE] UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Thomas Steahr 610s el jgý/ Date: 08-06-2012 Evaluated by: Stephen F. Superson i< $L~t4~ Date: 08-06-2012

                                                                 /

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-181

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-096 AWC # MP2-WB-016 Status Y[ NE] U-] Equipment ID No. M2T48B Equip. Class 21 Equipment Description "B" DieselEngine Fuel Oil Supply Tank Location: Bldg. AB Floor El. 38'-6" Room, Area DG Day Tank Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE-] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE- N/A[-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE] UE1 N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE NE] UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference SEWS for T48B (Rev. 0)

6. Based on the above anchorage evaluations, is the anchorage free of YE NE] UE-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-182

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-096 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE1 N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NO UEI N/AS and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE N/AZI
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NO U-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Minor cracks in concrete slabs, will not impact the seismic adequacy of the tank. Evaluated by: William Price ýdWnen -Date: 08-13-2012 Evaluated by: Stephen F. Superson Date: 08-13-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-183

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-097 AWC # MP2-WB-028 Status YE NEI U-] Equipment ID No. M2X169A Equip. Class 21 Equipment Description "A"DC SwitchgearRoom Chiller(Vital Chiller) Condenser Location: Bldg. TB Floor El. 14'-6" Room, Area ChillersArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZNIEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE] UE1 N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UL1 N/AE1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UL1 N/AE-
5. Is the anchorage configuration consistent with plant documentation? Y19 NEI UE1 N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

In accordancewith 25023-29577 and Calculation 82-209-329GD.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UI potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-184

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-097 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE] UI] N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] Ul] N/AE]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UI- N/AE]
10. Based on the above seismic interaction evaluations, is equipment free Y[ NE] U[]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YER NEI UEi adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Jim McKinney ýýý9ONjZ Date: 08-09-2012 Evaluated by: William Price . 1 - Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-185

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-098 AWC # MNP2-WB-010 Status Y1 NlE U[] Equipment ID No. M2X18A Equip. Class 21 Equipment Description 'A' RBCCWHeat Exchanger Location: Bldg. AB Floor El. -25'-6" Room, Area RBCCWHX Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YED NEI Ul] N/All
3. Is the anchorage free of corrosion that is more than mild surface YO NE] UL] N/An oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI ULE N/All
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE] N/AU1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with SEWS M2X18A sheets 1-6.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UD potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-186

Page 2 of 2 Seismic Walkdown Checklist (SWE) SWC # l'VflWD-SWEL-.098 Interaction Effect$

7. Are soft targets free from impact by nearby equipment or structures? YS NEI ULT N/AF
8. Are overhead equipmenat distribution systems, ceiling tiles and lighting, YIZND UQ N/AEI and masonry block walls not likely to collapse onto the equipment?

Instrument air line in overheadis small bore, adequatelysupported, does not create potentially adverse interactions.

9. Do attached lines have adequate flexibility to avoid damage? YIA NEI UE N/AD
10. Based on th6 above seismic interaction evaluations, is equipment free YO ND uO of potentially adverse seismic interaction effects?

Ladders and equipment box next to heat exchangerare restratnedper OA8. Temporary green taggedscaffold in place i 'adequatelybraced and there is no adverse interaction. ,OtherAdverse Condtions

11. Have you looked for and found no other seismic conditions that could Y0] NO Un adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: .ames, Petros&v Date: 08-07-2012 Evaluated by: JackDiLuna Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-187

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-099 AWC # MP2-WB-004 Status YZ N[] UE] Equipment ID No. M2X20A Equip. Class 21 Equipment Description 'A ' Sent Fuel Pool Cooling Heat Exchanger Location: Bldg. AB Floor El. -5'-6" Room, Area SFP HXArea Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YED NEI UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YZ NE] UE] N/A[]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE1 N/AE]
5. Is the anchorage configuration consistent with plant documentation? YZ N[E] UE1 N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Anchorage is consistent with SEWS sheets 1-9.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summar/ Report Appendix C C-188

Page 2 of 2 Seismic Waikdown Checklist (SWC) SWC # W2-WD-SWJ3EL-099 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UQ N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yv ND Uf N/AD and masonry block walls not likely to collapse onto the equipment?

Overhead lightingfixturesare hung by-1 " diameter conduitfrom ceiling, light andfixtures have no signifclantweight and have no adverse interactionwith heat exchanger.

9. Do attached lines have adequate flexibility to avoid damage? YO NO UlI N/AD
10. Based on the above seismic interaction evaluations, is equipment free YM N*I UI of potentially adverse seismic interaction effects?

Ladders storedneartool crib door are securedper O08 and will have no adverse interaction with heat exchanger. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEIl U-'

adversely affect the safety functions of the equipment? Comments (Additional pages may he added as necessary)

References:

SEWS LD X20A (Rev. 1) Sheets 1-9 Drawing25203-27018 Evaluated by: James PetroskW Date: 08-07-2012 Evaluated by: jackDiLuna Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-189

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP2-WD-SWEL-100 AWC # MP2-WB-018 Status YO NE] UE-] Equipment ID No. M22X23A Equip. Class 21 Equipment Description "A"Shutdown Coo ling Heat Exchanger Location: Bldg. AB Floor El. -45 "-6"" Room, Area "A" Safeguards Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UE] N/AE]

oxidation? Very mild surface corrosion noted which does not adversely affect the finction of the anchorage.

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[9 NEI UE1 N/A[]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Heat exchangeris supportedby pads at one end with 1 " diameter anchor bolts. The other end of tank is on rollers. The anchorage is addressedon SEWS X23A Rev. 0 and CalculationMP20R Section 5.3. Anchorage was inspectedand is consistent.

6. Based on the above anchorage evaluations, is the anchorage free of Y NE-I U-potentially adverse seismic conditions?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-190

Ln Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # 1WP2-M-SWEL-100 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE UEJ N/AUI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UQ N/AU3 and masonry block walls not likely to collapse onto the equipment?

Lightfixtures supported by conduit have no adverse affect on the heat exchanger.

9. Do attached lines have adequate flexibility to avoid damage? YN NOI UE N/AQ 10, Based on the above seismic interaction evaluations, is equipment free "Yl*NO urJ of potentially adverse seismic interaction effects?

Other Adverse Conditions

  .11. Have you looked for and found no other seismic conditions that could         YO NEI U[I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Calculation Vectra MP202 Rev. 0 Section 5.3 SEWS X23A Rev. 0 SH1-3 Drawing25203-27020 Drawing25203-11085 Evaluated by: James Petroslw , Date: 08-09-2012 Evaluated by: Jack DiLuna Th~-~ Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-191

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D Area Walk-by Checklists (AWC) (72 pages) D-1

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-001 Status Y[ Ni] U-] Location: Bldg. AB Floor El. 14'-6" Room, Area "B" EDG Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UI] N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YZ NI] U[] N/AM]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YN NI] UI] N/AI1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YIE NI] UI] N/AI]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YO NI] UI] N/A[]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-2

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-001

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UEi N/ADl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI ULI N/A-I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI U-1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Date: 08-14-2012 Evaluated by: Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-3

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-002 Status YED N[] U[] Location: Bldg. AB Floor El. -5' Room, Area BASTAREA Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UE3 NIAE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI U" N/AU degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NEI UE- N/AU raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI] UI N/AE1 interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NEI UE] N/AL!

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-4

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-002

6. Does it appear that the area is free of potentially adverse seismic YZ N[! UEJ N/AE-interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UO N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UE adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Tom Steahr Date: 08-09-2012

                                                      ~'

Evaluated by: Stephen Superson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-5

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-003 Status YED NEI U] Location: Bldg. AB Floor El. -5' Room, Area EastPEN Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI U! N/A!]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NE UE N/A!

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UE1 N/A!]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI U!] N/AE-interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NEI UE' N/AE1 interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-6

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-003

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U-i N/AE-interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI U-1 N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI U-1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by; Sombat Pornprasert £~NJ~ Date: 08-14-2012 Evaluated by: Thomas Steahr Iý2 0/Xz7- ý Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-7

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-004 Status YM NEI ULI Location: Bldg. AB Floor El. -5' Room, Area SFP Cooling Area Instructions for Completing Checklist This checkdist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NE UEL N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YEE NE UE N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YS NEI UI1 N/All raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YM NE U- N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Overhead lightingfixtures are hung by approximately 1" diameter conduitfrom ceiling. Lights andfixtures have no significantweight and have no adverse interactionwith equipment in the area

5. Does it appear that the area is free of potentially adverse seismic YZ NE UE1 N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-8

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-004

6. Does it appear that the area is free of potentially adverse seismic YED NEI UL' N/AL]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YE NO] ULI N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladders stored near tool crib door (acrossfrom SFP electrical cabinet) secured in two places per ProcedureOA-8.

8. Have you looked for and found no other seismic conditions that could Yb NEI UL1 adversely affect the safety functions of the equipment in the area?

Station air lines in overheadare small bore (2" and smaller), well supported and do not present an adverse interactionwith equipment in the area. Comments (Additional pages may be added as necessary) Evaluated by: James Petroskl * ,.-- ' Date: 08-07-2012 Evaluated by: L.Jack DiLuna Qv2_ Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-9

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-005 Status YIZ NMI UD Location: Bldg. AB Floor El. -5' Room, Area WESTPEN Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NE U-1 N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NDI ULI N/AD degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NDI UD N/AD' raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NDI UD1 N/AD1 interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NDI UD3 N/ADl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-10

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-005

6. Does it appear that the area is free of potentially adverse seismic YE NEI UEZ N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI UI N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. I-lave you looked for and found no other seismic conditions that could YO NEI UEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert 1:91- X. 1- 1?0 ý - Date: 08-14-2012 Evaluated by: Thomas Steahr '5xlý1ý'  !; Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-1 1

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-006 Status YE* NEI U[I Location: Bldg. AB Floor El. 14'-6" Room, Area A Battery Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ NO Ur N/A[

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YN NEI UI N/AO degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NEI UE" N/AU raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial Y[ NEI U[ N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YE NEI U[ N/A]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-12

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-006

6. Does it appear that the area is free of potentially adverse seismic YO NEI UI- N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI U['- N/All interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NOl UEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price iAk1~~*I Date: 08-10-2012 Evaluated by: Stephen Superson Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-13

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-007 Status YN NEI Ul1 Location: Bldg. AB FloorEl. 14'-6" Room, Area EastDC Switchgear Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UE-1 N/AU-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y0 NEI UED N/AU-degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NDI UD] N/AU raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NDI UU- N/AU-interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO ND UE1 N/AU interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-14

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-007

6. Does it appear that the area is free of potentially adverse seismic YE NEI UL] N/AL1 interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/AlE interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI ULI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Date: 08-10-2012 Evaluated by: Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report AppendixD D-15

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-008 Status YZJ NE] UF] Location: Bldg. AB Floor El. 14'-6" Room, Area Hallway Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UE- N/All potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YE NEI UE] N/All degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UI- N/All raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UE- N/All interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NEI U- N/All interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D 1_D716

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-008

6. Does it appear that the area is free of potentially adverse seismic YE NOI U1 N/AZ1 interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI UD- N/A[3 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO N[l UE-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert PO Date: 08-14-2012 Evaluated by: Thomas Steahr Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-17

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-009 Status YZ NEI U!] Location: Bldg. AB Floor El. 14'-6" Room, Area B51 and B6lRooms Instructions for Completing Checldist This checkdist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checldist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YS NEI U!] N/A!]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Y0 NEI U!] N/A!-]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YN NI] U!] N/A!]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? Seismic Cable Trays.

4. Does it appear that the area is free of potentially adverse seismic spatial YZ N!] U!] N/A[]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)? No adverse interactions.

5. Does it appear that the area is free of potentially adverse seismic YZ N!I Ur] N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-18

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-009

6. Does it appear that the area is free of potentially adverse seismic YN NEI ULI N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YO NEI UE] N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UEl adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Although Physically separate,two roomsfor MCC B51 and MCC B61 (Aux Bldg. 14'6"') were included in this area walkby. Evaluated by: James Petroslw >~-d Date: 09-05-2012 Evaluated by: Tom Steahr Date: 09-05-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-19

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-010 Status Y0 NEI Ur Location: Bldg. AB Floor El. -25 '-6" Room, Area RBCCWHXArea Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NO UO N/AU potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NEI UL N/AO degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NE UEF N/A-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NEI UU1 N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

OverheadLighting Fixtures are hung by conduit or chainfrom ceiling, lights andfixtures have no significantweight and have no adverse interaction with equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YN NE UU N/AU interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-20

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-010

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE' N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NO UU N/AO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Area adjacent to RBCCW Pump C is usedfor storage of scaffold materials.It was noted that some materialsare loosely placed on the floor and not restrainedper ProcedureOA 8. No adverse seismic interaction with the equipment was noted. In other areasladders and storage boxes are restrainedper OA 8. Noted yellow taggedscaffold

       #5178 over Pump C, scaffold is adequately braced and will not adversely impact any equipment.

Feedbackwas provided to laborercraft, who responded that all scaffold materialwould be restrainedor removed.

8. Have you looked for and found no other seismic conditions that could YZ NEIUU adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James Petrosky Date: 08-07-2012 Evaluated by: L.Jack DiLuna Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-21

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-011 Status YO NEI U[] Location: Bldg. AB Floor El. -25 '-6" Room, Area CHS Pump Area Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UEl N/AE' potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YED NEI UE- N/AE degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NEI UE- N/AE' raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NEI UE1 N/A[E interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YE NE U['] N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-22

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-011

6. Does it appear that the area is free of potentially adverse seismic YO NEI UEI N/AE-interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic Y[ NEI U-I N/AO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI U--

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) Area walk-by was conducted at the "A " chargingpump assembly. Evaluated by: Thomas Steahr d;~-7~-z~- 6 Date: 08-09-2012 Evaluated by: Stephen F. Superson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-23

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-012 Status YO NEI Ut] Location: Bldg. AB Floor El. -25"-6" Room, Area DegasiierArea Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NI] Ut] N/At]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI Ut] N/At]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NO] Ut] N/At]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YZ N[] Ut] N/At]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YN NO] Ut] N/At]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D 0-24

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-012

6. Does it appear that the area is free of potentially adverse seismic YE NEI UL1 N/Al!

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic Y[ NEI UL1 N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YM NEI UL1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by was conducted at the "A' waste gas compressorassembly. Evaluated by: Thomas Steahr Date: 08-09-2012 Evaluated by: Stephen F. Superson Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-25

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-013 Status Y0 NEI ULI Location: Bldg. AB Floor El. 36'-6" Room, Area Control Room H& V Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YED NE] UE N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YIE NE] U1 N/AOl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NE U- N/AE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YE NE] U- N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NO UO- N/AD interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTrF 2.3 Seismic Walkdown Summary Report Appendix D D-26

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-013

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/AL interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI ULI N/AEL interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UE adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. 1P~rac, AnsrA s,. QnnnA-,f P-

             *~J~y. jJV,,&VL4& I ~  ~&V~
                                             -fncar aoc,, &       ~rw. u-c.~p     I t, 0.1 r'-~}..~(J        -

Date: 08-15-2012 Evaluated by: Thomas Steahr ~6 /~972 Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-27

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-014 Status YO NEI U-1 Location: Bldg. AB Floor El. 36"-6" Room, Area East 480v Switchgear Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NEI UL N/AE' potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI UE1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UL N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI ULI N/AUl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NI UEI1 N/Al!

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-28

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-014

6. Does it appear that the area is free of potentially adverse seismic YNI NE] U-1 N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI UE1 N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI U--

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) None. Evaluated by: Date: 08-17-2012 Evaluated by: Date: 08-17-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-29

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-015 Status Y[Q NE] UM Location: Bldg. AB Floor El. 36'-6" Room, Area West 480v Switchgear Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UI- N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI U-- N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UEr N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE- N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NEI UEi N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-30

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-015

6. Does it appear that the area is free of potentially adverse seismic YS NEI UD N/ADI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI UHI N/ADI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NDI UD-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Expansionjoint/fire barrierreviewed, reference Tech. Eval. No. FP-EV-99-0002 Rev. 2 Attachment 2 Page 6,22. IVO T7E.' A c"u &1rrtk_ 406A (-R64.Mi-32,) &c A1lead~t~ Th'C (~'3 ev~-eýe a A - 5a(S' 4( JAA-d-T I r.- T C-'F qg'OV ITI-fAb1 ",-I A-Oy-w)-f- 7-0 /NV INV-5 i> *,ý,

  ". ,v   A.2,1
  • _ 5I I NI4 A:: ~ cj ' T -', A - -L 43L _,CI ' t. ' ý "e', I , -. " f Cl' t
  • Z" A' l Wdi tC-it A,th L f. / A-' " Y1 4 V I C(AA.,' 1 -
          *o,*-*-qv.,l~e-xA-tte¢*               5'AHe--     -1t,*-'/'v= j"        .ze1FI-. 2SZo     -5".5-,j6 3\ 1 Acvv~s-p' 4~.

Evaluated by: William Price Date: 08-10-2012 Evaluated by: Stephen Superson Date: 08-10-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-31

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-016 Status YO NEI ULI Location: Bldg. AB Floor El. 38'-6" Room, Area DGDAYTankRooni Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NO] UE N/AE3 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI Ur1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YM NEI ULI N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NE] UEl N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YZ NEI UF1 N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-32

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-016

6. Does it appear that the area is free of potentially adverse seismic YO NOi UE] N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UEI N/A0 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEIUE adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Small cracks in concretefloor, not structurallysignificant (MP2-WD-SWEL-096).. Evaluated by: William Price Date: 08-13-2012 Evaluated by: Stephen F. Superson A . _ZfN Date: 08-13-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-33

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-017 Status YO NEI UDl Location: Bldg. AB Floor El. 38'-6" Room, Area Main Exhaust Fan Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofijudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NE UEI1 N/Al]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YN Nil UI- N/Al]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO] NEI U[] N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO* NI] ULI N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE3 N/Al]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-34

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-017

6. Does it appear that the area is free of potentially adverse seismic YO NEI UEI N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UE] N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could Y[ NEi UUI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Sifperson Date: 08-17-2012 Evaluated by: William Price Date: 08-17-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-35

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-018 Status YZ NEI UI Location: Bldg. AB FloorEl, -45P'-6" Room, Area ,"A" Safeguards Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NOI UD N/AU potentially adverse seismic conditions (ifvisible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NEI U- N/AEU degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NO U[O N/AU raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE3 N/AU3 interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightfixtures in the room are generally supportedfrom the ceiling by conduit and no potentialadverse interactionswith equipment were noted.

5. Does it appear that the area is free of potentially adverse seismic YO NO ULE N/AUI interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-36

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-018

6. Does it appear that the area is free of potentially adverse seismic Y0 NEI UE N/AE]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YS NE UEJ N/A[-

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? I scaffold was noted in the room which was green-taggedand adequately bracedto avoid any adverse seismic interaction. Housekeepingin room was very good. Minorwater intrusion in one areawhich was not adversely effecting components.

8. Have you looked for and found no other seismic conditions that could YO NEI UD adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary)

  • Evaluated by: Jim Petrosb Date: 08-09-2012
                                                              ,EA Evaluated by: Jack DiLuna                                 -'S%.

Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-37

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-019 Status YZ NEJ ULi Location: Bldg. CB Floor El. 36'-6" Room, Area Control Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YI NEI UE- N/AZ potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NMI UE N/AEZ degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE- N/AO raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YED NEI UZ N/AO interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YE NEI UL N/AZ interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-38

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-019

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UL1 N/AZ interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI U-1 N/AZ interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Housekeeping was good, no interactionsidentified.

8. Have you looked for and found no other seismic conditions that could YM NEI Uil adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Walkdown in outerperimeter of Control Room (ReactorProtectionNIArea, RVAC cabinet,SPEC 200 cabinets, ESAS cabinets,Rear ofMain ControlBoards). Evaluated by: James Petrosk Date: 09-11-2012 Evaluated by: Toni Steahr Date: 09-11-12 t Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-39

Page I of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-020 Status YE NEI ULI Location: Bldg. CE Floor El. 14'-6" Room, Area Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NO UE[ N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y[D NE] UE N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NE UE1 N/A[l raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UI N/AOl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NEI UE- N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-40

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-020

6. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YED N[] UI' N/Al]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YZ NI] U--

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) Walk-by conducted in annulus CTMT 14 '-6" in area near 2-SI-614 (NE side) and C1 72 (West side) no adverse conditions or interactionsfound. Evaluated by: James McKinnev ~A~&a~2~ ~ZZ~4 Date: 08-16-2012 CI Evaluated by: James Petroskv ýý+eU Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-41

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-021 Status YEl NO- UI1 Location: Bldg. CE Floor El. 38"'6" Room, Area Pressurizercubicle Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YS NEI Ul] N/A[

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YM NE] Ul- N/A]

degraded conditions? 3, Based on a visual inspection from the floor, do the cable/conduit Y0 NE] Ul N/Al] raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YN NE] Ul- N/Al interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NEI Ul] N/Al]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-42

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-021

6. Does it appear that the area is free of potentially adverse seismic YO NEI U-1 N/AEl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YM NEI UO N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YE NEIUEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Walk-down was performedfrom entry platform on east side ofpressurizerblockhouse. No interactions or adverse conditions were found. Evaluated by: James McKinnev IX, Date: 08-16-2012 Evaluated by: James Petroskv Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-43

Page I of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-022 Status YN N[] UE Location: Bldg. CW Floor El. 14'6" Room, Area Intake Structufre Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[Z NEI UO- N/All potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NOI UO1 N/AO degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ N-17 UE NIAE1 raceways and 1HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial Y[ NO' U-' N/A[

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YO NEI U-1 N/AO interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-44

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-022

6. Does it appear that the area is free of potentially adverse seismic YO NEI U[ N/AEl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YEI NO U[3 N/A[-

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? Service Water Pump motor protection tank (forflood protection) not restrainedto prevent tipping in accordancewith procedure OA-8 requirements- CR 484290 written to document issue. No additional interactionsnoted

8. Have you looked for and found no other seismic conditions that could YZ NEI U-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr 6_ Aý-.. Date: 8/7/12 Evaluated by: Stenhen Suierson

          -j .... jr      *- . ....

Date: 8/7/12 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-45

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-023 Status YM Nil U[l1 Location: Bldg. EB Floor El. 60' Room, Area WEST PENROOM Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UE-I N/All potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YE NEI U-1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE- N/A[U raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE-] N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YN NEl] UE' N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-46

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-023

6. Does it appear that the area is free of potentially adverse seismic YN NEI U[- N/AUl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ N[-] UE1 N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO N[: U[I adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert Date: 08-14-2012 Evaluated by: Thomas Steahr -, Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-47

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-024 Status YO NiZ UFi Location: Bldg. EB Floor El. 71' Room, Area East PEN RBCCW Surge Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEZI U-I N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI U[1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO N[1 UI- N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NEI UI- N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YIE NI UI- N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-48

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-024

6. Does it appear that the area is free of potentially adverse seismic YN N[ UE- N/AlU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI U-1 N/AZl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UE[

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert &1- 6A..E,- P _. & -' Date: 08-14-2012 Evaluated by: Thomas Steahr Date: 08-14-2012 Millstone Power Station Unit 2 NTTOF 2.3 Seismic Walkdown Summary Report Appendix D D-49

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-025 Status YER NEI ULI Location: Bldg. EB Floor El. 38-6"' Room, Area WESTPENIROOM Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NE] UI- N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YEE NEI ULI N/AE]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UE] N/AF]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO N["] UI' N/AED interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YZ NEI UEt N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-50

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-025

6. Does it appear that the area is free of potentially adverse seismic YED NEI UD1 N/AE-interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UL- N/AE interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YZ NEI UE]

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert Date: 08-14-2012 Evaluated by: Thomas Steahr ~/ Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-51

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-026 Status Y[D NEI U'] Location: Bldg. TB Floor El. 45' Room, Area East & West Cable Vault Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NOl UIi N/Al]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI U' N/Al]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YZ NE U-] N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO NE UE3 N/Al]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YZ NEI U-] N/Al]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-52

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-026

6. Does it appear that the area is free of potentially adverse seismic YN NE] UE- N/AEI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UI- N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NEI U adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-15-2012 Evaluated by: Stephen Superson .7 Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-53

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-027 Status YE NEI UEI Location: Bldg. TB Floor El. 1 '-6" Room, Area AFWRooms Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NEI UI- N/AL]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YZ NEI Ui] N/AF]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NI U-] N/AL]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YIO NEI Ul' N/AL]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-54

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-027

5. Does it appear that the area is free of potentially adverse seismic YE NEI Ur- N/AU interactions that could cause flooding or spray in the area?

Duringthe area walk-by, an 8 "floor drain header and a 4 "floor drain lateralwere noted in the overhead of the AFW rooms. All of this overheadfloor drainpiping contains Victaulic couplings. These floor drains are normally empty, but could befilled in aflooding condition occurred in the area above. The structuralintegrity (seismic interaction)of this floor drainpiping has been previously qualified in DCNDM2-00-1888-98, TechnicalEvaluationM2-EV-970111, Rev. 0, DCNDM2-5-0661-96and Technical EvaluationM2-EV-970040, Rev.

0. Based on these previous evaluations, this area is considered acceptablefrom potentialfloodingperspective.
6. Does it appear that the area is free of potentially adverse seismic YZ NO- UL- N/A[]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YN NE UE] N/All interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UI-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: Date: 08-06-2012 Evaluated by: Date: 08-06-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-55

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-028 Status YO NEI UM] Location: Bldg. TB Floor El. 14'-6" Room, Area Misc. Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NEI U-] N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI U-I N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YEA NI] ULi N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI ULI N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-56

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MiP2-WB-028

5. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/A[Z interactions that could cause flooding or spray in the area?

Fireprotection line at Column E-19 is not laterallysupported and could impact the column in a seismic event. However, the vital chilled water pumps nearby are resistantto spray and would not be rendered inoperable if they were to be sprayed by afire suppression leak. In addition, the column that the suppression system may impact isfire coated. This coating would provide some cushion to mitigate any impact. Refer to CR484379.

6. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/AZI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI UE- N/A[Z interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could Y[O NE' UE" adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated Date: 08-09-2012 Evaluated Date: 08-09-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-57

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-029 Status YM NEI UM Location: Bldg. TB Floor El. 31 '6" Room, Area Lower 416OVSWGR Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NO] UOI N/A-]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YN NE] UEI N/Al degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI Ul N/AlO raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YOI NE] Ul N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/AO interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-58

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-029

6. Does it appear that the area is free of potentially adverse seismic YO NEI UE N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NM UI- N/AE' interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEIUE adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) No seismic design or interactionissuesfound. The detailedseismic inspection of SWEL-014, "4.16kV Bus 24C" was deferred due to plant operationalneeds and requirementfor safety tagging to conduct internalcabinet inspection. Evaluated by: Thomas Steahr. Date: 9/6/12 Evaluated by: James Petroslgv I Date: 9/6/12 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-59

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-030 Status YZ NEI UL1 Location: Bldg. TB Floor El. 54'-6" Room, Area Upper 4.16k) Swgr. Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI ULI N/A[

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI UOI N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NE ULI N/All raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YOJ NEI UD N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UI- N/A[l interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-60

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-030

6. Does it appear that the area is free of potentially adverse seismic YO NEI UE N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic Y[ NEI U[I- N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NE U[I adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by conducted at upper 416OVswitchgearroom coolingfan assembly M2F133. Evaluated by: William Price W4~hK~ Date: 08-15-2012 U Evaluated by: Stephen Superson ýý K Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-61

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-031 Status YED NOJ U[] Location: Bldg. TB Floor El. 36'-6" Room, Area East 480v Swgr. Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEIl Ul N/A[]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YN NEI UI1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE N/A[l raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YGI NEI ULI N/AEI interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NEI UI- N/AL1 interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-62

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-031

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI U- N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YID NEI UI--

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) None. Evaluated by: William Price Date: 08-15-2012 Evaluated by: Stephen Superson Date: 08-15-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-63

Page I of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-032 Status YO NI] ULI] Location: Bldg. TB Floor El. 54'-6" Room, Area MISC Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YED NO U[ N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO] NEI UI N/AE1 degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NEI UE N/AE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO] NEI UEi N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YOJ NEI UI N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-64

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-032

6. Does it appear that the area is free of potentially adverse seismic YE NO U- N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UE N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NO UO adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area Walk-By conducted at the Chilled Water Surge Tank, M2T98. Date: 08-14-2012 Date: 08-14-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-65

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-033 Status Y[ NE] ULi Location: Bldg. TB Floor El. 54'-6" Room, Area 6.9kVSWGR Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UE- N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NEI UE1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NO UE_ N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE1 N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YZ N[E UE1 N/A[E interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-66

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-033

6. Does it appear that the area is free of potentially adverse seismic YE NO1 UE N/All interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/Al!

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YZ NEI U-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area Walk-By conducted at the East 4160 SWGR Room Supply Fan,M2,F52. Evaluated by: Stephen Superson Date: 08-14-2012

                                                               /

Evaluated by: William Price Date: 08-15-2012 C) Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-67

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-034 Status YN NEI ULI Location: Bldg. YARD Floor El. 14'-6" Room, Area RWSTArea Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO* NEI UFH N/AH potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NHI UH- N/AHl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YED NEI UH N/AH raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NH UH- N/All interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightpost located about 8'from tank. Post is consideredseismically acceptable. Mi!lstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-68

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-034

5. Does it appear that the area is free of potentially adverse seismic YEI NEI UEI N/AO interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YE] NE- UE- N/A0 interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NEI UO adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas A. Steahr 7 `1- U 7 , Date: 08-07-2012 Evaluated by: Stephan F. Superson ~1~ -- K §~ Date: 08-07-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-69

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-035 Status YO NEI UL-Location: Bldg. Yard Floor El. 14'-6" Room, Area CSTArea Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZI NEI UI- N/AU potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI UI1 N/AU]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YZ Nfl UU1 N/AUl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial Y] NUI U-- N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

East side of tank containssupportsfrom RSST/NSST cable trays. Supports are seismically analyzed.

5. Does it appear that the area is free of potentially adverse seismic Y-I NEl UU'- N/AZ interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-70

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MIP2-WB-035

6. Does it appear that the area is free of potentially adverse seismic YE] NI] UII] N/AO interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NI] UEI N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YZI NE] UDZ adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas A. Steahr Date: 08-07-2012 Evaluated by: Stephen F. Superson ý' S_"Uý Date: 08-07-2012 Millstone Power Station Unit 2, NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-71

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-036 Status YE NI] UF1 Location: Bldg. CE Floor El. -3 '-6" Room, Area F14Carea Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YOI NI] UI] N/AI]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NI] Ui] N/AI]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE1 N/AE1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NI] UI] N/AI]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YN NEI UI] N/AI]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-72

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP2-WB-036

6. Does it appear that the area is free of potentially adverse seismic YN NEI ULI N/AU1 interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NOI U[I N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NO UEJ adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area surroundingF14C in the -3' containment annulus was unclutteredandfree of interactions.

                                                      ~/JAL)

Evaluated by: James McKinney Date: 08-16-2012 Evaluated by: James Petroskv Date: 08-16-2012 Millstone Power Station Unit 2 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-73

Dominion Nuclear Connecticut, Inc. Millstone Power Station Unit 3 Seismic Walkdown Summary Report Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic November, 2012

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Executive Summary On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff issued requests for information pursuant to 10 CFR 50.54(f) related to the Near Term Task Force (NTTF) recommendations. Enclosure 3 of the NRCs 50.54(f) letter requested utilities to provide information related to NTTF Recommendation 2.3: Seismic, as amended by the Staff Requirements Memoranda (SRM) associated with SECY-11-0124 and SECY-11-0137. The nuclear power industry and the NRC cooperatively developed guidelines and procedures to perform the seismic walkdowns. The resulting EPRI Report No. 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic (EPRI 1025286) provides guidance and procedures for performing the seismic walkdowns. Dominion followed the EPRI 1025286 guidance in developing the Seismic Walkdown Equipment List (SWEL), performing the Millstone Power Station (MPS) Unit 3 seismic walkdowns, and developing the submittal report. Seismic walkdowns of accessible items have been completed. Some items included on the SWEL were not sufficiently accessible to complete the walkdown inspection. Walkdowns for these items are planned to be completed by the end of the next scheduled refueling outage (Spring 2013). A revised Summary Report will be issued following completion of the seismic walkdowns. By completing and documenting the requested seismic walkdowns for MPS Unit 3, Dominion has met the objectives of the NRC request for information related to NTTF Recommendation 2.3: Seismic. Potentially adverse conditions identified during the completed seismic walkdowns and area walk-bys were submitted as Condition Reports (CRs) in the MPS Unit 3 corrective action program (CAP). To date, no significant issues that challenged the MPS Unit 3 seismic licensing or design basis have been identified as a result of the walkdowns. ii

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Millstone Power Station Unit 3 Seismic Walkdown Summary Report: Table of Contents SECTION PAGE Executive Sum m ary ...................................................................................................................... ii Background .................................................................................................................................. iv 1.0 Seism ic Licensing Basis Sum m ary ................................................................................. 1-1 2.0 Personnel Q ualifications Sum m ary ................................................................................. 2-1 2.1 Equipm ent Selection .................................................................................................... 2-1 2.2 Seism ic W alkdowns ..................................................................................................... 2-1 2.3 Licensing Basis Evaluations ........................................................................................ 2-1 2.4 IPEEE Review ............................................................................................................. 2-1 2.5 Peer Review ................................................................................................................ 2-1 3.0 SSC Selection ................................................................................................................. 3-1 3.1 Purpose ....................................................................................................................... 3-1 3.2 Methodology ................................................................................................................ 3-1 3.3 Results ......................................................................................................................... 3-3 3.4 Inaccessible Item s ....................................................................................................... 3-5 4.0 Seism ic W alkdowns and Area W alk-Bys ........................................................................ 4-1 5.0 Licensing Basis Evaluation ............................................................................................. 5-1 5.1 Sum m ary of Evaluations .............................................................................................. 5-1 5.2 Plant M odifications ...................................................................................................... 5-1 6.0 IPEEE Vulnerabilities ...................................................................................................... 6-1 7.0 Peer Review Sum m ary ................................................................................................... 7-1 8.0 References ...................................................................................................................... 8-1 Appendix A - Personnel Qualifications Appendix B.1 - Base List 1 Appendix B.2 - Seismic Walkdown Equipment List (SWEL) Appendix B.3 - Area Walk-by List Appendix C - Seismic Walkdown Checklists (SWC) Appendix D - Area Walk-by Checklists (AWC) iii

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report

Background

Following the accident at the Fukushima Daiichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established the Near Term Task Force (NTTF) in response to Commission direction. The NTTF was tasked with conducting a review of NRC regulations and processes and determining if the NRC should make additional improvements. A set of recommendations made by the task force was included in a report provided to the Commission. Although the NRC concluded that continued plant operation did not pose an imminent risk to public health and safety, the Commission directed the NRC staff (in the Staff Requirements Memorandum (SRM) to SECY-11-0093) to determine those recommendations that should be implemented without unnecessary delay. In SECY-11-0124, the NRC staff identified the NTTF recommendations that should be implemented without delay, including the development of information requests to be made under 10 CFR 50.54(f). The NRC issued the requests for information pursuant to 10 CFR 50.54(f) on March 12, 2012 related to the following NTTF recommendations (Reference 1):

  • Recommendation 2.1: Seismic
  • Recommendation 2.1: Flooding
  • Recommendation 2.3: Seismic
  • Recommendation 2.3: Flooding
    " Recommendation 9.3: Emergency Preparedness  of the NRC's 50.54(f) letter addressed providing information related to NTTF Recommendation 2.3: Seismic, as amended by the SRMs associated with SECY-1 1-0124 and SECY-1 1-0137. Enclosure 3 requested that licensees:
1. Develop a methodology and acceptance criteria for seismic walkdowns to be endorsed by the NRC staff,
2. Perform seismic walkdowns using the NRC-endorsed walkdown methodology,
3. Identify and address degraded, nonconforming, or unanalyzed conditions through a corrective action program, and
4. Verify the adequacy of licensee monitoring and maintenance procedures.

The nuclear power industry and the NRC agreed to cooperate in the development of guidelines and procedures to perform the seismic walkdowns. The resulting EPRI Report No. 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic (EPRI 1025286) (Reference 2) provides guidance and procedures for performing the seismic walkdowns. The guidance addresses selection of personnel, selection of a sample of structures, systems, and components (SSCs) that represent a diversity of component types and ensures inclusion of components from critical systems and functions as described in the NRCs 50.54(f) letter, conduct of the walkdowns, evaluations against the plant seismic licensing basis, and reporting requirements. EPRI 1025286 also includes checklists to be used by the seismic walkdown engineers for seismic evaluations. iv

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report The guidance contained in the EPRI 1025286 was developed to meet NRC's objectives, and in a letter dated May 31, 2012 (Reference 3), the NRC confirmed that the EPRI 1025286 guidance directs licensees to perform walkdowns in a manner that will address Requested Information Items l.a through 1.g in the 50.54(f) letter. The NRC staff also confirmed that Section 8, "Submittal Report," of the EPRI 1025286 guidance outlines the appropriate information to be submitted in response to Requested Information Items 2.a through 2.f. of Enclosure 3 of the 50.54(f) letter. Dominion used the EPRI 1025286 guidance in developing and performing the seismic walkdowns at Millstone Power Station (MPS) Unit 3 in response to the NRC's 50.54(f) letter. In addition, Dominion followed the EPRI 1025286 Section 8 guidance for the development of this report. v

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 1.0 Seismic Licensing Basis Summary The seismic licensing basis for MPS Unit 3 is documented in the MPS Unit 3 FSAR, Chapter 3, Design of Structures, Components, Equipment, and Systems (Reference. 4). Seismic Category I equipment has been classified in accordance with Regulatory Guide 1.29, Rev. 3, Seismic Design Classification. The FSAR describes the safe shutdown earthquake (SSE) loads and their application to structures and components. The SSE is defined as the maximum vibratory ground motion at the plant site that can reasonably be predicted from geologic and seismic evidence. The operating basis earthquake (OBE) is that earthquake which, considering the local geology and seismology, can be reasonably expected to occur during the plant life. A SSE of 0.17g and a 1/2 SSE value of 0.09g in the horizontal direction and two-thirds of these values in the vertical direction, input at the bedrock surface, have been used as the design bases for seismic loading. In accordance with 10 CFR 100, Appendix A, the operating basis earthquake is taken to be at least one half of the SSE, or 0.09g. The design for the SSE is intended to assure that the integrity of the reactor coolant pressure boundary is not compromised, that the capability to shut down the reactor and maintain it in a safe condition is not compromised, and that the capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to the guideline exposures of 10 CFR 100 is not compromised. For the OBE loading condition, the reactor coolant system is designed to be capable of continued safe operation. Safety Class 1 and 2 equipment are designed to withstand the forces of the OBE and SSE. For normal conditions plus OBE loadings, the resulting stresses are limited to allowable working stresses as defined in the ASME B&PV Code, Section III, Appendix XVII, for normal and upset conditions. For normal conditions plus SSE loadings, the stresses are limited to within the allowable values given by Subarticle NA 2110 for critical parts of the equipment which are required to maintain the capability of the equipment to perform its safety function. Permanent deformation is allowed for the loading combination which includes the SSE to the extent that there is no loss of any safety function. Equipment and components that use seismic testing as qualification basis conform to applicable industry standards, such as IEEE 344-1975. Qualification of Class 1E electrical equipment conforms to IEEE 344-1975. The FSAR sections most applicable to equipment qualification are: 0 3.7N3, Seismic Subsystem Analyses (NSSS Vendor supplied equipment) 0 3.7B3, Seismic Subsystem Analyses (non-NSSS Vendor supplied equipment)

  • 3.10, Seismic Qualification of Seismic Category 1 Instrumentation and Electrical Equipment Nuclear steam supply system (NSSS) vendor qualification methods approved by the NRC are discussed further in FSAR Section 5.4.1. Seismic adequacy of non-NSSS Seismic Category 1 equipment is documented using Static Analysis, Dynamic Testing, and Testing including combinations of methods. The EPRI STERI process (Seismic Technical Evaluation of Replacement Items TR-104871) may be used to demonstrate that seismically rugged or insensitive replacement items exhibit seismic performance equivalent to original items.

1-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 2.0 Personnel Qualifications Summary A summary of the requirements, as outlined in the EPRI 1025286 (Reference 2), for the different seismic walkdown activities is provided as follows. 2.1 Equipment Selection Personnel responsible for equipment selection should have knowledge of plant operations, plant documentation, and associated SSCs. They should have the capability to select a broad distribution of SSCs for the Seismic Walkdown Equipment List (SWEL). The Equipment Selection Personnel should also have knowledge of the IPEEE program. Equipment Selection Personnel: James A. Petrosky, supported by licensed plant operators, and design and system engineering personnel. 2.2 Seismic Walkdowns The seismic walkdown engineers (SWEs) should have a degree in mechanical or civil/structural engineering, or equivalent; and experience in seismic engineering as it applies to nuclear power plants. In addition, the SWEs must successfully complete one of the following two training courses: NTTF 2.3 Seismic Walkdown Training Course or SQUG Walkdown Training Course. SWEs: William Price, Louis J. DiLuna Jr., James A. Petrosky, James McKinney, Stephen F. Superson, Sombat Pornprasert, and Thomas Steahr. 2.3 Licensing Basis Evaluations All potentially adverse seismic conditions were documented and evaluated within the corrective action program (CAP); no licensing basis evaluations of potehtially adverse seismic conditions were performed outside of the corrective action program defined by plant procedures. 2.4 IPEEE Review Reviewers should have adequate engineering experience to review and understand the results of the IPEEE program.

                                                                             /

IPEEE Reviewer: James A. Petrosky 2.5 Peer Review The peer review team should consist of a minimum of two individuals, one of whom has seismic engineering experience as it applies to nuclear power plants. Peer Reviewers: Marc Hotchkiss and Leo Nadeau. Appendix A provides the qualifications of the personnel involved in performing the seismic walkdown activities at MPS Unit 3. 2-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 3.0 SSC Selection 3.1 Purpose This section describes the process used to develop the seismic walkdown equipment list (SWEL), and documents the resulting SWEL and Area Walk-By list, in response to NRC's 10 CFR 50.54(f) letter dated March 12, 2012 (Reference 1). The SWEL was developed using the guidance provided in EPRI 1025286 (Reference 2) and defines the scope of the seismic walkdowns. 3.2 Methodology EPRI 1025286, Section 3, Selection of SSCs, describes the process used to identify items to be included on a SWEL. In general, the SWEL is comprised of two groups of items. The first is a sample of Seismic Category I components that support achieving safe shutdown and the other is a sample of components associated with the spent fuel pool. These lists are designated as SWEL 1 and SWEL 2, respectively. SWEL 1 and SWEL 2 are combined to form the SWEL, which defines the overall scope of equipment used as input to the seismic walkdowns. Additional information regarding the process used to develop the SWEL is provided below. SWEL 1 Development Selection of SWEL 1 components was performed by screening the MPS Unit 3 Seismic Category I equipment in a manner consistent with the equipment selection approach described in EPRI 1025286. The MPS Unit 3 Technical Requirements Manual (TRM) Section 7.6 (Reference 5), MPS Unit 3 Safety Functional Requirements Manual (SFRM) Section 4.3 (Reference 6), and MPS Unit 3 Master Equipment List Database were used to identify the frontline and support systems supporting Safety Grade Cold Shutdown (described in FSAR Section 5.4.7.2.3.5, Reference 4). MPS Unit 3 is licensed as a Safety Grade Cold Shutdown (SGCS) plant. The Seismic Category I frontline and support systems are those that support the following five safety functions:

   "    Reactor reactivity control 0    Reactor coolant pressure control
  • Reactor coolant inventory control
   "    Decay heat removal
  • Containment function Seismic Category I equipment within the frontline and support systems that support the above listed safety functions were identified. This list is termed Base List 1 in EPRI 1025286.

The SWEL 1 list was determined by applying the following five sample selection attributes, as applicable, defined in EPRI 1025286, to Base List 1. The required sample size for SWEL 1 was at between 90 and 120 items. The method of application for each attribute is summarized below:

1. A variety of types of systems. Sample items were selected to represent a broad range of frontline and support systems.
2. Maior new and replacement equipment (since the completion of IPEEE/USI A-46 evaluations). This attribute is not applicable because no previous seismic walkdowns 3-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report or evaluations were performed at MPS Unit 3 in response to USI A-46 or IPEEE requirements.

3. A variety of types of equipment. At least one item from each of the classes of equipment listed in EPRI 1025286, Appendix B, Classes of Equipment was included on SWEL 1 to provide a sample selection of a variety of equipment types. Where there was no seismic category I items for a specific class of equipment, no items in that equipment class were selected for SWEL 1.
4. A variety of environments. Sample items were selected from different locations in the plant to include various environments (hot, cold, dry, wet) and inside and outside installations.
5. Equipment enhanced due to vulnerabilities identified during the IPEEE program. The MPS Unit 3 IPEEE documentation was reviewed to determine equipment that had been modified or otherwise enhanced to reduce IPEEE vulnerabilities.

For each item on SWEL 1, the applicable supported safety function(s) are identified as a confirmation that the five safety functions are adequately represented. In addition, risk significant items on the SWEL 1 list are identified as confirmation that risk insights are adequately considered in the development of SWEL 1. SWEL 2 Development SWEL 2 was developed based on a review of systems associated with the spent fuel pool (SFP) that are Seismic Category I or components whose failure could result in a rapid drain-down of the water level in the SFP to less than ten feet above the fuel. For Seismic Category I systems associated with the SFP, a sample of components was identified using selection criteria similar to that described for SWEL 1. Any components whose failure could result in rapid drain-down of the SEP were to be identified and evaluated for addition to SWEL 2. Identified components that met the criteria for inclusion in the seismic walkdowns were to be added to SWEL 2. If no component failures were identified that could result in rapid drain-down of the SFP, no components were added to SWEL 2, and the basis for this conclusion was described. SWEL The SWEL was developed by combining the items on SWEL 1 and SWEL 2. The items on the SWEL were reviewed to determine the population of' items with anchorage, and at least 50% of those items were selected for configuration verification of the installed anchorage during the associated seismic walkdown. The SWEL serves as the input to the seismic walkdowns conducted in accordance with EPRI 1025286 Section 4, Seismic Walkdowns and Area Walk-Bys. A walk-by area is defined as the room containing SWEL item(s), or in the case of a large open space, the area within a 35 foot radius around a SWEL item. Walk-by areas are defined to ensure that all items on the SWEL are included within a walk-by area. 3-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 3.3 Results The methodology described in Section 3.2 was applied to develop the SWEL and the Area Walk-by list. The results of the implementations of this methodology are provided below. The SWEL was developed by personnel meeting the qualifications for equipment selection personnel described in Section 2.1. Qualifications of personnel involved in the development of the SWEL are identified in Appendix A. SWEL 1 The methodology described in Section 3.2 was utilized to develop SWEL 1. Seismic Category I equipment within the frontline and support systems that support the five safety functions listed in Section 3.2 were identified and are listed in Appendix B.1. This list is termed Base List 1 in EPRI 1025286. The five sample selection attributes, described in Section 3.2, were then applied to Base List 1. The results are summarized for each attribute below:

1. A variety of types of systems. Sample items were selected to represent a broad range of frontline and support systems. The number of selected items associated with each of the represented systems is provided in Appendix B.2 in the SWEL System Summary Table.
2. Mamor new and replacement equipment (since the completion of IPEEE/USI A-46 evaluations). This attribute is not applicable because no previous seismic walkdowns or evaluations were performed at MPS Unit 3 in response to USI A-46 or IPEEE requirements.
3. A variety of types of equipment. At least one item from each of the classes of equipment listed in EPRI 1025286, Appendix B: Classes of Equipment was included in SWEL 1 to provide a sample selection of a variety of equipment types. The number of items from each of the equipment classes is identified in Appendix B.2 in the SWEL Equipment Classes Summary Table. As described in Section 3.2, where there was no seismic category I equipment on Base List 1 for a specific class of equipment, no items in that equipment class were selected for SWEL 1. There were no items for equipment classes 12 and 13 on Base List 1, and the equipment class 19 items (temperature sensors) are inspected as part of other component assemblies. Therefore, no equipment from these three equipment classes was included in SWEL 1.
4. A variety of environments. Sample items were selected from different locations in the plant to include various environments (hot, cold, dry, wet). The installed location is identified on the SWEL in Appendix B.2 for each item, which provides an indication of the operating environment for the item.
5. Equipment enhanced due to vulnerabilities identified during the IPEEE program.

Based on a review of IPEEE documentation (References 7 and 8), no equipment enhancements were required due to IPEEE seismic vulnerabilities. 3-3

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report The resulting sample of equipment for the SWEL 1 list was 98 items, which are provided in Appendix B.2. For each item on the list, the applicable supported safety function(s), listed below, were indicated.

  • Reactor reactivity control
  • Reactor coolant pressure control
 "    Reactor coolant inventory control
  • Decay heat removal
 "    Containment function SWEL 2 SWEL 2 was developed based on a review of systems associated with the spent fuel pool (SFP) that are Seismic Category I or components whose failure could result in a rapid drain-down of the water in the SFP to less than ten feet above the top of the fuel. The review was supported by a licensed operator and knowledgeable system engineers.

The following Seismic Category I system associated with the SFP was identified:

  • Spent Fuel Pool Cooling and Purification System Base List 2, resulting from applying EPRI 1025286 Figure 1-2 screening criteria 1 and 2 to the Spent Fuel Pool Cooling and Purification System equipment list, is provided in Appendix B.2.

The following components have been identified as the SWEL 2 list using the walkdown item sample selection criteria consistent with the guidance in EPRI 1025286:

   -    M33SFC*P1A Spent Fuel Pool Cooling Pump A
   -    M33SFC*E1A Spent Fuel Pool Heat Exchanger A Rapid Drain-down The Spent Fuel Pool Cooling and Purification system piping penetrates the SFP liner at an elevation just below the normal operating level of 49' 10". The piping configuration precludes SFP drain down by the use of piping anti-siphon features at elevations 45', 48', and 50'8". The top of the fuel assemblies is at 25' 9" elevation. FSAR Section 9.1 states that the MPS Unit 3 SFP configuration of piping elevations and anti-siphoning devices prevents siphoning of fuel pool water.

Therefore, there are no components that could, upon failure, result in rapid drain-down of the SFP water level to below ten feet above the top of the fuel and no components have been added to SWEL 2 for this criterion. SWEL The SWEL was developed by combining the items on SWEL 1 and SWEL 2. The SWEL is provided in Appendix B.2. All items on the list are from SWEL 1 except those items indicated by footnote as originating from SWEL 2. 3-4

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report The items on the SWEL were reviewed to identify those that included anchorage (i.e., items that were not line-mounted equipment, such as valves). 63 items of the 68 items that included anchorage (92%) were selected for confirmation that the as-installed equipment anchorage is consistent with plant documentation of the anchorage design. The anchorage items selected for confirmation are indicated by a note on the SWEL. In addition, risk significant items on SWEL 1 were identified. This information was reviewed by the PRA subject matter expert as confirmation that risk insights were adequately considered in the development of the SWEL. As a result, 62 of the 100 items on the SWEL were identified as being risk significant. This list is the input to the seismic walkdowns conducted in accordance with EPRI 1025286, Section 4 Seismic Walkdowns and Area Walk-Bys. Walk-by areas were identified to include all of the items on the SWEL and are listed in Appendix B.3. 3.4 Inaccessible Items In the process of selecting SSCs to be included on the SWEL, items that were accessible and have visible anchorage were selected wherever possible. However, there were 24 items included on the SWEL that were not sufficiently accessible to complete the walkdown inspection. These items are listed in Table 3-1 'below and indicated by a footnote on the SWEL (Appendix B.2). The walkdowns for these items are planned to be completed by the end of the next scheduled refueling outage (Spring 2013). 3-5

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Table 3-1: Deferred Walkdown Items Inspection Completion ID Number Description Location Schedule M332Y 480 VOLT LOAD CENTER Auxiliary Building Spring 2013 RFO 32Y M33CHS*RV81 21 SEAL RETURN LINE INLET Containment Spring 2013 RFO CONTAINMENT RELIEF M33RCS*PCV455A POWER OPERATED Containment Spring 2013 RFO RELIEF VALVE M33CHS*MV8112 SEAL WATER RETURN Containment Spring 2013 RFO CTMT ISOL M33S1L*MV8808A SI ACCUMULATOR TANK 1 Containment Spring 2013 RFO __33SIL*__V_808A OUTLET ISOL M332-1 R1 480V AC MOTOR CONTROL CENTER Auxiliary Building Spring 2013 RFO 480V MCC 32-1U (EMERG) 'B' Diesel M332-1U1 EMERGENCY Generator Room Spring 2013 RFO GENERATOR 480 VOLT MCC 32-M332-2R 1 2R(EMERG) ROD Auxiliary Building Spring 2013 RFO CONTROL 1 M332-1W 480 VOLT MCC 32-1W(EMERG) AUX BLDG. Auxiliary Building Spring 2013 RFO M332-4T1 480V MCC ESF Building Spring 2013 RFO 480 VOLT MCC 32-M332-5T1 5T(EMERG) CIRC WATER Circulating Water Spring 2013 RFO PUMP HOUSE Pump House M332-2U1 480 VOLT MCC32-2U Auxiliary Building Spring 2013 RFO M33BYS*PNL2' BATTERY BUS 2 (301 B-1) Control Building Spring 2013 RFO M33BYS*PNL1l BATTERY BUS 1 (301A-1) Control Building Spring 2013 RFO M33VBA*XRC_21 VIAC-2 ALTERNATE Control Building Spring 2013 RFO SOURCE TRANSFORMER M33LAC*EXL2Pl 3LAC*PNL3C2P LIGHTING Control Building Spring 2013 RFO TRANSFORMER AC DIST PANEL M33SCV*XD5P1 TRANSFORMER Auxiliary Building Spring 2013 RFO AUXILIARY M33SCV*XD101 240V/120V STEP DOWN Control Building Spring 2013 RFO XFMR ORANGE M33CES*PNLTSB1 B TRAIN TRANSFER Control Building Spring 2013 RFO SWITCH PANEL M33BYS*CHGR-11 BATTERY CHARGER Control Building Spring 2013 RFO (301A-1) M33BYS*CHGR-31 BATTERY CHARGER 3 Control Building Spring 2013 RFO (301A-2) M33VBA*INV1l INVERTER 1 Control Building Spring 2013 RFO M33VBA*INV3' INVERTER 3 Control Building Spring 2013 RFO CHG HDR FLOW CNTRL M33CHS*ZT19OB1 VLV 3CHS*HCV190B ELEC Auxiliary Building Spring 2013 RFO CNTR MOD I 1 Walkdown inspection complete with the exception of access to electrical cabinet internally mounted items. 3-6

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 4.0 Seismic Walkdowns and Area Walk-Bys The seismic walkdowns and area walk-bys were performed consistent with the guidance provided in the EPRI 1025286 (Reference 2). A site-specific procedure was developed to implement the EPRI 1025286 seismic walkdown guidance for conducting and documenting the seismic walkdowns. A walkdown package was prepared for each component listed on the SWEL and for each area walk-by to be performed. Each package included a seismic walkdown checklist (SWC) or an area walk-by checklist (AWC) and the drawing(s) showing equipment location, plant documentation showing the anchorage details for each SWEL item requiring anchorage configuration verification. A hardcopy of the package was available for the SWEs during performance of the equipment walkdown or area walk-by. The seismic walkdowns and area walk-bys were performed by walkdown teams, which consisted of at least two (2) qualified SWEs. For the seismic walkdowns, the SWEs focused on the following adverse seismic conditions associated with each item of equipment as described in the EPRI 1025286 guidance:

   " adverse anchorage conditions,
   " adverse seismic spatial interactions, and
  • other adverse seismic conditions The purpose of the area walk-bys was to identify potentially adverse seismic conditions associated with other SSCs located in the vicinity of the SWEL items. For the area walk-bys, SWEs focused on the following potentially adverse seismic conditions as described in the EPRI 1025286 guidance:
   " anchorage conditions (ifvisible without opening equipment),
  • significantly degraded equipment in the area,
  • condition of cable/conduit raceways, including condition of supports or fill conditions, and HVAC ducting,
   " potential adverse seismic interactions including those that could cause flooding, spray, or a fire in the area, and
  • housekeeping items that could cause adverse seismic interactions.

During the walkdown or walk-by, the walkdown teams discussed conditions and/or any findings in the field, reached agreement on the results of the walkdown, and documented results of the seismic walkdowns and area walk-bys on the checklists. The results of' the completed seismic walkdowns are documented on SWCs, which are included as Appendix C. The results of the completed area walk-bys are documented on AWCs, which are included as Appendix D. The SWEL includes 100 items to be walked down and 32 area walk-bys are defined. Of these, 76 walkdowns and 29 area walk-bys have been completed. The remaining items, 24 walkdowns and 3 area walk-bys, have been deferred because the component or area was not sufficiently accessible to complete the walkdown inspection and walkdown checklists are not included in this report for those items. The schedule for performance of these deferred seismic walkdowns is described in Section 3.4. 4-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Table 4-1 lists potentially adverse seismic conditions identified during the completed seismic walkdowns and area walk-bys. The items listed in Table 4-1 were submitted as Condition Reports (CRs) in the plant corrective action program (CAP). Table 4-1 summarizes the potentially adverse seismic conditions, describes how the condition has been addressed, and provides the current status of the resolution. A low threshold was used to identify and document potential adverse conditions. In addition to items listed in Table 4-1, non-seismic related potentially adverse conditions such as various housekeeping and material condition items, were identified by the walkdown teams and addressed through the CAP. No significant issues that challenged the MPS Unit 3 seismic licensing or design basis were identified as a result of the walkdowns completed to date. As indicated in Table 4-1, no planned or newly installed changes to the plant are required to resolve the items identified during the walkdowns. 4-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Table 4-1: Potentially Adverse Seismic Conditions SWC / AWC Equipment ID CAP Description Resolution Status MP3-WD- MCC M332-5T CR484055 Door on spare bucket 5E of 480V Determined to be a minor maintenance- Work Order initiated to SWEL-007 1 MCC M332-5T was found unlatched housekeeping issue that did not repair door. and slightly open. adversely impact the seismic qualification of the MCC. MP3-WB-027 MSVB CR484067 Four 480V temporary electric heaters This is a seismic housekeeping issue The Four 480V (permit 14294-12-FP) stored in the and not an equipment seismic temporary electric 49'6" elevation of the Main Steam qualification or operability issue. heaters have been Valve Building (MSVB) are attached to properly secured in grating with lanyards, but should be accordance with the restrained to prevent tipping lAW Seismic Housekeeping Seismic Housekeeping Procedure. Procedure - CLOSED. MP3-WB-022 A' RHR Room CR484235 Seismic housekeeping issues were This is a seismic housekeeping issue Materials have been identified: A significant quantity of and not an equipment seismic removed or properly metal jacketed insulation sections qualification or operability issue. stored in accordance have been removed from piping and with the Seismic stacked on the floor throughout the Housekeeping room. The insulation sections and Procedure - CLOSED. some miscellaneous tooling were not stored in a manner consistent with the Seismic Housekeeping Procedure. MP3-WD- M33CHS*MV8116 CR484242 Moderate corrosion found on pipe Based on field observation of the welds, Work Order initiated to SWEL-050 support downstream of there is sufficient effective throat and clean and recoat the M33CHS*MV8116 (Charging Header weld length, therefore the support is corroded supports. Isolation Valve). Several supports functional and not an operability within 35 feet located in a concern. The environment is not severe "housekeeping water collection trough" and rapid degradation is not expected. also show minimal to moderate corrosion at the floor plate to support member interfaces. The lower portion of the tube steel support is welded to an embedded floor plate. The weld interface to floor plate shows moderate signs of corrosion. 4-3

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Table 4-1: Potentially Adverse Seismic Conditions SWC / AWC Equipment ID CAP Description Resolution Status MP3-WB-022 3SIL*MV8812A CR484243 Identified corrosion of the lower pipe Sufficient bolting material remains to Work Order initiated to clamp of PSR016, a vertical strut provide structural integrity of the pipe replace the corroded adjacent to 3SIL*MV8812A supporting clamp. However, the bolt should be bolting. pipe 3-SIL-012-4-2 in the 4' 'A' RHR replaced in a timely manner because the Room of the MP3 ESF Building. rate of degradation is not known. The bolt is showing surface corrosion with visual evidence of wastage of < 1/8" throughout the bolts length. Although not impacting it's structural integrity the wet environment requires near term replacement. MP3-WD- 3CCE*TK1 CR484958 Observed that the limiting seismic Engineering walkdowns and evaluation Corrective action has SWEL-098 interaction distance between of engineering documents has been completed to 3CCE*TK1 and Pipe Support CP- determined that the interaction is document the 372500-HOOl (for the 3CCE*TK1 Fill acceptable based upon the following: acceptable as-found Line) was approximately 1/8 inch, -Seismic II over I criteria are not directly separation distance which is less than the standard seismic applicable because both components between the tank and interaction acceptance criteria, are safety related, engineered and pipe support - analyzed components CLOSED

                                                                                                -Pipe Support CP372500-H001 is welded to Service Water Support 3SWP-2-PSR023 which is very robust and designed to deflect less than 1/16" inch.
                                                                                                -3CCE*TK1 is a 5 ft diameter rigid tank, anchored to floor in a manner which minimizes deflection (25212-29022 CS-H1ON Tho tnnk hnz hann        PIArfHr4 nQ location for seismic instrumentation (FSAR 3.7.4) due to its stiffness and representation of floor response.
                                                                                                - Because deflections are limited by design, it is not credible that impact loads generated from postulated seismic interactions could result in equipment I              I_                    I              I                                           damage or loss of function.

The seismic walkdown for this item is not complete (see Table 3-1) and the final seismic walkdown checklist is not included in the report. 4-4

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 5.0 Licensing Basis Evaluation The station CAP was used to document the evaluation of potentially adverse seismic conditions identified in Section 4.0. 5.1 Summary of Evaluations There were no conditions identified during the seismic walkdowns completed to date that challenge the validity of the current plant seismic licensing or design basis. 5.2 Plant Modifications There are no planned or newly installed changes to the plant as a result of implementation of the seismic walkdowns and area walk-bys completed to date. As identified in Table 4-1, actions planned as a result of seismic walkdown findings include documentation updates, maintenance items, and engineering evaluations to document as-found conditions. 5-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 6.0 IPEEE Vulnerabilities On June 28, 1991, the NRC issued Generic Letter (GL) 88-20, Supplement 4 (with NUREG-1407, Proceduraland Submittal Guidance) requesting each licensee to perform an individual plant examination of external events (IPEEE) to identify plant-specific severe accident vulnerabilities and to report the results to the Commission together with any licensee-determined improvements and corrective actions. The MPS Unit 3 response to GL 88-20, Supplement 4, was submitted to NRC in a letter dated December 23, 1991 (Reference 7). The Reference 7 letter referenced the Individual Plant Examination (IPE) Summary Report submittal dated August 31, 1990 (Reference 8) to fulfill the intent of GL 88-20, Supplement 4. The IPE was based on the updated MPS Unit 3 Probabilistic Safety Study, which was initially performed at initial plant operation. MPS Unit 3, which began commercial operation in 1986, was determined to be a high seismic margin plant. Although not identified as IPEEE vulnerabilities or outliers, the IPE Report (Reference 8), Table 6-2, Addressment of Significant PRA Findings, provides the seismic-related findings along with a description of how the items were addressed. The seismic related items are complete as indicated in Table 6-2 of the IPE Report. NRC letter dated May 26, 1998 (Reference 9) provides the NRC staff's evaluation of the Millstone Unit 3 IPEEE submittal and concludes that the intent of GL 88-20 Supplement 4 was met. 6-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 7.0 Peer Review Summary The Peer Review Team function and required activities are delineated in EPRI 1025286, Section 6, Peer Review. The Peer Review Team provided an overview of the following seismic walkdown activities, as defined in EPRI 1025286:

1. Selection of the SSCs included on the SWEL
2. Checklists prepared for the seismic walkdowns and area walk-bys
3. Licensing basis evaluations
4. Decisions for entering the potentially adverse seismic conditions into the CAP process
5. Submittal report Peer Review activities were performed during the preparation and performance of the seismic walkdowns. The Peer Review Team members were:
  • Marc Hotchkiss, Dominion, Peer Review Team Lead
  • Leo Nadeau, Bechtel Power A summary of the results of the Peer Review is provided below:
1. Selection of SSCs The Peer Review Team performed a comprehensive review of the SWNEL. The SWEL was compared to the requirements of EPRI 1025286, Section 3, Selection of SSC utilizing Appendix F, Peer Review Checklist and was found to appropriately apply the EPRI 1025286 guidance including:
  • Selection of SWEL 1 SSCs
  • Use of sample selection attributes
  • Adequate representation of the five safety functions
  • Consideration of risk insights
  • Selection of spent fuel pool related items All peer review comments were minor and were adequately resolved.
2. Sample of Seismic Walkdown Checklist (SWC) and Area Walkdown Checklist (AWC)

The Peer Review Team reviewed a sample of walkdown results and concluded that the SWCs and AWCs were completed in accordance with the EPRI 1025286 guidance.

a. Packages - The Peer Review Team reviewed a sample of the seismic walkdown documentation packages prepared before walkdowns were performed. These walkdown packages were reviewed to ensure the seismic walkdown checklist and related documentation (e.g., walkdown checklist, anchorage details drawings, etc.)

were included. The packages were determined to be adequate to support the walkdowns.

b. SWC/AWC - There are 100 SWCs. 33 SWCs were peer reviewed representing 33% of the total, which exceeds the EPRI 1025286 requirement for a 10 - 25 %

sample. 17 AWCs from a total of 32 were peer reviewed representing 53% of the 7-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report total. Overall, the SWC and AWC were determined to be appropriately detailed and complete.

c. Seismic Walkdown Engineers (SWEs) were interviewed by the Peer Review Team Lead to verify that they understood and followed the Guidance in EPRI 1025286, Section 4, Seismic Walkdowns and Area Walk-Bys. Results of the interviews indicated that each team understood and followed the EPRI guidance.

All peer review comments were minor and were adequately resolved.

3. Review of Licensing Basis Evaluations All potentially adverse seismic conditions identified during the walkdowns were entered into the CAP consistent with plant procedure. There were no Licensing Basis Evaluations, as defined in EPRI 1025286, performed that were in addition to the CAP reviews.
4. Review of Conditions Entered into CAP The threshold level at which field-identified conditions were entered in CAP was considered to be appropriate to ensure that potential licensing basis issues were documented and reviewed by Engineering and the Operations Shift Manager for operability concerns. Appropriate functional organizations (e.g., Operations, Maintenance, and Site Engineering) were routinely consulted and engaged in the evaluation of potentially adverse seismic conditions.
5. Review of Submittal Report A review of the submittal report was performed by members of the Peer Review Team and it was determined that the objectives and requirements of the 50.54(f) Letter were met.

7-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report 8.0 References

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(o Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of the Insights from the Fukushima Daiichi Accident, dated March 12, 2012 (ML12056A046).
2. EPRI 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, June 2012.
3. NRC letter, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 (ML12145A529).
4. Millstone Power Station Unit 3 Final Safety Analysis Report, Revision 21.3.
5. Millstone Power Station Unit 3 Technical Requirement Manual, through Change No.

174.

6. Millstone Power Station Unit 3 Safety Functional Requirements Manual, Revision 6.
7. Letter A09683, J. F. Opeka to NRC Document Control Desk, Response to Generic Letter 88-20, Supplement 4; Revised Response to Generic Letter 88-20, Supplement 1, Individual Plant Examination (IPE) for Sever Accident Vulnerabilities, dated December 23, 1991
8. Letter B13596, E. J. Mroczka to NRC Document Control Desk, Response to Generic Letter 88-20, Individual Plant Examination for Sever Accident VulnerabilitiesSummary Report Submittal, dated August 31, 1990
9. Letter A13809, J. W. Andersen, NRC to M. L. Bowling, Jr., Millstone Nuclear Power Station, Unit No. 3 - Individual Plant Examination of External Events (TAC No.

M83643), dated May 26, 1998 8-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix A Personnel Qualifications A-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Louis J. DiLuna Jr. Summary of Backqround and Experience: 0 Completed 5-day SQUG walkdown training course 0 BS Civil Engineering

  • MS Structural Engineering
  • PE, Massachusetts and New York 0 36 years of experience in seismic evaluation of components and supports Marc Hotchkiss Summary of Backqround and Experience:

0 Completed EPRI SWE training course (2012) 0 BS Mechanical Engineering 0 PE, Virginia

  • 29 years of commercial nuclear power plant experience including: plant and system engineering; plant modifications; project management; nuclear control room shift operations (SRO); shift technical advisor; and new plant licensing; 3 years of nuclear plant seismic engineering-related experience James McKinney Summary of Background and Experience:

0 Completed EPRI SWE training course (2012)

  • BS Mechanical/Structural Engineering
  • 36 years of nuclear seismic experience including: preparation and implementation of civil/structural plant modifications; civil/structural calculations; generating pipe stress and support calculations Leo Nadeau Summary of Background and Experience:
  • Completed EPRI SWE training course (2012) 0 BS Mechanical Engineering, MS Mechanical Engineering
  • 25 years of experience in project management and engineering activities related to nuclear power plant projects including: engineering and construction experience with refueling outages in operating facilities; performing new construction and refurbishment of nuclear power plants; 15 years of seismic engineering experience A-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report James A. Petrosky Summary of Background and Experience: 0 Completed 5-day SQUG walkdown training course (2001); Seismic Capability Engineer (2001)

  • BS Civil Engineering
  • MS Mechanical Engineering
  • PE, Connecticut and Rhode Island
  • 25 years of experience in nuclear seismic engineering including: preparation and implementation of civil/structural plant modifications; civil/structural calculations; equipment qualification using SQUG methodology Sombat Pornprasert Summary of Backqround and Experience:

0 Completed 5-day SQUG training course (1994); Completed EPRI Add-On Seismic IPE training course (1994); Completed SQUG NARE training course (1994); 0 BS Mechanical Engineering Technology 0 10 years of construction experience in nuclear power plant decommissioning and over 18 years of engineering and design experience within the power generation industry including: review of seismic documentation of components to ensure compliance with plant FSAR, specifications, and industry standards; seismic documentation package preparation for valves, pumps, heat exchangers, and electrical panels; equipment qualification using the SQUG GIP methodology and seismic margin analysis 0 SQUG representative for Northeast Utilities (1993-1995) William Price Summary of Background and Experience:

  • Completed 5-day SQUG walkdown training course (2012) 0 AS Architectural Engineering 0 31 years of Civil/Structural Engineering/Design Engineering experience at Millstone Nuclear Power station including: 20 years of experience performing design improvements for Millstone Units 1, 2, and 3; 10 years of experience as Engineering Design Supervisor for Civil/Mechanical Engineering Design at Millstone Nuclear Power Station A-3

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Thomas Steahr Summary of Background and Experience:

  • Completed 5-day SQUG training (2000); Seismic Capability Engineer (2001).

0 BS Mechanical Engineering

  • 10 years of nuclear seismic engineering experience including: preparation and implementation of civil/structural plant modifications; civil/structural calculations Stephen F. Superson Summary of Background and Experience:
  • Completed EPRI SWE training course (2012)
  • BS Civil Engineering
  • 30 years of experience in Structural Engineering including: seismic design and analysis of safety-related components, building steel, and structures; coordination and implementation of nuclear plant modifications; lead engineering direction A-4

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix B.1 Base List 1 8.1-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1 M33HVQ*ACUS1A ESF SELF-CONTAINED AIR CONDITIONING UNIT 3314D ESG ACS ES ABOVE "A" SIH PUMP 0036 06 2 M33HVQ*ACUS1B ESF SELF-CONTAINED AIR CONDITIONING UNIT 3314D ESG ACS ES NORTH CUBICLE 0036 3 M33HVQ*ACUS2A ESF SELF-CONTAINED AIR CONDITIONING UNIT 3314D ESG ACS ES ABOVE MTR DR.FW/PMP 0036 4 M33HVQ*ACUS2B ESF SELF-CONTAINED AIR CONDITIONING UNIT 3314D ESG ACS ES SOUTH CUB 0036 5 M33HVR*ACU1A EAST MCC ROD CONTROL AND CABLE VAULT AIR CONDITION UNIT 3314A RBV ACU AB 0066 6 M33HVR*ACU1B WEST MCC ROD CONTROL AND CABLE VAULT AIR CONDITIONING UNIT 3314A RBV ACU AB 0066 7 M33HVC*ACU1A CONTROL ROOM A/C UNIT SPLY 3314F ACC ACU CB 0064 8 M33HVC*ACU1B CONTROL ROOM A/C UNIT SPLY 3314F ACC ACU CB 0078 9 M33HVC*ACU2A AC UNIT INSTRUMENT RACK & COMPUTER ROOM 3314F ACC ACU CB 0064 10 M33HVC*ACU2B AC UNIT INSTRUMENT RACK & COMPUTER ROOM 3314F ACC ACU CB 0078 11 M33HVC*ACU3A EAST SWGR ROOM BACKUP AIR CONDITIONING UNIT 3314F ACC ACU CB ABOVE BAT-.ROOM#5 0004 12 M33HVC*ACU3B WEST SWGR ROOM BACKUP AIR CONDITIONING UNIT 3314F ACC ACU CB 0004 13 M33HVC*ACU4A EAST SWGR ROOM A/C UNIT 3314F ACC ACU CB 0004 14 M33HVC*ACU4B WEST SWGR ROOM A/C UNIT 3314F ACC ACU CB 0004 15 M33SIL*AV8877A REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS C -007 16 M33SIL*AV8877B REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS B -007 17 M33SIL*AV8877C REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS A -007 18 M33SIL*AV8877D REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR FLTR FAN A -007 19 M33SIL*AV8879A REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS C -007 20 M33SIL*AV8879B REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS B -007 21 M33SIL*AV8879C REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR CLNG ASS A -007 22 M33SIL*AV8879D REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI AOV CS ABOVE AIR FLTR FAN A -007 23 M33SIL*AV8889B LPSI TEST VALVE 3301 LPI AOV CS ANNULUS 0003 08 B.1-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 24 M33SIH*CV8823 TEST LINE ISOL SI TO COLD LEG INJ 3308 HPI AOV CS 0019 06 25 M33SIH*CV8824 TEST LINE ISOL SI TO 1/3 HOT LEG 3308 HPI AOV CS 0019 06 26 M33SIH*CV8843 TEST LINE ISOL CHARGING PUMP HDR CK 3308 HPI AOV CS ANNULUS 0008 08 27 M33SIH*CV8881 TEST LINE ISOL SI TO 2/4 HOT LEG 3308 HPI AOV CS 0005 28 M333L-3FWA*AOV23A S/G AUXILIARY FEEDWATER ALTERNATE VLV SUCTION CLOSED LIMIT SWITCH 3322 AFW AOV ES (A) AUX FW PUMP 0022 S/G AUXILIARY FEEDWATER ALTERNATE VLV SUCTION CLOSED LIMIT 3322 AFW AOV ES (A) AUX FW PUMP 0024 09 29 M333L-3FWA*AOV23B SWITCH 3W E A P2 30 M333L-3FWA*AOV61A S/G AUXILIARY FEEDWATER PUMP A SUCTION ISOL VLV CLOSED LIMIT 3322 AFW AOV ES FWA PlA ROOM 0022 SWT 31 M333L-3FWA*AOV61 B S/G AUXILIARY FEEDWATER PUMP A SUCTION ISOL VLV CLOSED LIMIT 3322 AFW AOV ES EWA P1A ROOM 0024 10 SWT 32 M333U-3FWA*AOV23A S/G AUXILIARY FEEDWATER ALTERNATE VLV SUCTION OPEN LIMIT 3322 AFW AOV ES (A) AUX FW PUMP 0022 02 SWITCH 33 M333U-3FWA*AOV23B S/G AUXILIARY FEEDWATER ALTERNATE VLV SUCTION OPEN LIMIT 3322 AFW AOV ES (A) AUX FW PUMP 0027 08 SWITCH S/G AUXILIARY FEEDWATER PUMP A SUCTION ISOL VLV OPEN LIMIT A) AU ROMP 002720 34 M333U-3FWA*AOV23B SWT 3322 _ FW AOV ES 35 M333U-3FWA*AOV61 B S/G AUXILIARY FEEDWATER PUMP A SUCTION ISOL VLV OPEN LIMIT 3322 AFW AOV ES FWA PlA ROOM 0025 02 SWT 36 M33FWA*AOV23A SGAFW ALTERNATE SUCTION VALVE (A MOTOR DRIVEN) 3322 AFW AOV ES (A) AUX FW PUMP 0027 37 M33FWA*AOV23B SGAFW ALTERNATE SUCTION VALVE (B MOTOR DRIVEN) 3322 AFW AOV ES B AUXILIARY FW PUMP 0027 38 M33FWA*AOV25 DEMIN WTR STORAGE TK HEATING CIRC LINE ISOL 3322 AFW AOV YD DWST TANK 0026 39 M33FWA*AOV26 DEMIN WTR STORAGE TK HEATING CIRC LINE ISOL 3322 AFW AOV YD DWST TANK 0026 40 M33FWA*AOV61A SGAFW PUMP (A) NORMAL SUCTION ISOLATION VALVE 3322 AFW AOV ES FWA P1A ROOM 0024 06 41 M33FWA*AOV61B SGAFW PUMP (B) NORMAL SUCTION ISOLATION VALVE 3322 AFW AOV ES FWA P1B ROOM 0026 A AUX FEEDWATER A TRAIN DISCHARGE CROSS CONN 3322 AFW AOV ES APUMP 42 M33FWA*AOV62A 43 M33FWA*AOV62B B TRAIN DISCHARGE CROSS-CONN 3322 AFW AOV ES B AUX FEEDWATER PUMP 44 M33FWA*HCV37 STEAM GENERATOR AUXILIARY FEEDWATER ALTERNATE SUCTION 3322 AFW AOV ES 0021 B.1-3

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 45 M33MSS*AOV65 TDAFWP TURB EXH SILENCER DRAIN 3322 STG AOV ES 0021 46 M33SWP*AOV39A SERVICE WATER A DIESEL GENERATOR HEAT EXCHANGE OUTLET 3326 SWS AOV DG A DIESEL 0036 47 M33SWP*AOV39B SERVICE WATER B DIESEL GENERATOR HEAT EXCHANGE OUTLET 3326 SWS AOV DG B DIESEL 0036 48 M33CHS*AOV64 FAILED FUEL DET WATER ISOLATION 3304A CVC AOV AB OUTSIDE SEAL WTR RM 0009 06 49 M33CHS*AOV68 FAILED FUEL DET INLET ISOLATION 3304A CVC AOV AB OUTSIDE SEAL WTR RM 0005 06 50 M33CHS*AOV71 VOL CONTTK 3304A CVC AOV AB 0043 51 M33CHS*AV8141A RCP A SEAL LEAKOFF ISOLATION 3304A CVC AOV CS "A" CUBICLE 0007 52 M33CHS*AV8141B RCP B SEAL LEAKOFF ISOLATION 3304A CVC AOV CS "B" CUBICLE 0018 53 M33CHS*AV8141C RCP C SEAL LEAKOFF ISOLATION 3304A CVC AOV CS "C" CUBICLE 0003 08 54 M33CHS*AV8141D RCP D SEAL LEAKOFF ISOLATION 3304A CVC AOV CS D CUBICLE 0020 55 M33CHS*CV8152 LETDOWN HEADER CTMT ISOLATION 3304A CVC AOV AB PIPE PEN# Z-24 MEZZ 0018 56 M33CHS*FCV121 CHARGING FLOW CONTROL VALVE 3304A CVC AOV AB 0004 06 57 M33CHS*FV99 VCT SWIRL CONTROLLER 3304A CVC AOV AB VCT TOP OF TANK 0057 58 M33CHS*HCV123 EXCESS LETDOWN FLOW CONTROLLER 3304A CVC AOV CS EXCESS LTDN HX -008 59 M33CHS*HCV128 LETDOWN FROM RHR FLOW CONTROLLER 3304A CVC AOV AB LTDN MOD HX 0004 06 60 M33CHS*HCV182 RCP SEAL WATER FLOW CONTROLLER 3304A CVC AOV AB "C" CHRGNG PMP CUB. 0024 06 61 M33CHS*HCV184 LOOP FILL HEADER FLOW CONTROLLER 3304A CVC AOV JAB VALVE MEZZ NEAR STRS 0012 62 M 3 3.C,HS *L,. ,- VCT

                        .... HIGH LEVEL DUMP                                  3304A CVC AOV  AB   PLATFORM ABOVE VCT   0060 63   M33CHS*PCV131       LETDOWN PRESSURE CONTROL VALVE                        3304A CVC AOV  AB                        0004 06 64   M33CHS*FCV110A      BORIC ACID SUPPLY TO BLENDER ISOLATION                3304C CVC AOV  AB   A CHARGING PMP CUB   0030 65   M33CHS*FCV111A      PRIMARY WATER SUPPLY TO BLENDER                       3304C CVC AOV  AB   BORIC ACID PMP A RM  0047 06 66   M33SIL*AV8889D      LPSI TEST VALVE                                       3307A LPI AOV  CS   ANNULUS              0003 08 67   M33RHS*FCV618       RESIDUAL HEAT REMOVAL A HEAT TOTAL FLOW CNTL          3307B RHR AOV   ES  BTWN RHS PIT & EIA   0021 06 68   M33RHS*FCV619       RESIDUAL HEAT REMOVAL B HX TOTAL FLOW CNTL            3307B RHR AOV   ES                       0021 06 B.1-4

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 69 M33RHS*HCV606 RES HX ElA FLOW CONT 3307B RHR AOV ES RHS CUBE A 0004 70 M33RHS*HCV607 RESIDUAL HEAT REMOVAL HX E1B FLOW CNTL 3307B RHR AOV ES RHS'B' CUBICLE 0004 71 M33HVC*AOV20 CNTL RM VENT EXHAUST AIR ISOL 3314F ACC AOV CB 0064 72 M33HVC*AOV21 CNTL RM VENT EXHAUST AIR ISOL 3314F ACC AOV CB 0064 73 M33HVC*AOV22 CNTRL ROOM VENTILATION OUT ISOL VLV 3314F ACC AOV CB MEZZANINE 0064 74 M33HVC*AOV23 CNTRL ROOM VENTILATION OUT ISOL VLV 3314F ACC AOV CB MEZZANINE 0064 75 M33HVC*AOV25 CNTRL ROOM VENTILATION INLET ISOL VV 3314F ACC AOV CB ABOVE MANUAL DOOR 0064 76 M33HVC*AOV26 CONTROL ROOM VENTILATION INLET ISOLATION VALVE 3314F ACC AOV CB ABOVE TORNADO DOOR 0064 77 M33DTM*AOV29A MSI TRAIN A STEAM HEADER DRAIN (1SG) 3316A DTM AOV MS S/W CUBE 0063 78 M33DTM*AOV29B MSI TRAIN A STEAM HEADER DRAIN (2SG) 3316A DTM AOV MS S/E CUBE 0063 79 M33DTM*AOV29C MSI TRAIN A STEAM HEADER DRAIN (3SG) 3316A DTM AOV MS N/E CUBE 0063 80 M33DTM*AOV29D MSI TRAIN A STEAM HEADER DRAIN (4SG) 3316A DTM AOV MS N/E CUBE 0063 81 M33DTM*AOV61A MSI TRAIN B STEAM HEADER DRAIN (1SG) 3316A DTM AOV MS S/E CUBE 0063 82 M33DTM*AOV61B MSI TRAIN B STEAM HEADER DRAIN (2SG) 3316A DTM AOV MS S/E CUBE 0063 83 M33DTM*AOV61C MSI TRAIN B STEAM HEADER DRAIN (3SG) 3316A DTM AOV MS N/E CUBE 0063 84 M33DTM*AOV61D MSI TRAIN B STEAM HEADER DRAIN (4SG) 3316A DTM AOV MS N/E CUBE 0063 85 M33DTM*AOV63A MSI TRAIN A STEAM HEADER DRAIN (1TT) 3316A DTM AOV ES CUBICLE SW OF TT 0024 86 M!33DTM*AOV63B MS! TRAIN A STEAM HEADER DRAIN (2TT) 3316A DTM AOV ES CUBICLE SW OF TT 0022 87 M33DTM*AOV63D CTMT ISOL A SG STM HDR DRAIN (4TT) 3316A DTM AOV ES CUBICLE SW OF TT 0024 88 M33DTM*AOV64A MSI TRAIN B STEAM HEADER DRAIN (1ITT) 3316A DTM AOV ES SW CORNER OF 0023 ROOM 02 89 M33DTM*AOV64B MSI TRAIN B STEAM HEADER DRAIN (2TT) 3316A DTM AOV ES SW CORNER OF ROOM 0012 90 M33DTM*AOV64D MSI TRAIN B STEAM HEADER DRAIN (4TT) 3316A DTM AOV ES W SIDE ABOVE PLTFRM 0012 91 M33MSS*AOV31A TERRY TURBINE STEAM ISOLATION FROM A S/G 3316A STG AOV ES CUBE SOUTH OF TERRY 0025 92 M33MSS*AOV31 B TERRY TURBINE STEAM ISOLATION FROM B S/G 3316A STG AOV ES CUBE SOUTH OF TERRY 0025 B. 1-5

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 93 M33MSS*AOV31 D TERRY TURBINE STEAM ISOLATION FROM D S/G 3316A STG AOV ES CUBE SOUTH OF TERRY 0025 94 M33MSS*HV28A STEAM GENERATOR 1 MSIV BYPASS VALVE 3316A STG AOV MS 0073 06 95 M33MSS*HV28B STEAM GENERATOR 2 MSIV BYPASS VALVE 3316A STG AOV MS 0073 06 96 M33MSi*HV28C STEAM GENERATOR 3 MSIV BYPASS VALVE 3316A STG AOV MS 0073 06 97 M33MSS*HV28D STEAM GENERATOR 4 MSIV BYPASS VALVE 3316A STG AOV MS 0073 06 98 M33MSS*PV20C MAIN STEAM PRESSURE RELIEVING CONTROL 3316A STG AOV MS LOCATED ON B MS LINE 0068 99 M33CCP*AOV10A TRA NON-SAFETY HEADER SUPPLY ISOL 3330A CCR AOV AB UNDER CCP PP'S 0004 100 M33CCP*AOV10B TR B NON-SAFETY HEADER SUPPLY ISOL 3330A CCR AOV AB UNDER CCP PP'S 0004 06 101 M33CCP*AOV178A RPCCW RETURN 1 RCP THERMAL BARRIER 3330A CCR AOV CS CUBICLE A 0026 102 M33CCP*AOV178B RPCCW RETURN 2 RCFO THERMAL BARRIER 3330A CCR AOV CS B PUMP MEZZANINE 0026 103 M33CCP*AOV178C RPCCW RETURN 3 RCP THERMAL BARRIER 3330A CCR AOV CS CUBICLE C 0026 06 104 M33CCP*AOV178D RPCCW RETURN 4 RCP THERMAL BARRIER 3330A CCR AOV CS D PUMP MEZZANINE 0026 105 M33CCP*AOV179A TR A RPCCW SUPPLY HEADER DIV 3330A CCR AOV CS IN PASSAGEWAY 0021 06 106 M33CCP*AOV179B TR B RPCCW SUPPLY HEADER DIV 3330A CCR AOV CS IN PASSAGEWAY 0021 06 107 M33CCP*AOV180A TR A RPCCW RETURN HEADER DIV 3330A CCR AOV CS IN PASSAGEWAY 0006 06 108 M33CCP*AOV180B TR B RPCCW RETURN HEADER DIV 3330A CCR AOV CS IN PASSAGEWAY 0006 06 109 M33CCP*AOV194A TRA RPCCW NON-SAFETY HEADER RETURN ISOL 3330A CCR AOV AB MEZZANINEUNDER 0004 06 PUMP 110 M33CCP*AOV194B TR B RPCCW NON-SAFETY HEADER RETURN ISOL 3330A CCR AOV AB MEZZANpNEUDER 0004 06 PUMP 111 M33CCP*AOV197A TRA RPCCW NON-SAFETY HEADER SUPPLY ISOL 3330A CCR AOV AB MEZZANINE, UNDER PP 0004 06 112 M33CCP*AOV197B TR B RPCCW NON-SAFETY HEADER SUPPLY ISOL 3330A CCR AOV AB MEZZANINEUNDER 0004 06 PUMP 113 M33CCP*AOV19A TR A RPCCW NON-SAFETY HEADER RETURN ISOL 3330A CCR AOV AB UNDER CCP PP'S 0004 06 114 M33CCP*AOV19B TR B RPCCW NON-SAFETY HEADER RETURN ISOL 3330A CCR AOV AB UNDER CCP PP'S 0004 06 115 M33CCP*AOV31C TRA RE31 SAMPLE ISOL 3330A CCR AOV AB NEXTTO CHILLER UNIT 0043 06 B.1-6

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 116 M33CCP*AOV31D TR B RE31 SAMPLE ISOL 3330A CCR AOV AB NEXT OT CHR UNIT 0043 06 117 M33CCP*TV172 LETDOWN HEAT EXCHANGER OUTLET TEMPERATURE CONTROL VALVE 3330A CCR AOV AB OUT BRNMTR RM W 0004 WALL 118 M33CCP*TV32A RPCCW HEAT EXCHANGER A OUTLET TCV 3330A CCR AOV AB 0024 06 119 M33CCP*TV32B RPCCW HEAT EXCHANGER B OUTLET TCV 3330A CCR AOV AB 0024 06 120 M3300P*TV320 COMP COOLING HEAT EXCHANGER OUTLET TEMPERATURE CONTROL 3330A OCR AOV AB 0024 06 VALVES (2) 121 M33CCE*AOV26A A' CHARGING PUMP COOLING PUMP SUCTION XCONN 3330D CCE AOV AB CHRG PP CLG PP RM 0024 06 122 M33CCE*AOV26B B CHARGING PUMP COOLING PUMP SUCTION XCONN 3330D CCE AOV AB CHG PP CLG ROOM 0024 06 123 M33CCE*AOV30A 'A CHARGING PUMP COOLING PUMP DISCHARGE TRANSFER 3330D OCE AOV AB OHG PP OLG PP RM 0024 06 CONNECTION 124 M33CCE*AOV30B 'B'CHARGING PUMP COOLING PUMP DISCHARGE TRANSFER 3330D CCE AOV AB CHG PP CLG PP ROOM 0025 06 CONNECTION I_1_1 125 M33CCE*TV37A 'ACHARGING PUMP COOLING TEMPERATURE CONTROL VALVE 3330D CCE AOV AB CHG PP CLN PP ROOM 0024 06 126 M33CCE*TV37B B CHARGING PUMP COOLING TEMPERATURE CONTROL VALVE 3330D CCE AOV AB CHG PP CLR TEMP CONT 0024 06 127 M3301A-1 BATTERY 1 (301A-1) 3345C EDC BTY CB BATTERY 0004 128 M3301A-2 BATTERY 3 (301A-2) 3345C EDC BTY CB BATTERY 0004 129 M3301B-1 BATTERY 2 (301B-1) 3345C EDC BTY CB BATTERY 0004 130 M3301B-2 BATTERY 4 (301 B-2) 3345C EDC BTY CB BATTERY 0004 131 M33BYS*CHGR-1 BATTERY CHARGER 1 (301A-1) 3345C EDC CHG CB EAST SWGR ROOM 0004 132 M33BYS*CHGR-2 BATTERY CHARGER 2 (301B-1) 3345C EDC CHG CB WEST SWGR ROOM 0004 133 M33BYS*CHGR-3 BATTERY CHARGER 3 (301A-2) 3345C EDC CHG CB EAST SWITCHGEAR 0004 134 M33BYS*CHGR-4 BATTERY CHARGER 4 (301B-2) 3345C EDC CHG CB WEST SWGR ROOM 0004 135 M33BYS*CHGR-5 BATTERY CHARGER 5 (301C-1) 3345C EDC CHG CB EAST SWGR ROOM 0004 136 M33BYS*CHGR-7 BATTERY CHARGER 7 (301A-3) 3345C EDC CHG CB EAST SWGR ROOM 0004 137 M33BYS*CHGR-8 BATTERY CHARGER 8 (3-1B-3) 3345C EDC CHG CB WEST SWGR ROOM 0004 138 M33HVK*CHL1A CONTROL BLDG WATER CHILLER 3314F CBW CHL CB 0064 B.1-7

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 139 M33HVK*CHL1B CONTROL BLDG WATER CHILLER 3314F CBW CHL CB 0064 140 M33EGS*EGA EMERGENCY DIESEL GENERATOR (A) 3346A DGN EAG DG D/G 'A' 0024 141 M33EGS*EGB EMERGENCY DIESEL GENERATOR (B) 3346A DGN EAG DG D/G'B' 0024 142 M33HVR*FN13A CHARGING PUMP EXHAUST FAN 3314A RBV FAN AB 0066 143 M33HVR*FN13B CHARGING PUMP EXHAUST FAN 3314A RBV FAN AB 0066 144 M33HVR*FN14A CHRG & CMPNT COOLING PUMP SUPPLY FAN 3314A RBV FAN AB 0074 145 M33HVR*FN14B AUXILIARY BUILDING CHARGING PUMP SUPPLY FAN 3314A RBV FAN AB 0066 146 M33HVR*FN6A AUXILIARY BUILDING FILTER EXCHANGE FAN 3314A RBV FAN AB 0076 147 M33HVR*FN6B AUXILIARY BUILDING FILTER EXCHANGE FAN 3314A RBV FAN AB 0066 148 M33HVR*MIS13A CHARGING PMP CUBE EXHST FAN FLEX CONNECTION MISSLE BARRIER 3314A RBV FAN AB 0066 149 M33HVR*MIS13B CHARGING PMP CUBE EXHST FAN FLEX CONNECTION MISSLE BARRIER 3314A RBV FAN AB 0066 150 M33HVR*MIS14A CHARGING PMP & COMP CLG PMP AREA FLEX CONNECT MISSILE 3314A RBV FAN AB 0074 BARRIER 151 M33HVR*MIS14B CHARGING'PMP & COMP CLG PMP AREA FLEX CONNECT MISSILE 3314A RBV FAN AB 0074 BARRIER 152 M33HVR*FN10A FUEL BUILDING EXHAUST FAN 3314C RBV FAN AB 153 M33HVR*FN1OA1 FUEL BLDG EXHAUST FAN 3314C RBV FAN AB 154 M33HVR*FN1OA2 FUEL BLDG EXHAUST FAN 3314C RBV FAN AB 155 M33HVR*FN10B FUEL BLDG EXHAUST FAN 3314C RBV FAN AB 156 M33HVR*FN10B1 FUEL BLDG EXHAUST FAN 3314C RBV FAN FB 157 M33HVR*FN10B2 FUEL BLDG EXHAUST FAN 3314C RBV FAN AB 158 M33HVQ*FN5A AUXILIARY FD PUMP AREA EMERGENCY SUPPLY FAN 3314D ESG FAN ES SOUTH CUB EASTWALL 0036 159 M33HVQ*FN5B AUXILIARY FD PUMP AREA EMERGENCY SUPPLY FAN 3314D ESG FAN ES STH.CUB. FLOOR LVL 0036 160 M33HVQ*FN6A AUXILIARY FD PUMP AREA EMERGENCY EXHAUST FAN 3314D ESG FAN ES STH.CUB. OVRHD ESTWL 0036 161 M33HVQ*FN6B AUXILIARY FD PUMP AREA EMERGENCY EXHAUST FAN 3314D ESG FAN ES STH.CUB. OVHD EASTWL 0036 B.1-8

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 162 M33HVC*FNIA CONTROL ROOM EMERGENCY AIR SUPPLY FAN 3314F ACC FAN CB 0064 163 M33HVC*FN1B CONTROL ROOM EMERGENCY AIR SUPPLY FAN 3314F ACC FAN CB 0064 164 M33HVC*FN2A CHILLER EQUIPMENT ROOM SUPPLY VENT FAN 3314F ACC FAN CB 0064 165 M33HVC*FN2B CHILLER EQUIPMENT ROOM SUPPLY FAN 3314F ACC FAN CB 0064 166 M33HVC*FN3A EAST SWGR AND BATTERY ROOMS 1, 3 & 5 SUPPLY FAN 3314F ACC FAN CB 0004 167 M33HVC*FN3A1 E SWGR RM EXH FAN 1 3314F ACC FAN CB 0000 00 168 M33HVC*FN3A2 E SWGR RM EXH FAN 2 3314F ACC FAN CB 0000 00 169 M33HVC*FN3B WEST SWITCHGEAR AND BATTERY ROOMS 2 & 4 SPLY FAN 3314F ACC FAN CB 0004 170 M33HVC*FN3B1 WEST SWGR ROOM EXH FN 1 3314F ACC FAN CB 0000 00 171 M33HVC*FN3B2 WEST SWGR ROOM EXH FN 2 3314F ACC FAN CB 0000 00 172 M33HVC*FN7A CNTRL BLG EQUIP RM EXHST FAN 3314F ACC FAN CB 0064 173 M33HVC*FN7B CNTRL BLG EQUIP RM EXHST FAN 3314F ACC FAN CB 0064 174 M33HVC*FN9A BAT ROOM (1) VENTILATION EXHAUST FAN 3314F ACC FAN CB 0004 175 M33HVC*FN9B BAT ROOM (2) VENTILATION EXHAUST FAN 3314F ACC FAN CB 0004 176 M33HVC*FN9C BAT ROOM (3) VENTILATION EXHAUST FAN 3314F ACC FAN CB 0004 177 M33HVC*FN9D BAT ROOM (4) VENTILATION EXHAUST FAN 3314F ACC FAN CB 0004 178 M33HVC*FN9E BAT ROOM (5) VENTILATION EXHAUST FAN 3314F ACC FAN CB 0004 179 M33HVP*FNIA EMERGENCY GENERATOR BUILDING SUPPLY FAN 3314H DGV FAN DG 0044 180 M33HVP*FN1B EMERGENCY GENERATOR BUILDING SUPPLY FAN 3314H DGV FAN DG 0044 181 M33HVP*FN1C EMERGENCY GENERATOR BUILDING SUPPLY FAN 3314H DGV FAN DG 0044 182 M33HVP*FN1D EMERGENCY GENERATOR BUILDING SUPPLY FAN 3314H DGV FAN DG 0044 183 M33SFC*E1A SPENT FUEL POOL COOLER 3305 SFC HXR FB 184 M33SFC*E1B SPENT FUEL POOL COOLER 3305 SFC HXR FB 185 M33SIH*E2A SI PUMP LUBRICATION OIL COOLER 3308 HPI HXR ES 0024 B.1-9

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 186 M33SIH*E2B SI PUMP LUBRICATION OIL COOLER 3308 HPI HXR ES 0024 187 M33FWL*E2A "A" MDAFP LUBE OIL COOLER 3322 FWL HXR ES 0021 188 M33FWL*E2B "B" MDAFP LUBE OIL COOLER 3322 FWL HXR ES 0021 189 M33FWL*E3 TDAFP LUBE OIL COOLER 3322 FWL HXR ES 0021 190 M33CHS*E1 REGENERATIVE HEAT EXCHANGER 3304A CVC HXR CS 0003 191 M33CHS*E2 LETDOWN HEAT EXCHANGER 3304A CVC HXR AB 0024 192 M33CHS*E3 EXCESS LETDOWN HEAT EXCHANGER 3304A CVC HXR CS 0003 193 M33CHS*E4 SEAL WATER HEAT EXCHANGER 3304A CVC HXR AB 0024 194 M33CHS*E9A CHARGING PUMP LO COOLER 3304A CVC HXR AB 0024 195 M33CHS*E9B CHARGING PUMP LO COOLER 3304A CVC HXR AB 0024 196 M33CHS*E9C CHARGING PUMP LO COOLER 3304A CVC HXR AB 0024 197 M33RHS*E1A RESIDUAL HEAT EXCHANGER 3307B RHR HXR ES A RHR CUBICLE 0004 06 198 M33RHS*E1B RESIDUAL HEAT EXCHANGER 3307B RHR HXR ES B RHR CUBICLE 0004 06 199 M33RHS*E2A RHR PUMP SEAL COOLER 3307B RHR HXR ES 0004 200 M33RHS*E2B RHR PUMP SEAL COOLER 3307B RHR HXR ES 0004 201 M33HVK*E1A HEAT EXCHANGER FOR CONTROL BUILDING WATER CHILLER 3314F CBW HXR CB 0064 202 M33HVK*E1B HEAT EXCHANGER FOR CONTROL BUILDING WATER CHILLER. 3314F CBW HXR CB 203 M33CCP*EIA RPCCW HEAT EXCHANGER A 3330A CCR HXR AR 0024 204 M33CCP*E1B RPCCW HEAT EXCHANGER B 3330A CCR HXR AB 0024 205 M33CCP*E1C RPCCW HEAT EXCHANGER C 3330A CCR HXR AB 0024 206 M33CCE*E1A A CHARGING PUMP COOLER 3330D CCE HXR AB 0024 06 207 M33CCE*E1B B CHARGING PUMP COOLER 3330D CCE HXR AB 0024 06 208 M33EGS*E1A ENGINE AIR COOLER WATER HEAT EXCHANGER 3346A DGN HXR DG DG-A 0024 06 209 M33EGS*E1B ENGINE AIR COOLER WATER HEAT EXCAHNGER 3346A DGN HXR DG DG-B 0024 06 B.1-10

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 210 M33EGS*E2A JACKET WATER COOLER 3346A DGN HXR DG 0024 211 M33EGS*E2B JACKET WATER COOLER 3346A DGN HXR DG 0024 212 M33EGS*E3A LUBE OIL HEAT EXCHANGER 3346A DGN HXR DG D/G 'A' 0024 213 M33EGS*E3B LUBE OIL HEAT EXCHANGER 3346A DGN HXR DG D/G'B' 0024 214 M33EGS*E4A GOVERNOR LUBE OIL COOLER 3346A DGN HXR DG 0024 215 M33EGS*E4B GOVERNOR LUBE OIL COOLER 3346A DGN HXR DG 0024 216 M33VBAINV1 INVERTER 1 3345B EDC IVT CB EAST SWITCHGEAR RM 0004 06 217 M33VBA*INV2 VIAC-2 INVERTER 3345B EDC IVT CB WEST SWITCHGEAR 0004 ROOM 218 M33VBAINV3 INVERTER 3 3345B EDC IVT CB EAST SWGR ROOM 0004 219 M33VBA*INV4 VIAC-4 INVERTER 3345B EDC IVT CB WEST SWITCHGEAR 0004-ROOM 220 M3G-3RHS*FCV610 FLOW CONTROL VALVE INDICATING LIGHT 3307B RHR LCT 221 M3G-3RHS*FCV611 FLOW CONTROL VALVE INDICATING LIGHT 3307B RHR LCT 222 M3R-3RHS*FCV610 FLOW CONTROL VALVE INDICATING LIGHT 3307B RHR LCT 223 M3R-3RHS*FCV611 FLOW CONTROL VALVE INDICATING LIGHT 3307B RHR LCT 224 M332R 480 VOLT LOAD CENTER BUS 32R 3344A ESO LCT AB EAST MCC ROD 0024 06 CONTROL 225 M332S 480 VOLT LOAD CENTER 32S 3344A ESO LCT AB EAST MCC ROD 0024 06 CONTROL 226 M332T 480 VOLT LOAD CENTER BUS 32T(3EJS-US-1A) 3344A ESO LCT CB 'EAST SVViTCHGEAR RM. 0004 06 227 M332U 480 VOLT LOAD CENTER BUS 32U (3EJS*US-1B) 3344A ESO LCT CB WEST SWITCHGEAR 0004 06 ROOM 000 228 M332V 480 VOLT LOAD CENTER BUS 32V 3344A ESO LCT AB WEST MCC ROD 0024 06 CONTROL 229 M332W LOAD CENTER 32W 3344A ESO LCT AB ST MCC ROD 0024 06 CONTROL WEST MCC 024OD 230 M332X 480 VOLT LOAD CENTER 32X 3344A ESO LCT AB WSTROD0024 CONTROL 06 B.1-11

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 231 M332Y 480 VOLT LOAD CENTER 32Y 3344A ESO LCT AB EAST MCC ROD 0024 06 CONTROL 232 M332-1 R 480V AC MOTOR CONTROL CENTER 3344B ELC MCC AB 0024 233 M332-1T 480V MCC 32-1T (EMERG) EMERGENCY GENERATOR 3344B ELC MCC DG 0024 234 M332-1U 480V MCC 32-1U(EMERG) DIESEL GENERATOR BLDG 3344B ELC MCC DG 0024 235 M332-IW 480 VOLT MCC 32-1W(EMERG) AUX BLDG 3344B ELC MCC AB 0024 236 M332-2R 480 VOLT MCC 32-2R(EMERG) ROD CONTROL 3344B ELC MCC AB 0024 237 M332-2RA 480V MCC 32-2RA (EMER) RX COOLANT ISOL VLVS STARTERS 3344B ELC MCC AB 0024 238 M332-2T 480 VOLT MCC 32-2T(EMERG) CONTROL BLDG. 3344B ESO MCC CB 0004 06 239 M332-2U 480V MCC 32-2U (EMERGENCY) CONTROL BLDG 3344B ELC MCC CB 0004 06 240 M332-2W 480V MCC 32-2W(EMERG) ROD CONTROL 3344B ELC MCC AB 0024 241 M332-3U 480 VOLT MCC (EMERG) 3344B ELC MCC ES 0036 06 242 M332-4T 480V MCC 3344B ELC MCC ES 0036 243 M332-4U VITAL MOTOR CONTROL CENTER 3344B ELC MCC ES SOUTH 0036 244 M332-5T 480 VOLT MCC 32-5T(EMERG) CIRC WATER PUMP HOUSE 3344B ELC MCC CW 0014 245 M332-5U 480 VOLT MCc 32-5U(EMERG) CIRC WATER PUMPHOUSE 3344B ELC MCC CW 0014 246 M33EHS*MCC2B1 480 VOLT MCO 3EHS*MCC2B1 (EMERG) AUX BUILDING 3344B ELC MCC AB 0045 06 247 M33EHS*MCC2B2 480 VOLT MCC 3EHS*MCC2B2 (EMERG) AUX BUILDING 3344B ELC MCC AB 0045 06 248 M33EHS*MCC3A1 480 VOLT MCC 3EHS*MCC3A1 ((BUS 32-1R(F3J)) 3344B ELC MCC AB MCCiROD CONTROL 0024 06 249 M33EHS*MCC3B1 480 VOLT MCC 3EHS*MCC3B1 ((BUS 32-1W(F3J)) 3344B ELC MCC AB MCC/ROD CONTROL 0024 06 250 M33HVR*MOD140A AUX BLDG FLT SYS VLV 3314A RBV MOD AB 0089 251 M33HVR*MOD140B AUX BLDG FLT SYS VLV, INLET TO FN6B 3314A RBV MOD AB 0066 06 252 M33HVR*MOD28A 3HVR*FN6A OUTLET DAMPER 3314A RBV MOD AB 0089 253 M33HVR*MOD28B 3HVR*FN6B OUTLET DAMPER 3314A RBV MOD AB 0073 254 M33HVR*MOD49A CHG PP CUBICLE OUTLET DAMPER (H.P SURVEY PRIOR) 3314A RBV MOD AB 3CHS*TK5A-BORIC ACID 0045 B.1-12

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 255 M33HVR*MOD49B CHG PP CUBICLE OUTLET DAMPER (H.P SURVEY PRIOR) 3314A RBV MOD AB 3CHS*TK5A BORIC ACID 0043 256 M33HVR*MOD49C1 CHG PP CUBICLE OUTLET DAMPER 3314A RBV MOD AB BEHIND CHS-TK5B 0043 06 257 M33HVR*MOD49C2 CHG PP CUBICLE OUTLET DAMPER 3314A RBV MOD AB BEHIND CHS-TK5B 0043 258 M33HVR*MOD50A CHG PP CUBICLE INLET DAMPER 3314A RBV MOD AB PASSAGE WAY 0043 259 M33HVR*MOD50B CHG PP CUBICLE INLET DAMPER 3314A RBV MOD AB 0043 260 M33HVR*MOD50C1 CHG PP CUBICLE INLET DAMPER 3314A RBV MOD AB IN HALLWAY 0043 261 M33HVR*MOD5OC2 CHG PP CUBICLE INLET DAMPER 3314A RBV MOD AB 0043 262 M33HVR*MOD72A FUEL BLDG FLTR EXHAUST FAN OUTLET DAMPER 3314C RBV MOD AB STH OF HVR*FN10A 0089 263 M33HVR*MOD72B FUEL BLDG FLTR EXHAUST FAN OUTLET DAMPER 3314C RBV MOD AB STH OF HVR*FN10B 0066 264 M33HVQ*MOD26A1 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES 0038 265 M33HVQ*MOD26A2 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES FAR SOUTH 266 M33HVQ*MOD26B1 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES 0047 267 M33HVQ*MOD26B2 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES FAR SOUTH 0047 268 M33HVQ*MOD26C1 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES 0043 269 M33HVQ*MOD26C2 AUXILIARY FEEDWATER PUMP AREA VENTILATION INLET & EXHAUST 3314D ESG MOD ES 0043 270 M33HVC*MOD33A CNTL BLDG EMER VENT FAN (1A) INLET DAMPER 3314F ACC MOD CB 0067 271 M33HVC*MOD33B CNTL BLDG EMER VENT FAN (1B) INLET DAMPER 3314F ACC MOD CB 0064 06 272--- M33HVPMOD20A DIESEL EDG) GENERATOR ENCLOSURE VENTILATION OUTLET DAMPER ("A" '1-, DGV MOD D "A" DIESEL 0nnA0 273 M33HVP*MOD20B DIESEL GENERATOR ENCLOSURE VENTILATION OUTLET DAMPER ("B" 3314H DGV MOD DG "B" DIESEL 0049 EDG) 274 M33HVP*MOD20C DIESEL GENERATOR ENCLOSURE VENTILATION OUTLET DAMPER ("A" 3314H DGV MOD DG "A" DIESEL 0049 EDG) 275 M33HVP*MOD20D DIESEL GENERATOR ENCLOSURE VENTILATION OUTLET DAMPER ("B" 3314H DGV MOD DG "B" DIESEL 0049 EDG) 276 M33HVP*MOD23A DIESEL GENERATOR ENCLOSURE VENTILATION INLET DAMPER ("A" 3314H DGV MOD DG "A" DIESEL 0043 1 _____________ _ IEDG) I_ __I_'III B.1-13

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 277 M33HVP*MOD23B DIESEL GENERATOR ENCLOSURE VENTILATION INLET DAMPER ("B" 3314H DGV MOD DG "B" DIESEL 0043 EDG) 278 M33HVP*MOD26A DIESEL GENERATOR ENCLOSURE RECIRC DAMPER ("A" EDG) 3314H DGV MOD DG "A" DIESEL 0038 279 M33HVP*MOD26B DIESEL GENERATOR ENCLOSURE RECIRC DAMPER ("B" EDG) 3314H DGV MOD DG "B" DIESEL 0038 280 M33RCS*MV8000A POWER OPERATED RELIEF VALVE BLOCK 3301 RCS MOV CS PRESSURIZER CUBE 0077 281 M33RCS*MV8000B PRESSURIZER RELIEF ISOLATION VALVE 3301 RCS MOV CS PRESSURIZER 0077 282 M33RCS*MV8001A REACTOR COOLANT LOOP "A" HOT LEG STOP 3301 RCS MOV CS CUBICLE A 0029 283 M33RCS*MV8001B REACTOR COOLANT LOOP "B" HOT LEG STOP 3301 RCS MOV CS CUBICLE B 0020 284 M33RCS*MV8001C REACTOR COOLANT LOOP "C" HOT LEG STOP 3301 RCS MOV CS CUBICLE C 0024 285 M33RCS*MV8001D REACTOR COOLANT LOOP "D" HOT LEG STOP 3301 RCS MOV CS CUBICLE D 0003 286 M33RCS*MV8002A REACTOR COOLANT LOOP "A" COLD LEG STOP 3301 RCS MOV CS CUBICLE A 0003 287 M33RCS*MV8002B REACTOR COOLANT LOOP "B" COLD LEG STOP 3301 RCS MOV CS CUBICLE B 0003 288 M33RCS*MV8002C REACTOR COOLANT LOOP "C" COLD LEG STOP 3301 RCS MOV CS CUBICLE C 0024 289 M33RCS*MV8002D REACTOR COOLANT LOOP "D" COLD LEG STOP 3301 RCS MOV CS CUBICLE D 0003 290 M33RCS*MV8003A REACTOR COOLANT LOOP "A" BYPASS VALVE 3301 RCS MOV CS CUBICLE A 0024 291 M33RCS*MV8003B REACTOR COOLANT LOOP "B" BYPASS VALVE 3301 RCS MOV CS CUBICLE B 0024 292 M33RCS*MV8003C REACTOR COOLANT LOOP "C" BYPASS VALVE 3301 RCS MOV CS CUBICLE C 0024 293 M33RCS*MV8003D REACTOR COOLANT LOOP "D" BYPASS VALVE 3301 RCS MOV CS CUBICLE D 0024 294 M33RCS*MV8098 REACTOR VESSEL HEAD VENT TO EXCESS LETDOWN VALVE 3301 RCS MOV CS EXCESS LETDOWN HX -010 295 M33SIH*MV8801A CHARGING PUMP SI HEADER ISOL 3308 HPI MOV AB MEZZANINE CTMT 0004

                                                                                                     ,PENET 296  M33SIH*MV8801B      CHARGING PUMP SI HEADER ISOL                             3308  HPI MOV  AB    MEZZANINE CTMT    0004 PENET 297  M33SIH*MV8802A      A SI PUMP TO HOT LEG ]NJ                                 3308  HPI MOV  ES    BEHIND QSS PUMP A 0021 06 298  M33SIH*MV8802B      B SI PUMP TO HOT LEG INJ                                 3308  HPI MOV  ES    BEHIND QSS PUMP B 0021 06 299  M33SIH*MV8806       RWST SUPPLY TO SI PUMPS                                  3308  HPI MOV  ES    UNDER SIH PP'S    0049 04 B.1-14

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 300 M33SIH*MV8807A LOW PRESS SI CHARGING PUMP SUCT XCONN 3308 HPI MOV ES HPSI-A-PUMP 0021 06 301 M33SIH*MV8807B LOW PRESS SI CHARGING PUMP SUCT XCONN 3308 HPI MOV ES HPS1-PUMP-A 0021 06 302 M33SIH*MV8813 SI PUMPS MASTER MINIFLOW ISOL 3308 HPI MOV ES ESF BLDG SUMP PUMP 0004 06 303 M33SIH-MV8814 A SI PUMP MINIFLOW ISOL 3308 HPI MOV ES HPSl PUMP A 0021 06 304 M33SIH*MV8821A A SI PUMP TO COLD LEG INJ 3308 HPI MOV ES BEHIND QSS PUMP A 0021 06 305 M33SIH*MV8821B B SI PUMP TO COLD LEG INJ 3308 HPI MOV ES BEHIND SS PUMP A 0021 06 306 M33SIH*MV8835 SI COLD LEG MASTER ISOL 3308 HPI MOV ES MEZZ BHND QSS PMP 0021 06 307 M33SIH*MV8920 B SI PUMP MINIFLOW ISOL 3308 HPI MOV ES HPSI-PUMP-B 0021 06 308 M33SIH*MV8923A A SI PUMP SUCTION ISOL 3308 HPI MOV ES HPSI-A-PUMP 0021 06 309 M33SIH*MV8923B B SI PUMP SUCTION ISOL 3308 HPI MOV ES HPSI-PUMP-B 0021 06 310 M33SIH*MV8924 LPSI CHARGING PUMP SUCTION DIVISION 3308 HPI MOV ES HPSI PUMP A 0024 06 311 M33FWA*MOV35A STEAM GENERATOR AUXILIARY FDW ISOLATION VALVE 3322 AFW MOV ES A/C RHR HX CUBICLE 0040 312 M33FWA*MOV35B STEAM GENERATOR AUXILIARY FEEDWATER ISOLATION 3322 AFW MOV ES 0021 06 313 M33FWA*MOV35C STEAM GENERATOR FEEDWATER ISOLATION 3322 AFW MOV ES 0021 314 M33FWA*MOV35D STEAM GENERATOR AUXILIARY FDW ISOLATION VALVE 3322 AFW MOV ES A/C RHR HX CUBICLE 0040 315 M33SWP*MOV102A "A" SERVICE WATER PUMP DISCHARGE VALVE 3326 SWS MOV CW NORTH SW CUBICLE 0014 06 316 M33SWP*MOV102B "B" SERVICE WATER PUMP DISCHARGE VALVE 3326 SWS MOV CW 0014 06 317 M33SWP*MOV102C "C" SERVICE WATER PUMP DISCHARGE VALVE 3326 SWS MOV CW NORTH SW PP CUBICLE 0014 06 318 M33SWP*MOV102D "D" SERVICE WATER PUMP DISCHARGE VALVE 3326 SWS MOV CW SOUTH SRVICE H20 CUB 0014 06 319 M33SWP*MOV115A CIRCULATING WATER PUMP LUBE WATER VALVE 3326 SWS MOV CW 0014 320 M33SWP*MOV1 15B CIRCULATING WATER PUMP LUBE WATER VALVE 3326 SWS MOV CW CHLORINE PIT 0014 321 M33SWP*MOV24A STRAINER "A" BACKWASH VALVE 3326 SWS MOV CW NO SW PP CUBICLE 0014 06 322 M33SWP*MOV24B STRAINER "B" BACKWASH 3326 SWS MOV CW SO SW CUBICLE 0014 06 323 M33SWP*MOV24C SERVICE PUMP C DISCHARGE STRAINER BACKWASH VALVE 3326 SWS MOV CW NO SW CUBICLE 0014 06 B.1-15

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 324 M33SWP*MOV24D STRAINER "D" BACKWASH 3326 SWS MOV CW SOUTH SW CUBICLE 0014 06 325 M33SWP*MOV50A RX PLANT CMPNT COOLING HEAT EXCHANGER SUPPLY VALVE 3326 SWS MOV AB RPCCW 0024 06 326 M33SWP*MOV50B RX PLANT CMPNT COOLING HEAT EXCHANGER SUPPLY VALVE 3326 SWS MOV AB 0024 327 M33SWP*MOV54A CTMT RECIRC CLR SUPPLY VLV *ALL WORK PRIORITY 2* 3326 SWS MOV ES UNDER FWA PP'S 0004 328 M33SWP*MOV54B CTMT RECIRC COOLER INLET 3326 SWS MOV ES UNDER FWA PP'S 0004 06 329 M33SWP*MOV54C CTMT RECIRC CLR INLET *ALL WORK PRIORITY 2* 3326 SWS MOV ES UNDER FWA PP'S 0004 06 330 M33SWP*MOV54D CTMT RECIRC COOLER INLET 3326 SWS MOV ES UNDER FWA PP'S 0004 06 331 M33SWP*MOV57A "A" CONTAINMENT RECIRCULATION COOLER OUTLET 3326 SWS MOV ES CONT. RECIR. CLR. RM 0037 06 332 M33SWP*MOV57B SERVICE WATER COOLER OUTLET VALVE 3326 SWS MOV ES CONT. RECIR. CLR. RM 0037 06 333 M33SWP*MOV57C "C" CONTAINMENT RECIRCULATION COOLER OUTLET 3326 SWS MOV ES CONT. RECIR. CLR. RM 0037 06 334 M33SWP*MOV57D SERVICE WATER COOLER OUTLET VALVE 3326 SWS MOV ES CONT. RECIR. CLR. RM 0037 06 335 M33SWP*MOV71A SERVICE WATER SUPPLY TO TPCCW HEAT EXCHANGERS 3326 SWS MOV AB 0004 06 336 M33SWP*MOV71 B SERVICE WATER HEAT EXCHANGER INLET VALVE 3326 SWS MOV AB 0004 06 337 M33SWP*TV35A CONTROL BLDG AIR CONDITIONING OUTLET 3326 SWS MOV CB CHILLER ROOM 0076 00 338 M33SWP*TV35B CONTROL BLDG AIR CONDITIONING INLET 3326 SWS MOV CB CHILLER ROOM 0064 00 339 M33SWP*TV35-SPARE CONTROL BLDG AIR CONDITIONING OUTLET SPARE 3326 SWS MOV 0000 00 340 M33CHS*LCV112B VCT OUTLET ISOLATION 3304A CVC MOV AB VCT 0043 06 341 M33CHSLCV1 12C VCT OUTLET !SOLAT!ON 3304A CVC MOV AB VCT ROOM 0043 06 342 M33CHS*LCV112D RWST SUPPLY TO CHARGING PUMP SUCTION 3304A CVC MOV AB PIPE TUNNEL (ABOVE) 0006 06 343 M33CHS*LCV1 12E RWST SUPPLY TO CHARGING PUMP SUCTION 3304A CVC MOV AB ABOVE FB PIPE TUNNEL 0004 06 344 M33CHS"MV8100 SEAL WATER RETURN CTMT ISOL 3304A CVC MOV AB PENETRATION #23 0004 06 345 M33CHS*MV8105 CHARGING HEADER ISOLATION 3304A CVC MOV AB CTMT PIPE PEN. 26 0004 06 346 M33CHS*MV8106 CHARGING FLOW CONTROLLER ISOLATION 3304A CVC MOV AB CTMT PIPE PEN. 26 0004 06 347 M33CHS*MV8109A RCP A SEAL SUPPLY ISOLATION 3304A CVC MOV AB MEZZANINE PENET#16 0004 06 B.1-16

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 348 M33CHS*MV8109B RCP B SEAL SUPPLY ISOLATION 3304A CVC MOV AB MEZZANINE PENET#17 0004 06 349 M33CHS*MV8109C RCP C SEAL SUPPLY ISOLATION 3304A CVC MOV AB MEZZANINE PENET #18 0004 06 350 M33CHS*MV8109D RCP D SEAL SUPPLY ISOLATION 3304A CVC MOV AB MEZZANINE PENET#19 0004 06 351 M33CHS*MV8110 CHARGING RECIRC ISOL TO SEAL WATER 3304A CVC MOV AB CHARGING PUMP RM A 0024 06 352 M33CHS*MV8111A CHARGING PUMP 3A RECIRC ISOL 3304A CVC MOV AB CHARGING PUMP RM A 0024 06 353 M33CHS*MV8111B CHARGING PUMP 3B RECIRC ISOL 3304A CVC MOV AB CHG PP RM "B" 0024 06 354 M33CHS*MV8111C CHARGING PUMP 3C RECIRC ISOL 3304A CVC MOV AB CHG PP RM "C" 0024 06 355 M33CHS-MV8112 SEAL WATER RETURN CTMT ISOL 3304A CVC MOV CS 6' INBOARD OF COL 2 0003 08 356 M33CHS*MV8116 SAFETY GRADE S/D CHARGING ISOL 3304A CVC MOV AB MEZZANINE, PENS. 0007 357 M33CHS*MV8438A CHARGING PUMP A/C DISCHARGE ISOL 3304A CVC MOV AB CHG PP RM A 0024 06 358 M33CHS*MV8438B CHARGING PUMP B/C DISCHARGE ISOL 3304A CVC MOV AB CHG PP RM B 0024 06 359 M33CHS*MV8438C CHARGING HEADER XCONN 3304A CVC MOV AB CHG PP RM A 0024 06 360 M33CHS*MV8468A LPSI TO CHARGING SUCTION ISOL 3304A CVC MOV AB CHG PP RM A 0024 06 361 M33CHS*MV8468B LPSI TO CHARGING SUCTION ISOL 3304A CVC MOV AB CHG PP RM "B" 0024 06 362 M33CHS*MV8511A CHARGING PUMP RELIEF ISOL TRAIN A 3304A CVC MOV AB 3CHS*P3C CUBE 0024 06 363 M33CHS*MV8511B CHARGING PUMP RELIEF ISOL TRAIN B 3304A CVC MOV AB 3CH*P3C CUBE 0024 06 364 M33CHS*MV8512A CHARGING PUMP RELIEF ISOL TRAIN B 3304A CVC MOV AB 3CHS*P3C CUBE 0024 06 365 M33CHS*MV8512B CHARGING PUMP RELIEF !SOLTRAIN A 3304A CVC MOV AB 3CHS*P3C CUBE 0024 06 366 M33CHS*MV8104 EMERGENCY BORATION 3304C CVC MOV AB CHARGING PUMP A 0024 06 367 M33CHS*MV8507A BAT A GRAVITY BORATION 3304C CVC MOV AB BAT (A) 0043 06 368 M33CHS*MV8507B BAT B GRAVITY BORATION 3304C CVC MOV AB BAT (B) 0049 06 369 M33SIL*MV8804A LPSI TO CHARGING PUMP SUCTION 3307A LPI MOV ES UNDER HPSI PUMPS 0007 370 M33SIL*MV8804B RHR B DISCH TO SI PUMP 3307A LPI MOV ES BELOW HPSI PUMP B 0013 371 M33SIL*MV8808A SI ACCUMULATOR TANK 1 OUTLET ISOL 3307A LPI MOV CS ACCUM A -024 06 B.1-17

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 372 M33SIL*MV8808B SI ACCUMULATOR TANK 2 OUTLET ISOL 3307A LPI MOV CS ACCUM B -024 06 373 M33SIL*MV8808C SI ACCUMULATOR TANK 3 OUTLET ISOL 3307A LPI MOV CS ACCUM C -024 06 374 M33SIL*MV8808D SI ACCUMULATOR TANK 4 OUTLET ISOL 3307A LPI MOV CS ACCUM. D -024 06 375 M33RHS-FCV610 RESIDUAL HEAT REMOVAL PUMP PlA MINIFLOW RECIRC 3307B RHR MOV ES (A) RHR PUMP 0004 376 M33RHS*FCV611 RESIDUAL HEAT REMOVAL MINI FLOW RECIRCULATING VALVE 3307B RHR MOV ES "B" RHR CUBICLE 0004 377 M33RHS*MV8701A RESIDUAL HEAT REMOVAL LOOP A OUTBOARD ISOLATION VALVE 3307B RHR MOV CS OUTSIDE CUB. "D" 0012 08 378 M33RHS*MV8701B RESIDUAL HEAT REMOVAL PUMP SUCTION VALVE FROM RCS 3307B RHR MOV ES RHR CUB. "A" PlA 0007 379 M33RHS*MV8701C RESIDUAL HEAT REMOVAL INBOARD ISOLATION VALVE 3307B RHR MOV CS CUB."A" UNDER S/G 0020 380 M33RHS*MV8702A RHR PUMP SUCT ISOL FROM RCS 3307B RHR MOV ES RHS CUB. "B" E1B 0007 381 M33RHS*MV8702B RESIDUAL HEAT REMOVAL LOOP B OUTBOARD ISOLATION VALVE 3307B RHR MOV CS OUTSIDE CUB. "D" 0012 08 382 M33RHS*MV8702C RESIDUAL HEAT REMOVAL SYSTEM INBOARD ISOLATION VALVE 3307B RHR MOV CS CUB. "D" UNDER S/G 0020 383 M33RHS*MV8716A A RHR DISCHARGE TO HOT LEGS AND RWST 3307B RHR MOV ES RHR CUB. A 0021 384 M33RHS*MV8716B B RHR DISCHARGE TO HOT LEGS AND RWST 3307B RHR MOV ES RHR B CUB. 0021 385 M33SIL*MV8809A RHR A DISCH TO COLD LEG INJECTION 3307B LPI MOV ES RHR A CUBE 0008 06 386 M33SIL*MV8809B RHR B DISCH TO COLD LEG INJECTION 3307B LPI MOV ES RHR B CUBE 0015 06 387 M33SIL*MV8812A "A" RHR PUMP SUCTION FROM RWST 3307B LPI MOV ES (A) RHR PUMP 0008 388 M33SIL*MV8812B "B" RHR PUMP SUCTION FROM RWST 3307B LPI MOV ES (B) RHR PUMP 0008 389 M33SIL*MV840A RESIDUAL HEAT RMVL PUMP TO HOT LEGS CTMT PENET (95-OUTSIDE) 3307B LPI MOV ES RHR B CUBE-SW OF PMP 0015 06 390 M33HVK*MOV1003A (A) CONTROL BUILDING CHILLER;HOT GAS BYPASS VALVE 3314F CBW MOV CB 0000 00 391 M33HVK*MOV1003B (B) CONTROL BUILDING CHILLER;HOT GAS BYPASS VALVE 3314F CBW MOV CB 0000 00 392 M33MSS*MOV17A AUX FDW PUMP TURBINE STEAM SUPPLY NON RETURN VALVE 3316A STG MOV ES AUX FEED PUMP #2 0021 393 M33MSS*MOV17B AUX FDW PUMP TURBINE STEAM SUPPLY NON RETURN VALVE 3316A STG MOV ES AUX FEED PUMP #2 0021 394 M33MSS*MOV17D AUX FDW PUMP TURBINE STEAM SUPPLY NON RETURN VALVE 3316A STG MOV ES AUX FEED PUMP #2 0021 395 M33MSS*MOV18A MAIN STEAM PRESSURE RELIEF ISOLATION VALVE 3316A STG MOV MS OFF OF MS LINE A 0068 B.1-18

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 396 M33MSS*MOV18B MAIN STEAM PRESSURE RELIEF ISOLATION VALVE 3316A STG MOV MS OFF OF MS LINE B 0068 397 M33MSS-MOV18C MAIN STEAM PRESSURE RELIEF ISOALTION VALVE 3316A STG MOV MS OFF OF MS LINE C 0068 398 M33MSS*MOV18D MAIN STEAM PRESSURE RELIEF ISOALTION VALVE 3316A STG MOV MS OFF MS LINE D 0068 399 M33MSS*MOV74A MAIN STEAM PRESSURE RELIEF ISOLATION VALVE BYPASS 3316A STG MOV MS OFF MS LINE A 0068 400 M33MSS*MOV74B MAIN STEAM PRESSURE RELIEF ISOLATION VALVE BYPASS 3316A STG MOV MS OFF OF MS LINE B 0068 401 M33MSS*MOV74C MAIN STEAM PRESSURE RELIEF ISOLATION VALVE BYPASS 3316A STG MOV MS OFF OF C MS LINE 0068 402 M33MSS*MOV74D MAIN STEAM PRESSURE RELIEF ISOLATION VALVE BYPASS 3316A STG MOV MS OFF OF DMN STM LINE 0068 403 M33CCP*MOV222 TR A CHILLED WATER SUPPLY ISOL 3330A CCR MOV CS COLUMN 2 -024 404 M33CCP*MOV223 TR A CHILLED WATER SUPPLY ISOL 3330A CCR MOV CS 1-024 405 M33CCP*MOV224 TR A CHILLED WATER RETURN ISOL 3330A CCR MOV CS COLUMN 2 IMB -024 406 M33CCP*MOV225 TR A CHILLED WATER RETURN ISOL 3330A CCR MOV CS ABOVE A CAR -024 407 M33CCP*MOV226 TR B CHILLED WATER SUPPLY ISOL 3330A CCR MOV CS IN MEZZANINE -024 408 M33CCP*MOV227 TR B CHILLED WATER SUPPLY ISOL 3330A CCR MOV CS ABOVE B CAR -024 409 M33CCP-MOV228 TR B CHILLED WATER RETURN ISOL 3330A CCR MOV CS IN MEZZANINE -024 410 M33CCP*MOV229 TR B CHILLED WATER RETURN ISOL 3330A CCR MOV CS ABOVE B CAR -024 411 M33CCP*MOV45A TR A RPCCW CTMT SUPPLY HEADER ISOL 3330A CCR MOV AB PENETRATION Z39 0004 412 M33CCP*MOV45B TR B RPCCW CTMT SUPPLY HEADER ISOL 3330A CCR MOV AB PENETRATION Z40 0004 413 M33CCP*MOV48A TRA RPCCW CTMT RETURN INNER ISOL 3330A CCR MOV CS PENETRATION 41 0003 08 414 M33CCP*MOV48B TR B RPCCW CTMT RETURN INNER ISOL 3330A CCR MOV CS IN PASSAGEWAY 0009 03 415 M33CCP*MOV49A TRA RPCCW CTMT RETURN OUTER ISOL 3330A CCR MOV AB PENETRATION Z41 0004 416 M33CCP*MOV49B TR B RPCCW CTMT RETURN OUTER ISOL 3330A CCR MOV AB PENETRATION Z42 0004 417 M33RCS*3301 REACTOR COOLANT SYSTEM 3301 RCS MSC CS 0000 00 418 M33RCS*SHLD1 NEUTRON SHIELD 3301 RCS MSC CS 419 M33RCS*SYS3301 REACTOR COOLANT SYSTEM, VESSEL AND INTERNALS 3301 RCS MSC CS VARIOUS 0000 00 B.1-19

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 420 M33SFC*3305 SPENT FUEL POOL COOLING AND PURIFICATION 3305 SFC MSC FB VARIOUS 0000 00 421 M33SIH*3308 HIGH PRESSURE SAFTY INJECTION 3308 HPI MSC 0000 00 422 M33FWA*3322 AUXILIARY FEEDWATER 3322 AFW MSC TB 0000 00 423 M33FWA*FLS1A AUXILIARY FEEDWATER TO SG1A SPECTACLE FLANGE 3322 AFW MSC CS SG1A CUBICLE 0066 424 M33FWA*FLS1B AUXILIARY FEEDWATER TO SG1 B SPECTACLE FLANGE 3322 AFW MSC CS SG1 B CUBICLE 0066 425 M33FWA*FLS1C AUXILIARY FEEDWATER TO SG1C SPECTACLE FLANGE 3322 AFW MSC CS SGlC CUBICLE 0066 426 M33FWA*FLS1D AUXILIARY FEEDWATER TO SG1D SPECTACLE FLANGE 3322 AFW MSC CS SG1D CUBICLE 0066 427 M33FWL*SYS3322 AUXILIARY FEEDWATER LUBE OIL & DEMIN WTR STORAGE TK (S&W 3322 FWL MSC CW VARIOUS 0000 00 I _ _ _ _ _ 3322A) I_1_1 428 M33SWP*3326 SERVICE WATER SYSTEM 3326 SWS MSC 0000 00 429 M33ENS*3343 4.16 KV ELECTRICAL EQUIPMENT (VITAL) 3343 ES4 MSC CB 0014 06 430 M33CES*3415 CONTROL CKT. CABINETS 3415 ELC MSC CB RACK ROOM 0000 00 431 M33CHS*3304 CHEMICAL & VOLUME CONTROL 3304A CVC MSC 0000 00 432 M33CHS*3304A CHEMICAL & VOLUME CONTROL 3304A CVC MSC 0000 00 433 M33CHS*EJ1A FLEX HOSE ON #1 SEAL LEAK OFF FOR 3RCS*P1A 3304A CVC MSC CS 0018 434 M33CHS*EJ1B FLEX HOSE ON #1 SEAL LEAK OFF FOR 3RCS*P1B 3304A CVC MSC CS 0018 435 M33CHS*EJ1C FLEX HOSE ON #1 SEAL LEAK OFF FOR 3RCS*P1C 3304A CVC MSC CS 0018 436 M33CHS*EJ1D FLEX HOSE ON #1 SEAL LEAK OFF FOR 3RCS*P1D 3304A CVC MSC CS 0018 437 M33CHS*3304C PRIMARY MAKEUP AND CHEMICAL ADDITION 3304C CVC MSC 0000 00 438 M33SIL*3307A LOW PRESSURE SAFETY INJECTION SYSTEM MICSELLANEOUS ID 3307A LPI MSC CS VARIOUS 0000 00 439 M33SIL*3307B LOW PRESSURE SAFETY INJECTION (VITAL) 3307A LPI MSC 0000 00 440 M33SIL*UY/762T SFTY INJ ACC TKS NIT VNT VLV 3SIL*HCV943B MASTER TEST 3307A LPI MSC CB 0047 06 441 M33RHS*3307B RESIDUAL HEAT REMOVAL 3307B RHR MSC 0000 00 442 M33HVR*3314A AUXILIARY BUILDING HVAC SYSTEM 3314A RBV MSC AB 0066 06 443 M33HVR*3314C FUEL BLDG HVAC SYSTEM;HVR/HVF,VENTILATION,FILTRATION. 3314C RBV MSC FB 0000 00 B. 1-20

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1

                                                                                   *LOC                                  EL   EL ITEM       LOCAL ID                           EQUIPMENT DESCRIPTION                  SYS SYS COMP BLD         ROOM        FT    IN 444  M33HVQ*3314D        ESF BLDG HVAC SYSTEM                                     3314D  ESG MSC   ES                    0000 00 445  M33HVC*3314F        CONTROL BLDG.HVAC;BLDG PURGE,BTY ROOM HVAC,COM & INST    3314F  ACC MSC   CB                    0000 00 MI3HV*334           RACK A/C 446  M33HVP*3314H        EMERGENCY GENERATOR ENCLOSURE VENTILATION SYSTEM         3314H  DGV MSC   DG                    0041 447  M33DTM*3316A        MAIN STEAM & RELIEF VENTS & DRAINS.                      3316A  DTM MSC                         0000 00 448  M33MSS*3316A        MAIN STEAM SYSTEM                                        3316A  STG MSC                         0000 00 449  M33SVV*3316A        MAIN STEAM VENTS AND DRAINS                              3316A  VDM MSC   MS                    0000 00 450  M3AA-3MSS*CTV27A    VALVE POSITION INDICATION AND POWER SUPPLY CHASSIS (MB5) 3316A  STG MSC 451  M3AA-3MSS*CTV27B    VALVE POSITION INDICATION AND POWER SUPPLY CHASSIS (MB5) 3316A  STG MSC 452  M3AA-3MSS*CTV27C    VALVE POSITION INDICATION AND POWER SUPPLY CHASSIS (MB5) 3316A  STG MSC 453  M3AA-3MSS*CTV27D    VALVE POSITION INDICATION AND POWER SUPPLY CHASSIS (MB5) 3316A  STG MSC 454  M33CCP*3330A        CCP SYS                                                  3330A  CCR MSC   AB                    0000 00 455  M33CCP'FLS2A        SPECTACLE FLANGE DOWNSTREAM OF 3CCP*V018                 3330A  CCR MSC   CS                    0003 08 456  M33CCP*FLS2B        SPECTACLE FLANGE DOWNSTERAM OF 3CCP*V060                 3330A  CCR MSC   CS                    0012 06 457  M33CCP*FLS3A        SPECTACLE FLANGE UPSTREAM OF 3CCP*MOV48A                 3330A  CCR MSC   CS                    0003 08 458  M33CCP*FLS3B        SPECTACLE FLANGE UPSTREAM OF 3CCP*MOV48B                 3330A  CCR MSC   CS                    0003 08 459  M33CCE*3330D        CHARGING PUMP COOLING                                    3330D  CCE MSC                         0000 00 460  M33EJS*3344A        480 VOLT VITAL LOAD CENTERS EJS/NJS                      3344A  ELC MSC                         0000 00 461  M33EHS*3344B        480 VOLT VITAL MOTOR CONTROL CENTERS                     3344B  ELC MSC                         0000 00 462  M33EHS*SYS3344B     STATION ELECTRICAL SERVICE 480V MOTOR CONTROL CENTERS    33448  ESO MSC                         0000 00 EHS/NHS 463  M33MCC*3344B        480 VOLT MOTOR CONTROL CENTERS (VITAL)                   3344B  ESO MSC                         0000 00 464  M33VBA*3345B        120V VITAL INSTRUMENT AC                                 3345B  ELC MSC   CB                    0004 06 465  M33BYS*3345C        125 VOLT DC ELECTRICAL SYSTEM                            3345C  EDC MSC                         0000 00 466  M315G-14U           DIESEL GENERATOR'A' ELECTRICAL SYSTEM                    3346A  DGN MSC                         0000 00 B. 1-21

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 467 M315G-15U DIESEL GENERATOR'B' ELECTRICAL SYSTEM 3346A DGN MSC DG 0000 00 468 M33EGA*3346A DIESEL AIR START SYSTEM 3346A DSA MSC 0000 00 469 M33EGD*3346A DIESEL EXHAUST, COMBUSTION AIR & CRANKCASE VACUUM 3346A DAX MSC DG D/G ENCLOSURES 0000 00 470 M33EGO*3346A DIESEL LUBE OIL SYSTEM 3346A DLS MSC 0000 00 471 M33EGS*3346A EMERGENCY DIESEL/GENERATOR JACKET & INTERCOOLER WATER 3346A DGN MSC DG EMERG GEN ENCL A/B 0000 00 472 M33EGF*3346B DIESEL FUEL OIL 3346B DFS MSC DG 0000 00 473 M33RPS*3407A WESTINGHOUSE 7300 RACKS 3407A RPS MSC CB RACK ROOM 0047 06 474 M33CES*3407B BALANCE OF PLANT; SPEC 200 CABINETS 3407B BOP MSC CB RACK ROOM 0047 06 475 M33LTG*3720B1 STATION LIGHTING EMERGENCY GROUP 1 3720B LTG MSC 0000 00 476 M33RCS*P1A REACTOR COOLANT PUMP 3301 RCS PMP CS 0030 477 M33RCS*P1B REACTOR COOLANT PUMP 3301 RCS PMP CS 0030 478 M33RCS*P1C REACTOR COOLANT PUMP 3301 RCS PMP CS 0030 479 M33RCS*P1D REACTOR COOLANT PUMP 3301 RCS PMP CS 0030 480 M33RCS*P1SP REACTOR COOLANT PUMP - SPARE 3301 RCS PMP FB RAILROAD ACCESS 0024 481 M33RCS*P2SP REACTOR COOLANT PUMP - SPARE, SN# 1162E93G03-6 3301 RCS PMP FB RAILROAD ACCESS 0024 482 M33RCS*P3SP REACTOR COOLANT PUMP - SPARE, SN# 1162E93G03-7 3301 RCS PMP FB RAILROAD ACCESS 0024 483 M33RCS*P4SP REACTOR COOLANT PUMP - SPARE, SN# 1162E93G01-8 3301 RCS PMP FB RAILROAD ACCESS 0024 AOA R

     *O-^      A         EL   OCL CO*IN   G, PM A                             3305  SEC PMP   FB                     0024 485   M33SFC*P1B         FUEL POOL COOLING PUMP B                              3305  SFC PMP   FB                     0024 486   M33SIH*P1A         A SAFETY INJECTION PUMP                               3308  HPI PMP   ES  ESF "A" CUB.       0021 487  M33SIH*P1B          B SAFETY INJECTION PUMP                               3308  HPI PMP   ES  NORTH CUB.         0021 488  M33SIH*P1SP         SAFETY INJECTION PUMP & MOTOR - SPARE                 3308  HPI PMP  WH NNECO WAREHOUSE #6   0024 489  M33FWA*P1A          MOTOR DRIVEN STEAM GENERATOR AUX FEED PUMP            3322  AFW PMP   ES  MIDDLE SOUTH ESF   0021 490   M33FWA*PIB         MOTOR DRIVEN STEAM GENERATOR AUX FEED PUMP            3322  AFW PMP   ES  SOUTHERN CUB.      0021 B. 1-22

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 491 M33FWA*P2 TURBINE DRIVEN AUXILIARY FEEDWATER PUMP 3322 AFW PMP ES 0021 492 M33FWL*P4 MAIN LUBE OIL PUMP (SHAFT DRIVEN FOR TERRY TURBINE) 3322 FWL PMP ES 0021 493 M33FWL*P5 AUX LUBE OIL PUMP (TURBINE DRIVEN AUX FEEDWATER PUMP) 3322 FWL PMP ES TERRY TURB PMP SKID 0021 494 M33FWL*P6A SHAFT DRIVEN LUBE OIL PUMP (A MOTOR DRIVEN AFW PUMP) 3322 FWL PMP ES 0021 495 M33FWL*P6B SHAFT DRIVEN LUBE OIL PUMP (B MOTOR DRIVEN AFW PUMP) 3322 FWL PMP ES 0021 496 M33BOGUSID2 TEST AGAIN 3326 BOP PMP 497 M33SWP*P1A SERVICE WATER PUMP 3326 SWS PMP CW 0014 498 M33SWP*P1B SERVICE WATER PUMP 3326 SWS PMP CW 0014 499 M33SWP*PIC SERVICE WATER PUMP 3326 SWS PMP CW 0014 500 M33SWP*P1D SERVICE WATER PUMP 3326 SWS PMP CW 0014 501 M33SWP*P2A CONTROL BUILDING AIR CIND BSTR PUMP MOTOR 3326 SWS PMP CB 0064 502 M33SWP*P2B CONTROL BUILDING AIR COND BSTR PUMP MOTOR 3326 SWS PMP CB CHILLER ROOM 0064 503 M33SWP*P2SP WAREHOUSE SPARE FOR CONTROL BLDG AIR CONDITIONING 3326 SWS PMP WH 0000 00 BOOSTER PUMPS 504 M33SWP*P3A MCC AND ROD CONTROL AREA BOOSTER PUMP 3326 SWS PMP AB 0043 505 ~NEAR BORON RECOV 04 505 M33SWP*P3B MCC AND ROD CONTROL AREA BOOSTER PUMP 3326 SWS PMP AB N0043 PNL 506 M33CHS*P3A A CHARGING PUMP 3304A CVC PMP AB "A" CHG PMP CUBICLE 0024 507 M33CHS*P3B B CHARGING PUMP 3304A CVC PMP AB AREA 2 0024 508 M33CHS*P3C C CHARGING PUMP 3304A CVC PMP AB AREA2 0024 509 M33CHS*P6A CHARGING PUMP AUX LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP A 0024 510 M33CHS*P6B CHARGING PUMP AUX LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP B 0024 511 M33CHS*P6C CHARGING PUMP AUX LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP C 0024 512 M33CHS*P6SP CHARGING PUMP AUXILIARY LUBE OIL PUMP (SPARE) 3304A CVC PMP FB SEAL REBUILD CAGE 0014 513 M33CHS*P7A A CHARGING PUMP SHAFT DRIVEN LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP A 0024 06 B.1-23

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 514 M33CHS*P7B B CHARGING PUMP SHAFT DRIVEN LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP B 0024 515 M33CHS*P7C C CHARGING PUMP SHAFT DRIVEN LUBE OIL PUMP 3304A CVC PMP AB CHARGING PUMP C 0024 516 M33CHS*P2A BORIC ACID TRANSFER PUMP 3304C CVC PMP AB AREA2 0043 517 M33CHS*P2B BORIC ACID TRANSFER PUMP 3304C CVC PMP AB AREA 2 0043 518 M33RHS*P1A RESIDUAL HEAT REMOVAL PUMP 3307B RHR PMP ES 0004 519 M33RHS*P1B RESIDUAL HEAT REMOVAL PUMP 3307B RHR PMP ES RHR B CUBICLE 0004 520 M33RHS*P1SP RHR PUMP ***SPARE ...(MTR SN # 1S-75), (NAT'L BD. # 233) 3307B RHR PMP WH WHSE-9 0014 06 521 M33HVK*P1A CONTROL BUILDING CHILLED WATER PUMP 3314F CBW PMP CB 0064 522 M33HVK*P1B CONTROL BUILDING CHILLED WATER PUMP 3314F CBW PMP CB COL. 54, LINE A4 0064 523 M33HVK*P3A A CONTROL BUILDING CHILLER LUBE OIL PUMP 3314F CBW PMP CB 0064 524 M33HVK*P3B B CONTROL BUILDING CHILLER LUBE OIL PUMP 3314F CBW PMP CB 0064 525 M33CCP*P1A RPCCW PUMP A 3330A CCR PMP AB NRTHENDUNDR HTEXCH 0024 526 M33CCP*P1B RPCCW PUMP B 3330A CCR PMP AB NRTH HTEXCH END UNDR 0024 06 527 M33CCP*P1C RPCCW PUMP C 3330A CCR PMP AB NRTH END UNDR 0024 HTEXCH 528 M33CCE*P1A A CHARGING PUMP COOLING PUMP 3330D CCE PMP AB AREA 2 0024 529 M33CCE*P1B B CHARGING PUMP COOLING PUMP 3330D CCE PMP AB AREA2 0024 530 M33EGO*P1A ROCKER ARM PRE-LUBE O!L PUMP 3346A DLS PMP DG D/G 'A' 0027 531 M33EGO*P1B ROCKER ARM PRE-LUBE OIL PUMP 3346A DLS PMP DG D/G'B' 0027 532 M33EGO*P2A ROCKER ARM LUBE OIL PUMP 3346A DLS PMP DG D/G 'A' 0027 533 M33EGO*P2B ROCKER ARM LUBE OIL PUMP 3346A DLS PMP DG D/G 'B' 0027 534 M33EGO*P3A ENGINE DRIVEN LUBE OIL PUMP 3346A DLS PMP DG D/G 'A' 0027 535 M33EGO*P3B ENGINE DRIVEN LUBE OIL PUMP 3346A DLS PMP DG D/G'B' 0027 536 M33EGO*P4A LUBE OIL AND FILTER PUMP 3346A DLS PMP DG D/G'A' 0027 B.1-24

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 537 M33EGO*P4B LUBE OIL AND FILTER PUMP 3346A DLS PMP DG D/G 'B' 0027 538 M33EGS*P1A ENGINE DRIVEN COOLING WATER PUMP 3346A DGN PMP DG D/G'A' 0016 539 M33EGS*P1B ENGINE DRIVEN COOLING WATER PUMP 3346A DGN PMP DG D/G'B' 0016 540 M33EGS*P2A JACKET WATER CIRC PUMP 3346A DGN PMP DG D/G'A' 0024 541 M33EGS*P2B JACKET WATER CIRC PUMP 3346A DGN PMP DG D/G'B' 0024 542 M33EGS*P3A ENGINE DRIVEN INTERCOOLER WATER PUMP 3346A DGN PMP DG D/G 'A' 0024 06 543 M33EGS*P3B ENGINE DRIVEN INTERCOOLER WATER PUMP 3346A DGN PMP DG D/G'B' 0024 544 M33EGF*P1A EMERGENCY GEN FUEL OIL XFER PUMP 3346B DFS PMP FV FUEL VAULT 'A' 0016 545 M33EGF*P1B EMERGENCY GEN FUEL OIL XFER PUMP 3346B DFS PMP FV FUEL VAULT 'B' 0016 546 M33EGF*P1C EMERGENCY GEN FUEL OIL XFER PUMP 3346B DFS PMP FV FUEL VAULT 'A' 0016 547 M33EGF*P1 D EMERGENCY GEN FUEL OIL XFER PUMP 3346B DFS PMP FV FUEL VAULT 'B' 0016 548 M33EGF*P2A DIESEL GENERATOR DC MOTOR DRIVEN FUEL OIL PUMPS 3346B DFS PMP DG 0016 549 M33EGF*P2B DIESEL GENERATOR DC MOTOR DRIVEN FUEL OIL PUMPS 3346B DFS PMP DG 0000 00 550 M33EGF*P3A DIESEL GENERATOR ENGINE DRIVEN FUEL PUMP 3346B DFS PMP DG D/G 'A' 551 M33EGF*P3B DIESEL GENERATOR ENGINE DRIVEN FUEL PUMP 3346B DFS PMP DG D/G 'B' 552 M33RCS*PNL10 REACTOR COOLANT SYSTEM PANEL - EAST SWGR. 3301 RCS PNL AB 0024 553 M33RCS*PNL10(1) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR43,73,74 GRP"A" 3301 RCS PNL AB 0024 554 M33RCS*PNL10(2) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR33,61,62 GRP".A" 3301 RCS PNL AB 0024 555 M33RCS*PNL10(3) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR23,49,50 GRP"A" 3301 RCS PNL AB 0024 556 M33RCS*PNL10(4) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR28,55,56 GRP"A" 3301 RCS PNL AB 0024 557 M33RCS*PNL10(5) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR38,67,68 GRP"A" 3301 RCS PNL AB 0024 558 M33RCS*PNL20 REACTOR COOLANT SYSTEM PANEL - WEST SWGR. 3301 RCS PNL AB 0024 559 M33RCS*PNL20(1) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR44,75,76 GRP"B" 3301 RCS PNL AB 0024 560 M33RCS*PNL20(2) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR34,63,64 GRP"B" 3301 RCS PNL AB 0024 B.1-25

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 561 M33RCS*PNL20(4) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR29,57,58 GRP"B" 3301 RCS PNL AB 0024 562 M33RCS*RAKSTVA PROCESS PROTECTION RACK;"A" LOOP STOP VALVE CABINET 3301 RCS PNL CB 0047 563 M33RCS*RAKSTVB PROCESS PROTECTION RACK;"B" LOOP STOP VALVE CABINET 3301 RCS PNL CB 0047 564 M33RPS*PNLAS AUXILIARY SHUTDOWN PANEL 3411 ESA PNL CB 0004 565 M33CES*3414 MAIN CONTROL BOARD - GENERAL 3414 MCB PNL 0000 00 566 M33CES*MCB-MB1 MAIN BOARD 1 3414 MCB PNL CB 0047 567 M33CES*MCB-MB2 MAIN CONTROL BOARD 2 3414 MCB PNL CB 0047 568 M33CES*MCB-MB3 MAIN CONTROL BOARD 3414 MCB PNL CB 0047 569 M33CES*MCB-MB4 MAIN CONTROL BOARD 3414 MCB PNL CB 0047 570 M33CES*MCB-MB5 MAIN BOARD 5 3414 MCB PNL CB 0047 571 M33CES*MCB-MB6 MAIN BOARD 6 3414 MCB PNL CB 0047 572 M33CES*MCB-MB7 MAIN BOARD 7 3414 MCB PNL CB CONTROL ROOM 0047 06 573 M33CES*MCB-MB8 MAIN BOARD 8 3414 MCB PNL CB 0047 574 M33CES*PNLBD1O ISOLATION PANEL DIESEL BUILDING-ORANGE 3415 ELC PNL DG 0024 575 M33CES*PNLBD1P ISOLATION PANEL DIESEL BUILDING-PURPLE 3415 ELC PNL DG 0024 576 M33CES*PNLBE10 ISOLATION PANEL ENGINEERED SAFETY FEATURE BUILDING-ORANGE 3415 ELC PNL ES 0036 577 M33CES*PNLBE1P ISOLATION PANEL ENGINEERED SAFETY FEATURE BUILDING-PURPLE 3415 ELC PNL ES 0036 578 M33CES*PNLBE20 ISOLATION PANEL ENGINEERED SAFETY FEATURE BUILDING-ORANGE 3415 ELC PNL ES 0036 579 M33CES*PNLBE2P ISOLATION PANEL ENGINEERED SAFETY FEATURE BUILDING-PURPLE 3415 ELC PNL ES 0036 06 580 M33CES*PNLBG1O ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-ORANGE 3415 ELC PNL CB 0004 581 M33CES*PNLBG1P ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-PURPLE 3415 ELC PNL CB EMERG. SWITCHGEAR 0004 582 M33CES*PNLBG2O ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-ORANGE 3415 ELC PNL CB 0004 583 M33CES*PNLBG2P ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-PURPLE 3415 ELC PNL CB 0004 584 M33CES*PNLBG3O ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-ORANGE 3415 ELC PNL CB 0004 B. 1-26

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 585 M33CES*PNLBG3P ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-PURPLE 3415 ELC PNL CB 0004 586 M33CES*PNLBG4O ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-ORANGE 3415 ELC PNL CB 0004 587 M33CES*PNLBG4P ISOLATION PANEL EMERGENCY SWITCHGEAR ROOM-PURPLE 3415 ELC PNL CB 0004 588 M33CES*PNLBP1O ISOLATION PANEL CIRCULATING WATER PH-ORANGE 3415 ELC PNL CW SERVICE CUB.A & C 0024 589 M33CES*PNLBP1P ISOLATION PANEL CIRCULATING WATER PH-PURPLE 3415 ELC PNL CW 0014 590 M33CES*PNLBR10 ISOLATION PANEL ROD CONTROL MCC A -ORANGE 3415 ELC PNL AB 0024 591 M33CES*PNLBR1P ISOLATION PANEL ROD CONTROL MCC A-PURPLE 3415 ELC PNL AB 0024 592 M33CES*PNLBR20 ISOLATION PANEL ROD CONTROL MCC A -ORANGE 3415 ELC PNL AB EAST MCC ROD 0024 CONTROL 593 M33CES*PNLBR2P ISOLATION PANEL ROD CONTROL MCC A -PURPLE 3415 ELC PNL AB 0024 594. M33CES*PNLBR30 ISOLATION PANEL ROD CONTROL MCC A-ORANGE 3415 ELC PNL AB 0024 595 M33CES*PNLBR3P ISOLATION PANEL ROD CONTROL MCC A -PURPLE 3415 ELC PNL AB 0024 596 M33CES*PNLBR40 ISOLATION PANEL ROD CONTROL MCC A -ORANGE 3415 ELC PNL AB 0024 597 M33CES*PNLBR4P ISOLATION PANEL ROD CONTROL MCC A -PURPLE 3415 ELC PNL AB 0024 598 M33CES*PNLBR50 ISOLATION PANEL ROD CONTROL MCC A -ORANGE 3415 ELC PNL AB 0024 599 M33CES*PNLBR5P ISOLATION PANEL ROD CONTROL MCC A -PURPLE 3415 ELC PNL AB 0024 600 M33CES*PNLBS10 ISOLATION PANEL SPREADING ROOM-ORANGE 3415 ELC PNL CB 0024 601 M33CES*PNLBS1P ISOLATION PANEL SPREADING ROOM-PURPLE 3415 ELC PNL CB 0024 602 M33CES*PNLBS2O ISOLATION PANEL SPREADING ROOM-ORANGE 3415 ELC PNL CB 0024 603 M33CES*PNLBS2P ISOLATION PANEL SPREADING ROOM-PURPLE 3415 ELC PNL CB 0024 604 M33CES*PNLBS30 ISOLATION PANEL SPREADING ROOM-ORANGE 3415 ELC PNL CB 0024 605 M33CES*PNLBS3P ISOLATION PANEL SPREADING ROOM-PURPLE 3415 ELC PNL CB 0024 606 M33CES*PNLFTSP FIRE TRANSFER PANEL 3415 ELC PNL CB EAST SWITCHGEAR RM 0004 06 607 M33CES*PNLTSA TRANSFER SWITCH PANEL, TRAIN A 3415 ELC PNL CB 0004 608 M33CES*PNLTSB "B"TRAIN TRANSFER SWITCH PANEL 3415 ELC PNL CB 0004 B. 1-27

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 609 M33CES*RAKAUXA AUX RACK 3415 ELC PNL CB 0000 00 610 M33CES*RAKAUXB AUX RACK 3415 ELC PNL CB 0000 00 611 M33HVR*PNL-FLT-1A "A" AUXILIARY BUILDING FILTER HEATER 3314A RBV PNL AB EAST MRC 0024 612 M33HVR*PNL-FLT-1B ELECTRICAL PANEL FOR 3HVR*FLT1B 3314A RBV PNL AB WEST MRC 0024 613 M33HVR*PNL-FLT-2A ELECTRICAL PANEL FOR 3HVR*FLT2A 3314C RBV PNL AB EAST MRC 0024 614 M33HVR*PNL-FLT-2B ELECTRICAL PANEL FOR 3HVR*FLT2B 3314C RBV PNL AB WEST MRC 0024 615 M33HVC*PNL-FLT-1A EMER. FLT TEMPERATURE CONTROL 3314F ACC PNL CB 0064 616 M33HVC*PNL-FLT-1B CONTROL ROOM FILTER DISCONN SWITCH 3314F ACC PNL CB 0064 617 M33HVK*PNLCHL1A WALL MOUNTED CHILLER CONTROL PANEL 3314F CBW PNL CB 0064 618 M33HVK*PNLCHL1B WALL MOUNTED CHILLER CONTROL PANEL 3314F CBW PNL CB 0064 619 M33MSS*PNL10 CURRENT LIMITER PANEL 3316A STG PNL CB CABLE SPREADING RM. 0024 620 M33MSS*PNL1P CURRENT LIMITER PANEL 3316A STG PNL CB CABLE SPREADING RM. 0024 621 M33RCP*PNL5 SERVICE PANEL 3344A EVI PNL AB 0024 622 M33RCS*PNL1 SERVICE PANEL - EAST SWGR 3344A RCS PNL AB 0024 06 CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR43,73,74 3344A RCS PNL 0000 00 623 M33RCS*PNL1(1) GRP "A" CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR28,55,56 3344A RCS PNL 0000 00 624 M33RCS*PNL1(2) GRP "A" 4 R CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR33,61,62 3344A RCS PNL 0000 00 625 M33RCS*PNL1(3) GRP "A" 3 CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR38,67,68 3344A RCS PNL AB 0000 00 626 M33RCS*PNL1(4) GRP "A" 627 !M33RCS*PNLl(5) G pCTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR23,49,50 3344A RCS PNL AB 0000 00 62I3RSNI5 GRP "A" 34A RSPLA 000 628 M33RCS*PNL2 SERVICE PANEL - AUX BLDG 24 WEST SWGR. 3344A RCS PNL AB 0000 00 CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR44,75,76 3344A RCS PNL AB 0000 00 629 M33RCS*PNL2(1) GRP "B" 630 M33RCS*PNL2(2) CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR29,57,58 3344A RCS PNL AB 0000 00 GRP "B" B. 1-28

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 631 M33RCS-PNL2(3) CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR34,63,64 3344A RCS PNL AB 0000 00 GRP "B" 632 M33RCS*PNL2(4) CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR39,69,70 3344A RCS PNL AB 0000 00 GRP "B" 633 M33RCS*PNL2(5) CTMT PEN OVERCURRENT PRIMARY PROTECTION 3RCS-HTR24,51,52 3344A RCS PNL AB 0000 00 633M33RS*PNL2(5 GRP "B" 634 M33RCS*PNL20(3) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR24,51,52 GRP"B" 3344A RCS PNL AB 0024 635 M33RCS*PNL20(5) CTMT PEN SECONDARY PROTECTION FOR 3RCS-HTR39,69,70 GRP"B" 3344A RCS PNL AB 0000 00 636 M33RCP-PNL3B1(FlF) SPARE BREAKER 3344B ESO PNL AB 0000 00 637 M33SCV*BKR250-12A 15A FEED TO 3EGA-DRY1A 3345A EVI PNL DG 0024 638 M33SCV*BKR25P SECONDARY PROTECTION PANEL FROM 3SCV*PNL25P 3345A EVI PNL DG 639 M33SCV*JB100 SECONDARY PROTECTION PANEL 3345A EVI PNL ES 640 M33SCV*JB11P SECONDARY PROTECTION PANEL 3SCV*JB1 1P 3345A EVI PNL CB 641 M33SCV*JB10 SECONDARY PROTECTION PANEL (DUP ID, USE M33SCV*JBPNL10) 3345A EVI PNL 642 M33SCV*JB1P SECONDARY PROTECTION PANEL 3345A EVI PNL 643 M33SCV*JBR1O SECONDARY PROTECTION PANEL 3345A EVI PNL CB 644 M33SCV*JBR1 P SECONDARY PROTECTION PANEL 3345A EVI PNL CB 0000 00 645 M33SCV*PNL100 120 VOLT VITAL PANEL 3345A EVI PNL ES 0036 646 M33SCV*PNL100(06) 120 VOLT VITAL PANEL PRIMARY BREAKER FOR 3SSP-SKD2 3345A EVI PNL ES 0036 06 647 M33$CV*PNL1OP 120 VOLT VITAL PANEL 3345A EVI PNL ES 0036 648 M33SCV*PNL11P 120 VOLT VITAL PANEL 3345A EVI PNL ES 0036 649 M33SCV*PNL10 120 VOLT VITAL PANEL 3345A EVI PNL CB 0047 650 M33SCV*PNL1O(08) 120 VOLT VITAL BREAKER FOR 3HVR*MOD49C1 & 3HVR*MOD50C1 3345A EVI PNL AB 0024 651 M33SCV*PNL10(1) 240/120V BREAKER FOR 3RCS-HTR23,49,50 PRESS HTR 3345A EVI PNL AB 0024 652 M33SCV*PNL10(29) PRIMARY PENETRATION BREAKER FOR 3SIL*MV8808A 3345A EVI PNL CB 0047 653 M33SCV*PNL10(30) PRIMARY PROTECTION PENETRATION FOR 3SIL*MV8808C 3345A EVI PNL CB 0047 B.1-29

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 654 M33SCV*PNL1P 120 VOLT VITAL PANEL 3345A EVI PNL CB 0047 655 M33SCV*PNL1P(12) 120 VOLT VITAL BREAKER FOR 3HVR*MOD49B & 3HVR*MOD50A 3345A EVI PNL AB 0024 656 M33SCV*PNL1P(13) 120 VOLT VITAL BREAKER FOR 3HVR*MOD49C2 & 3HVR*MOD5OC2 3345A EVI PNL AB 0024 657 M33SCV*PNLIP(28) PRIMARY PROTECTION PENETRATION FOR 3SIL*MV8808D 3345A EVI PNL CB 0047 658 M33SCV*PNLIP(29) PRIMARY PROTECTION PENETRATION FOR 3SIL*MV8808B 3345A EVI PNL CB 0047 659 M33SCV*PNL24O 120 VOLT VITAL PANEL 3345A EVI PNL CW 0014 660 M33SCV*PNL24P 120 VOLT VITAL PANEL 3345A EVI PNL CW 0014 661 M33SCV*PNL25O 120 VOLT VITAL PANEL 3345A EVI PNL DG 0024 662 M33SCV*PNL250(12) 15A FEED TO 3EGA-DRY1A 3345A EVI PNL DG 0024 663 M33SCV*PNL250(14) 15A FEED TO 3EGA-DRY2A 3345A EVI PNL DG 0024 664 M33SCV*PNL25P 120 VOLT VITAL PANEL 3345A EVI PNL DG 0024 665 M33SCV*PNL25P(12) 15A FEED TO 3EGA-DRY1B 3345A EVI PNL DG 0024 666 M33SCV*PNL25P(14) 15A FEED TO 3EGA-DRY2B 3345A EVI PNL DG 0024 667 M33SCV*PNL5O 120 VOLT VITAL PANEL 3345A EVI PNL AB MCC/RC 0024 668 M33SCV*PNL50(10) 120 VOLT VITAL PANEL3SCV*PNL50(10) FOR 3HVU-FN1A 3345A EVI PNL AB 0024 669 M33SCV*PNL50(11) BREAKER FOR HEATER EJS*US-2A (SECTION 3) 3345A EVI PNL 0000 00 CNTMT PENETRATION PRIMARY PROTECTION BREAKER FOR 3HVU-670 M33SCV*PNL50(15) FN2A 3345A EVIPNL AB 0024 671 M33SCV*PNL50(6) 120 VOLT VITAL PANEL PRIMARY BREAKR FOR 3HVR-FT10 3345A EVi PNL AB MCC/RC 0024 672 M33SCV*PNL5P 120 VOLT VITAL PANEL 3345A EVI PNL AB MCC/RC 0024 673 M33SCV*PNL5P(1 1) 120 VOLT VITAL BREAKER FOR 3HVR*MOD28B 3345A EVI PNL AB 0024 674 M33SCV*PNL9O 120 VOLT VITAL PANEL 3345A EVI PNL AB MCC/RC 0024 675 M33SCV*PNL90(12) 120 VOLT VITAL BREAKER FOR 3HVR*MOD28A 3345A EVI PNL AB 0024 676 M33SCV*PNL90(13) 120 VOLT VITAL BREAKER FOR 3HVR*MOD140A 3345A EVI PNL AB 0024 677 M33SCV*PNL90(15) 120 VOLT VITAL BREAKER FOR 3HVR*MOD45C1 3345A EVI PNL AB 0024 B.1-30

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 678 M33SCV-PNL9O(18) CNTMT PENETRATION SECONDARY PROTECTION BREAKER FOR 3345A EVI PNL AS 0024 3RMS*RM41 679 M33SCV*PNL90(24) 120 VOLT VITAL BREAKER FOR 3HVR*MOD46A 3345A EVI PNL AB 0024 680 M33SCV*PNL9P 120 VOLT VITAL PANEL 3345A EVI PNL AB MCC/RC 0024 681 M33SCV*PNL9P(10) 120 VOLT VITAL BREAKER FOR 3HVU-FN1B 3345A EVI PNL AB 0024 682 M33SCV-PNL9P(11 CNTMT PENETRATION PRIMARY PROTECTION BREAKER FOR 3HVU- 3345A EVI PNL AB 0024 FN2B 683 M33SCV*PNL9P(13) 120 VOLT VITAL BREAKER FOR 3HVR*MOD45B2 3345A EVI PNL AB 0024 684 M33SCV*PNL9P(17) CNTMT PENETRATION SECONDARY PROTECTION BREAKER FOR 3345A EVI PNL AB 0024 3RMS*RM42 I 1 1 685 M33SCV*PNL9P(23) 120 VOLT VITAL BREAKER FOR 3HVR*MOD140B 3345A EVI PNL AB 0024 686 M33SCV*PNL9P(24) 120 VOLT VITAL BREAKER FOR 3HVR*MOD46B 3345A EVI PNL AB 0024 687 M33SCV*PNLH2A 120 VOLT VITAL PANEL 3345A EVI PNL CB 0004 688 M33SCV*PNLH2B 120 VOLT VITAL PANEL 3345A EVI PNL CB 0004 689 M33SCV*PNLR10 120 VOLT VITAL PANEL 3345A EVI PNL CB 0004 06 690 M33SCV*PNLR10(08) 120 VOLT VITAL BREAKER FOR 3HVR*MOD49A & 3HVR*MOD50A 3345A EVI PNL AB 0024 691 M33SCV*PNLR1P 120 VOLT VITAL PANEL 3345A EVI PNL CB 0004 692 M33HVR*PNL4A VITAL FUSE PANEL 3345B EVI PNL AB 693 M33HVR*PNL4B VITAL FUSE PANEL 3345B EVI PNL AB 694 M33VBA*PNL-VB1 VrITL BUS PANELS 120VAC 3345B ELC PNL CB 0004 06 695 M33VBA*PNL-VB2 VITAL BUS PANELS 120VAC 3345B ELC PNL CB 0004 06 696 M33VBA*PNL-VB3 VITAL BUS PANELS 120VAC 3345B ELC PNL CB 0004 06 697 M33VBA*PNL-VB4 VITAL BUS PANELS 120VAC 3345B ELC PNL CB 0004 06 698 M33BYS*PNL1 BATTERY BUS 1 (301A-1) 3345C EDC PNL CB 0004 699 M33BYS*PNLI(03) 250A FEEDER BREAKER FROM SWING CHARGER 3BYS*CHGR7 TO 3345C EDC PNL CB 0004 3BYS*PNL1 700 M33BYS*PNL1(04) 250A FEEDER BREAKER FROM 3BYS*CHGR1 TO 3BYS*PNL1 3345C EDC PNL CB 0004 B. 1-31

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 701 M33BYS*PNL1(05) 200A FEEDER BREAKER TO 3VBA*INV1 3345C EDC PNL CB 0004 702 M33BYS*PNL1(06) 90A FEEDER BREAKER FROM 3BYS*PNL1 TO 3BYS*PNLDG1F 3345C EDC PNL CB 0004 703 M33BYS*PNL13F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 704 M33BYS*PNL14F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 705 M33BYS*PNL15F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 706 M33BYS*PNL16F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 707 M33BYS*PNL17F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 708 M33BYS*PNL18F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 709 M33BYS*PNL1F 125 VDC BATTERY 301B-2 DISTRIBUTION PANEL 3345C EDC PNL CB 0046 06 710 M33BYS*PNL1V 125 VDC BATTERY 301A-1 DISTRIBUTION PANEL 3345C EDC PNL CB 0004 711 M33BYS*PNL1V(01) 50A FEED TO 34C SWITCHGEAR 3345C EDC PNL CB 0004 712 M33BYS*PNL1V(02) 50A FEED TO 32T SWITCHGEAR 3345C EDC PNL CB 0004 713 M33BYS*PNL1V(10) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL1F 3345C EDC PNL CB 0004 714 M33BYS*PNL1V(11) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL2F 3345C EDC PNL CB 0004 715 M33BYS*PNL1V(12) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL13F 3345C EDC PNL CB 0004 716 M33BYS*PNL1V(13) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL15F 3345C EDC PNL CB 0004 717 M33BYS*PNL1V(14) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL17F 3345C EDC PNL CB 0004 718 MD33BYS*PNL1V(1 5 SPARE 3345C EDC PNL 719 M33BYS*PNL1V(16) 20A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL20F 3345C EDC PNL CB 0004 720 M33BYS*PNL1V(17) 50A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL22F 3345C EDC PNL CB 0004 721 M33BYS*PNL2 BATTERY BUS 2 (3011B-1) 3345C EDC PNL CB 0004 722 M33BYS*PNL2(03) 250A FEEDER BREAKER FROM SWING CHARGER 3BYS*CHGR8 TO 3345C EDC PNL CB 0004 3BYS*PNL2 723 M33BYS*PNL2(04) 250A FEEDER BREAKER FROM 3BYS*CHGR2 TO 3BYS*PNL2 3345C EDC PNL CB 0004 724 M33BYS*PNL2(05) 200A FEEDER BREAKER TO 3VBA*INV2 3345C EDC PNL CB 0004 B. 1-32

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 725 M33BYS*PNL2(06) 90A FEEDER BREAKER FROM 3BYS*PNL2 TO 3BYS*PNLDG2F 3345C EDC PNL CB 0004 726 M33BYS*PNL20F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0004 06 727 M33BYS*PNL21F 125 VDC BATTERY DISTRIBUTION PNL 21F 3345C EDC PNL CB 0004 06 728 M33BYS*PNL22F 125 VOLT DC ELECTRICAL PANEL 3345C EDC PNL AB 0024 06 729 M33BYS*PNL23F 125 VOLT DC PANEL 3345C EDC PNL AB 0024 06 730 M33BYS*PNL2F 125 VDC BATTERY DISTRIBUTION PANEL 3345C EDC PNL CB 0046 06 731 M33BYS*PNL2V "B" TRAIN DC DISTRIBUTION PANEL TO ALL OTHER PANELS/ CONT 3345C EDC PNL CB 0004 POWER 3 1 732 M33BYS*PNL2V(01) 50A FEED TO 34D SWITCHGEAR 3345C EDC PNL CB 0004 733 M33BYS*PNL2V(02) 50A FEED TO 32U SWITOHGEAR 3345C EDC PNL CB 0004 734 M33BYS*PNL2V(10) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL3F 3345C EDC PNL CB 0004 735 M33BYS*PNL2V(11) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL4F 3345C EDC PNL CB 0004 736 M33BYS*PNL2V(13) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL16F 3345C EDC PNL CB 0004 737 M33BYS-PNL2V(14) 60A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL18F 33450 EDO PNL 08 0004 738 M33BYS*PNL2V(15) SPARE 3345C EDC PNL 739 M33BYS*PNL2V(16) 20A FEED TO 125VDC DISTR FUSE PANEL 3BYS*PNL21F 3345C EDC PNL CB 0004 740 M33BYS*PNL2V(17) 50A FEED TO 125VDC DISTR FUSE PANEL 3BYS-PNL23F 3345C EDC PNL CB 0004 741 M33BYS*PNL3 BATTERY BUS 3 (301A-2) 3345C EDC PNL CB 0004 06

                        .250A FEEDER BREAKER FROM SWING CHARGER 3BYS*CHGR7 TOI 742  M33BYS*PNL3(02)      3Y*A                                                      3345C EDC PNL   CB                    0004 1       ~       3BYS*PNL3I 743  M33BYS*PNL3(03)      200A FEEDER BREAKER TO 3VBA*INV3                          3345C EDC PNL   CB                    0004 744  M33BYS*PNL3(04)      100A FEEDER BREAKER FROM 3BYS*CHGR3 TO 3BYS*PNL3          3345C EDC PNL   CB                    0004 745  M33BYS*PNL3(07)      20A FEEDER BREAKER INTERNALLY USED TO 3BYS*PNL3           3345C EDC PNL   CB                    0004 746  M33BYS*PNL3F         125 VOLT DC ELECTRICAL SYSTEM                             33450 EDC PNL   CB                    0046 06 747  M33BYS*PNL4          BATTERY BUS 4 (3018-2)                                    3345C EDC PNL   CB                    0004 06 B. 1-33

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 748 M33BYS*PNL4(02) 250A FEEDER BREAKER FROM SWING CHARGER 3BYS*CHGR8 TO 3345C EDC PNL CB 0004 3BYS*PNL4 749 M33BYS*PNL4(03) 200A FEEDER BREAKER TO 3VBA*INV4 3345C EDC PNL CB 0004 750 M33BYS*PNL4(04) 100A FEEDER BREAKER FROM 3BYS*CHGR4 TO 3BYS*PNL4 3345C EDC PNL CB 0004 751 M33BYS*PNL4(07) 20A FEEDER BREAKER INTERNALLY USED TO 3BYS*PNL4 3345C EDC PNL CB 0004 752 M33BYS*PNL4F 125 VOLT DC ELECTRICAL SYSTEM 3345C EDC PNL CB 0046 06 753 M33BYS*PNLDG1F 125V DC PANEL 3345C EDC PNL DG 0024 06 754 M33BYS*PNLDG2F 125V DC PANEL 3345C EDC PNL DG 0024 06 755 M33EGS*PNL1A EMERGENCY GENERATOR DISTRIBUTION PANEL-SKID MOUNTED 3346A DGN PNL DG D/G 'A' 0024 756 M33EGS*PNL1B EMERGENCY GENERATOR DIST PANEL 3346A DGN PNL DG D/G'B' 0024 757 M33EGS*PNLA EMERG GEN CONTROL PANEL 3346A DGN PNL DG 0024 758 M33EGS*PNLB B EMERGENCY GENERATOR CONTROL PANEL 3346A DGN PNL DG 0024 759 M33EGS*PNLCNTA EMERG GEN "A" 480V AUXILIARIES CONTROL PANEL 3346A DGN PNL DG D/G'A' 0024 06 760 M33EGS*PNLCNTB EMERG GEN "B" 480V AUXILIARIES CONTROL PANEL 3346A DGN PNL DG D/G 'B' 0024 06 761 M33EGS*PNLRLYA RELAY PANEL FOR EMERGENCY DIESEL GENERATOR "A" 3346A DGN PNL DG D/G 'A' 0024 762 M33EGS*PNLRLYB RELAY PANEL FOR EMERGENCY DIESEL GENERATOR "B" 3346A DGN PNL DG D/G 'B' 0024 763 M33RPS*RAKSET1 REACTOR PROTECTION SYSTEM RACK SET 1 3407A RPS PNL CB 0047 764 M33RPS*RAKSET2 REACTOR PROTECTION SYSTEM RACK SET 2 3407A RPS PNL CB 0047 765 M33RPS*RAKSET3 REACTOR PROTECTION SYSTEM INSTRUMENTATION RACK 3407A RPS PNL CB 0047 766 M33RPS*RAKSET4 REACTOR PROTECTION SYSTEM RACK SET 4 3407A RPS PNL CB 0047 767 M33RPS*RAKSET5 REACTOR PROTECTION RACK SET 5 3407A RPS PNL CB 0047 768 M33RPS*RAKSET6 7300 CABINET 11 3407A RPS PNL CB 0047 769 M33CES*IPNLCB10 ANALOG ISOLATION CABINET 3407B BOP PNL CB CABLE ROOM SPREADING 0024 06 77 ,,,,CABLE SPREADING 0024 06 770 M33CES*IPNLCB1P ANALOG ISOLATION CABINET 3407B BOP PNL CB ROOM B.1-34

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 771 M33CES*IPNLI01 INSTRUMENT PANEL - ORANGE 3407B BOP PNL CB RACK ROOM 0047 772 M33CES*IPNLI08 INSTRUMENT PANEL - PURPLE 3407B BOP PNL CB RACK ROOM 0047 773 M33CES*IPNLI09 B.O.P. INSTRUMENT PANEL 3407B BOP PNL CB RACK ROOM 0047 774 M33CES*IPNLI19 INSTRUMENT PANEL-PURPLE 34078 BOP PNL CB RACK ROOM 0047 775 M33CES*IPNLI20 INSTRUMENT PANEL-ORANGE 3407B BOP PNL CB 0043 06 776 M33CES*IPNLI21 INSTRUMENT PANEL - PURPLE 3407B BOP PNL CB 0043 06 777 M33CES*IPNLI22 INSTRUMENT PANEL-ORANGE 3407B BOP PNL CB 778 M33RCS*HCV442A REACTOR VESSEL VENT VALVE 3301 RCS SOV CS DECK ABOVE PRT -009 06 779 M33RCS*HCV442B B REACTOR HEAD VENT 3301 RCS SOV CS DECK ABOVE PRT -024 06 780 M33RCS*SOV459 LETDOWN ISOLATION 3301 RCS SOV CS 0003 08 781 M33RCS*SOV460 LETDOWN ISOLATION 3301 RCS SOV CS 0003 08 782 M33RCS*SV8032 REACTOR VESSEL LEAKOFF TO REACTOR COOLANT DRAINS 3301 RCS SOV CS 0008 783 M33RCS*SV8095A A REACTOR VESSEL HEAD VENT ISOLATION UPSTREAM 3301 RCS SOV CS PRESSURIZER 0056 784 M33RCS*SV8095B B REACTOR VESSEL HEAD VENT ISOLATION UPSTREAM 3301 RCS SOV CS PRESSURIZER 0053 785 M33RCS*SV8096A A REACTOR VESSEL HEAD VENT ISOLATION DOWNSTREAM 3301 RCS SOV CS PRESSURIZER 0056 786 M33RCS*SV8096B B REACTOR HEAD VENT ISOLATION DOWNSTREAM 3301 RCS SOV CS PRESSURIZER 0053 787 M33RCS*SV8145 REACTOR COOLANT SYSTEM SPRAY 3301 RCS SOV CS

                                   , ,I
                                      ,- L^,I AT  V('U^ I-= *NiLET ,SO.IATONI 788  M33RCS'SV8153       EXCESS LETDOWN HE  ,ECAG,           INLET        TI       3301  RCS SOV   CS  EXCESS LETDOWN HX 0006 789  M33RCS-SV8037A      LOOP 1 TO CHS LETDOWN DRAIN HEADER                        3301  RCS SOV   CS 790  M33RCS-SV8037B      LOOP 2 TO CHS LETDOWN HEADER DRAIN                        3301  RCS SOV   CS                    0005 791  M33RCS-SV8037C      LOOP 3 TO CHS LETDOWN DRAIN HEADER                        3301  RCS SOV   CS 792  M33RCS-SV8037D      LOOP 4 TO CHS LETDOWN DRAIN HEADER                        3301  RCS SOV   CS                    0005 793  M33SIL*SV8825       SAFETY INJECTIONS PUMP HOT LEG TEST LINE                  3301  LPI SOV   CS                    0018 794  M33SIL*SV8890A      RESIDUAL HEAT REMOVAL TO COLD LEG TEST LINE               3301  LPI SOV   CS                    0013 B.1-35

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 795 M33SIL*SV8890B RESIDUAL HEAT REMOVAL TO COLD LEG TEST LINE 3301 LPI SOV CS 0007 796 M33SIL-SV8872A LOW PRESSURE SAFETY INJECT TO HIGH PRESSURE SAFETY INJECT 3301 LPI SOV CS 797 M33SIL-SV8872B LOW PRESSURE SYSTEM INJECT TO HIGH PRESSURE SYSTEM INJECT 3301 LPI SOV CS 798 M33SIL-SV8872C LOW PRESSURE TO SAFETY INJECT TO HIGH PRESSURE SAFETY 3301 LPI SOy CS INJECT 799 M33SIL-S\/8872D LOW PRESSURE SAFETY INJECTION TO HIGH PRESSURE SAFETY 3301 LPI SOV CS INJECT 800 M33SIL-SV8877A REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -010 801 M33SIL-SV8877B REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -010 802 M33SIL-SV8877C REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -011 803 M33SIL-SV8877D REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -010 804 M33SIL-SV8879A REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -010 805 M33SIL-SV8879B REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -018 806 M33SIL-SV8879C REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -011 807 M33SIL-SV8879D REACTOR COOLANT CHECK VALVE LEAK TEST 3301 LPI SOV CS -010 808 M33SIL-SV8889B RHR PUMP HOT LEG TEST LINE 3301 LPI SOV CS -016 809 M33SIL-SV8889D RHR PUMP HOT LEG TEST LINE 3301 LPI SOV CS 0013 810 M33SIH*SV8823 TEST LINE ISOL SI TO COLD LEG INJ SOV 3308 HPI SOV CS 0018 811 M33SIH*SV8824 TEST LINE ISOL SI TO 1/3 HOT LEG SOV 3308 HPI SOV CS 812 M33SIH*SV8843 TEST LINE ISOL CHARGING PUMP HEADER CK SOV 3308 HPI SOV CS 0008 813 M33SIH*SV8871 SI TEST HEADER CTMT INNER ISOL SOV 3308 HPI SOV CS 0019 814 M33SIH*SV8881 TEST LINE ISOL SI TO 2/4 HOT LEG SOV 3308 HPI SOV CS 0021 815 M33SIH*SV8882 TEST LINE ISOL SI COLD LEG INJ SOV 3308 HPI SOV CS 0006 816 M33SIH*SV8888 SI ACCUM MASTER FILL ISOL SOV 3308 HPI SOV AB 0004 817 M33SIH*SV8889A SIP HOT LEG TEST LINE 3308 HPI SOV CS 0016 B.1-36

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 818 M33SIH*SV8889C SIP HOT LEG TEST LINE 3308 HPI SOV CS 0016 819 M33SIH*SV8964 SI TEST HEADER CTMT OUTER ISOL SOV 3308 HPI SOV AB 0017 820 M33FWA*HV31A AUXILIARY FEEDWATER CONTROL VALVE 3322 AFW SOV ES 0024 821 M33FWA*HV31 B AUXILIARY FEEDWATER CONTROL VALVE 3322 AFW SOV ES 0024 822 M33FWA*HV31C AUXILIARY FEEDWATER CONTROL VALVE 3322 AFW SOV ES 0024 823 M33FWA*HV31 D AUXILIARY FEEDWATER CONTROL VALVE 3322 AFW SOV ES 0024 824 M33FWA*HV32C TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW SOV ES 0021 825 M33FWA*HV36A TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW SOV ES 0036 06 826 M33FWA*HV36B TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW SOV ES 'B'&'D'RSS CUBICLE 0024 827 M33FWA*HV36C TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW SOV ES 0024 828 M33FWA*HV36D TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW SOV ES 0036 06 829 M33FWA*SOV23A STEAM GENERATOR AUXILIARY FEEDWATER PUMP ALTERNATE 3322 AFW SOV ES 0021 SUCTION 830 M33FWA*S0V23B STEAM GENERATOR AUXILIARY FEEDWATER PUMP ALTERNATE 3322 AFW SOV ES 0021 SUCTION 831 M33FWA*S0OV25 DEMINERALIZER WATER STORAGE TANK HEATER CIRCULATING LINE 3322 AFW SOV YD 0025 ISOLATIO 832 M33FWA*S0V26 DEMINERALIZER WATER STORAGE TANK HEATER CIRCULATING LINE 3322 AFW SOV YD 0026 ISOLATIO 833 M33FWA*SOV61A DWST TO P1A&B ISO VLVS 3322 AFW SOV ES 0000 00 834 M33FWA*SOV61 B DWST TO PIA&B ISO VLVS 3322 AFW SOV ES 0000 00 835 M33FWA*SOV62A P1A&B X CONN VLVS 3322 AFW SOV ES 836 M33FWA*SOV62B P1A&B X CONN VLVS 3322 AFW SOV ES 837 M33FWL*SOV104 TURB TRIP & THR VLV LUBE OIL 3322 FWL SOV ES 0021 838 M33MSS*SOV65 SILENCER DRAIN 3322 STG SOV ES 0021 839 M33SWP*SOV39A EMERGENCY DIESEL COOLER OUTLET 3326 SWS SOV DG 0036 840 M33SWP*SOV39B EMERGENCY DIESEL COOLER OUTLET 3326 SWS SOV DG 0036 B.1-37

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 841 M33CHS*HCV190A CHARGING HEADER FLOW CONTROL 3304A CVC SOV AB CTMT PIPE PENETRATN 0004 06 842 M33CHS*HCV190B CHARGING HEADER FLOW CONTROL 3304A CVC SOV AB MEZZANINE, PENS. 0004 843 M33CHS*SOV129 LETDOWN DEMINERALIZER VOLUME CONTROL TANK 3304A CVC SOV AB CHS HX CUBE(HI/RAD) 0004 06 844 M33CHS*SOV390A RE69 INLET ISOLATION 3304A CVC SOV AB NEAR SOUTH STAIRWAY 0004 06 845 M33CHS*SOV390B RE69 OUTLET ISOLATION 3304A CVC SOV AB NEAR SOUTH STAIRWAY 0004 06 846 M33CHS*SV1 12A1 VOLUME CONTROL TANK 3304A CVC SOV AB 0057 847 M33CHS*SV1 12A2 VOLUME CONTROL TANK 3304A CVC SOV AB 0057 848 M33CHS*SV8143 EXCESS LETDOWN VCT/CDTT 3304A CVC SOV CS 0009 849 M33CHS*SV8146 CHARGING SYSTEM TO REACTOR COOLANT SYSTEM ISOLATION 3304A CVC SOV CS 0010 850 M33CHS*SV8147 CHARGING SYSTEM TO REACTOR COOLANT SYSTEM ISOLATION 3304A CVC SOV CS 0010 851 M33CHS*SV8149A LETDOWN ORIFICE ISOLATION 3304A CVC SOV CS 0001 852 M33CHS*SV8149B LETDOWN ORIFICE ISOLATION 3304A CVC SOV CS 0001 853 M33CHS*SV8149C LETDOWN ORIFICE ISOLATION 3304A CVC SOV CS 0001 854 M33CHS*SV8152 LETDOWN ISOLATION 3304A CVC SOV AB 0004 855 M33CHS*SV8160 LETDOWN ISOLATION 3304A CVC SOV CS 0004 856 M33CHS*SOV110B BA BLEND CONTAINMENT 3304C CVC SOV AB 0055 857 M33CHS*SOV111A TOTAL MAKEUP CONTAINMENT 3304C CVC SOV AB 0045 858 858 M33CI.,-S*S,.r ,.nA1

                      ..  ,.,,-L r*r       ......
                                  *v,,VrrM RA        CONTAINMENT
  • A-I 3304C.

34 CVC SOy AB 0049 859 M33CHS*SV1 10A1 BORIC ACID BLENDER CONTROL 3304C CVC SOV AB 0024 860 M33CHS*SV110A2 BORIC ACID BLENDER CONTROL 3304C CVC SOV AB 0024 06 861 M33S]L*HCV943A SI ACCUMULATOR TANK VENT CONTROL 3307A LPI SOV CS ACCUM A-D -022 862 M33SIL*HCV943B SI ACCUMULATOR TANK VENT CONTROL 3307A LPI SOV CS -024 863 M33SIL*SV8875A SAFETY INJECTION ACCUM TANK 1 NITROGEN SUPPLY 3307A LPI SOV CS ACCUM A 864 M33SIL*SV8875B SAFETY INJECTION ACCUM TANK 2 NITROGEN SUPPLY 3307A LPI SOV CS ACCUM B B. 1-38

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 865 M33SIL*SV8875C SAFETY INJECTION ACCUM TANK 3 NITROGEN SUPPLY 3307A LPI SOV CS ACCUM C 866 M33SIL*SV8875D SAFETY INJECTION ACCUM TANK 4 NITROGEN SUPPLY 3307A LPI SOV CS ACCUM D 867 M33SIL*SV8875E SAFETY INJECT ACCUM TANK 1 N2 SUPPLY 3307A LPI SOV CS ACCUM A 868 M33SIL*SV8875F SAFETY INJECT ACCUM TANK 2 N2 SUPPLY 3307A LPI SOV CS ACCUM B 869 M33SIL*SV8875G SI ACCUM TANK 3 NITROGEN SUPPLY 3307A LPI SOV CS ACCUM C -018 870 M33SIL*SV8875H SAFETY INJECTION ACCUM TANK 4 N2 SUPPLY 3307A LPI SOV CS ACCUM D -018 871 M33SIL*SV8880 NITROGEN ACCUMULATOR LINE ISOLATION 3307A LPI SOV AB 0004 872 M33SIL*SV8968 SOLENOID 3307A LPI SOV CS 873 M33SIL-SV8878A ACCUM FILL LINE ISOLATION 3307A LPI SOV CS -022 874 M33SIL-SV8878B ACCUM FILL LINE ISOLATION 3307A LPI SOV CS -022 875 M33SIL-SV8878C ACCUM FILL LINE ISOLATION 3307A LPI SOV CS -022 876 M33SIL-SV8878D ACCUM FILL LINE ISOLATION 3307A LPI SOV CS -022 877 M33RHS*SOV606 3RHS*HCV606 AIR OPERATOR SOLENOID VALVE 3307B RHR SOV ES 0000 00 878 M33RHS*SOV607 3RHS*HCV607 AIR OPERATOR SOLENOID VALVE 3307B RHR SOV ES 0000 00 879 M33RHS*SOV618 3RHS*FCV618 AIR OPERATOR SOLENOID VALVE 3307B RHR SOV ES 0000 00 880 M33RHS*SOV619 3RHS*FCV619 AIR OPERATOR SOLENOID VALVE 3307B RHR SOV ES 0000 00 881 M33HVR*SOV10A HI RANGE RAD MON SOLENOID OPERATED VALVE 3314A RBV SOV AB 882 M33HVR*SOVI9A RE19A1/A2 COMPRESSED A'R 'SOLATION VALVE 3314A RBV SOV AB 883 M33HVR*SOV20A AUXILIARY BLDG FILTER INLET DAMPER 3314A RBV SOV AB 0084 884 M33HVR*SOV20B AUXILIARY BLDG FILTER INLET DAMPER 3314A RBV SOV AB 0066 06 885 M33HVR*SOV33A AUXILIARY BLDG HEATING & VENTILATION UNIT INLET DAMPER 3314A RBV SOV AB 0089 886 M33HVR*SOV33B AUXILIARY BLDG HEATING & VENTILATION UNIT INLET DAMPER 3314A RBV SOV AB 0089 887 M33HVR*SOV35A AUXILIARY BLDG HEATING & VENTILATION UNIT OUTLET DAMPER 3314A RBV SOV AB 0090 888 M33HVR*SOV35B AUXILIARY BLDG HEATING & VENTILATION UNIT OUTLET DAMPER 3314A RBV SOV AB 0090 B.1-39

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 889 M33HVR*SOV39A AUXILIARY BLDG EXHAUST FAN TO ATMOSPHERE ISOLATION DAMPER 3314A RBV SOV AB 0088 890 M33HVR*SOV39B AUXILIARY BUILDING EXHAUST FAN TO ATMOSPHERE ISOLATION 3314A RBV SOV AB 0089 DAMPER 891 M33HVR*SOV40A AUXILIARY BUILDING EXHAUST FAN TO ATMOSPHERE ISOLATION 3314A RBV SOV AB 0082 DAMPER 892 M33HVR*SOV4OB AUXILIARY BUILDING EXHAUST FAN TO ATMOSPHERE ISOLATION 3314A RBV SOV AB 0081 DAMPER 893 M33HVR*SOV42A AUXILIARY BUILDING EXHAUST FAN DISCHARGE TO FILTER 3314A RBV SOV AB 0066 894 M33HVR*SOV42B AUXILIARY BUILDING EXHAUST FAN DISCHARGE TO FILTER 3314A RBV SOV AB 0066 895 M33HVR*SOV43A AUXILILARY BUILDING EXHAUST FAN DISHCHARGE TO FILTER 3314A RBV SOV AB 0087 896 M33HVR*SOV43B AUXILIARY BUILDING EXHAUST FAN DISCHARGE TO FILTER 3314A RBV SOV AB 0087 897 M33HVR*SOV44A CHARGING PUMP CUBICLE NORMAL OUTLET DAMPER 3314A RBV SOV AB 0066 06 898 M33HVR*SOV44A1 CHG PMP CUB NORM OUTL DMPR 3314A RBV SOV AB 899 M33HVR*SOV44B CHARGING PUMP CUBICLE NORMAL OUTLET DAMPER 3314A RBV SOV AB 0066 06 900 M33HVR*SOV44B1 CHG PMP CUB NORM OUTL DMPR 3314A RBV SOV AB 901 M33HVR*SOV85 PIPE TUNNEL INLET DAMPER 3314A RBV SOV AB 0066 902 M33HVR*SOV86 PIPE TUNNEL AREA EXHAUST FAN INLET DAMPER 3314A RBV SOV AB 0090 903 M33HVR*SOV184A1 FUEL BUILDING SUPPLY AIR ISOLATION 3314C RBV SOV FB 0055 904 M33HVR*SOV184A2 FUEL BUILDING SUPPLY AIR ISOLATION 3314C RBV SOV FB 0055 905 M33HVR*SOV184B1 FUEL BLDG SUPPLY AIR ISOLATION 3314C RBV SOV FB 0055 906 M33HVR*SOV184B2 FUEL BLDG SUPPLY AIR ISOLATION 3314C RBV SOV FB 0055 907 M33HVR*SOV80A FUEL BUILDING FILTER INLET DAMPER 3314C RBV SOV AB 0085 908 M33HVR*SOV80B FUEL BUILDING FILTER INLET DAMPER 3314C RBV SOV AB 0080 909 M33HVR*SOV81A FUEL BUILDING FILTER INLET DAMPER 3314C RBV SOV AB 0090 910 M33HVR*SOV81B FUEL BUILDING FILTER INLET DAMPER 3314C RBV SOV AB 0066 06 911 M33HVQ*SOV1190A TEMP.CONTROL SOLENOID VALVE FOR COIL 1 3314D ESG SOV ES MECH ROOM B 0036 B.1-40

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 912 M33HVQ*SOV1 190B TEMP.CONTROL SOLENOID VALVE FOR COIL 1 3314D ESG SOV ES MECH ROOM B 0036 913 M33HVQ*SOV1191A TEMP. CONTROL SOLENOID VALVE FOR COIL-2 3314D ESG SOV ES MECH ROOM B 0036 914 M33HVQ*SOV1191B TEMP. CONTROL SOLENOID VALVE FOR COIL-2 3314D ESG SOV ES MECH ROOM B 0036 915 M33HVQ*SOV1 192A HOT GAS BY-PASS SOLENOID VALVE 3314D ESG SOV ES MECH ROOM B 0036 916 M33HVQ*SOV1 192B HOT GAS BY-PASS SOLENOID VALVE 3314D ESG SOV ES MECH ROOM B 0036 917 M33HVQ*SOV1290A TEMP.CONTROL SOLENOID VALVE FOR COIL 1 3314D ESG SOV ES MECH ROOM C 0036 918 M33HVQ*SOV1290B TEMP.CONTROL SOLENOID VALVE FOR COIL 1 3314D ESG SOV ES MECH ROOM D 0036 919 M33HVQ*SOV1291A TEMP. CONTROL SOLENOID VALVE FOR COIL-2 3314D ESG SOV ES MECH ROOM C 0036 920 M33HVQ*SOV1291B TEMP. CONTROL SOLENOID VALVE FOR COIL-2 3314D ESG SOV ES MECH ROOM D 0036 921 M33HVQ*SOV1292A HOT GAS BY-PASS SOLENOID VALVE 3314D ESG SOV ES MECH ROOM C 0036 922 M33HVQ*SOV1292B HOT GAS BY-PASS SOLENOID VALVE 3314D ESG SOV ES MECH ROOM D 0036 923 M33HVQ*SOV40A SI & QSS AND RES HX AREAS EXHAUST 3314D ESG SOV ES 0051 924 M33HVQ*SOV40B SI & QSS AND RES HX AREAS EXHAUST 3314D ESG SOV ES 0051 925 M33HVQ*SOV40C SI & QSS AND RESIDUAL HEAT EXCHANGE AREAS EXHAUST 3314D ESG SOV ES 0051 926 M33HVQ*SOV40D SI & QSS AND RESIDUALR HEAT EXCHANGE AREAS EXHAUST 3314D ESG SOV ES 0051 927 M33HVQ*SOV41A SI & QSS AND RES HXAREA SPLY 3314D ESG SOV ES 0036 928 M33HVQ*SOV41 B SI & QSS AND RESIDUAL HEAT TRANSFER SUPPLY 3314D ESG SOV ES 0036 929 M33HVQ*SOV41C S! & QSS AND RESIDUAL HEAT EXCHAGE AREA SUPPPLY 3314D ESG SOV ES 0036 930 M33HVQ*SOV41D SI & QSS AND RESIDUAL HEAT EXCHANGE AREA SUPPLY 3314D ESG SOV ES 0036 931 M33HVQ*SOV42A CONT RECIRC PPS & CLRS AREA EXCHANGE 3314D ESG SOV ES 0050 932 M33HVQ*SOV42B CONTAINMENT RECIRC PUMPS & COOLERS AREA EXHAUST 3314D ESG SOV ES 0049 933 M33HVQ*SOV42C CONT RECIRC PPS & CLRS AREA EXCHANGE 3314D ESG SOV ES 0049 934 M33HVQ*SOV42D CONTAINMENT RECIRC PUMPS & COOLERS AREA EXHAUST 3314D ESG SOV ES 0050 935 M33HVQ*SOV43A CONTAINMENT RECIRC PUMPS & COOLERS AREA SUPPLY 3314D ESG SOV ES 0036 B.1-41

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 936 M33HVQ*SOV43B CONTAINMENT RECIRC PUMPS & COOLERS AREA SUPPLY 3314D ESG SOV ES 0036 937 M33HVQ*SOV43C CONTAINMENT RECIRC PUMPS & COOLERS AREA SUPPLY 3314D ESG SOV ES 0036 938 M33HVQ*SOV43D CONTAINMENT RECIRC PUMPS & COOLERS AREA SUPPLY 3314D ESG SOV ES 0036 939 M33HVC*SOV1 19A EMERGENCY VENT RECIRC 3314F ACC SOV CB 0066 940 M33HVC*SOV1 19B EMERGENCY VENT RECIRC 3314F ACC SOV CB 0066 941 M33HVC*SOV20 CONT RM VENT OUT ISOLATION VALVE 3314F ACC SOV CB 942 M33HVC*SOV21 CONT RM VENT OUT ISOLATION VALVE 3314F ACC SOV CB 0064 943 M33HVC*SOV22 CONT RM VENT OUT ISOLATION VALVE 3314F ACC SOV CB 0082 944 M33HVC*SOV23 CONT RM VENT OUT ISOLATION VALVE 3314F ACC SOV CB 0064 945 M33HVC*SOV25 CONT RM VENT INLET ISOLATION VALVE 3314F ACC SOV CB 0082 946 M33HVC*SOV26 CONT RM VENT INLET ISOLATION VALVE 3314F ACC SOV CB 0064 947 M33HVC*SOV27A CONT BLDG VENT INLET 3314F ACC SOV CB 0085 948 M33HVC*SOV27B CONT BLDG VENT INLET 3314F ACC SOV CB 0085 949 M33HVC*SOV74A BANK (A) OUTLET VALVE 3314F ACC SOV CB ABOVE AIR FLASKS 0078 06 950 M33HVC*SOV74B BANK B OUTLET VALVE 3314F ACC SOV CB 0078 06 951 M33HVK*SOV1002 (A) CONTROL BUILDING CHILLER;2-WAY OIL COOLER SOLENOID VALVE 3314F CBW SOV CB 0064 06 952 M33HVK*SOV1027 (B) CONTROL BUILDING CHILLER;2 WAY OIL COOLER SOLENOID VALVE 3314F CBW SOV CB 0000 00 953 M33HVK*,'CV68A SUPPLY ISOLATION 33!4F 0BW SOV CB 0064 954 M33HVK*TV68B SUPPLY ISOLATION 3314F CBW SOV CB 0064 955 M33HVK*TV69A SUPPLY ISOLATION 3314F CBW SOV CB 0064 956 M33HVK*TV69B SUPPLY ISOLATION 3314F CBW SOV CB 0064 957 M33HVK*-V70A CHILLED WATER SUPPLY HEADER ISOLATION 3314F CBW SOV CB 0064 958 M33HVK*TV70B SUPPLY ISOLATION 3314F CBW SOV CB 0064 959 M33HVK*TV71A SUPPLY ISOLATION 3314F CBW SOV CB 0064 B. 1-42

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 960 M33HVK*TV71B SUPPLY ISOLATION 3314F CBW SOV CB 0064 961 M33HVK*TV72A RETURN ISOLATION 3314F CBW SOV CB 0064 962 M33HVK*TV72B RETURN ISOLATION 3314F CBW SOV CB 0064 963 M33HVK*TV73A RETURN ISOLATION 3314F CBW SOV CB 0064 964 M33HVK*TV73B RETURN ISOLATION 3314F CBW SOV CB 0064 965 M33HVK*TV74A RETURN ISOLATION 3314F CBW SOV CB 0064 966 M33HVK*TV74B RETURN ISOLATION 3314F CBW SOV CB N. WEST CORNER 0064 967 M33HVK*TV75A RETURN ISOLATION 3314F CBW SOV CB 0066 968 M33HVK*TV75B RETURN ISOLATION 3314F CBW SOV CB 0066 969 M33DTM*SOV29A MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 970 M33DTM*SOV29B MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 971 M33DTM*SOV29C MAIN STEAM LINE DRAIN 3316A DTM SOV MS 0062 972 M33DTM*SOV29D MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 973 M33DTM*SOV61A MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 974 M33DTM*SOV61B MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 975 M33DTM*SOV61C MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 976 M33DTM*SOV61D MAIN STEAM LINE DRAIN; SOLENOID 3316A DTM SOV MS 0062 977 M33DTM*SOV63A MAIN STEAM LNE DRAIN 33!6A DTM SOV ES 0025 978 M33DTM*SOV63B MAIN STEAM LINE DRAIN 3316A DTM SOV ES 0025 979 M33DTM*SOV63D MAIN STEAM LINE DRAIN 3316A DTM SOV ES 0025 980 M33DTM*SOV64A MAIN STEAM LINE DRAIN 3316A DTM SOV ES 0025 981 M33DTM*SOV64B MAIN STEAM LINE DRAIN 3316A DTM SOV ES 0004 06 982 M33DTM*SOV64D MAIN STEAM LINE DRAIN 3316A DTM SOV ES 0025 983 M33MSS*SOV20A STEAM PRESSURE RELEIF TRIP(MSI) VALVE 3316A STG SOV MS 0069 B.1-43

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 984 M33MSS*SOV20B STEAM PRESSURE RELEIF TRIP (MSI) VALVE 3316A STG SOV MS 0069 985 M33MSS*SOV20C STEAM PRESSURE RELEIF TRIP (MSI) VALVE 3316A STG SOV MS 0069 986 M33MSS*SOV20D STEAM PRESSURE RELEIF TRIP (MSI) VALVE 3316A STG SOV MS 0069 987 M33MSS*SOV28A1 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 988 M33MSS*SOV28A2 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 989 M33MSS*SOV28B1 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 990 M33MSS*SOV28B2 MAIN STEAM LINE BYPASS 3316A STG SOV MS 0074 991 M33MSS*SOV28C1 MAIN STEAM LINE ISOLATION BYPASS 3316A STG SOV MS 0074 992 M33MSS*SOV28C2 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 993 M33MSS*SOV28D1 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 994 M33MSS*SOV28D2 MAIN STEAM ISOLATION BYPASS 3316A STG SOV MS 0074 995 M33MSS*SOV31A1 S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 996 M33MSS*SOV31A2 S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 997 M33MSS*SOV31BI S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 998 M33MSS*SOV31B2 S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 999 M33MSS*SOV31D1 S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 1000 M33MSS*SOV31D2 S/G AUXILIARY FEEDPUMP TURBINE STEAM SUPPLY 3316A STG SOV ES 0026 1001 M33MSS*SV27AIA MAIN STEAM ISOLATION TR!P VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1002 M33MSS*SV27A1B MAIN STEAM ISOLATION TRIP VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1003 M33MSS*SV27A2A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1004 M33MSS*SV27A2B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1005 M33MSS*SV27A3A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1006 M33MSS*SV27A3B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1007 M33MSS*SV27A4A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 B.1-44

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1008 M33MSS*SV27A4B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1009 M33MSS*SV27B1A MAIN STEAM ISOLATION TRIP VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1010 M33MSS*SV27BIB MAIN STEAM ISOLATION TRIP VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1011 M33MSS*SV27B2A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1012 M33MSS*SV27B2B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1013 M33MSS*SV27B3A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1014 M33MSS*SV27B3B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1015 M33MSS*SV27B4A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1016 M33MSS*SV27B4B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1017 M33MSS*SV27C1A MAIN STEAM ISOLATION TRIP VALVE (DENERGIZED CLOSED CONICAL 3316A STG SOV MS 0066 SEAT) 1018 M33MSS*SV27C1B MAIN STEAM ISOLATION TRIP VALVE (DENERGIZED CLOSED,CONICAL 3316A STG SOV MS 0066 SEAT) 1019 M33MSS*SV27C2A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1020 M33MSS*SV27C2B MAIN STEAM ISOLATION TRIP VALVE. 3316A STG SOV MS 0066 1021 M33MSS*SV27C3A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1022 M33MSS*SV27C3B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1023 M33MSS*SV27C4A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1024 M33MSS*SV27C4B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1025 M33MSS*SV27D1A MAIN STEAM ISOLATION TRIP VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1026 M33MSS*SV27D1B MAIN STEAM ISOLATION TRIP VALVE (NORMALLY OPEN, CONICAL SEAT) 3316A STG SOV MS 0066 1027 M33MSS*SV27D2A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1028 M33MSS*SV27D2B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1029 M33MSS*SV27D3A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1030 M33MSS*SV27D3B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 B. 1-45

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1031 M33MSS*SV27D4A MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1032 M33MSS*SV27D4B MAIN STEAM ISOLATION TRIP VALVE 3316A STG SOV MS 0066 1033 M33MSS*SV27- MSIV SOLENOID SPARES (DE-ENERGIZED TO OPEN OR CLOSE) 3316A STG SOV WH 0000 SPARES 1034 M33CCP*SOV10A TR A RPCCW NON-SAFETY HEADER SUPPLY ISOL SOV 3330A CCR SOV AB 0004 06 1035 M33CCP*SOV10B TR B RPCCW NON-SAFETY HEADER SUPPLY ISOL SOV 3330A CCR SOV AB 0004 06 1036 M33CCP*SOV178A RPCCW RETURN 1 RCP THERMAL BARRIER SOV 3330A CCR SOV CS 0003 08 1037 M33CCP*SOV178B RPCCW RETURN 2 RCP THERMAL BARRIER SOV 3330A CCR SOV CS 0003 08 1038 M33CCP*SOV178C RPCCW RETURN 3 RCP THERMAL BARRIER SOV 3330A CCR SOV CS 0003 08 1039 M33CCP*SOV178D RPCCW RETURN 4 RCP THERMAL BARRIER SOV 3330A CCR SOV CS 0003 08 1040 M33CCP*SOV179A TR A RPCCW SUPPLY HEADER DIV SOV 3330A CCR SOV CS 0021 1041 M33CCP*SOV179B TR B RPCCW SUPPLY HEADER DIV SOV 3330A CCR SOV CS 0021 1042 M33CCP*SOV180A TR A RPCCW RETURN HEADER DIV SOV 3330A CCR SOV CS 0006 1043 M33CCP*SOV180B TR B RPCCW RETURN HEADER DIV SOV 3330A CCR SOV CS 0006 1044 M33CCP*SOV194A TR A RPCCW NON-SAFETY HEADER RETURN ISOL SOV 3330A CCR SOV AB 0004 06 1045 M33CCP*SOV194B TR B RPCCW NON-SAFETY HEADER RETURN ISOL SOV 3330A CCR SOV AB 0004 06 1046 M33CCP*SOV197A TR A RPCCW NON-SAFETY HEADER SUPPLY ISOL SOV 3330A CCR SOV AB 0004 06 1047 M33CCP*SOV197B TR B RPCCW NON-SAFETY HEADER SUPPLY ISOL SOV 3330A CCR SOV AB 0004 06 1048 M33CCP*SOV19A TRA RPCCW NON-SAFETY HEADER RETURN ISOL SOV 3330A CCR SOV AB 0004 06 1049 M33CCP*SOV19B TR B RPCCW NON-SAFETY HEADER RETURN ISOL SOV 3330A CCR SOV AB 0004 06 1050 M33CCP*SOV66A RHR HEAT EXCHANGER A COOLING OUTLET SOV 3330A CCR SOV ES 0006 1051 M33CCP*SOV66B RHR HEAT EXCHANGER B COOLING OUTLET SOV 3330A CCR SOV ES 0006 1052 M33CCE*SOV26A CHARGING PUMP COOLER OUT CROSSOVER 3330D CCE SOV AB 0028 1053 M330CE*SOV26B CHARGING PUMP COOLER OUT CROSSOVER 3330D CCE SOV AB 0028 1054 M33CCE*SOV30A CHARGING PUMP COOLING PUMP DISCHARGE CROSSOVER 3330D CCE SOV AB 0025 B. 1-46

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1055 M33CCE*SOV30B CHARGING PUMP COOLING PUMP DISCHARGE CROSSOVER 3330D CCE SOV AB 0025 1056 M33CCE*SOV37A CHARGING PUMP COOLING TEMPERATURE OUTLET SOLENOID 3330D CCE SOV AB 0025 1057 M33CCE*SOV37B CHARGING PUMP COOLING TEMPERATURE OUTLET SOLENOID 3330D CCE SOV AB 0025 1058 M33EGA*SOV25A (A) DIESEL START AIR SHUTDOWN SOLENOID 3346A DSA SOV DG A TRAIN 0027 00 1059 M33EGA*SOV25B (B) DIESEL START AIR SHUTDOWN SOLENOID 3346A DSA SOV DG B TRAIN 0027 00 1060 M33EGA*SOV26A (A) DIESEL START AIR START SOLENOID HEADER 2A 3346A DSA SOV DG A TRAIN 0027 00 1061 M33EGA*SOV26B (B) DIESEL START AIR START SOLENOID HEADER 2B 3346A DSA SOV DG B TRAIN 0027 00 1062 M33EGA*SOV27A (A) DIESEL START AIR START SOLENOID HEADER 1A 3346A DSA SOV DG A TRAIN 0027 00 1063 M33EGA*SOV27B (B) DIESEL START AIR START SOLENOID HEADER 1B 3346A DSA SOV DG D/G 'B' 0027 00 1064 M33SIH*STRT1A STRAINER (Y. 61N) 3308 HPI STR AB 0021 1065 M33SIH*STRT1B STRAINER 3308 HPI STR AB 0021 1066 M33SWP*STR1A SERVICE WATER PUMP STRAINER 3326 SWS STR CW 0014 1067 M33SWP*STR1B SERVICE WATER PUMP STRAINER 3326 SWS STR CW 0014 1068 M33SWP*STR1C SERVICE WATER PUMP STRAINER 3326 SWS STR CW 0014 1069 M33SWP*STR1D SERVICE WATER PUMP STRAINER 3326 SWS STR CW EAST SWP CUBICLE 0014 1070 M33SWP*STR3A SERVICE WATER PUMP STRAINER MOTOR 3326 SWS STR CW 0014 1071 M33SWP*STR3B SERVICE WATER PUMP STRAINER MOTOR 3326 SWS STR CW SWP*PUMP B&D CUB 0014 I072 A=WP*ST' R. SERVICE WATE- P UMP STRE __0TOR 3326 SWS STR CW A&C STRNR CUB. 0014 1073 M33SWP*STR3D SERVICE WATER PUMP STRAINER 3326 SWS STR CW 0014 1074 M33EGA*STR1A EMERGENCY GENERATOR AIR STARTUP STRAINER 3346A DSA STR DG D/G 'A' 0027 1075 M33EGA*STR1B EMERGENCY GENERATOR AIR STARTUP STRAINER 3346A DSA STR DG D/G 'B' 0027 1076 M33EGA*STR2A EMERGENCY GENERATOR AIR STARTUP STRAINER 3346A DSA STR DG D/G 'A' 0027 1077 M33EGA*STR2B EMERGENCY GENERATOR AIR STARTUP STRAINER 3346A DSA STR DG D/G 'B' 0027 1078 M33EGO*STR1A LUBE OIL STRAINER 3346A DLS STR DG D/G 'A' 0027 B. 1-47

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1079 M33EGO*STR1B LUBE OIL STRAINER 3346A DLS STR DG DIG 'B' 0027 1080 M33EGO*STR2A PRELUBE OIL FILTER PUMP STRAINER 3346A DLS STR DG D/G 'A' 1081 M33EGO*STR2B PRELUBE OIL FILTER PUMP STRAINER 3346A DLS STR DG D/G 'B' 1082 M33EGO*STR4A LUBE OIL SUCTION STRAINER 3346A DLS STR DG D/G 'A' 1083 M33EGO*STR4B LUBE OIL SUCTION STRAINER 3346A DLS STR DG D/G 'B' 0027 1084 M33EGO*STR5A LUBE OIL STRAINER 3346A DLS STR DG D/G 'A' 1085 M33EGO*STR5B LUBE OIL STRAINER 3346A DLS STR DG D/G 'B' 0024 06 1086 M33EGF*STR1A FUEL OIL XFER PUMP 1A DISC.STR.(EXTINSION LADDER REQD.FOR 3346B DFS STR FV FUEL VAULT'A' 0017 ENTRY) 1 1 1087 M33EGF*STR1B B TRANSFER PUMP DISCHARGE STRAINER 3346B DFS STR FV FUEL VAULT'B' 0017 1088 M33EGF*STR1C FUEL OIL XFER PUMP 1C DISC.STR.(EXTINSION LADDER REQD.FOR 3346B DFS STR FV FUEL VAULT'A' 0017 ENTRY) 1089 M33EGF*STR1D FUEL OIL XFER PUMP 1 D DISC.STR.(EXTINSION LADDER REQD.FOR 3346B DFS STR FV FUEL VAULT 'B' 0017 ENTRY) 1090 M33RCS*SV8010A PRESSURIZER SAFETY VALVE 'A' 3301 RCS SVL CS PRESSURIZER CUBE 0079 1091 M33RCS*SV8010B PRESSURIZER SAFETY VALVE 3301 RCS SVL CS PRESSURIZER CUBE 0079 1092 M33RCS*SV8010C PRESSURIZER SAFETY VALVE 3301 RCS SVL CS PRESSURIZER 0079 1093 M33SFC*RV52A 'A' FUEL POOL COOLER OUTLET 3305 SFC SVL FB SFC HEAT EXCH RM 0053 1094 M33SFC*RV52B 'B' FUEL POOL COOLER OUTLET 3305 SFC SVL FB SFC HEAT EXCH RM 0053 M33S.HRV.001 3S.H*PA (A) SIH PUAP;OIL PRESSURE REUI ATING RELIEF VALVE 3308 HPI SVL ES 0000 00 1096 M33SIH*RV1003 3SIH*PIB (B) SIH PUMP;OIL PRESSURE REGULATING RELIEF VALVE 3308 HPI SVL ES 10000 00 1097 M33SIH*RV8851 HI PRESSURE SAFETY INJECTION COMMON HEADER RELIEF 3308 HPI SVL ES MEZZ BHND QSS-PA 0032 1098 M33SIH*RV8853A 3SIH*P1A DISCHARGE HEADER RELIEF 3308 HPI SVL ES BEHIND QSS PUMP A 0021 06 1099 M33SIH*RV8853B LOOPS 1 & 3 HOT LEG INJECTION RELIEF VALVE 3308 HPI SVL ES BEHIND QSS PUMP B 0021 06 1100 M33SIH*RV8858 SAFETY INJECTION (COMMON) SUCTION HEADER RELIEF 3308 HPI SVL ES SUMP PUMP 0004 06 1101 M33SIH*RV8870 PENETRATION 99 OVERPRESSURE PROTECTION-INSIDE 3308 HPI SVL CS ANNULUS B.1-48

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1102 M33SIH*RV8925A 3SIH*P1A SUCTION LINE RELIEF VALVE 3308 HPI SVL ES 1103 M33SIH*RV8925B 3SIH*P1B SUCTION LINE RELIEF 3308 HPI SVL ES 1104 M33FWA*RV45 TURBINE AUXILIARY FEEDWATER PUMP DISCHARGE RELIEF 3322 AFW SVL ES AUX TURB PUMP ROOM 0024 06 1105 M33FWA*RV64A AUX FEED PUMP PlA SUCTION RELIEF VAVE 3322 AFW SVL ES 1106 M33FWA*RV64B AUXILIARY FEEDWATER 3FWA*P1B SUCTION LINE RELIEF 3322 AFW SVL ES 1107 M33FWA*RV65 AUXILIARY FEEDWATER 3FWA*P2 SUCTION LINE RELIEF 3322 AFW SVL ES 1108 M33FWL*RV110 AUX FD WTR P2 LO. PP DISH RLF 3322 FWL SVL ES 1109 M33FWL*RV117A AUXILIARY FEEDWATER PUMP P1 LUBE OIL PUMP DISCHARGE RELIEF 3322 FWL SVL ES 1110 M33FWL*RV117B AUXILIARY FEEDWATER PUMP P1 LUBE OIL PUMP DISCHARGE RELIEF 3322 FWL SVL ES 1111 M33SWP*RV132A MCC ROD CONTROL A/C UNIT "A" RELIEF 3326 SWS SVL AB MCC A/C UNIT ROOM 0066 06 1112 M33SWP*RV132B MCC ROD CONTROL A/C UNIT "B" RELIEF 3326 SWS SVL AB MCC A/C UNIT ROOM 0066 06 1113 M33SWP*RV89A CONT BLDG A/C UNIT WATER CHILLER "A" RELIEF 3326 SWS SVL CB A/C UNIT ROOM 0064 06 1114 M33SWP*RV89B CONT BLDG A/C UNIT WATER CHILLER "B" RELIEF 3326 SWS SVL CB A/C UNIT 0064 06 1115 M33SWP*RV90A EMER DIESEL GEN AIR CLR HEAT EXCHANGER "A" RELIEF 3326 SWS SVL DG "A" EMRGNCY DSL GEN 0024 06 1116 M33SWP*RV90B EMER DIESEL GEN AIR CLR HEAT EXCHANGER "B" RELIEF 3326 SWS SVL DG "B" EMRGNCY DSL GEN 0024 06 1117 M33SWP*RV91A CTMT RECIRC PMP AC UNIT"A" RELIEF 3326 SWS SVL ES SELF CONT A/C-2A 0051 04 1118 M33SWP*RV91B CTMT RECIRC PMP A/C UNIT "B" RELIEF 3326 SWS SVL ES SELF CONT A/C-2B 0051 04 1119 M33SWP*RV92A RSDL HT RMVL PMP A/C UNIT "A" RELIEF 3326 SWS SVL ES SELF CONT AC-lA 0051 04 1120 M33SWP*RV92B RSDL HT RMVL PMP A/C UNIT "B" RELIEF 3326 SWS SVL ES SELF CONT A/C-1B 0051 04 1121 M33SWP*RV93A SAFETY INJECTION PMP COOLER "A" RELIEF 3326 SWS SVL ES SFTY INJ PMP ROOM 0020 06 1122 M33SWP*RV93B SAFETY INJECTION PMP COOLER "B" RELIEF 3326 SWS SVL ES SFTY INJEC PMP ROOM 0020 06 1123 M33SWP*RV94A A RSS HEAT EXCHANGER RELEIF 3326 SWS SVL ES RSS HEAT EXCHANGER 0051 04 1124 M33SWP*RV94B B RSS HEAT EXCHANGER RELEIF 3326 SWS SVL ES RSS HEAT EXCHANGER 0051 04 1125 M33SWP*RV94C C RSS HEAT EXCHANGER RELEIF 3326 SWS SVL ES RSS HX 0051 04 B. 1-49

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1126 M33SWP*RV94D D RSS HEAT EXCHANGER RELEIF 3326 SWS SVL ES RSS HX 0051 04 1127 M33SWP*RV95A RX PLANT COMP COOL WATER HEAT EXCH "A" RELIEF 3326 SWS SVL AB CCP HX AREA 0024 06 1128 M33SWP*RV95B RX PLANT COMP COOL WATER HEAT EXCH "B" RELIEF 3326 SWS SVL AB CCP HX 0024 06 1129 M33SWP*RV95C RX PLT CMPNT CLG WATER HEAT EXCH "C" RELIEF 3326 SWS SVL AB CCP HX 0024 06 1130 M33SWP*RV96A CHARGING PUMP COOLER "A" RELIEF 3326 SWS SVL AB CCE HX 0024 06 1131 M33SWP*RV96B CHARGING PUMP COOLER "B" RELIEF 3326 SWS SVL AB CCE HX 0024 06 1132 M33CHS*RV8113 SEAL WATER RETURN RELIEF VALVE (INSIDE CTMT) 3304A CVC SVL CS PEN. 23Z 0003 08 1133 M33CHS*RV8117 LETDOWN LINE INSIDE CTMT RELIEF 3304A CVC SVL CS OUTSD OF GEN (C)CUBE 0003 08 1134 M33CHS*RV8119 LOW PRESSURE LETDOWN CONTROLLER RELIEF 3304A CVC SVL AB SEAL WATER HX CUBE 0004 06 1135 M33CHS*RV8120 VOLUME CONTROL TANK PRESSURE RELIEF 3304A CVC SVL AB LTDWN HEAT 0004 06 EXCHANGER 1136 M33CHS*RV8121 SEAL RETURN LINE INLET CONTAINMENT RELIEF 3304A CVC SVL CS NEAR PEN 23Z 0003 08 1137 M33CHS*RV8123 SEAL WATER HEAT EXCHANGER RELIEF 3304A CVC SVL AB SEALWATER HX 0004 06 1138 M33CHS*RV8124 LOW PRESS SI SUCTION RELIEF TO CHS PUMPS 3304A CVC SVL AB "A" CHG PUMP CUBICLE 0024 06 1139 M33CHS*RV8351 PEN#62 OVERPRESSURE RELIEF 3304A CVC SVL CS 1140 M33CHS*RV8501A CHARGING PUMP 3CHS*P3A SUCTION LINE RELIEF 3304A CVC SVL AB 3CHS*P3A CUBICLE 1141 M33CHS*RV8501B CHARGING PUMP 3CHS*P3B SUCTION LINE RELIEF 3304A CVC SVL AB 3CHS*P3B CUBICLE 1142 M33CHS*RV8501C CHARGING PUMP 3CHS*P3C SUCTION LINE RELIEF 3304A CVC SVL AB 3CHS*P3C CUBICLE 1143 M33SIL*RV8855A ACCUMULATOR TANK RELIEF 3307A LPI SVL ICS 0003 1144 M33SIL*RV8855B ACCUMULATOR TANK RELIEF 3307A LPI SVL CS 0003 1145 M33SIL*RV8855C ACCUMULATOR TANK RELIEF 3307A LPI SVL CS 0003 1146 M33SIL*RV8855D ACCUMULATOR TANK RELIEF 3307A LPI SVL CS 0003 1147 M33SIL*RV8857 SIL ACCUMULATOR NITROGEN SUPPLY RELIEF VALVE 3307A LPI SVL CS VLV MZZNNE FRM AUX 0022 1148 M33RHS*RV37A "A" TRAIN RHR SUCTION RELIEF BETWEEN 8701C AND 8701A 3307B RHR SVL CS CTMT PASSAGEWAY 0004 06 1149 M33RHS*RV37B B RHS SUCTION HEADER CONTAINMENT RELIEF 3307B RHR SVL CS CTMT PASSAGEWAY 0004 06 B.1-50

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1150 M33RHS*RV8708A RHS PUMP A SUCTION HEADER RELIEF (91-OUTSIDE) 3307B RHR SVL CS CTMT PASSAGEWAY 0004 06 1151 M33RHS*RV8708B RHS PUMP B SUCTION HEADER RELIEF (92-OUTSIDE) 3307B RHR SVL CS CTMT PASSAGEWAY 0004 06 1152 M33SlL*RV8842 RHS PUMP COMMON DISCHARGE HEADER RELIEF 33076 LPI SVL ES RHR B CUBE OVERHEAD 0004 06 1153 M33SIL*RV8856A "A" RESIDUAL HEAT REMOVAL PUMP DISCHARGE HEADER RELIEF 3307B LPI SVL ES A RHR PUMP ROOM 0004 06 1154 M33SlL*RV8856B B RHS PUMP DISCHARGE HEADER RELIEF 3307B LPI SVL ES BRHRROOM 0004 06 OVERHEAD 1155 M33HVR*RV10A1 HI RANGE RAD MON 3314A RBV SVL AB 1156 M33HVR*RV10B1 NORM RANGE RAD MON 3314A RBV SVL AB 1157 M33HVR*RV19A1 HI RANGE RAD MON 3314A RBV SVL AB 1158 M33HVR*RV19B1 HI RANGE RAD MON 3314A RBV SVL AB 1159 M33HVQ*RV68A1 RELIEF VALVE TO 3HVQ*ACUS1A CONDENSER 3314D ESG SVL ES 1160 M33HVQ*RV68A2 RELIEF VALVE TO 3HVQ*ACUS2B 3314D ESG SVL ES 1161 M33HVQ*RV68A3 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1162 M33HVQ*RV68A4 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1163 M33HVQ*RV68B1 RELIEF VALVE TO 3HVQ*ACUS1 B CONDENSER 3314D ESG SVL ES 1164 M33HVQ*RV68B2 RELIEF VALVE TO 3HVQ*ACUS1B CONDENSER 3314D ESG SVL ES 1165 M33HVQ*RV68B3 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1166 M33HVQ*RV68B4 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1167 M33HVQ*RV69A1 RELIEF VALVE TO 3HVQ*ACUS2ACONDENSER 3314D ESG SVL ES 1168 M33HVQ*RV69A2 RELIEF VALVE TO 3HVQ*ACUS2A CONDENSER 3314D ESG SVL ES 1169 M33HVQ*RV69A3 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1170 M33HVQ*RV69A4 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1171 M33HVQ*RV69B1 RELIEF VALVE TO 3HVQACUS2BCONDENSER 3314D ESG SVL ES 1172 M33HVQ*RV69B2 RELIEF VALVE TO 3HVQ*ACUS2B 3314D ESG SVL ES 1173 M33HVQ*RV69B3 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES B.1-51

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1174 M33HVQ*RV69B4 RELIEF VALVE FROM ACUS UNIT 3314D ESG SVL ES 1175 M33HVC*RV125A1 AIR STORAGE TANK RELIEF 3314F ACC SVL CB 0076 06 1176 M33HVC*RV125A2 AIR STORAGE TANK RELIEF 3314F ACC SVL CB 0076 06 1177 M33HVC*RV125B1 AIR STORAGE TANK RELIEF 3314F ACC SVL CB 0078 06 1178 M33HVC*RV125B2 AIR STORAGE TANK RELIEF 3314F ACC SVL CB 0076 06 1179 M33MSS*RV22A A STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E. CORNER OF MSVB 0069 1180 M33MSS*RV22B B STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS SE CORNER OF MSVB 0069 1181 M33MSS*RV22C C S/G SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0069 1182 M33MSS*RV22D D STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0069 1183 M33MSS*RV23A A STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E. CORNER OF MSVB 0076 1184 M33MSS*RV23B B STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E CORNER OF MSVB 0076 1185 M33MSS*RV23C C S/G SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1186 M33MSS*RV23D D STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1187 M33MSS*RV24A A STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E. CORNER OF MSVB 0076 1188 M33MSS*RV24B B STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E. CORNER OF MSVB 0076 1189 M33MSS*RV24C C S/G SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1190 M33MSS*RV24D D STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1191 M33MSS*RV25A ASTEAM GENERATOR -SAFETYVA.LVE 3316A STG SVL MS S.E. CORNER OF MSVB 0076 1192 M33MSS*RV25B B STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS 0068 1193 M33MSS*RV25C C S/G SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1194 M33MSS*RV25D "D"STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 1195 M33MSS*RV26A A STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS S.E. CORNER OF MSVB 0076 1196 M33MSS*RV26B B STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS SE. CORNER OF MSVB 0076 1197 M33MSS*RV26C C S/G SAFETY VALVE 3316A STG SVL MS N.E. CORNER OF MSVB 0076 8.1-52

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1198 M33MSS*RV26D "D"STEAM GENERATOR SAFETY VALVE 3316A STG SVL MS 0068 1199 M33CCP*RV239A RHR PUMP A SEAL COOLER RELIEF 3330A CCR SVL ES RHR A CUBICLE 0012 06 1200 M33CCP*RV239B RHR PUMP B SEAL COOLER RELIEF 3330A CCR SVL ES RHR B 0018 1201 M33CCP*RV258A REACTOR COOLANT PUMP UPPER BEARING 3330A CCR SVL CS 0037 1202 M33CCP*RV258B REACTOR COOLANT PUMP UPPER BEARING 3330A CCR SVL CS 0037 1203 M33CCP*RV258C REACTOR COOLANT PUMP UPPER BEARING 3330A CCR SVL CS 0037 1204 M33CCP*RV258D REACTOR COOLANT PUMP UPPER BEARING 3330A CCR SVL CS 0037 1205 M33CCP*RV275A CONTAINMENT PENETRATION (A) RELIEF (41-OUTSIDE) 3330A CCR SVL AB PENETRATION MEZZANIN 1206 M33CCP*RV275B CTMT PEN (B) RELIEF (42-OUTSIDE) 3330A CCR SVL AB PENE MEZZANINE #42 1207 M33CCP*RV39 EXCESS LETDOWN HEAT EXCHANGE SHELL SIDE RELIEF 3330A CCR SVL CS EXCESS LTD HX CUB -010 1208 M33CCP*RV54A RCP (A) THERMAL BARRIER RELIEF 3330A CCR SVL CS IN MEZZANINE 0020 1209 M33CCP*RV54B RCP (B) BARRIER RELIEF 3330A CCR SVL CS (C) CUBE MEZZANINE 0020 1210 M33CCP*RV54C RCP (C) THERMAL BARRIER RELIEF 3330A CCR SVL CS CUBICLE CMEZZANINE 0020 1211 M33CCP*RV54D REACTOR COOLANT PUMP THERMAL BARRIER RELIEF 3330A CCR SVL CS CUBICLE D 0018 1212 M33CCP*RV59A SPENT FUEL POOL COOLER RELIEF 3330A CCR SVL FB FUEL POOL COOLER RM 0052 06 1213 M33CCP*RV59B B FUEL POOL COOLER RELIEF VALVE 3330A CCR SVL FB FUEL POOL COOLER RM 0052 06 1214 M33CCP*RV64A RHR HEAT EXCHANGER A RELIEF 3330A CCR SVL ES RHR (A) 0008 06 1215 M33CCP*RV64B RHR HEAT EXCHANGER B RELIEF 3330A CCR SVL ES RHR B 0008 '06 1216 M33CCP*RV82 RFO CCP RV82 3330A CCR SVL AB 0035 1217 M33CCP*RV85 SEAL WATER HEAT TRANSFER SHELL SIDE RELIEF VALVE 3330A CCR SVL AB UP & IN SEAL WTR CUB 0024 06 1218 M33CCE*RV40A 3CCE-E1 DISCHARGE 3330D CCE SVL AB CHRG PP CLG ROOM 0024 06 1219 M33CCE*RV40B 3CCE-E1 DISCHARGE 3330D CCE SVL AB CHRG PP CDLG ROOM 0024 06 1220 M33CCE*RV43A A CHG PUMP COOLING RELIEF VALVE 3330D CCE SVL AB CCE PUMP A ROOM 1221 M33CCE*RV43B CHARGING PUMP B OIL COOLER RELIEF 3330D CCE SVL AB CCE PUMP B ROOM B.1-53

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1222 M33CCE*RV43C CHARGING PUMP "C"OIL COOLER RELIEF 3330D CCE SVL AB CCE PUMP C ROOM 1223 M33EGA*RV24A1 "A" DIESEL STARTING AIR RECEIVER TANK 1A RELIEF (V8) 3346A DSA SVL DG D/G A 0034 1224 M33EGA*RV24A2 "A" DIESEL STARTING AIR RECEIVER TANK 2A RELIEF (V15) 3346A DSA SVL DG A TRAIN 0034 1225 M33EGA*RV24B1 "B" DIESEL STARTING AIR RECEIVER TANK 1B RELIEF (V34) 3346A DSA SVL DG B TRAIN 0034 1226 M33EGA*RV24B2 "B" DIESEL STARTING AIR RECEIVER TANK 2B RELIEF (V41) 3346A DSA SVL DG B TRAIN 0034 1227 M33EGO*RV31A PRE-LUBE OIL AND FILTER PUMP DISCH RELIEF VALVE 3346A DLS SVL DG D/G 'A' 0025 1228 M33EGO*RV31B PRE-LUBE OIL AND FILTER PUMP DISCH RELIEF VALVE 3346A DLS SVL DG D/G 'B' 0025 1229 M33EGO*RV36A ROCKER ARM PRE-LUBE OIL PP DISCH RELIEF VALVE 3346A DLS SVL DG D/G 'A' 0025 1230 M33EGO*RV36B MOTOR DRIVEN ROCKER ARM PRE-LUBE OIL PUMP DISCHARGE 3346A DLS SVL DG D/G 'B' 0025 1231 M33EGO*RV37A ENGINE DRIVEN ROCKER ARM LUBE OIL PUMP DISCH RELIEF VALVE 3346A DLS SVL DG D/G 'A' 0025 1232 M33EGO*RV37B ENGINE DRIVEN ROCKER ARM LUBE OIL PUMP DISCH RELIEF VALVE 3346A DLS SVL DG 0025 1233 M33EGO*RV38A ENGINE DRIVEN LUBE OIL PUMP DISCHARGE 3346A DLS SVL DG DIG 'A' 0025 1234 M33EGO*RV38B ENGINE DRIVEN LUBE OIL PUMP DISCHARGE 3346A DLS SVL DG D/G 'B' 0025 1235 M33EGS*RV32A JACKET WATER HEATER OUTLET RELIEF VALVE 3346A DGN SVL DG D/G 'A' 0025 1236 M33EGS*RV32B JACKET WATER HEATER OUTLET RELIEF VALVE 3346A DGN SVL DG D/G 'B' 0025 1237 M33EGF*RV35A "A" DIESEL ENGINE DRIVEN FUEL PUMP P3A RELIEF 3346B DFS SVL DG DG "A" 1238 M33EGF*RV35B "B" DIESEL ENGINE DRIVEN FUEL PUMP P3B RELIEF 3346B DFS SVL DG DG "B" 1239 ,v,33EGF*RV36A "A" DIESEL DC MOTOR DRIVEN FUEL PUMP P2A RELIEF 3346B DFS SVL DG DG "A" 1240 M33EGF*RV36B "B" DIESEL DC MOTOR DRIVEN FUEL PUMP P2B RELIEF 3346B DFS SVL DG DG "B" 1241 M334C 4.16KV EMERG BUS 3343 ES4 SWG CB SWITCHGEAR 0004 06 1242 M334D 4.16KV EMERG BUS 3343 ES4 SWG CB SWITCHGEAR 0004 06 1243 M33CHS*TRS-P3C/1 34D21-2/34C22-2 TRANSFER SWITCH TO 3CHS*P3C 3304A CVC SWT AB 0045 1244 M33CHS*TRS-P3C/2 34D21-2/34C22-2 TRANSFER SWITCH #2 TO 3CHS*P3C 3304A CVC SWT AB 0045 1245 M33CCP*TRS-P1C/1 34C10-2 TRANSFER SWITCH #1 TO 34D9-6 REACTOR COOLING PMP 3330A CCR SWT AB 0045 3CCP*P1C B. 1-54

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1246 M33CCP*TRS-P1C/2 34C10-2 TRANSFER SWITCH #2 TO 34D9-6 REACTOR COOLING PMP 3330A CCR SWT AB 0045 3CCP*PlC 1247 M33RCS*TK1 PRESSURIZER 3301 RCS TNK CS 0024 1248 M33FWA*TK1 DEMIN WATER STORAGE TANK 3322 AFW TNK YD 0024 1249 M33CHS*TK2 VOLUME CONTROL TANK 3304A CVC TNK AB 0043 1250 M33CHS*TK5A A BORIC ACID TANK 3304C CVC TNK AB 0043 1251 M33CHS*TK5B B BORIC ACID TANK 3304C CVC TNK AB 0043 1252 M33SIL*TK1A SAFETY INJECTION ACCUMULATOR TANK 3307A LPI TNK CS 0024 1253 M33SIL*TK1B SAFETY INJECTION ACCUMULATOR TANK 3307A LPI TNK CS 0024 1254 M33SIL*TK1C SAFETY INJECTION ACCUMULATOR TANK 3307A LPI TNK CS -024 1255 M33SIL*TK1D SAFETY INJECTION ACCUMULATOR TANK 3307A LPI TNK CS -024 1256 M33HVC*TK1A AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1257 M33HVC*TK1B AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1258 M33HVC*TK1C AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1259 M33HVC*TK1D AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1260 M33HVC*TK1E AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1261 M33HVC*TK1F AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1262 M33HVC*TK1G AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1263 M33HVC*TK1H AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1264 M33HVC*TKIJ AIR STORAGE BOTTLE 3314F ACC TNK CB 0064 1265 M33HVK*TK1A CONTROL BUILDING CHILLED WATER EXPANSION TANK 3314F CBW TNK CB 0064 1266 M33HVK*TK1B CONTROL BUILDING CHILLED WATER EXPANSION TANK 3314F CBW TNK CB 0064 1267 M33CCP*TK1 RPCCW SURGE TANK 3330A CCR TNK AB 0066 1268 M33CCE*TK1 CHARGING PUMP COOLING SURGE TANK 3330D CCE TNK AB 0043 1269 M33EGA*TK1A DIESEL START AIR RECIEVER TANK 3346A DSA TNK DG D/G 'A' 0024 B.1-55

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1270 M33EGA*TK1B DIESEL START AIR RECIEVER TANK 3346A DSA TNK DG DIG 'B' 0027 1271 M33EGA*TK2A DIESEL START AIR RECIEVER TANK 3346A DSA TNK DG D/G 'A' 0024 1272 M33EGA*TK2B DIESEL START AIR RECIEVER TANK 3346A DSA TNK DG D/G 'B' 0027 1273 M33EGA*TK3A AIR TANK 3346A DSA TNK DG D/G'A' 0024 1274 M33EGA*TK3B AIR TANK 3346A DSA TNK DG D/G 'B' 0027 1275 M33EGS*TK1A FRESH WATER EXPANSION TANK 3346A DGN TNK DG D/G 'A' 0034 1276 M33EGS*TK1B FRESH WATER EXPANSION TANK 3346A DGN TNK DG D/G'B' 0034 1277 M33EGF*TK1A EMERGENCY GEN FUEL OIL STORAGE TK 3346B DFS TNK FV FUEL VAULT'A' 0016 06 1278 M33EGF*TK1B EMERGENCY GEN FUEL OIL STORAGE TK 3346B DFS TNK FV FUEL VAULT'B' 0024 06 1279 M33EGF*TK2A EMERGENCY GEN FUEL OIL DAY TANK 3346B DFS TNK DG D/G 'A' 0037 06 1280 M33EGF*TK2B EMERGENCY GEN FUEL OIL DAY TANK 3346B DFS TNK DG D/G 'B' 0037 06 1281 M33RCS*AV8032 REACTOR VESSEL FLANGE LEAKOFF ISOLATION 3301 RCS VLV CS CUBICLE B 0008 06 1282 M33RCS*AV8036A CHS FILL HEADER TO LOOP 1 3301 RCS VLV CS CUBE A, ATOP XOVER 0012 1283 M33RCS*AV8036B CHS FILL HEADER TO LOOP 2 3301 RCS VLV CS CUBE B, ATOP XOVER 0012 1284 M33RCS*AV8036C CHS FILL HEADER TO LOOP 3 3301 RCS VLV CS CUBE C, ATOP XOVER 0012 1285 M33RCS*AV8036D CHS FILL HEADER TO LOOP 4 3301 RCS VLV CS CUBE DABOVE XOVER 0012 1286 M33RCS*AV8037A REACTOR COOLANT LOOP 1 DRAIN ISOLATION 3301 RCS VLV CS CUBE A BEHIND XOVER 0005 128o7 iviorC.,S- Av8, ,B RE.... OR

  • I TOLANT 2 DRA!N!SOLATION 3301 RCS VLV CS CUBE B.BEHIND XOVER 0005 1288 M33RCS*AV8037C REACTOR COOLANT LOOP 3 DRAIN ISOLATION 3301 RCS VLV CS CUBE C, BEHIND XOVER 0005 1289 M33RCS*AV8037D REACTOR COOLANT 4 DRAIN ISOLATION 3301 RCS VLV CS CUBE D BEHIND XOVER 0005 1290 M33RCS*AV8145 PRESSURIZER AUXILIARY SPRAY(CVCS) 3301 RCS VLV CS REGEN HX -009 1291 M33RCS*AV8153 EXCESS LETDOWN LINE ISOLATION 3301 RCS VLV CS 0007 1292 M33RCS*LCV459 LETDOWN ISOLATION 3301 RCS VLV CS VALVE MEZZ-BY STAIR 0012 1293 M33RCS*LCV460 LETDOWN ISOLATION 3301 RCS VLV CS CUBICLE C B.1-56

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1294 M33RCS*PCV455A POWER OPERATED RELIEF VALVE 3301 RCS VLV CS PRESSURIZER 0076 1295 M33RCS*PCV455B PRESSURIZER PRESSURE SPRAY VALVE 3301 RCS VLV CS PRESSURIZER 0053 1296 M33RCS*PCV455C PRESSURIZER PRESSURE SPRAY VALVE 3301 RCS VLV CS PRESSURIZER 0053 1297 M33RCS*PCV456 PRESSURIZER PRESSURE RELIEF 3301 RCS VLV CS PRESSURIZER 0075 1298 M33RCS*PORVSPARE SPARE PRESSURE OPERATED RELIEF VALVE (PORV) 3301 RCS VLV WH WAREHOUSE 5 0000 00 1299 M33SIH*AV8882 TEST LINE ISOL SI COLD LEG INJ 3308 HPI VLV CS ANNULUS 0003 08 1300 M33SIH*AV8889A TEST LINE ISOL SI TO HOT LEG 1 3308 HPI VLV CS 0019 06 1301 M33SIH*AV8889C TEST LINE ISOL SI TO HOT LEG 3 3308 HPI VLV CS 0018 1302 M33SIH*CV8871 SI TEST HEADER CTMT INNER ISOL 3308 HPI VLV CS ANNULUS 0016 1303 M33SIH*CV8888 SI ACCUM MASTER FILL ISOL 3308 HPI VLV AB PENETRATION 0004 06 1304 M33SIH*CV8964 SI TEST HEADER CTMT OUTER ISOL 3308 HPI VLV AB PENETRATION MEZZ 0017 06 1305 M33FWA*HV32A TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW VLV ES 0021 1306 M33FWA*HV32B TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW VLV ES 0021 1307 M33FWA*HV32D TURBINE DRIVEN AUXILIARY FEEDWATER CONTROL VLV 3322 AFW VLV ES 0024 1308 M33FWA*V135 PIPING VENT VALVE FOR 3FWA*RV45 3322 AFW VLV 0000 1309 M3GOV-SOL-3FWA*T1 TDAFP GOVERNOR SHUTDOWN AIR BLEED SOLENOID VALVE 3322 AFW VLV 0000 00 1310 M33SWP*HV39A AIR SUPPLY TO SWP*AOV39A (3EGS*E2A) EMERG. DIESEL COOLER 3326 SWS VLV DG OUTLET 1311 M33SWP*PV112A1 3HVQ*ACU 1A FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1312 M33SWP*PV112A2 3HVQ*ACU 1A FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1313 M33SWP*PV112B1 3HVQ*ACU 1B FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1314 M33SWP*PV112B2 3HVQ*ACU 1B FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1315 M33SWP*PV113A1 3HVQ*ACU 2A FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1316 M33SWP*PV1 13A2 3HVQ*ACU 2A FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1317 M33SWP*PV1 13B1 3HVQ*ACU 2B FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 B. 1-57

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1318 M33SWP*PV1 13B2 3HVQ*ACU 28 FREON PRESSURE CONTROL VALVE 3326 SWS VLV ES 0036 1319 M33SWP*PV98A A SERVICE WATER PUMP LUBE WATER PRESSURE CONTROL VALVE 3326 SWS VLV CW 0022 1320 M33SWP*PV98B B SERVICE WATER PUMP LUBE WATER PRESSURE CONTROL VALVE 3326 SWS VLV CW 0022 1321 M33SWP*PV98C C SERVICE WATER PUMP LUBE WATER PRESSURE CONTROL VALVE 3326 SWS VLV CW 0022 1322 M33SWP*PV98D D SERVICE WATER LUBE WATER PRESSURE CONTROL VALVE 3326 SWS VLV CW 0022 1323 M33CHS*AV8101 VCT VENT ISOLATION 3304A CVC VLV AB BORIC ACID PP RM 2A 0043 06 1324 M33CHS*AV8143 EXCESS LETDOWN DIVERSION 3304A CVC VLV CS EXCESS HEAT EX ROOM 0013 06 1325 M33CHS*AV8146 CHARGING LOOP 1 ISOLATION 3304A CVC VLV CS REGEN HEAT 0008 EXCHANGE 1326 M33CHS*AV8147 CHARGING LOOP 4 ISOLATION 3304A CVC VLV CS REGEN HEAT 0008 EXCHANGE 1327 M33CHS*AV8149A A LETDOWN ORIFICE ISOLATION 3304A CVC VLV CS REGEN HEAT EXCH RM 0003 08 1328 M33CHS*AV8149B B LETDOWN ORIFICE ISOLATION 3304A CVC VLV CS REGEN HX UPPER LEVEL 0001 REGEN HEAT EXCH 1329 M33CHS*AV8149C C LETDOWN ORIFICE ISOLATION 3304A CVC VLV CS ROOM ROOM 0003 08 1330 M33CHS*CV8160 LETDOWN HEADER CTMT ISOLATION 3304A CVC VLV CS INSIDE S/G CUB. "C" 0004 1331 M33CHS*RV8393 EQUIP MFR SUPPLY 3304A CVC VLV CS 0000 00 1332 M33CHS*RV8511A "A"CHARGING PUMP OIL PUMP DISCHARGE RELEIF 3304A CVC VLV AB "A" CHG PP CUBICLE 0024 06 1333 M33CHS*RV8511B "B" CHARGING PUMP LUBE OIL PUMP RELIEF 3304A CVC VLV AB "C"CHG PP CUBICLE 0024 06 1334 M33CHS*RV8511C VENDOR SUPPLIED 3304A CVC VLV AB 0000 00 1335 M33CHS*TCV129 DEMIN HIGH TEMPERATURE BYPASS 3304A CVC VLV AB LTDN MOD HEAT EXCH 0004 06 1336 M33CHS*FCV110B BLENDED MAKEUP TO VCT OUTLET 3304C CVC VLV AB BORIC ACID PUMP A 0043 06 1337 M33CHS*FCV111B MAKEUP TO VCT ISOLATION 3304C CVC VLV AB BORIC ACID PUMP A 0043 06 1338 M33SIL*AV8872A LOW PRESS SI TO HIGH PRESS SI 3307A LPI VLV CS ABOVE AIR CLNG ASSC -007 1339 M33SIL*AV8872B LOW PRESS SI TO HIGH PRESS SI 3307A LPI VLV CS ABOVE AIR CLNG ASS B 1340 M33SIL*AV8872C LOW PRESS SI TO HIGH PRESS SI 3307A LPI VLV CS ABOVE AIR CLNG ASS A -007 B.1-58

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1341 M33SIL*AV8872D LOW PRESS SI TO HIGH PRESS SI 3307A LPI VLV CS ABOVE AIR FLTR FAN A -007 1342 M33SIL*AV8878A SAFETY INJECT ACCUMULATE TANK 1 FILL FROM HIGH PRESS SAFETY 3307A LPI VLV CS ACCUM A -024 INJ 1343 M33S1L*AV8878B SAFETY INJECT ACCUMULATE TANK 2 FILL FROM HIGH PRESS SAFETY 3307A LPI VLV CS ACCUM B -024 06 1 I~~NJI1 1344 M33SIL*AV8878C SAFETY INJECT ACCUMULATE TANK 3 FILL FROM HIGH PRESS SAFETY 3307A LPI VLV CS ACCUM C -021 1345 M33SIL*AV8878C INJ N 3307A LPI VLV CS 'ACCUM CB02 INJ SAFETY INJECT ACCUMULATE TANK 4 FILL FROM HIGH PRESS SAFETY 1346 M33SIL*CV8825 TEST ISOL LPSI TO 2/4 HOT LEGS 3307A LPI VLV CS ANNULUS 0003 08 1347 M33SIL*CV8880 SI ACCUMULATOR NITROGEN SUPPLY ISOL 3307A LPI VLV AB 0014 1348 M33SIL*CV8890A TEST ISOL LPSI TO 1/2 COLD LEGS 3307A LPI VLV CS ANNULUS 0003 08 1349 M33SIL*CV8890B TEST ISOL LPSI TO 3/4 COLD LEGS 3307A - LPI VLV CS ANNULUS 0003 08 AN NULUS 1350 M33SIL*CV8968 SI ACCUMULATOR NITROGEN SUPPLY ISOL 3307A LPI VLV CS CONTAINMENT 0021 06 1351 M33HVR*PCV19A HI RANGE RAD MONITOR VALVE 3314A RBV VLV AB 1352 M33HVQ*PCV1 193A HEAT EXCHANGER INLET PRESSURE CONTROL VALVE 3314D ESG VLV ES 1353 M33HVQ*PCV1 193B HEAT EXCHANGER INLET PRESSURE CONTROL VALVE 3314D ESG VLV ES 1354 M33HVQ*PCV1293A HEAT EXCHANGER INLET PRESSURE CONTROL VALVE 3314D ESG VLV ES 1355 M33HVQ*PCV1293B HEAT EXCHANGER INLET PRESSURE CONTROL VALVE 3314D ESG VLV ES 1356 M33HVQ*TCV1051A HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1357 M33HVQ*TCV1051B HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1358 M33HVQ*TCV1052A HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1359 M33HVQ*TCV1052B HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1360 M33HVQ*TCV1061A HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1361 M33HVQ*TCV1061B HEAT EXCHANGER INLET TEMPERATURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1362 M33HVQ*TCV1062A HEAT EXCHANGER INLET TEMPERTURE CONTROL VALVE 3314D ESG VLV ES 0000 00 B. 1-59

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1363 M33HVQ*TCV1062B HEAT EXCHANGER INLET TEMPERTURE CONTROL VALVE 3314D ESG VLV ES 0000 00 1364 M33HVC*PCV68A AIR STORAGE TANK OUTLET PRESSURE REDUCER 3314F ACC VLV CB 0080 1365 M33HVC*PCV68B AIR STORAGE TANK OUTLET PRESSURE REDUCER 3314F ACC VLV CB 0080 1366 M33HVK*LCV1006 (A) CONTROL BUILDING CHILLER;LOW SIDE REFRIGERANT FLOAT 3314F CBW VLV CB 0000 00 VALVE 1367 M33HVK*LCV1011 A-CONTROL BUILDING CHILLER;CONDENSER REFRIGERANT LEVEL 3314F CBW VLV CB 0000 00 FLOAT VLV 1368 M33HVK*LCV1031 (B) CONTROL BUILDING CHILLER;LOW SIDE REFRIGERANT FLOAT 3314F CBW VLV CB 0000 00 VALVE 1369 M33HVK*LCV1 036 B-CONTROL BUILDING CHILLER;CONDENSER REFRIGERANT LEVEL 3314F CBW VLV CB 0000 00 FLOAT VLV 1370 M33HVK*PCV1000 A-CB CHILLER COMPONENT MOTOR COOLING LINE PRESSURE CONT 3314F CBW VLV CB 0000 00 VALVE 1371 M33HVK*PCV1004 (A) CONTROL BUILDING CHILLER;ECONOMIZER GAS VALVE 3314F CBW VLV CB 0000 00 1372 M33HVK*PCV1025 (B) CB CHILLER;COMP MOTOR COOLING LINE PRESSURE CONT VALVE 3314F CBW VLV CB 0000 00 1373 M33HVK*PCV1029 (B) CONTROL BUILDING CHILLER;ECONOMIZER GAS VALVE 3314F CBW VLV CB 0000 00 1374 M33HVK*PDV32A CHLD WTR SPLY & RTRN DIFF PRS (TRAIN A) IND & CNTRL MOD VLV CNT 3314F CBW VLV CB 0081 1375 M33HVK*PDV32B CHLL WTR SPLY & RTN DIFF PRS (TRAIN B) IND & CNTRL MOD VLV 3314F CBW VLV CB 0081 CNTRL 1376 M33HVK*RV152A (A) CHILLER, COOLER REFRIGERANT RELIEF VALVE (*V1013A) 3314F CBW VLV CB 0069 09 1377 M33HVK*RV152B (B) CHILLER, COOLER REFRIGERANT RELIEF VALVE (*V1013B) 3314F CBW VLV CB 0069 09 1,378 ,,3,,-V,,V153A (A) CHILLER, COOLER 1:lRIGERANT RELIEF VALVE (*V1014A) 3314F CBW VLV CB 0069 09 1379 M33HVK*RV153B (B) CHILLER, COOLER REFRIGERANT RELIEF VALVE (*V1014B) 3314F CBW VLV CB 0069 09 1380 M33HVK*TV39A 3HVC*ACU2A CHILLED WATER RETURN TEMPERATURE CONTROL VLE3314F CBW VLV CB 0064 06 1381 33HVKTV39B VALVE1 3HVC*ACU2B CHILLED WATER RETURN TEMPERATURE CONTROL 31FCWVVC 040 VALVE 1382 M33HVK*TV41A 3HVC-ACU1 CHILLED WATER COIL 3314F CBW VLV CB 0064 1383 M33HVK*TV41B CONTROL ROOM AIR CONDITIONING UNIT 3HVC*ACU1B TEMP CONTROL 3314F CBW VLV CB 0064 B.1-60

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1384 M33HVK*TV76A ACU#4 CHILLED WATER TEMPERATURE CONTROL 3314F CBW VLV CB 0066 1385 M33HVK*TV76B ACU#4 CHILLED WATER TEMPERATURE CONTROL 3314F CBW VLV CB 0066 1386 M33HVK*TV77A ACU#3 CHILLED WATER TEMPERATURE CONTROL 3314F CBW VLV CB 0066 1387 M33HVK*TV77B ACU#3 CHILLED WATER TEMPERATURE CONTROL 3314F CBW VLV CB 0066 1388 M33MSS*CTV27A MAIN STEAM ISOLATION TRIP VALVE 3316A STG VLV MS" 0066 1389 M33MSS*CTV27B MAIN STEAM ISOLATION TRIP VALVE 3316A STG VLV MS 0066 1390 M33MSS*CTV27C MAIN STEAM ISOLATION TRIP VALVE 3316A STG VLV MS 0066 1391 M33MSS*CTV27D MAIN STEAM ISOLATION TRIP VALVE 3316A STG VLV MS 0066 1392 M33MSS*MCV5 3FWA*T1 SGAFW TURBINE CONTROL VALVE 3316A STG VLV ES TERRY TURBINE 0024 1393 M33MSS*MSV5 TURBINE DRIVEN SGAFW PUMP STEAM ISOLATION 3316A STG VLV ES TERRY TURBINE 0024 1394 M33MSS*PV20A MAIN STEAM PRESSURE RELIEVING VALVE 3316A STG VLV MS S/E CUBE 0069 1395 M33MSS*PV20B MAIN STEAM PRESSURE RELIEVING CONTROL 3316A STG VLV MS LOCATED ON C MS LINE 0069 1396 M33MSS*PV20D MAIN STEAM PRESS RELIEVING CONTROL 3316A STG VLV MS LOCATED ON A MS LINE 0068 1397 M33CCP*FV66A (A) RHR HEAT EXCHANGE COOLING OUTLET ISOLATION 3330A CCR VLV ES PIPE TUNNEL 4'6" 0010 1398 M33CCP*FV66B B RHR HX CCP OUTLET CV 3330A CCR VLV ES PIPE TUNNEL 4'6" 0010 1399 M33CCP*LV61 SI PUMP COOLING SURGE TANK FILL 3330A CCR VLV ES SIS PUMP SURGE TK 0039 06 1400 M33CCP*LV91 CHARGING PUMP COOLING SURGE TANK FILL 3330A CCR VLV AB CHG PMP COL SURGE 0049 1 TK 1401 M33EGA*ASV1A RIGHT BANK AIR START CONTROL VALVE 3346A DSA VLV DG A TRAIN 0027 1402 M33EGA*ASV1B RIGHT BANK AIR START CONTROL VALVE 3346A DSA VLV DG B TRAIN 0027 1403 M33EGA*ASV2A LEFT BANK AIR START CONTROL VALVE 3346A DSA VLV DG A TRAIN 0027 1404 M33EGA*ASV2B LEFT BANK AIR START CONTROL VALVE 3346A DSA VLV DG B TRAIN 0027 1405 M33EGA*EFV35A1 "A" DIESEL COMP INST EXCESS AIR FLOW VALVE - SPRING LOADED 3346A DSA VLV DG D/G 'A' 0027 (V986) 1406 M33EGA*EFV35A2 "A" DIESEL COMP INST EXCESS AIR FLOW VALVE - SPRING LOADED 3346A DSA VLV DG NEXT TO RECIEVER 0027 (V985) B. 1-61

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1407 M33EGA*EFV35B1 "B" DIESEL COMP INST EXCESS AIR FLOW VALVE - SPRING LOADED 3346A DSA VLV DG DIG'B' 0027 (V984) 1408 M33EGA*EFV35B2 "B" DIESEL COMP INST EXCESS AIR FLOW VALVE - SPRING LOADED 3346A DSA VLV DG NEXT TO COMPRESSOR 0027 (V983) 1409 M33EGO*PCV22A ROCKER ARM LUBE OIL HEADER PCV 3346A DLS VLV DG D/G 'A' 0025 1410 M33EGO*PCV22B ROCKER ARM LUBE OIL HEADER PCV 3346A DLS VLV DG D/G 'B' 0025 1411 M33EGO*TCV20A LUBE OIL HEAT EXCHANGER TEMPERATURE CONTROL 3346A DLS VLV DG D/G 'A' 0025 1412 M33EGO*TCV20B LUBE OIL HEAT EXCHANGER TEMPERATURE CONTROL 3346A DLS VLV DG D/G 'B' 0025 1413 M33EGS*TCV44A ENGINE AIR COOLER WATER HEAT EXCHANGER TCV 3346A DGN VLV DG D/G 'A' 0025 1414 M33EGS*TCV44B ENGINE AIR COOLER WATER HEAT EXCHANGER TCV 3346A DGN VLV DG D/G 'B' 0025 1415 M33EGS*TCV5OA "A" DIESEL JACKET WATER COOLER 3-WAY TEMPERATURE CONTROL 3346A DGN VLV DG "A" DIESEL ROOM 0030 06 VALVE 1416 M33EGS*TCV5OB "B" DIESEL JACKET WATER COOLER 3-WAY TEMPERATURE CONTROL 3346A DGN VLV DG "B" DIESEL ROOM 0030 06 VALVE 1417 M33HVR*XRC28A CONSTANT VOLTAGE TRANSFORMER FOR DAMPER ACUTATOR 3314A RBV XMF AB 0033 1417 M3(MOD28A) 1 1 1418 M33HVR*XRC28B CONSTANT VOLTAGE TRANSFORMER FOR DAMPER ACUTATOR 3314A RBV XMF AB 0035 (MOD28B) 1419 M33HVR*XRC72A CONSTANT VOLTAGE TRANSFORMER FOR DAMPER ACUTATOR 3314C RBV XMF AB 0033 (MOD72A) 1420 M33HVQ*ACUS1A-T1 CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1421 M33HVQ*ACUS1A-T2 HEATER CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1422 M33HVQ*ACUS1B-T1 CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1423 M33HVQ*ACUS1B-T2 EATER CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1424 M33HVQ*ACUS2A-T1 CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1425 M33HVQ*ACUS2A-T2 HEATER CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1426 M33HVQ*ACUS2B-T1 CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1427 M33HVQ*ACUS2B-T2 HEATER CONTROL CIRCUIT SUPPLY TRANSFORMER 3314D ESG XMF 0000 00 1428 M332R-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32R-1H ASSEMBLY 3344A ESO XMF B. 1-62

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1429 M332R-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32R-2H ASSEMBLY 3344A ESO XMF 1430 M332S-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32S-1H ASSEMBLY 3344A ESO XMF 1431 M332S-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32S-2H ASSEMBLY 3344A ESO XMF 1432 M332T-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32T-1H ASSEMBLY 3344A ESO XMF 1433 M332T-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32T-2H ASSEMBLY 3344A ES0 XMF 1434 M332U-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32U-1H ASSEMBLY 3344A ESO XMF 1435 M332U-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32U-1H ASSEMBLY 3344A ESO XMF 1436 M332V-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32V-1H ASSEMBLY 3344A ESO XMF 1437 M332V-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32V-2H ASSEMBLY 3344A ESO XMF 1438 M332W-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32W-1H ASSEMBLY 3344A ESO XMF 1439 M332W-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32W-2H ASSEMBLY 3344A ESO XMF 1440 M332X-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32X-1H ASSEMBLY 3344A ESO XMF 1441 M332X-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32X-2H ASSEMBLY 3344A ESO XMF 1442 M332Y-1H 480V/120V VOLTAGE MONITORING TRANSFORMER 32Y-1H ASSEMBLY 3344A ESO XMF 1443 M332Y-2H 480V/120V VOLTAGE MONITORING TRANSFORMER 32Y-2H ASSEMBLY 3344A ESO XMF 1444 M33EJS*X-1A 1000 KVA TRANSFORMER 3344A ELC XMF CB 0004 1445 M33EJS*X-1B 1000 KVA TRANSFORMER 3344A ELC XMF CB 0004 1446 Mj33EjS*X-2A 1000 WvA TRANSFORM,_ER 3344A I -LCXMF CP 1447 M33EJS*X-2B 1000 KVA TRANSFORMER 3344A ELC XMF AB 1448 M33EJS*X-3A 1000 KVA TRANSFORMER 3344A ELC XMF AB 0024 1449 M33EJS*X-3B 1000 KVA TRANSFORMER 3344A ELC XMF AB 0024 1450 M33EJS*X-4A 1000 KVA TRANSFORMER 3344A ELC XMF AB 0024 1451 M33EJS*X-4B 4160/480 TRANSFORMER (1000KVA) FOR 32X BUS 3344A ELC XMF AB WEST MCC ROD 0024 1 ~ CONTROLI B.1-63

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1452 M33SCV*XD100 AC DIST PANEL TRANSFORMER ENGINEERED SAFETY FEATURE 3345A EVI XMF ES 0036 BUILDING 1453 M33SCV*XD10P 240/120V 1PH STEP-DOWN TRANSFORMER PU 3345A EVI XMF ES 0036 1454 M33SCV*XD11P AC DIST PANEL TRANSFORMER ENGINEERED SAFETY FEATURE 3345A EVI XMF ES 0036 BUILDING 1455 M33SCV*XD10 240/120V 1PH STEP-DOWN XFMR OR 3345A EVI XMF CB 0004 1456 M33SCV*XD1P AC DIST PANEL TRANSFORMER CONTROL 3345A EVI XMF CB 0004 1457 M33SCV*XD240 AC DIST PANEL TRANSFORMER-CWPH 3345A EVI XMF CW 0014 1458 M33SCV*XD24P AC DIST PANEL TRANSFORMER-CWPH 3345A EVI XMF CW 0014 1459 M33SCV*XD250 AC DIST PANEL TRANSFORMER-EGE 3345A EVI XMF DG 0024 1460 M33SCV*XD25P AC DIST PANEL TRANSFORMER-EGE 3345A EVI XMF DG 0024 1461 M33SCV*XD50 240/120V 1PH STEP-DOWN TRANSFORMER OR 3345A EVI XMF AB 0024 1462 M33SCV*XD5P AC DIST PANEL TRANSFORMER AUXILIARY 3345A EVI XMF AB 0024 1463 M33SCV*XD90 AC DIST PANEL TRANSFORMER AUXILIARY 3345A EVI XMF AB 0024 1464 M33SCV'XD9P AC DIST PANEL TRANSFORMER AUXILIARY 3345A EVI XMF AB 0043 1465 M33SCV*XDH2A AC DIST PANEL TRANSFORMER CONTROL 3345A EVI XMF CB 0004 1466 M33SCV*XDH2B AC DIST PANEL TRANSFORMER CONTROL 3345A EVI XMF CB 0004 1467 M33VBA*XD-1A VITAL BUS ISOLATION TRANSFORMER 3345B ELC XMF CB 0004 1468 M33VBA*XD-2A VITAL BUS ISOLATION TRANSFORMER 3345B ELC XMF CB 0004 1469 M33VBA*XD-3A VITAL BUS ISOLATION TRANSFORMER 3345B ELC XMF CB IN BACK OF INV-3 0004 1470 M33VBA*XD-4A VITAL BUS ISOLATION XFMR 3345B ELC XMF CB 0004 1471 M33VBA*XRC-1 STEP DOWN & REGULATING TRANSFORMER 3VBA*XRC-1 3345B EVI XMF CB ABOVE BAT PM 301A-1 0014 1472 M33VBA*XRC-2 VIAC-2 ALTERNATE SOURCE TRANSFORMER 3345B ELC XMF CB WEST SWITCHGEAR 0004 ROOM 1473 M33VBA*XRC-3 STEP DOWN & REGULATING TRANSFORMER 3VBA*XRC-3 3345B ELC XMF CB EAST SWITCHGEAR 0004 1474 M33VBA*XRC-4 VIAC-4 ALTERNATE SOURCE TRANSFORMER 3345B ELC XMF CB WEST SWITCH GEAR 0004 B.1-64

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1475 M33LAC*EXL10 3LAC*PNL3C10 LIGHTING TRANSFORMER 3720B LTG XMF CB 0004 1476 M33LAC*EXL2P 3LAC*PNL3C2P LIGHTING TRANSFORMER 3720B LTG XMF CB 0004 1477 M33LAC*EXL30 3LAC*PNL3C3O LIGHTING TRANSFORMER 3720B LTG XMF CB 0004 1478 M33LAC*EXL4P 3LAC*PNL3C4P LIGHTING TRANSFORMER 3720B LTG XMF CB WEST SW/GR,SNW WALL 0004 1479 M33LAD*EXL10 LIGHTING TRANSFORMER 3LAD*EXL10 (PANEL 3LAD*PNL3DG1O) 3720B LTG XMF DG 0051 1480 M33LAD*EXL2P 3LAD*PNL3DG2P LIGHTING TRANSFORMER 3720B LTG XMF DG SOUTH MUFFLER ENCL 0052 1481 M33LAK*EXL1O 3LAK*PNL3ESF10 LIGHTING TRANSFORMER 3720B LTG XMF ES RSS CUB, SOUTH WALL 0004 1482 M33LAK*EXL2P 3LAK*3ESF2P LIGHTING TRANSFORMER 3720B LTG XMF ES ES RSS CUBICLE B&D 0004 06 1483 M33LAP*EXL1O LIGHTING TRANSFORMER FOR PANEL 3LAP*PNL3P1O 3720B LTG XMF AB EAST BUSS ROOM 0024 1484 M33LAP*EXL2P 3LAP*PNL3P2P LIGHTING TRANSFORMER 3720B LTG XMF AB 0024 1485 M33LAR*EXL10 LIGHTING TRANSFORMER 3LAR*EXL10 (PANEL 3LAR*PNL3RC1O) 3720B LTG XMF AB EAST-ROD DRIVE 0024 1486 M33LAR*EXL2P 3LAR*PNL3RC2P LIGHTING TRANSFORMER 3720B LTG XMF AB 0024 1487 M33LAT*EXL10 3LAT*PNL3T10 LIGHTING TRANSFORMER 3720B LTG XMF CB EAST SWGR ROOM 0004 1488 M33LAT*EXL2P 3LAT*PNL3T2P LIGHTING TRANSFORMER 3720B LTG XMF CB 0004 1489 M33LAW*EXL10 3LAW-PNL3CW1O LIGHTING TRANSFORMER 3720B LTG XMF CW 0014 1490 M33LAW*EXL2P 3LAW-PNL3CW2P LIGHTING TRANSFORMER 3720B LTG XMF CW 0014 1491 M33RCS*FT414 REACTOR COOLANT LOOP 1 FLOW TRANSMITTER 3301 RCS ýXMT CS COLU MN 122 CRANE WALUMLN CRANE 0004 1492 M33RCS*FT415 REACTOR COOLANT LOOP 1 FLOW TRANSMITTER 3301 RCS XMT CS COL WALL 0004 1493 M33RCS*FT415 REACTOR COOLANT LOOP 1 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 12 CRANE 0004 1494 M33RCS*FT416 REACTOR COOLANT LOOP 2 FLOW TRANSMITTER 3301 RCS XMT CS WALL CLM18RAE 0004 WALL 1495 M33RCS*FT425 REACTOR COOLANT LOOP 2 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 18 CRANE 0004 WALL I0004 1496 M33RCS*FT426 REACTOR COOLANT LOOP 2 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 18 CRANE WALL B.1-65

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1497 M33RCS*FT434 REACTOR COOLANT LOOP 3 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 1 CRANE WALL 0004 1498 M33RCS*FT435 REACTOR COOLANT LOOP 3 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 1 CRANE WALL 0004 1499 M33RCS*FT436 REACTOR COOLANT LOOP 3 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 1 CRANE WALL 0004 1500 M33RCS*FT444 REACTOR COOLANT LOOP 4 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 9 CRANE WALL 0004 1501 M33RCS*FT445 REACTOR COOLANT LOOP 4 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 9 CRANE WALL 0004 1502 M33RCS*FT446 REACTOR COOLANT LOOP 4 FLOW TRANSMITTER 3301 RCS XMT CS COLUMN 9 CRANE WALL 0004 1503 M33RCS*LT459 PRESSURIZER LEVEL (CHANNEL 1) LEVEL TRANSMITTER 3301 RCS XMT CS CONTAINMENT 0003 08 COLUMN 14 CRANE 1504 M33RCS*LT460 PRESSURIZER LEVEL (CHANNEL 2) LEVEL TRANSMITTER 3301 RCS XMT CS WALL 0008 02 1505 M33RCS*LT461 PRESSURIZER LEVEL TRANSMITTER 3301 RCS XMT CS COLUMN 14 CRANE 0008 02 WALL 1506 M33RCS*PT403 REACTOR COOLANT SYSTEM WIDE RANGE PRESSURE XMTR 3301 RCS XMT CS COLUMN 10 CRANE 0003 08 WALL 1507 M33RCS*PT403A REACTOR COOLANT SYSTEM WIDE RANGE PRESSURE XMTR 3301 RCS XMT CS COLUMN 10 CRANE 0003 08 WALL 1508 M33RCS*PT405 RCS WIDE RANGE PRESS XMITTER (IN FRONT ELEVATOR) 3301 RCS XMT CS OTR ANNULUS FRNT ELV 0003 08 1509 M33RCS*PT405A REACTOR COOLANT SYSTEM WIDE RANGE PRESSURE TRANSMITTER 3301 RCS XMT CS 0003 08 1510 M33RCS*PT455 PRESSURIZER 3RCS*TK1 PRESSURE XMTR (CHANNEL 1) 3301 RCS XMT CS CONTAINMENT 0003 02 1511 M33RCS*PT456 PRESSURIZER 3RCS*TK1 PRESSURE XMTR (CHANNEL 2) 3301 RCS XMT CS 0008 02 COLUMN6RN 1512 M33RCS*PT457 PRESSURIZER 3RCS*TK1 PRESSURE TRANSMITTER (CHANNEL 3) 3301 RCS XMT COLUMN 16 CRANE CS WALL 0004 COLUMN1 RN 1513 M33RCS*PT458 PRESSURIZER 3RCS*TK1 PRESSURE TRANSMITTER (CHANNEL 4) 3301 RCS XMT CS WALLMN 15 CRANE 0004 1514 M33RCS*PT49 R/C LOOP 1 WIDE RANGE PRESSURE TRANSMITTER 3301 RCS XMT CS COLUMN 10 CRANE 0003 08 WALL 1515 M33RCS*PT50 R/C LOOP 4 WIDE RANGE PRESSURE TRANSMITTER 3301 RCS XMT CS COLUMN 9 CRANE WALL 0003 08 REACTOR VESSEL 3RCS*RV1 VENT VALVE 3RCS*HVC442B POSITION 1516 M33RCS*ZT442A XMR3301 XMTR RCS XMT AB 0024 1517 M33RCS*ZT442B REACTOR VESSEL 3RCS*RV1 VENT VALVE 3RCS*HCV442B POSITION 3301 RCS XMT CS 0024 XMTR B.1-66

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1518 M33RCS-LT459C PRESSURIZER LEVEL TRANSMITTER 3301 RCS XMT CS 0003 08 1519 M33RCS-LT462 PRESSURIZER LEVEL COLD INDICATION LEVEL TRANSMITTER 3301 RCS XMT CS 0003 08 1520 M33RCS-LT51A CONTROL ROOM SHUTDOWN LEVEL ND. & RHR PERFORMANCE 3301 RCS XMT CS OUTSIDE CRANE WALL 0003 06 MONITORING. 1521 M33RCS-LT51B CONTROL ROOM SHUTDOWN LEVEL ND. & RHR PERFORMANCE 3301 RCS XMT CS OUTSIDE CRANE WALL 0003 06 MONITORING. 1522 M33RCS-PT405B RCS WIDE RNGE PRESSURE XMTR 3301 RCS XMT CS 0013 07 1523 M33RCS-PT455B PRESSURIZER 3RCS*TK1 PRESSURE TRANSMTTER 3301 RCS XMT CS 0003 08 1524 M33SFC-FT19 FUEL POOL COOLERS RETURN FLOW FLOW TRANSMITTER 3305 SFC XMT FB 0045 1525 M33SFC-PT36 FUEL POOL COOLING PMPS DISCHARGE PRESSURE TRANSMITTER 3305 SFC XMT FB 0024 06 1526 M33SIH-FT63 SAFETY INJECTION PUMPS MINIFLOW FLOW TRANSMITTER 3308 HPI XMT ES 0004 06 1527 M33SIH-FT917 CHARGING PUMP DISCHARGE FLOW INDICATION FLOW TRANSMITTER 3308 HPI XMT AB 0004 06 1528 M33SIH-FT918 SAFETY INJECTION PUMP 'A' DISCHARGE FLOW TRANSMITTER 3308 HPI XMT ES 0021 1529 M33SIH-FT922 SAFETY INJECTION PUMP 'B' DISCHARGE FLOW TRANSMITTER 3308 HPI XMT ES 0004 1530 M33SIH-PT62A SAFETY INJECTION PUMP 3SIH*P1A SUCTION PRESSURE TRANSMITTER 3308 HPI XMT ES 0012 1531 M33SIH-PT62B SAFETY INJECTION PUMP 3SIH*P1B SUCTION PRESSURE TRANSMITTER 3308 HPI XMT ES 0004 06 1532 M33SIH-PT919 SAFETY INJECTION PUMP DISCHARGE PRESSURE TRANSMITTER 3308 HPI XMT ES 0010 1533 M33SIH-PT923 SAFETY INJECTION PUMP DISCHARGE PRESSURE TRANSMITTER 3308 HPI XMT ES 0010 1534 M33FWA*FT33A AUX FW FLO TO STEAM GENERATOR 3RCS*SG1A FLOW TRANSMITTER 3322 AFW XMT CS COLUMN WALL 11 OUTER 0025 1535 M33FWA*FT33B AUX FW FLO TO STEAM GENERATOR 3RCS*SG1B FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 19 OUTER 0024 WALL 1536 M33FWA*FT33C AUX FW FLO TO STEAM GENERATOR 3RCS*SGIC FLOW TRANSMITTER 3322 AFW XMT COLUMN 20 OUTER CS WALL 0004 1537 M33FWA*FT33D AUX FW FLO TO STEAM GENERATOR 3RCS*SG1D FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 11 OUTER 0004 WALL 1538 M33FWA*FT51A AUX FW FLO TO STEAM GENERATOR 3RCS*SG1A FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 10 OUTER 0025 WALL B.1-67

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1539 M33FWA*FT51 B AUX FW FLO TO STEAM GENERATOR 3RCS*SG1B FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 20 OUTER 0004 WALL 1540 M33FWA*FT51C AUX FW FLO TO STEAM GENERATOR 3RCS*SG1C FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 20 OUTER 0004 WALL 1541 M33FWA*FT51D AUX FW FLO TO STEAM GENERATOR 3RCS*SG1D FLOW TRANSMITTER 3322 AFW XMT CS COLUMN 10 OUTER 0025 WALL 1542 M33FWA*LT20A DEMINERALIZED WTR STORAGE TNK 3FWA*TK1 LVL XMITTER 3322 AFW XMT ES 0004 1543 M33FWA*LT20B DEMINERALIZED WTR STORAGE TNK 3FWA*TK1 LVL XMITTER 3322 AFW XMT ES 0004 1544 M33FWA*ST40 AUXILIARY FEEDWATER PUMP 3FWA*P2 TURBINE SPEED TACHOMETER 3322 AFW XMT ES 0021 1545 M33FWA-FT51A2 AUX FDWTR FLW TO STM GEN 3RCS*SG1A FLOW TRANSMITER 3322 AFW XMT CS 3CES*PNLBS3P 0024 06 1546 M33FWA-FT51D2 AUX FEEDWTR FLOW TO STEAM GEN 3RCS*SG1 D FLOW XMTTR 3322 AFW XMT CS 0024 1547 M33FWA-PT28A AUXILIARY FEEDWATER PUMP 3FWA*P1A SUCTION PRESSURE PRESS 3322 AFW XMT ES 0012 XMTR 1548 M33FWA-PT28B AUXILIARY FEEDWATER PMP 3FWA*P1B SUCTION PRESSURE 3322 AFW XMT ES 0012 TRANSMITTER 1549 M33FWA-PT28C AUXILIARY FEEDWATER PMP 3FWA*P2 SUCTION PRESSURE 3322 AFW XMT ES 0012 TRANSMITTER 1550 M33FWA-PT29A AUXILIARY FEEDWATER PUMP 3FWA*P1A DISCHARGE PRESSURE 3322 AFW XMT ES 0012 TRANSMITTER 1551 M33FWA-PT29B AUXILIARY FEEDWATER PUMP 3FWA*P1B DISCHARGE PRESSURE 3322 AFW XMT ES 0012 TRANSMITTER 1552 M33FWA-PT29C AUXILIARY FEEDWATER PUMP 3FWA*P2 DISCHARGE PRESSURE 3322 AFW XMT ES 0012 TRANSMITTER 1553 M33SWP-FT43A RX PLANT COMP HX (TRAIN A) OUTLET FLOW IND AND ALRM FLW 3326 SWS XMT AR 0009 TRANSMTTR 1554 M33SWP-FT43B RX PLANT COMP HX (TRAIN B) OUTLET FLOW TRANSMITTER 3326 SWS XMT AB 0009 1555 M33SWP-FT59A 3RSS*E1A SERVICE WATER OUTLET FLOW TRANSMITTER 3326 SWS XMT ES 0004 06 1556 M33SWP-FT59B 3RSS*E1B SERVICE WATER OUTLET FLOW TRANSMITTER 3326 SWS XMT ES 0004 06 1557 M33SWP-FT59C 3RSS*E1C SERVICE WATER OUTLET FLOW TRANSMITTER 3326 SWS XMT ES 0004 1558 M33SWP-FT59D 3RSS*E1 D SERVICE WATER OUTLET FLOW TRANSMITTER 3326 SWS XMT ES 0004 06 1559 M33SWP-PT106A AIR COND BOOSTER PMP 3SWP*P2A SUCTION PRESS TRANSMITTER 3326 SWS XMT CB 0069 B.1-68

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1560 M33SWP-PT106B AIR COND BOOSTER PMP 3SWP*P2B SUCTION PRESS TRANSMITTER 3326 SWS XMT CB 0069 1561 M33SWP-PT26A SERV WATER SUPPLY PRESS (HDR A) PRESSURE TRANSMITTER 3326 SWS XMT CW PUMPHOUSE 0018 05 1562 M33SWP-PT26B SERV WATER SUPPLY PRESS (HDR B) PRESSURE TRANSMITTER 3326 SWS XMT CW PUMP HOUSE 0018 05 1563 M33SWP-PT42A AIR COND BOOSTER PMP 3SWP*P2A DISCH PRESS IND PRESS 3326 SWS XMT GB 0069 TRANSMITTER 1564 M33SWP-PT42B AIR COND BOOSTER PMP 3SWP*P2B DISCH PRESS IND PRESS 3326 SWS XMT GB 0069 TRANSMITTER 1565 M33SWP-PT98A SERVICE WTR PMP 3SWP*P1A LUBE WATER PRESSURE TRANSMITTER 3326 SWS XMT CW 0019 1566 M33SWP-PT98B SERVICE WTR PMP 3SWP*P1B LUBE WATER PRESSURE TRANSMITTER 3326 SWS XMT CW 0019 1567 M33SWP-PT98C SERVICE WTR PMP 3SWP*P1C LUBE WATER PRESSURE TRANSMITTER 3326 SWS XMT CW 0019 1568 M33SWP-PT98D SERVICE WTR PMP 3SWP*P1D LUBE WATER PRESSURE TRANSMITTER 3326 SWS XMT CW 0019 1569 M33CHS*ZT19OA CHARGING HEADER FLOW CNT VLV 3CHS*HCV190A ELECTRONIC 3304A CVC XMT AB 0004 CONTROL MOD 1570 M33CHS*ZT19OB CHARGING HEADER FLOW CNT VLV 3CHS*HCV190B ELECTRONIC 3304A CVC XMT AB 0024 CONTROL MOD 1571 M33CHS-FT121 CHARGING LINE FLOW CONTROL VALVE 3CHS*FCV121 FLOW 3304A CVC XMT AB 0004 TRANSMITTER 1_1 1572 M33CHS-FT132 LTDN HTX 3CHS*E2 FLOW INDICATION AND ALRM FLOW TRANSMITTER 3304A CVC XMT AB 0004 1573 M33CHS-FT139 REACTOR COOLANT LOOP FILL HEADER FLOW INDICATION FLOW 3304A CVC XMT AB CES-RK12-06 0004 06 TRANSMITTR 1574 M33CHS-FT142 REACTOR COOLANT PUMP 3RCS*P1 D #1 SEAL WTR INJ FLOW 3304A CVC XMT AB 3CES-RK-06 0004 06 TRANSMITTER REACTOR COOLANT PUMP ....... ,~-., SEAL_ 'A".R 1N" F 1- A 1575 M33CHS-FT143 TASIER3304A CVC XMT JAB 13CES-RK-07 0004 1576 M33CHS-FT144 REACTOR COOLANT PUMP 3RCS*P1B #1 SEAL WTR INJ FLOW TRANSMITTER 3304A CVC XMT AB 3CES-RK-07 0004 1577 M33CHS-FT145 REACTOR COOLANT PUMP 3RCS*PIA #1 SEAL WTR INJ FLOW 3304A CVC XMT AB 0004 TRANSMITTER 1578 M33CHS-FT154 REACTOR COOLANT PMP 3RCS*P1D FLOW TRANSMITTER 3304A CVC XMT CS CONTAINMENT -008 04 1579 M33CHS-FT155 REACTOR COOLANT PMP 3RCS*P1C FLOW TRANSMITTER 3304A CVC XMT CS -008 09 1580 M33CHS-FT156 REACTOR COOLANT PMP 3RCS*P1B FLOW TRANSMITTER 3304A CVC XMT CS -008 06 B. 1-69

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1581 M33CHS-FT157 REACTOR COOLANT PMP 3RCS*P1A FLOW TRANSMITTER 3304A CVC XMT CS -008 04 1582 M33CHS-FT158 REACTOR COOLANT PMP 3RCS*P1D FLOW TRANSMITTER 3304A CVC XMT CS CONTAINMENT -008 04 1583 M33CHS-FT159 REACTOR COOLANT PMP 3RCS*PIC HI RANGE FLOW 3304A CVC XMT CS -008 04 1584 M33CHS-FT160 REACTOR COOLANT PMP 3RCS*P1B FLOW TRANSMITTER 3304A CVC XMT CS CONTAINMENT -008 04 1585 M33CHS-FT161 REACTOR COOLANT PMP 3RCS*P1A FLOW TRANSMITTER 3304A CVC XMT CS CONTAINMENT -008 04 1586 M33CHS-FT75 IN SERVICE CHARGING PUMPS RECIRCULATION FLOW TRANSMITTER 3304A CVC XMT AB 3CES-RK12-09 0004 06 1587 M33CHS-FT99 VOLUME CONTROL TANK 3CHS*TK2 SWIRL CONTROL FLOW 3304A CVC XMT AB 3CES-RK12-02 0043 06 TRANSMITTER 1588 M33CHS-LT1 12 VOLUME CONTROL TANK 3CHS*TK2 LEVEL TRANSMITTER 3304A CVC XMT A1B 0044 1589 M33CHS-PT1 15 VOL CONT TANK PRESSURE TRANSMITTER 3304A CVC XMT AB 0043 1590 M33CHS-PT120 CHARGING PUMPS 3CHS*P3A,B&C DISCHARGE PRESSURE 3304A CVC XMT AB 3CES*MCB-MB3 0047 06 TRANSMITTER 1591 M33CHS-PT124 EXCESS LETDOWN HEAT EXCHG 3CHS*E3 OUTLET PRESSURE 3304A CVC XMT CS 0006 08 TRANSMITTER LW PRESSURE LETDOWN PRESSURE CNTRL VLV 3CSH*PCV131 PRS 0004 06 3CH-T113304A LW2 CVC XMT AB0046 19MCST1 TRANSMTTR 1593 M33CHS-PT138 REACTOR COOLANT LOOP FILL HEADER PRS INDICATION PRS TRANS 3304A CVC XMT CS 0008 02 1594 M33CHS-PT150 RCP 3RCS*P1D #1 SEAL DIF PRS IND AND ALAM DIF PRS TRANSMITTER 3304A CVC XMT CS 0011 03 1595 M33CHS-PT151 RCP 3RCS*P1C #1 SEAL DIF PRS IND AND ALAM DIF PRS TRANSMITTER 3304A CVC XMT CS 0006 08 1596 M33CHS-PT152 RCP 3RCS*P1B #1 SEAL DIF PRS IND AND ALRM DIF PRS TRANSMITTER 3304A CVC XMT CS 0006 08 1597 M33CHS-PT153 RCP 3RCS*P1A #1 SEAL DIF PRS IND AND ALRM DIF PRS TRANSMITTER 3304A CVC XMT CS 0006 08 IN SERVICE CHARGING PUMP 3CHS*P3A SUCTION PRESSURE 1598 M33CHS-PT76A TRANSMITTER 3304A CVC XMT AB 3CES-RK12-09 0004 06 1599 M33CHS-PT76B IN SERVICE CHARGING PUMP 3CHS*P3B SUCTION PRESSURE 3304A CVC XMT AB 3CES-RK1 2-03 0004 06 TRANSMITTER 1600 M33CHS-PT76C IN SERVICE CHARGING PUMP 3CHS*P3B SUCTION PRESSURE 3304A CVC XMT AB 3CES-RK12-03 TRANSMITTER 1601: M33CHS-PT77A 3304A ICVC XMT IAB 3CES-RK12-09 IN SERVICE CHARGING PUMP 3CHS*P3A DISCHARGE PRESSURE TRANSMITTER B. 1-70

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1602 M33CHS-PT77B IN SERVICE CHARGING PUMP 3CHS*P3B DISCH PRESSURE TRANSMITTER 3304A CVC XMT AB 3CES-RK12-03 0004 06 1603 M33CHS-PT77C IN SERVICE CHARGING PUMP 3CHS*P3C DISCH PRESSURE 3304A CVC XMT AB 3CES-RK12-03 0004 06 TRANSMITTER 1604 M33CHS-PT80 GASEOUS WST TO CHEMICL & VOL CNTRL SYS PRESSURE CNTRL PRS AB 0045 06 160 M3CHSPT8 TRANSMT 3304A CVC XMT 1605 M33CHS*FT1 10 BORIC ACID INJECT VLV 3CHS*FCV1 10A TO FLOW TRANSMITTER 3304C CVC XMT CB 0029 06 1606 M33CHS*LT102 BORIC ACIC TANK 3CHS*TK5A LEVEL TRANSMITTER 3304C CVC XMT AB 0005 1607 M33CHS*LT1O4 BORIC ACID TANK 3CHS*TK5A LEVEL TRANSMITTER 3304C CVC XMT AB 0024 1608 M33CHS*LT105 BORIC ACID TANK 3CHS*TK5B LEVEL TRANSMITTER 3304C CVC XMT AB 0025 1609 M33CHS*LT106 BORIC ACID TANK 3CHS*TK5B LEVEL TRANSMITTER 3304C CVC XMT AB 0005 1610 M33CHS-FT111 REACTOR MAKEUP WTR INJECT VLV 3CHS*FCV1 11A FLOW 3304C CVC XMT AB 1611 M33CHS-FT183 EMER BORATION FLOW TRANSMITTER 3304C CVC XMT AB 3CES-RK12-09 0004 06 1612 M33CHS-PT78A IN SERVICE BORIC ACID TRANS PMP 3CHS*P2A DISCH PRESS 3304C CVC XMT AB 0043 TRANSMITTER 1613 M33SIL*ZT943A SI TANK N2 VENT VALVE POSITION TRANSMITTER (3SIL*HCV943A) 3307A LPI XMT CS 0024 1614 M33SIL*ZT943B SI TANK N2 VENT VALVE POSITION TRANSMITTER (3SIL*HCV943B) 3307A LPI XMT AB 0024 1615 M33SIL-LT950 SFTY INJ ACCUM TK 1A LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1616 M33SIL-LT951 SFTY INJ ACCUM TK 1A LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1617 M33SIL-LT952 SFTY INJ ACCUM TK 1B LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1618 M33SIL-LT953 SFTY ]NJ ACCUM TK 1B LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1619 M33SIL-LT954 SFTY INJ ACCUM TK 1C LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1620 M33SIL-LT955 SFTY INJ ACCUM TK 1C LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1621 M33SIL-LT956 SFTY INJ ACCUM TK 1D LEVEL TRANSMITTER 3307A LPI XMT CB -009 03 1622 M33SIL-LT957 SFTY INJ ACCUM TK 1D LEVEL TRANSMITTER 3307A LPI XMT CS -009 03 1623 M33SIL-PT960 SFTY INJ ACCUM TK 1A PRESSURE TRANSMITTER 3307A LPI XMT CS -004 03 B. 1-71

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List 1 LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1624 M33SIL-PT961 SFTY INJ ACCUM TK 1A PRESSURE TRANSMITTER 3307A LPI XMT CS BETWEEN A&D ACC -004 03 TANK 1625 M33SIL-PT962 SFTY INJ ACCUM TK 1B PRESSURE TRANSMITTER 3307A LPI XMT CS -004 03 1626 M33SIL-PT963 SFTY INJ ACCUM TK 1B PRESSURE TRANSMITTER 3307A LPI XMT CS BETWEEN B&C ACC -004 03 TANK 1627 M33SIL-PT964 SFTY INJ ACCUM TK lC PRESSURE TRANSMITTER 3307A LPI XMT CS -004 03 1628 M33SIL-PT965 SFTY INJ ACCUM TK IC PRESSURE TRANSMITTER 3307A LPI XMT CS BETWEEN B&C AGO -004 03 TANK 1629 M33SIL-PT966 SFTY INJ ACCUM TK ID PRESSURE TRANSMITTER 3307A LPI XMT CS -004 03 1630 M33SIL-PT967 SFTY INJ ACCUM TK 1D PRESSURE TRANSMITTER 3307A LPI XMT CS BETWEEN A&D AGO -004 03 1631 M33RHS-FT618 RHR HX ElA BYPASS CONTROL FLOW TRANSMITTER 3307B RHR XMT ES 0021 1632 M33RHS-FT619 RHR HX E1B BYPASS CONTROL FLOW TRANSMITTER 3307B RHR XMT ES 0004 1633 M33RHS-PT26A IN SERV RHR PP SUCT PRESSURE TRANSMITTER 3307B RHR XMT ES 0012 1634 M33RHS-PT26B IN SERV RHR PP SUCT PRESSURE TRANSMITTER 3307B RHR XMT ES 0012 1635 M33RHS-PT614 RHR PMP PlA DISCH PRESSURE TRANSMITTER 3307B RHR XMT ES 0021 1636 M33RHS-PT615 RHR PMP P1B DISCH PRESSURE TRANSMITTER 3307B RHR XMT ES 0010 1637 M33HVR*PDT208A AUX BLDG FLT EXH FAN DIFF PRESSURE TRANSMITTER 3314A RBV XMT AB 0009 1638 M33HVR*PDT208B AUX BLDG FLT EXH FAN DIFF PRESSURE TRANSMITTER 3314A RBV XMT AB 0069 1639 M33HVR*PT104A AUX BLDG FLT 3HVR*FLT1A INLET CONTROL PRESSURE TRANSMITTER 3314A RBV XMT AB 0066 1640 M33HVR*PT104B AUX BLDG FLT 3HVR*FLT1B INLET CONTROL PRESSURE TRANSMITTER 3314A RBV XMT AB 0066 1641 M33HVC-PT73A AIR STORAGE TKS HEADER "A&B" PRESSURE TRANSMITTER 3314F ACC XMT CB 0064 1642 M33HVC-PT73B AIR STORAGE TKS HEADER "A&B" PRESSURE TRANSMITTER 3314F ACC XMT CB 0064 1643 M33HVK*PDT32A CHILLED WTR SUPPLY & RETURN (TRAIN A) PRESSURE TRANSMITTER 3314F CBW XMT CB 0081 1644 M33HVK*PDT32B CHILLED WTR SUPPLY & RETURN (TRAIN B) PRESSURE TRANSMITTER 3314F CBW XMT CB 1645 M33HVK-FT49A WATER CHILLER 3HVK*CHL1A OUTLET FLOW INDICATION FLOW 3314F C8W XMT GB 0069 I_________ TRANSMITTER III_ B. 1-72

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1646 M33HVK-FT49B WATER CHILLER 3HVK*CHL1 B OUTLET FLOW INDICATION FLOW 3314F CBW XMT GB 0069 TRANSMITTER 1647 M33HVK-PT48A CHILLED WTR PMP 3HVK*P1A DISCHARGE PRESSURE IND PRESSURE 3314F CBW XMT CB 0069 TRANSMTT 1648 M33HVK-PT48B CHILLED WTR PMP 3HVK*P1B DISCHARGE PRESSURE IND PRESSURE 3314F CBW XMT GB 0069 TRANSMVTT _________ 1649 M33HVK-PT51A CHILLED WTR PMP 3HVK*P1A SUCTION PRESSURE INDICATION PRS 3314F CBW XMT CB 0069 TRANSMIT-1650 M33HVK-PT51 B CHILLED WTR PMP 3HVK*P1B SUCTION PRESSURE INDICATION PRS 3314F CBW XMT GB 0069 TRANSMIT 1651 M33MSS*FTC12 STEAM GENERATOR 3RCS*SG1A STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0029 TRANSMITTER 1652 M33MSS*FT513 STEAM GENERATOR 3RCS*SG1A STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0029 TRANSMITTER1 1653 M33MSS*PT505 HI PRS TRBN 3M12-T1 IMPLSE CHMBR PRS (CHANNEL 1) PRES 3316A STG XMT TB 0043 TRANSMITTER 1654 M33MSS*PT516 HI PRS TRBN 3MSS-T1 IMPLSE CHMBR PRS (CHANNEL 2) PRES 3316A STG XMT TB 0043 TRANSMITTER 1655 M33MSS*PT514 STEAM GEN 3RCS*SG1IA STEAM LINE PRESSURE (CHANNEL 1) 3316A STG XMT MS 0049 TRANSMITTER 1656 M33MSS*PT515 STEAM GEN 3RCS*SG1A STEAM LINE PRESSURE (CHANNEL 2) 3316A STG XMT MS 0049 TRANSMITTER 1657 M33MSS*PT516 STM GEN 3RCS*SG1A STM LINE PRESS (CHANNEL 3) XMTTER 3316A STG XMT MS 0049 1658 M33MSS*PT524 STEAM GEN 3RCS*SGIB STEAM LINE PRESSURE (CHANNEL 1) 3316A STG XMT MVS 0049 TRANSMITTER 1659 M33MSS*PT525 STEAM GEN 3RCS*SG1B STEAM LINE PRESSURE (CHANNEL 2) 3316A STrG XMT MS 0049 TRANSMITTER 1660 M33MSS*PT526 STEAM GEN 3RCS*SG1B STEAM LINE PRESSURE (CHANNEL 3) 3316A STG XMT MS 0049 TRANSMITTER 1661 M33MSS*PT534 STEAM GEN 3RCS*SG1C STEAM LINE PRESSURE (CHANNEL 1) 3316A STG XMT MS 0049 TRANSMITTER 1662 M33MSS*PT535 STEAM GEN 3RCS*SG1C STEAM LINE PRESSURE (CHANNEL 2) 3316A STG XMT MS 0049 TRANSMITTER 1663 M33MSS*PT536 STEAM GEN 3RCS*SGlC STEAM LINE PRESSURE (CHANNEL 3) 3316A STG XMT MS 0049 TRANSMITTER 1_9_ B.1-73

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1664 M331V1SS*PT544 1664 33MSSPT544 STEAM GEN 3RCS*SG1D STEAM LINE PRESSURE (CHANNEL 1) TRANSMITTER316 3316A STG TXM XMT MS MS04 0049 1665 M33MSS*PT545 STEAM GEN 3RCS*SG1D STEAM LINE PRESSURE (CHANNEL 2) 3316A STG I_1_1XMT MS 0049 TRANSMITTER 1666 M33MSS*PT546 STEAM GEN 3RCS*SG1D STEAM LINE PRESSURE (CHANNEL 4) TRANSMITTER 3316A STG XMT MS 0049 1667 M33MSS-FT522 STEAM GENERATOR 3RCS*SG1B STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0024 06 TRANSMITTER 1668 M33MSS-FT523 STEAM GENERATOR 3RCS*SG1B STEAM FLOW INDICATION FLOW TRANSMITTER 3316A STG XMT CS 0029 1669 M33MSS-FT532 STEAM GENERATOR 3RCS*SG1C STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0029 TRANSMITTER I_________ I_ 1670 M33MSS-FT533 STEAM GENERATOR 3RCS*SG1C STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0029 TRANSMITTER 1671 M33MSS-FT542 STEAM GENERATOR 3RCS*SGlD STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0029 TRANSMITTER 1672 M33MSS-FT543 STEAM GENERATOR 3RCS*SG1D STEAM FLOW INDICATION FLOW 3316A STG XMT CS 0024 06 TRANSMITTER 1673 M33MSS-PT20A MAIN STM PRESS RELIEF VLV 3MSS*PV2OA PRESS XMITTER 3316A STG XMT MS 0054 1674 M33MSS-PT20B MAIN STM PRESS RELIEF VLV 3MNI*PV2EB PRESS XMTR 3316A STG XMT MS 0054 1675 M33MSS-PT20C MAIN STM PRESS RELIEF VLV 3MSS*PV20C PRESS XMITTER 3316A STG XMT MS MAIN STEAM VLV.BLDG. 0044 1676 M33MSS-PT20D MAIN STM PRESS RELIEF VLV 3MSS*PV20D PRESS XMITTER 3316A STG XMT MS MAIN STEAM VLV.BLDG. 0049 1677 M33MSS-PT32 STM GEN AUX FEED PUMP STEAM SUPLY PRESS IND PRESSURE 3316A STG XMT ES 0004 TRANSMITTER 1678 M33MSS-PT514B STM GEN 3RCS*SG1ASTM LINE PRESSURE TRANSMTTER 3316A STG XMT CS 0024 06 1679 M33MSS-PT524B STM GEN 3RCS*SG1B STEAM LINE PRESS TRANSMITTR 3316A STG XMT CS 0024 06 1680 M33MSS-PT534B STM GEN 3RCS*SGIC STM LINE PRESS TRANSMITTER 3316A STG XMT CS 0024 06 1681 M33MSS-PT544B STM GEN 3RCS*SG1D STEAM LINE PRESS TRANSMITTER 3316A STG XMT CS 0024 06 1682 M33CCP*FT178A RCP 3RCS*P1A THERMAL BARRIER FLOW TRANSMITTER 3330A CCR XMT CS COLUMN WALL 12 CRANE 0004 1683 M33CCP*FT178B RCP 3RCS*P1B THERMAL BARRIER FLOW TRANSMITTER 3330A CCR XMT CS COLUMN 18 CRANE 0004 1 1 IWALLI B.1-74

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1684 M33CCP*FT178C RCP 3RCS*P1C THERMAL BARRIER FLOW TRANSMITTER 3330A CCR XMT CS COLUMN 2 CRANE WALL 0004 1685 M33CCP*FT178D 3RCS*P1 D THERMAL BARRIER FLOW TRANSMITTER 3330A CCR XMT CS COLUMN 8 CRANE WALL 0003 1686 M33CCP*FT67A RESIDUAL HEAT EXCHANGER 3RHS*E1A OUTLET FLOW TRANSMITTER 3330A CCR XMT ES 0004 1687 M33CCP*FT67B RESIDUAL HEAT EXCHANGER 3RHS*E1B OUTLET FLOW TRANSMITTER 3330A CCR XMT ES 0004 1688 M33CCP*TT32A RX PLANT COMP COOLER 3CCP*E1A OUT TEMP CONT VLV TEMP 3330A CCR XMT AB 0029 08 TRANSMITTER 1689 M33CCP*TT32B RX PLANT COMP COOLER 3CCP*E1 B OUT TEMP CONT VLV TEMP 3330A CCR XMT AB 0029 08 TRANSMITTER 1690 M33CCP*TT32C RX PLANT COMP COOLER 3CCP*E1C OUT TEMP CONT VLV TEMP 3330A CCR XMT AB 0029 08 TRANSMITTER 1691 M33CCP-FT11A COMP COOL SAFETY SUPPLY HEADER FLOW TRANSMITTER 3330A CCR XMT FB 0011 1692 M33CCP-FT11B COMP COOL SAFETY SUPPLY HEADER FLOW TRANSMITTER 3330A CCR XMT FB 0011 1693 M33CCP-FT15A CONT COOL SUPPLY HEADER FLOW TRANSMITTER 3330A CCR XMT AB 0016 06 1694 M33CCP-FT15B CONT COOL SUPPLY HEADER FLOW TRANSMITTER 3330A CCR XMT AB 0016 06 1695 M33CCP-FT230 CHARGING TRANSMITTERPUMP COOLING SURGE TANK 3CCE*TK1 INLET FLOW 3330A CCR XMT AB 0049 1696 M33CCP-FT233 SAFETY INJ PMP COOL SG TK 3CCI*TK1 INLET FLOW TRANSMITTER 3330A CCR XMT ES 0039 1697 M33CCP-LT20A COMP COOL WTR SURGE TK 33CP*TK1 M/U LEVEL TRANSMITTER 3330A CCR XMT AB 0069 06 1698 M33CCP-LT20B COMP COOL WTR SURGE TK 33CP*TK1 M/U LEVEL TRANSMITTER 3330A CCR XMT AB 0069 09 1699 M33CCP-PT256A RX PLANT COMP COOL PMP 3CCP*P1A SUCT COOL PRESS 3330A CCR XMT AB 0009 TRANSMITTER 1700 M33CCP-PT256B B PUMP SUCTION PRESSURE TRANSMITTER 3330A CCR XMT AB 0009 1701 M33CCP-PT256C RX PLANT COMP COOL PMP 3CCP*P1C SUCT COOL PRESS 3330A CCR XMT AB 0009 TRANSMITTER 1702 M33CCP-PT29A COMP COOL PMP 3CCP*P1A DISCH PRESS TRANSMITTER 3330A CCR XMT AB 0029 1703 M33CCP-PT29B COMP COOL PMP 3CCP*P1B DISCH PRESS TRANSMITTER 3330A CCR XMT AB 0027 1704 M33CCP-PT29C COMP COOL PMP 3CCP*P1C DISCH PRESS TRANSMITTER 3330A CCR XMT AB 0029 1705 M33CCE-FT35A CHG PMPS OIL CLER 3CHS*E9A OUT FL ALARM TRANS, VLVS AND 3330D CCE XMT AB 0030 07 TUBING IIII B.1-75

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Base List I LOC EL EL ITEM LOCAL ID EQUIPMENT DESCRIPTION SYS SYS COMP BLD ROOM FT IN 1706 M33CCE-FT35B CHARGING PMPS OIL COOLER 3CHS*E9B OUTLET FLOW ALARM 33300 CCE XMT AB 0030 07 TRANSMITTER 1707 M33CCE-FT35C CHARGING PMPS OIL COOLER 3CHS*E9C OUTLET FLOW ALARM 3330D CCE XMT AS 0030 07 TRANSMITTER 1708 M33CCE-PT29A CHARGING PMPS COOL PUMP 3CCE*P1A DISCH PRESSURE 3330D CCE XMT AB 0030 05 1 ~~TRANSMITTERI 1 1709 M33CCE-PT298 CHARGING PMPS COOL PUMP 3CCE*P18 DISCH PRESSURE 3330D CCE XMT AB 0028 05 TRANSMITTER 1710 M33CCE-PT41A CHARGING PMPS COOL PUMP 3CCE*P1A SUCTION PRESSURE 33300 CCE XMT AB 0030 05 TRANSMITTER 1711 M33CCE-PT41B CHARGING PMPS COOL PUMP 3CCE*P1B SUCTION PRESSURE 33300 CCE XMT AB 0028 05 TRANSMITTER 1712 M33EGF-FT31A FUEL OIL TRANSFER PMP 3EGF*PA,*P1BC DISCHARGE FLOW 3346B DES XMT DG FUEL OIL VAULT 0017 01 TRANSMITTER 1713 M33EGF-FT31B FUEL OIL TRANSFER PMP 3EGF*P1B,*PlD DISCHARGE FLOW 3346B DFS XMT DG FUEL OIL VAULT 0014 TRANSMITTER 1714 M33EGF-LT29A FUEL OIL DAY TANK 3EGF*TK2A LEVEL TRANSMITTER 3346B DFS XMT EB "A" DIESEL ENCLOSURE 0024 1715 M33EGF-LT29B FUEL OIL DAY TANK 3EGF*TK2B LEVEL TRANSMITTER 3346B DFS XMT EB 0024 06 1716 M33EGF-PT21A FUEL OILTRANSFER PUMP 3EGF*P1A DISCHARGE PRESSURE 3346B DFS XMT DG FUEL OIL VAULT 0017 01 TRANSMITTER 1717 M33EGF-PT21B FUEL OIL TRANSFER PUMP 3EGFPIB DISCHARGE PRESSURE 3346B DFS XMT DG FUEL OIL VAULT 0024 06 TRANSMITTER 1718 M33EGF-PT21C FUEL OIL TRANSFER PUMP 3EGFP1C DICSHARGE PRESSURE 3346B DFS XMT DG FUEL OIL VAULT 0017 01 TRANSMITTER 1719 I M33EGF-PT21 D FUEL OIL TRANSFER PUMP 3EGF*P1D DISCHARGE PRESSURE 3346B DES XMT DG FUEL OIL VAULT 0017 TPANIITTF0 B.1-76

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix B.2 Seismic Walkdown Equipment List (SWEL)

1. SWEL (Combined SWEL 1 and SWEL 2)
2. Base List 2 / SWEL 2
3. Summary Tables B.2-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report

1. SWEL (Combined SWEL I and SWEL 2)

Seismic Walkdown Equipment List (SWEL) SGCS Risk Item # Class Function ID Equipment Description System Bldg Elev Significant 5 Safety Area Notes Reference (YIN) Functions Walkby 1 0 Support M33SWP*STR1A SERVICE WATER PUMP STRAINER A SWS CW 14 Y 1,2,3,4,5 019 2,3 2 1 Support M332-11R 480V AC MOTOR CONTROL CENTER ELC AB 24 Y 1,2,3,4,5 002 1,2,3 480V MCC 32-1U (EMERG) 3 1 Support M332-1U EMERGENCY GENERATOR ELC DG 24 Y 1,2,3,4,5 020 1,2,3 480 VOLT MCC 32-2R(EMERG) ROD 4 1 Support M332-2R CONTROL ELC AB 24 Y 1,2,3,4,5 002 1,2,3 480 VOLT MCC 32-1W(EMERG) AUX 5 1 Support M332-1W BLDG. ESO AB 24 Y 1,2,3,4,5 002 1,2,3 6 1 Support M332-4T 480V MCC ELC ES 36 Y 1,2,3,4,5 024 1,2,3 480 VOLT MCC 32-5T(EMERG) CIRC 7 1 Support M332-5T WATER PUMP HOUSE ELC CW 14 Y 1,2,3,4,5 019 1,2,3 8 1 Support M332-2U 480 VOLT MCC32-2U ELC AB 24-6 Y 1,2,3,4,5 013 1,2,3 RX VESSEL VENT VLV 9 20 Support M33RCS*ZT442B 3RCS*HCV442B POSITIION XMTR RCS AB 24-6 N 1,2,3,4,5 013 2,3 SI TANK N2 VENT VLV POS XMTR 10 20 Support M33SIL*ZT943B (3SIL*HCV943B) LPI AB 24-6 N 1,2,3,4,5 013 2,3 11 2 Support M332Y 480 VOLT LOAD CENTER 32Y ESO AB 24-6 Y 1,2,3,4,5 002 1,2 12 2 Support M33BYS*PNL2 BATTERY BUS 2 (301B-1) EDC CB 4 Y 1,2,3,4,5 008 1,2,3 13 2 Support M33BYS*PNL1 BATTERY BUS 1 (301A-1) EDC CB 4 Y 1,2,3,4,5 009 1,2,3 DIESEL GENERIATOR 'B' ELECTRICAL 14 3 Support M315G-15U SYSTEM DGN DG 24 Y 1,2,3,4,5 020 2,3 15 3 Support M33ENS*SWGB 4.16KV EMERG BUS (SWGR) ES4 CB 4-6 Y 1,2,3,4,5 008 2,3 34C10-2 TRANSFER SWITCH #1 TO 16 3 Support M33CCP*TRS-P1C 34d9-6 3CCP*P1C CCR AB 45 N 1,2,3,4,5 014 2,3 34D21-2/34C22-2 TRANSFER SWITCH 17 3 Support M33CHS*TRS-P3C TO 3CHS*P3C CVC AB 45 N 1,2,3,4,5 015 2,3 FUEL BLDG FILTER EXH FAN OUTLET 18 0 Support M33HVR*MOD72B DAMPER RBV AB 66 N 4,5 031 B.2-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) SGCS Risk Item # Class Function ID Equipment Description System Bldg Elev Significant 5 Safety Area Notes (Y/N) Functions Walkby Reference FUEL BLDG FILTER EXH FAN OUTLET 19 0 Support M33HVR*MOD72A DAMPER RBV AB 66 N 4,5 031 VIAC-2 ALTERNATE SOURCE 20 4 Support M33VBA*XRC-2 TRANSFORMER ELC CB 4 Y 1,2,3,4,5 008 1,2,3 3LAC*PNL3C2P LIGHTING 21 4 Support M33LAC*EXL2P TRANSFORMER ELC CB 4 N 1,2,3,4,5 008 1,2,3 AC DIST PANEL TRANSFORMER 22 4 Support M33SCV*XD5P AUXILIARY EVI AB 24 N 1,2,3,4,5 013 1,2,3 240V/120V STEP DOWN XFMR 23 4 Support M33SCV*XD10 ORANGE EVI CB 4 Y 1,2,3,4,5 010 1,2,3 24 5 Frontline TRM M33CCE*P1A A CHARGING PUMP COOLING PUMP CCE AB 24 Y 1,2,3, 001 2,3 25 5 Frontline TRM M33CCP*P1A RPCCW PUMP A CCR AB 24 Y 1,2,3,4,5 001 2,3 26 5 Frontline TRM M33CHS*P3A A CHARGING PUMP CVC AB 24 Y 1,2,3 003 2,3 MOTOR DRIVEN STEAM GENERATOR 27 5 Frontline TRM M33FWA*P1A AUX FEED PUMP AFW ES 21 Y 2,4 023 2,3 TURBINE DRIVEN AUXILIARY 28 5 Frontline TRM M33FWA*P2 FEEDWATER PUMP AFW ES 21 Y 2,4 023 2,3 29 5 Support M33SFC*P1A FUEL POOL COOLING PUMP A SFC FB 24 N 4 026 2,3,4 30 5 Support M33SWP*P2B CONTRL BLDG AC BOOSTER PUMP B SWS CB 64 N 1,2,3,4 012 2,3 MCC AND ROD CONTROL AREA 31 5 Support M33SWP*P3A BOOSTER PUMP A SWS AB 43 N 1,2,3,4 005 2,3 32 6 Frontline TRM M33RHS*P1A RESIDUAL HEAT REMOVAL PUMP RHR ES 4 Y 4 022 2 33 6 Support M33SWP*P1A SERVICE WATER PUMP SWS CW 14 Y 1,2,3,4 019 2 Frontline RCP SEAL WATER FLOW 34 7 SFRM M33CHS*HCV182 CONTROLLER CVC AB 24-6 N 1,2,3, 003 Frontline SEAL RETURN LINE INLET 35 7 SFRM M33CHS*RV8121 CONTAINMENT RELIEF CVC CS 3-8 N 1,2,3 017 1 Frontline 36 7 SFRM M33FWA*AOV62A A TRAIN DISCHARGE CROSS CONN AFW ES Y 2,4, 023 TERRY TURBINE STEAM ISOLATION 37 7 Frontline TRM M33MSS*AOV31A FROM A S/G STG ES 25 Y 2,4, 022 B.2-3

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) SGCS Risk 5 Safety Area Item # Class Function ID Equipment Description System Bldg Elev Significant Functions Walkby Notes Reference (Y/N)_FunctionsWa_(YN 38 7 Frontline TRM M33MSS*CTV27A MAIN STEAM ISOLATION TRIP VALVE STG MS 66 Y 4 027 A STEAM GENERATOR SAFETY 39 7 Support M33MSS*RV22A VALVE STG MS 69 Y 4 027 C STEAM GENERATOR SAFETY 40 7 Support M33MSS*RV23C VALVE STG MS 76 Y 4 027 41 7 Frontline TRM M33RCS*PCV455A POWER OPERATED RELIEF VALVE RCS CS 76 Y 2 016 RESIDUAL HEAT REMOVAL B HEAT 42 7 Frontline TRM M33RHS*FCV619 TOTAL FLOW CNTL RHR ES 21-6 Y 4 025 LETDOWN HX E2 OUTER CTMT 43 7 Support M33CHS*CV8152 ISOLATION CVC AB 18 Y 5 004 44 8 Frontline TRM M33CHS*HCV190A CHARGING HEADER FLOW CONTROL CVC AB 4-6 N 1.2.3 004 45 8 Frontline TRM M33CHS*LCV1 12B VCT OUTLET ISOLATION CVC AB 43-6 Y 1.2.3 029 Frontline 46 8 SFRM M33CHS*MV8105 CHARGING HEADER ISOLATION CVC AB 4-6 Y 1.2.3 004 Frontline 47 8 SFRM M33CHS*MV8109D RCP A SEAL SUPPLY ISOLATION CVC AB 4-6 N 1.2.3 004 Frontline CHARGING RECIRC ISOL TO SEAL 48 8 SFRM M33CHS*MV8110 WATER CVC AB 24-6 Y 1.2.3 003 Frontline 49 8 SFRM M33CHS*MV8112 SEAL WATER RETURN CTMT ISOL CVC CS 3-8 N 1,2,3 017 50 8 Frontline TRM M33CHS*MV8116 SAFETY GRADE S/D CHARGING ISOL CVC AB 7 Y 1.2.3 004 CHARGING PUMP A/C DISCHARGE 51 8 Frontline TRM M33CHS*MV8438A ISOL CVC AB 24-6 Y 1.2.3 003 52 8 Frontline TRM M33CHS*MV8507B BAT B GRAVITY BORATION CVC AB 43-6 Y 1.2.3 030 AUXILIARY FEEDWATER CONTROL 53 8 Frontline TRM M33FWA*HV31A VALVE AFW ES 24 Y 2,4 023 TURBINE DRIVEN AUXILIARY 54 8 Frontline TRM M33FWA*HV32A FEEDWATER CONTROL VLV AFW ES 21 Y 2,4 023 TURBINE DRIVEN AUXILIARY 55 8 Frontline TRM M33FWA*HV32D FEEDWATER CONTROL VLV AFW ES 21 Y 2,4 023 STEAM GENERATOR AUXILIARY FDW 56 8 Frontline TRM M33FWA*MOV35A ISOLATION VALVE AFW ES 40 Y 2,4 024 B.2-4

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) SGCS Risk Item # Class Function ID Equipment Description System Bldg Elev Significant 5 Safety Area Notes (Y/N) Functions Walkby Reference MAIN STEAM PRESSURE RELIEF 57 8 Frontline TRM M33MSS*MOV74A ISOLATION VALVE BYPASS STG MS 68 Y 4 027 Frontline RESIDUAL HEAT REMOVAL PUMP 58 8 SFRM M33RHS*FCV610 PlA MINIFLOW RECIRC RHR ES 4 Y 4 022 Frontline B RHR DISCHARGE TO HOT LEGS 59 8 SFRM M33RHS*MV8716B AND RWST RHR ES 21 Y 4 025 SI ACCUMULATOR TANK 1 OUTLET 60 8 FrontlineTRM M33SIL*MV8808A ISOL LPI CS 6 Y 1,2,3 018 1 "A" RHR PUMP SUCTION FROM 61 8 Frontline TRM M33SIL*MV8812A RWST LPI ES 8 Y 1,2,3 022 Frontline 62 8 SFRM M33SIH*MV8801A CHARGING PUMP SI HEADER ISOL HPI AB 18 Y 2,3,4,5 004 EMERGENCY GENERATOR BUILDING 63 9 Support M33HVP*FN1B SUPPLY FAN DGV DG 44 Y 1,2,3,4,5 021 2,3 64 9 Support M33HVR*FN13A CHARGING PUMP EXHAUST FAN RBV AB 66 Y 1,2,3 006 2,3 CHRG & CMPNT COOLING PUMP 65 9 Support M33HVR*FN14A SUPPLY FAN RBV AB 74 Y 1,2,3 006 2,3 66 9 Support M33HVR*FN10B1 FUEL BLDG EXHAUST FAN RBV AB 66 N 1,2,3,4,5 031 2,3 67 10 Support M33HVC*ACU1B CONTROL ROOM A/C UNIT SPLY ACC CB 64 N 1,2,3,4,5 012 2 ESF SELF-CONTAINED AIR 68 10 Support M33HVQ*ACUS1A CONDITIONING UNIT ESG ES 36-6 N 1,2,3,4,5 024 2,3 69 11 Support M33HVK*CHL1B CONTROL BLDG WATER CHILLER CBW CB 64 N 1,2,3,4,5 012 2,3 125 VDC BATTERY DISTRIBUTION 70 14 Support M33BYS*PNL2V PANEL EDC CB 4 Y 1,2,3,4,5 008 2,3 71 14 Support M33SCV*PNLR1O 120 VOLT VITAL PANEL EVI CB 4-6 Y 1,2,3,4,5 010 2,3 72 14 Support M33CES*PNLTSB B TRAIN TRANSFER SWITCH PANEL ELC CB 4-6 N 1,2,3,4,5 008 1,2,3 73 15 Support M3301B-2 BATTERY 4 (301B-2) EDC CB 4 N 1,2,3,4,5 009 2,3 74 15 Support M3301B-1 BATTERY 2 (301B-1) EDC CB 4 Y 1,2,3,4,5 009 2,3 75 16 Support M33BYS*CHGR-1 BATTERY CHARGER 1 (301A-1) EDC CB 4 N 1,2,3,4,5 010 1,2,3 76 16 Support M33BYS*CHGR-3 BATTERY CHARGER 3 (301A-2) EDC CB 4 N 1,2,3,4,5 010 1,2,3 B.2-5

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) SGCS Risk Item # Class Function ID Equipment Description System Bldg Elev Significant 5 Safety Area Notes Reference (YIN) Functions Walkby 77 16 Support M33VBA*INV1 INVERTER 1 EDC CB 4-6 Y 1,2,3,4,5 010 1,2,3 78 16 Support M33VBA*INV3 INVERTER 3 EDC CB 4 Y 1,2,3,4,5 010 1,2,3 EMERGENCY DIESEL GENERATOR 79 17 Support M33EGS*EGB (B) DGN DG 24 Y 1,2,3,4,5 020 2 80 18 Support M33CES*IPNLI01 INSTRUMENT PANEL - ORANGE BOP CB 47 N 1,2,3,4,5 011 2,3 81 18 Support M33CES*IPNLI20 INSTRUMENT PANEL-ORANGE BOP CB 43-6 N 1,2,3,4,5 011 2,3 CHG HDR FLOW CNTRL VLV 82 20 Support M33CHS*ZT190B 3CHS*HCV190B ELEC CNTR MOD CVC AB 24 N 1,2,3,4,5 013 1,2,3 REACTOR PROTECTION SYSTEM 83 18 Support M33RPS*RAKSET1 RACK SET 1 RPS CB 47 N 1,2,3,4,5 011 2,3 REACTOR PROTECTION SYSTEM 84 18 Support M33RPS*RAKSET3 INSTRUMENTATION RACK RPS CB 47 N 1,2,3,4,5 011 2,3 85 18 Support M33RPS*RAKSET5 REACTOR PROTECTION RACK SET 5 RPS CB 47 N 1,2,3,4,5 011 2,3 86 20 Support M33CES*MCB-MB1 MAIN BOARD 1 MCB CB 47 N 1,2,3,4,5 011 2,3 87 20 Support M33CES*MCB-MB3 MAIN CONTROL BOARD MCB CB 47 N 1,2,3,4,5 011 2,3 88 20 Support M33CES*MCB-MB5 MAIN BOARD 5 MCB CB 47 N 1,2,3,4,5 011 2,3 89 20 Support M33CES*PNLFTSP FIRE TRANSFER PANEL SWITCH ELC CB 4-6 N 1,2,3,4,5 010 2,3 90 20 Support M33RPS*PNLAS AUXILIARY SHUTDOWN PANEL ESA CB 4 N 1,2,3,4,5 008 2,3 91 21 Support M33CCP*E1A RPCCW HEAT EXCHANGER A CCR AB 24 Y 1,2,3,4,5 001 2,3 Frontline 92 21 SFRM M33CHS*E4 SEAL WATER HEAT EXCHANGER CVC AB 24 N 1,2,3 001 2,3 93 21 Frontline TRM M33CHS*TK5A A BORIC ACID TANK CVC AB 43 Y 1,2,3 005 2,3 94 21 Support M33EGA*TK1 B DIESEL START AIR RECIEVER TANK DSA DG 24 Y 1,2,3,4,5 020 2,3 EMERGENCY GEN FUEL OIL DAY 95 21 Support M33EGF*TK2B TANK DFS DG 37-6 Y 1,2,3,4,5 021 2,3 96 21 Frontline TRM M33FWA*TKI DEMIN WATER STORAGE TANK AFW YD 24 Y 2,4, 028 2,3 HEAT EXCHANGER FOR CONTROL 97 21 Support M33HVK*E1B BUILDING WATER CHILLER CBW CB 64 N 1,2,3,4,5 012 2,3 B.2-6

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Seismic Walkdown Equipment List (SWEL) SGCS Risk 5 Safety Area Item # Class Function ID Equipment Description System Bldg Elev Significant Functions Walkby Notes Reference (Y/N) 98 21 Support M33CCE*TK1 CCESURGETANK CCE AB 43 Y 1,2,3,4 032 2,3 99 21 Frontline TRM M33RHS*E1A RESIDUAL HEAT EXCHANGER RHR ES 4-6 Y 4 022 2,3 100 21 Support M33SFC*EIA SPENT FUEL POOL COOLER SFC FB 24 N 4 028 2,3,4 Notes:

1. Not sufficiently accessible to complete the walkdown inspection. To be inspected when accessible.
2. Has anchorage
3. Detailed anchorage inspection
4. SWEL 2 item, all other items SWEL 1 Safety Functions
1. Reactivity Control
2. Reactor Coolant Pressure Control
3. Reactor Coolant Inventory Control
4. Decay Heat Removal
5. Containment Function B.2-7

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report

2. Base List 2 / SWEL 2 LOCAL ID Equipment Description SWEL 2 M31A-3SFC*P1A FUEL POOL COOLING PUMP PlA REMOTE CONTROL SWITCH M31A-3SFC*P1B FUEL POOL COOLING PUMP P1B REMOTE CONTROL SWITCH M31B-3SFC*P1A FUEL POOL COOLING PUMP PlA LOCAL CONTROL SWITCH M31B-3SFC*P1B FUEL POOL COOLING PUMP P1B LOCAL CONTROL SWITCH M33SFC*E1A SPENT FUEL POOL COOLER X M33SFC*E1B SPENT FUEL POOL COOLER M33SFC*LS25A FUEL POOL LOW WATER LEVEL ALARM SWITCH M33SFC*LS25B FUEL POOL LOW WATER LEVEL ALARM SWITCH M33SFC*P1A FUEL POOL COOLING PUMP A X M33SFC*P1B FUEL POOL COOLING PUMP B M33SFC*TE27A FUEL POOL WATER TEMP IND, ELEMENT M33SFC*TE27B FUEL POOL WATER TEMP IND, ELEMENT M33SFC-FT19 FUEL POOL COOLERS RETURN FLOW FLOW TRANSMITTER M33SFC-PI29A PRESSURE GAUGE M33SFC-PI29B PRESSURE GAUGE M33SFC-PT36 FUEL POOL COOLING PMPS DISCHARGE TRNMTE_______ PRESSURE TRANSMITTER M343-3SFC*P1A LOCAL/REMOTE CONTROL TRANSFER SWITCH M343-3SFC*P1B LOCAL/REMOTE CONTROL TRANSFER SWITCH B.2-8

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report

3. Summary Tables: Equipment Classes and Systems SWEL Equipment Classes Summary Table GIP Equipment Class Title Class 0 Miscellaneous 1 Motor Control Centers 2 Low Voltage Switchgear 3 Medium Voltage Switchgear 4 Transformers 5 Horizontal Pumps 6 Vertical Pumps 7 Fluid Operated Valves 8 Motor Operated Valves, Solenoid Operated Valves 9 Fans 10 Air Handlers 11 Chillers 12 Air Compressors 13 Motor Generators 14 Distribution Panels 15 Batteries on Racks 16 Battery Chargers and Inverters 17 Engine Generators 18 Instruments on Racks 19 Temperature Sensors 20 Instrumentation and Control Panels and Racks 21 Tanks and Heat Exchangers (GIP Section 7)

TOTAL B.2-9

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report SWEL System Summary Local Equipment SSystem ystem Description Count 3301 Reactor Coolant 2 3305 Spent Fuel Pool Cooling and Purification 2 3308 High Pressure Safety Injection 1 3322 Auxiliary Feedwater 8 3326 Service Water 4 3343 Station Electrical 4160V 3* 3411 Auxiliary Shutdown Panel 1 3414 Main Control Panels 3 3415 Control Circuit Isolator Cabinets 2 3304A Charging and Volume Control 14 3304C Boric Acid 2 3307A Low Pressure Safety Injection 2 3307B Residual Heat Removal 6 3314A Auxiliary Building HVAC 2 3314C Fuel Building HVAC 3 3314D ESF Building HVAC 1 3314F Control Building HVAC and Chilled Water 3 3314H EDG Building HVAC 1 3316A Main Steam Reliefs 5 3330A Reactor Plant Component Cooling Water 2 3330D Charging Pumps Cooling 2 3344A 480V Load Centers 1 3344B 480V Motor Control Centers 7 3345A 120VAC Distribution 3 3345B 120VAC Vital Electrical 3 3345C 125VDC Distribution 7 3346A Emergency Diesel Generator 3 3346B Emergency Diesel Generator Fuel Oil 1 3407A Westinghouse 7300 Racks 3 3407B Foxboro Spec 200 Racks 2 3720B Emergency Station Lighting 1 TOTAL 100

  • Includes 4160V CHS & CCP Pump Transfer Switches3305 B.2-10

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix B.3 Area Walk-by List B.3-1

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Area Walk-by List SWEL Item MP3 AWC MP2 Plant Area Description Count. MP3-WB-001 Aux Bldg 24' Misc Mech 4 MP3-WB-002 Aux Bldg 24' MCC Rod Control East 4 MP3-WB-003 Aux Bldg 24' Chrg Pump Cubicles 4 MP3-WB-004 Aux Bldg 4'6" Penetration Area 6 _MP3-WB-005 Aux Bldg 43' Fans 2 MP3-WB-006 Aux Bldg 66' 2 MP3-WB-007 Aux Bldg 43' 'A' BAST Room 0 MP3-WB-008 Control Bldg 4'6" West Switchgear 7 MP3-WB-009 Control Bldg 4'6" Batteries 3 MP3-WB-010 Control Bldg 4'6" East Switchgear 7 MP3-WB-01 1 Control Bldg 47' Panels 8 MP3-WB-012 Control Bldg 64' HVAC 4

        .MP3-WB-013        Aux Bldg 24'6" MCC Rod Control West                         5 MP3-WB-014       Aux Bldg 46' MCC Rod Control West                           1 MP3-WB-015       Aux Bldg 46' MCC Rod Control East                           1 MP3-WB-016*       Containment 76'                                             1 MP3-WB-017*       Containment 3'8" Seal Return                                2 MP3-WB-018*       Containment -24' Accum A                                    1 MP3-WB-019       CW Pump House (Service Water)                               3 MP3-WB-020       A EDG Equipment 24'                                         4 MP3-WB-021       EDG Enclosure Ventil and Day Tank 37'                       2 MP3-WB-022       ESF Bldg RHR Pump 4'                                        5 MP3-WB-023       ESF Bldg AFW PuMP21'                                        6 MP3-WB-024       ESF Bldg Ventilation & Misc 36'                             3 MP3-WB-025       ESF Bldg RHR Penetrations 15' B Room                        2 MP3-WB-026       Fuel Bldg Spent Fuel Cooling 24'                             1 MP3-WB-027       Main Steam Valve Bldg 66'                                   4 MP3-WB-028       Yard 24'                                                    2 MP3-WB-029       AB 43' VCT Room                                              1 MP3-WB-030       AB 43' B BAST Room                                           1 MP3-WB-031       AB 66' Fuel Building Exh Fan Area                           3 MP3-WB-032       AB 43' 3CCE*TK1 Area                                         1 Area walK-by deterred. Associated SWI:L items inaccessible during normal plant operations.

B.3-2

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C Seismic Walkdown Checklists (153 pages) C-1

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-001 AWC # MT3-WB-019 Status Y1Z Nil U-1 EquipmentIDNo. M33SWP*STRIA Equip. Class 0 Equipment Description Service Water Pump Strainer "A" Location: Bldg. CW Floor El. 14' Room, Area , Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checkdist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI U-] N/Al]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U"] N/AE" oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UE- N/AE]
5. Is the anchorage configuration consistent with plant documentation? YN NEI U] N/All (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage of strainersupport cohlmns to floor are acceptable and are consistent with design drawings. Anchorage of strainerto support colwnns is acceptable but bolt size could not be confirmed with design drawings. Some bolts have nuts with very little or no threadprotruding (flush). These are evaluated andfound to be acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of YO NE] U-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-2

Page 2 of 2. Seismic Walkdown Checklist (SWC) SWC # MP3-WDSWEL-001 InteatoREffects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UO N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ] NEI UO] N/ACI and masonry blockwalls not likely to collapse onto the equipment?

YO NE UE NIA[

9. Do attached lines have adequate flexibility to avoid damage?

10, Based on the above seismic interaction evaluations, is equipment free Yj NE UEQ of potentially adverse seismic interaction effects? Other Adverse GConditions

11. Have you looked for and found no other seismic conditions that could YN NE] UOT adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

References:

DrawingNo. 2332.516-063-003 DrawingNo. 12179-EC-14M-9 CalculationNo. 12179-C14.2 (PQrdaa DrawingNo. 12179-EM-8A Evaluated by: James Petroslc, Date: 08-06-2012 Evaluated by: L. JackDILwna Date: 08-06-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-3

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-009 AWC # MP3-WB-013 Status YZ NEI UI-Equipment ID No. 3RCS*ZT442B Equip. Class 20 Equipment Description Reactor Vessel Vent Valve 3RCS*HCV 442B PositionXMTR Location: Bldg. AB Floor El. 24' Room, Area MCC Rod Control West Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YM NEI UEH N/AH
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI1 N/AlH oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE U[3 N/AEH
5. Is the anchorage configuration consistent with plant documentation? YO NO UH- N/AHl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference DWG 2512-33088 (EE-38ZC).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UEH potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-4

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-009 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE] U[3 N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YlN NO] U[1 N/ALl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UE- N/ALJ Flex Conduit and cablesfiom adjacentseismic cable tray.
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE1 of potentially adverse seismic interaction effects?

Overhead cable trays seismically supported. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NE] UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Date: 08/22/2012 Evaluated by: Thomas Steahr -411" ý&7 Date: 08/22/2012 Millstone Power Station Unit 3 N1TF 2.3 Seismic Walkdown Summary Report Appendix C C-5

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-010 AWC # MP3-WB-013 Status YO NEI UL] Equipment ID No. M33SIL*ZT943B Equip. Class 20 Equipment Description SI Tank N2 Vent Valve PositionTransmitter (3SIL *HCV943B) Location: Bldg. AB Floor El. 24' Room, Area MCC Rod Control West Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YM NEI UE- N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YNI NEI UE1 N/All oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation?. YN NE] UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference D WG 2512-33088 (EE-38ZC)

6. Based on the above anchorage evaluations, is the anchorage free of YO NEl UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-6

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-010 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YJO NEI UEU N/AUI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI ULI N/All and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN N[E] UU] N/AU Flexible Conduit
10. Based on the above seismic interaction evaluations, is equipment free YE N[: U-]

of potentially adverse seismic interaction effects? No adverse interactionsfound Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YlN NEIULE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Date: 08/22/2012

                                                        £7/k Evaluated by: JamesMcKinnev                                                             Date: 08/22/2012 Cl Millstone Power Station Unit 3  NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-7

Page l of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-014 AWC # MP3-WB-020 Status YO N[] UE] Equipment ID No. M315G-15U Equip. Class 3 Equipment Description Diesel Generator 'B' ElectricalSystem Location: Bldg. DG Floor El. 24" Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI N[9 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YLJ NI] ULi N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YLI NEI UL- N/AS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[I NEI UI N/AO
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UI- N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NI] UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-8

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # EW3-WD-SWEL-014 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE ULI N/AL
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI ULI N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE UL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

      'A1'train protected at time ofwalkdown.

Evaluated by: Stephen Superson Date: 08-13-2012

                                                             /

Evaluated by: William Price A% Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-9

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-015 AWC # MP3-WD-008 Status YO NO UI-Equipment ID No. 3ENS*SWGB Equip. Class 3 Equipment Description B 4.16KVEnergency SWGR Location: Bldg. CB Floor El. 4'6" Room, Area West SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UO N/AlE
3. Is the anchorage free of corrosion that is more than mild surface YO NI] U-' N/AL oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[a NEI U- N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NI] UL1 N/AL[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

Calculation C10.8 and Drawing25212-39010 SH. 422

6. Based on the above anchorage evaluations, is the anchorage free of Y NE]UI-1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-10

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-015 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN Nil ULI N/AL]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM Nil U[] N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YNI NEI Ur1 N/AE]
10. Based on the above seismic interaction evaluations, is equipment free Y9 NEL UL]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y9] NEI UL]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) The 3CHS*P3Csection of3ENS*SWGB (Bus 34D) was selectedfor inspection. The circuit breaker was removed to facilitatevisual inspection of the high voltage switchgear.Electricalmaintenance support was utilized to open thefrontpanel door and remove the rearpanel doorfor inspection. Evaluated by: James Petrosty _ _ _-_ Date: 08/17/2012

                                                      -)A Evaluated by: James McKinnev                                                                Date: 08/17/2012 U

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-ll

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-016 AWC # MP3-WD-014 Status Y0 NEI UnI Equipment ID No. 3CCP*TRS-P1C Equip. Class Equipment Description 34C10-2 TransferSwitch to 34D9-6 Reactor CoolingPump 3CCP*PIC Location: Bldg. AB Floor El. 45' Room, Area 45'MCC Rod Drive West Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments, Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y9 NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YER NEI UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YZ NO] UE- N/AE-oxidation?

....... 4;. Is.the anchorage. free of visible-cracks in the concrete-near-the anchors?.. YN*.NE]I UE]- N/AD-

5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Drawing25212-33021

6. Based on the above anchorage evaluations, is the anchorage free of YO NE] UE3 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-12

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-016 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEO NO] U" N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI0 NI] Ut] N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YIZ NEI UI- N/AC Flex conduit connections
10. Based on the above seismic interaction evaluations, is equipment free YN NEI U[-1 of potentially adverse seismic interaction effects?

No adverse seismic interactions Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE-I U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 3CCP*TRS-PICis comprised of 2 switches in one cabinet: 3CCP*TRS-P1C/1and 3CCP*TRS-PI C/2. Evaluated by: James Petroskv Date: 08/17/2012 Evaluated by: James McKinney F Date: 08/17/2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-13

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-017 AWC # MP3-WD-015 Status Y[ N[-] UF-EquipmentID No. 3CHS*TRS-P3C Equip. Class 3 Equipment Description 34D21-2/34C22-2 Transfer Switch to 3CHS*P3C Location: Bldg. AB Floor El. 45' Room, Area 45' East MCC Rod Drive Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI ULI N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE- N/A[Z oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE U[ N/A[
5. Is the anchorage configuration consistent with plant documentation? YZ NZ UZ N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing 25212-33021

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UZ potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-14

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-017 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI ULI N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UL- N/ALl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI NEI U-- N/ALE Flex conduit connections
10. Based on the above seismic interaction evaluations, is equipment free YO NEI U--

of potentially adverse seismic interaction effects? No adverse seismic interactions Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 3CHS*TRS-P3C is comprised of 2 switches in one cabinet: 3CHS*TRS-P3C/1J and 3CHS*TRS-P3C/2. Evaluated by: James Petroslg r--ý P-ý- Date: 08/17/2012 Evaluated by: James McKinnev Date: 08/17/2012 6~ Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-15

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-018 AWC # MP3-WB-031 Status YN NE] UE] Equipment ID No. 3HVR*MOD72B Equip. Class 0 Equipment Description Fuel Bldg FilterExhaust Fan Outlet Damper Location: Bldg. AB Floor El. 66 Room, Area 3HVR FN*6B Area Overhead Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YW NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UEi N/AM
3. Is the anchorage free of corrosion that is more than mild surface YU- NEI U-I N/AM oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YII NEIl U-I N/AN
5. Is the anchorage configuration consistent with plant documentation? YLI NEIl U- N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEL UE1 potentially adverse seismic conditions?

Motor operateddamper is not anchored.Damper (with attached linkage, limit switches, andoperator)is an in-line component in seismically supported ductwork. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-16

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MEP3-WD-SWEL-018 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YJA NE U-1 N/A[-
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI UiW N/AU and masomyr block walls not likely to collapse onto the equipment?

Overhead lighting secured on chains.

9. Do attached lines have adequate flexibility to avoid damage? YO NWj U-1 N/AEl Flexible conduit connections
10. Based on the above seismic interaction evaluations, is equipment free YI NEI UiW of potentially adverse seismic interaction effects?

No adverse interactions. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NWI UEW adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Date: 08/22/2012 Evaluated by: Thomas Steahr Date: 08/22/2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-17

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-019 AWC # MP3-WB-031 Status YZ Ni] UI] Equipment ID No. 3HVR*MOD72A Equip. Class 0 Equipment Description Fuel Bldg FilterExhaust Fan Outlet Damper Location: Bldg. AB Floor El. 66' Room, Area 3HVR FN*6A Area Overhead Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI U-] N/A0
3. Is the anchorage free of corrosion that is more than mild surface YFI NI] U-] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y--1 NEI U[1 N/AZ
5. Is the anchorage configuration consistent with plant documentation? Y'I NI] UI] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE potentially adverse seismic conditions?

Motor operateddamper is not anchored.Damper (with attached linkage, limit switches, andoperator) is an in-line component in seismically supported ductwork. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-18

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-019 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI Ui N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI NEI ULI N/ASl and masonry block walls not likely to collapse onto the equipment?

Mod is high in overhead, above the lights.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI US- N/ASl Flex conduit connections
10. Based on the above seismic interaction evaluations, is equipment free YED NEI UES of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] US1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petrosky lnýt C2-+ Date: 08/22/2012 Evaluated by: 77tomas Steahr A/4it Date: 08/22/2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-19

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-024 AWC # MP3-WB-001 Status YZ No UF-Equipment ID No. M33CCE*P1A Equip. Class 5 Equipment Description "A " ChargingPump Cooling Pump Location: Bldg. AB Floor El. 24 Room, Area "A" ChargingPump Cubicle Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO UE" N/ADl
3. Is the anchorage free of corrosion that is more than mild surface YED NO U-3 N/An oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE N/AEl
5. Is the anchorage configuration consistent with plant documentation? YZ NO U- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

Drawing No. 25212-11134 (Rev. 7) DrawingNo. 25212-29042 SH. 1 (Rev. 3) CalculationNo. 12179-C36.6 (Rev. 0)

6. Based on the above anchorage evaluations, is the anchorage free of YN NO U[:

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-20

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-024 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U- N/AS
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE1 N/Al!

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YN NEI U-1 N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YO NEI U-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NFE U--

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr Date: 08-07-2012 Evaluated by: Stephen F. Syperson Date: 08-07-2012 Millstone Power Station Unit 3 NTFTF 2.3 Seismic Walkdown Summary Report Appendix C C-21

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3 -WD-SWEL-025 AWC # MP3-WB-001 Status YE N[] UE] Equipment ID No. M33CCP*P1A Equip. Clas5, Equipment Description RBCCWPump A Location: Bldg. AB Floor El. 24 Room, Area HTEXCH Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y! NO'EUE N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YO NE UE' N/A[E oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE N/A[E
5. Is the anchorage configuration consistent with plant documentation? YO NE UE N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

DrawingNo. 25212-11134Rev. 7 Drawing No. 25212-29336 SH 3 Rev. J CalculationNo. 12179-SEO-C36.24Rev. 01 including CCN 001

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-22

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3 -WD-SWEL-025 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED Nl] U[] N/AU]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NEI UL- N/A[

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YE NEI U[] N/A[
10. Based on the above seismic interaction evaluations, is equipment free YZ N[-] UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[I NEI UM adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr ~Q~t 6~' Date: 08-07-2012 Evaluated by: Stephen F Superson Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-23

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-026 AWC # MP3-WB-003 Status YN NI] U[] Equipment ID No. M33CHS*P3A Equip. Class 5 Equipment Description "A" ChargingPump Location: Bldg. AB Floor El. 24 Room, Area "A" ChargingPump Cubicle Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NIl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NI] UI1 N/AI]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UI] N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NI] UI1 N/AI]
5. Is the anchorage configuration consistent with plant documentation? YO NI] UI N/AI]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference DrawingNo. 12179-EC-36F-9and DrawingNo. 12179-EC-36G-7

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-24

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-026 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NI] Ul- N/AUl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 NI] UI] N/AlU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NI] UI- N/AEl
10. Based on the above seismic interaction evaluations, is equipment free Y{ NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev Date: 08-08-2012 Evaluated by: William Price &Q(IZ4MA Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-25

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-027 AWC # MP3-WB-023 Status YO NEI UI-Equipment ID No. M33FWA*P1A Equip. Class 5 Equipment Description Motor Driven Steam GeneratorAux Feed Pump Location: Bldg. ES Floor El. 21' Rooi Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UE] N/AL]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UE] N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE] UL N/AL]

Hairline cracks from top ofpad to edge of chamferfor two ofsix anchor bolts.

5. Is the anchorage configuration consistent with plant documentation? YZI NE] UE] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

CalculationNo. C32-298, Rev. 0 and DrawingNo. 25212-29041 Sht. 6

6. Based on the above anchorage evaluations, is the anchorage free of YN NO- U]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-26

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-027 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[0 NEI UL N/AZl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE ULI N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y13 NEI UE1 N/AL
10. Based on the above seismic interaction evaluations, is equipment free YEI NE UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE UE1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: William Price YWQ/f~KVA\ Date: 08-07-2012 Evaluated by: James McKinney Date: 08-07-2012 7 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-27

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-028 AWC # MP3-WB-023 Status YZ NEI UI Equipment ID No. M33FWA*P2 Equip. I Equipment Description Turbine Driven Aux Feed Pump Location: Bldg. ES Floor El. 21' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchoraue

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[9 NEI U-1 N/AU
3. Is the anchorage free of corrosion that is more than mild surface YMI NEI UI-1 N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI ULI N/AZ
5. Is the anchorage configuration consistent with plant documentation? YO NEI UD N/AEU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

References:

CalculationNo. 121 79-C32.299 DrawingNo. 25212-11215,Rev. 6 Drawing No. 25212-29041 Sheet 1, Rev. J

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UO potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-28

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-028 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UIZ N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UL- N/A[I and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UEJ N/A[I
10. Based on the above seismic interaction evaluations, is equipment free YZ NO UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[i UI[-

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Stephen F.Superson Date: 08-13-2012 Evaluated by: William Price Date: 08-13-2012 U) Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-29

Page 1 of 3 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-029 AWC # MP3-WB-026 Status YZ N[-] U[-] Equipment ID No. M33SFC*P1A Equip. I Equipment Description Fuel Pool Cooling Pump'A' Location: Bldg. FB Floor El. 24'-6" Room, Area Manufacturer, Model, Etc. (optional but recommended) Gould Model 3405 size 10x12-12 Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y1 NEl UE-1 N/AE
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UE1 N/AE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE-1 U[-E N/AE
5. Is the anchorage configuration consistent with plant documentation? YZ NE-1 UE- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YED NEI U[-]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-30

Page 2 of 3 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-029 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UEU N/A[:
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI ULI N/AU and masonry block walls not likely to collapse onto the equipment?

Overheadfluorescent lightfixtures were reviewed and are adequately restrainedby chain with secured s-hooks, therefore no adverse interactionconcerns.

9. Do attached lines have adequate flexibility to avoid damage? YN NEI UEU N/AU1
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UU3 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YEE NEI U['

adversely affect the safety functions of the equipment? Wrenches are stored in a support beside the A SFP coolingpump. They are not secured but are close to the floor and do notprovide a seismic interactionconcern. Comments (Additional pages may be added as necessary) Evaluated by: James Petroslk Date: 08-07-2012 Evaluated by: Jack DiLuna Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-31

Page 3 of 3 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-029 Comments (continuation page)

Reference:

2214.702-006-001E, 12179-EC-38C-6, 12179-EM-7B, 12179-EC-738B-7, 12179-EP-77B, 12179-EM-7A, Calc. 12179-C38.735 (partial). Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-32

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-030 AWC # MP3-WB-012 Status YO NE UI] Equipment ID No. M33SWP*P2B Equip. Class 5 Equipment Description Control BLDG AC Booster Pump 'B' Location: Bldg. CB Floor El. 64' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of' an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEL of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE UE N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UI" N/AO" oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI U- N/ALl
5. Is the anchorage configuration consistent with plant documentation? YO NEI UE N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

Drawing 2332-502-042-009 Calculation No. 12179-C10.3 Rev. 0 S&WDrawing No. 12179-EB-39H

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UEI potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-33

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-030 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NEI UE- N/ArI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[D NEI UEI N/AFI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI ULI N/A[-
10. Based on the above seismic interaction evaluations, is equipment free YZ NE UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE9 NEI Uli adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Light Surface rust on one of the bolt head. Evaluated by: Sombat Porniprasert 9 " 11-k Date: 08-13-2012 Evaluated by: Thomas A. Steahr Date: 08-013-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-34

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-031 AWC # MP3-WB-005 Status Y[ N[I U-] Equipment ID No. M33SWP*P3A Equip. Class 5 Equipment Description MCC and Rod ControlArea Booster Pump A Location: Bldg. AB Floor El. 43' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UI- N/AE3
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U-- N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UEI N/Afl
5. Is the anchorage configuration consistent with plant documentation? Y[ NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See DrawingNo. 25212-11134, Rev. 7

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-I potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-35

Page 2 of 2. Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-031 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE1 N/AE)
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NI] UI1 N/All and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NO- U!I N/AZ
10. Based on the above seismic interaction evaluations, is equipment free YN NE] U-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YIZ NEI U!]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr f,* -L,,- z.,,'-rl*-. 4~c1 Date: 08-08-2012 Evaluated by: Stephen F. Superson Date: 08-08-2012 I Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-36

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-032 AWC # MP3-WB-022 Status YN N[] UD] Equipment ID No. M33RHS*P1A Equip. Class 6 Equipment Description Residual Heat Removal Pump Location: Bldg. ES Floor El. 4' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UOI N/AE3
3. Is the anchorage free of corrosion that is more than mild surface Y[I NEI UEI N/AE1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UI" N/A[
5. Is the anchorage configuration consistent with plant documentation? YO NEI U- N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

DrawingNo. 25212-22214 Nd DrawingNo. 25212-11518

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE" potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-37

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWO # AM3-WD-SWEL-032 Interaction Effects

7. Are soft targets free fi-om impact by nearby equipment or structures? YO NO UE N/AU
8. Areoverhead equipment, distribution systems, ceiling tiles and lighting, YO NINV U[I WAD and masonry block walls not likely to collapse onto the equipment?

Light Fixtures are suspended by chain with securedS-hooks,fixtures and bulbs will notpose any threat to RUR pump A. YO NE I I] N/AD

9. Do attached lines have adequate flexibility to avoid damage?

YO ND UD

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] U[]

adversely affect the safety functions of the equipment7 See A WC# Mp3- WB-022 for general housekeeping issues none ofwhich adversely affect the RHR A pump!. C.omm ts (Additional pages may be added as necessary) Evaluated by: James Petroskv ' Date: 08-08-2012 Evaluated by: L.Jack DiLuna Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-38

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-033 AWC # MP3-WB-019 Status YE N[ UE] Equipment ID No. M33SWP*P1A Equip. Equipment Description Service Water Pump Location: Bldg. CW Floor El. 14' Room, Area SWA Manufacturer, Model, Etc. (optional but recommended) Hayward Tyler 24VSN Vertical Single Stage Pump Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorasi

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIZ NiE UI- N/AEL
3. Is the anchorage free of corrosion that is more than mild surface YN NL UL- N/AEl oxidation?

Surface corrosion on motor to pump flange bolts, (seismically acceptable)no further action required.This is evaluatedandfound to be minor surface corrosion.

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0D NEI Ui N/AU
5. Is the anchorage configuration consistent with plant documentation? YO NEI UD N/AU1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-39

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Mf3-WD-SWEJA033

,Interaction Effects
7. Are soft targets free from impact by nearby equipment or structures? YO~ NEI UIJ N/A[I
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO~ NEI ULI N/A[If and masonry block walls not likely to collapse onto the equipment?

Overheadchain-hung light (not directly above pump) isfree to swing at end of chain and may interactwith seismicallysupported duct work with no adverse effects. Potentiallyfalling light may interactwith seismically stqportedtubingand transmittersand is evaluatedto have no adverse effects.

9. Do attached lines have adequate flexibility to avoid damage? Y9 N[3 ULJ N/AQI
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UO.

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismio conditions that could YO NEI U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Anchorage

Reference:

DrawingNo. 12179-EC-14L-8 DrawingNo. 12179-EM-8A DrawingNo. 2332.502-004-011. Evaluated by: James Petrosl.v Date: 08-06-2012 Evaluated by: JackDiLuna Date: 08-06-2012, Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-40

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-034 AWC # MP3-WB-003 Status YO NEI U[- Equipment ID No. M33CHS*HVC182 Equip. Class 7 Equipment Description RCP Seal Water Flow Controller Location: Bldg. AB Floor El. 24'6" Room, Area "C" ChargingPump Cubicle Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE! NEI UE! N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE! NE! UE! N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE! NE! UE! N/AO
5. Is the anchorage configuration consistent with plant documentation? YE! NEI UE! N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y NEI UE!

potentially adverse seismic conditions? No anchorage,therefore OK. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-41

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-034 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NI UEJ N/AZ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YIZ N[ ULI N/AZ and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NE UW1 N/AZ 3DGS-V876 to valve OK, based on valve (3) way support in close proximity.
10. Based on the above seismic interaction evaluations, is equipment free YENIEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev J l I J l Date: 08-08-2012 Evaluated by: William Price Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-42

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3WD-SWEL-036 AWC # MP3-WB-023 Status YN NEI U!] Equipment ID No. M33FWA*AOV62A Equip. Class 7 Equipment Description 'A' Train DischargeCross Connect Location: Bldg. ES Floor El. Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NN of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] U! N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/A[D
5. Is the anchorage configuration consistent with plant documentation? YEI NE] UE] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] U"]

potentially adverse seismic conditions? No anchorage therefore OK Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-43

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3WD-SWEL-036 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZI NE-I UE-- N/A[3 YO NIl ULI N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YI Nil] Ur1 N/AEl

9. Do attached lines have adequate flexibility to avoid damage?

Y0 Nil UI- A

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NEI U-i adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: William Price Date: 08-07-2012 Evaluated by: James McKinnev K/' Date: 08-07-2012 0 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-44

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-037 AWC # MP3-WB-023 Status YO NEI U[ Equipment ID No. M33MSS*AOV31A Equip. Class 7 Equipment Description Terr Turbine Steam Isolation From a S/G Location: Bldg. ES Floor El. 25' Room, Area Cube south of Terry Turbine Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[] UE1 N/A2
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UI- N/AS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE- N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE1 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI Ui potentially. adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-45

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-037 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y(E NEI ULI N/A[]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NFl U[-] N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE" N/AE
10. Based on the above seismic interaction evaluations, is equipment free Y9 NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NEI UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) In-line mounted valve. Evaluated by: Stephen Superson Date: 08-13-2012 Evaluated by: William Price Date: 08-13-2012 Millstone Power Station Unit 3 C) NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-46

Page l of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-038 AWC # MP3-WB-027 Status YE NEI ULI Equipment ID No. M33MSS*CTV27A Equip. Class 7 Equipment Description Main Steam Isolation Trip Valve Location: Bldg. MS Floor El. 66' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?

In-line component.

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NOi UI- N/AM
3. Is the anchorage free of corrosion that is more than mild surface YIO NiO UO N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YOI NI] U] N/AS
5. Is the anchorage configuration consistent with plant documentation? YIO NI] U-I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UD potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-47

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # NXMP3-SWEL-038 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NOI UO] N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y* N-I U[j N/AE and masonry block walls not likely to collapse onto the equipment?

Overheadfluorescent lightfixtures were reviewedand are adequately restrainedby chain with securedS-hooks, Therefore no adverse Interactionconcerns exist.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI U[D N/AD
10. Based on the above seismic interaction evaluations, is equipment free YO NO UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Hiave you looked for and found no other seismic conditions that could YO ND] UD"!

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) References :DrawingNo. 12179-C.L-MSS-33 Sheet 3 of 7 DrawingNo. 12179-EP-2D-12 DrawingNo. 12179-EP-2G-11 DrawingNo. 12179-CL-MSS-24 Sheet 2of2 Evaluated by: James Petrosiw Date: 08-07-2012 Evaluated by: , Jack&iLuna Date: 08-07-,2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-48

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-039 AWC # MP3-WB-027 Status YE NO UL] Equipment ID No. M33MSS*RV22A Equip., Equipment Description A Steam GeneratorSafetE Valve Location: Bldg. MS Floor El. 76' Rooi Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?

In-line component (valve).

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE1 NE UE] N/AN
5. Is the anchorage configuration consistent with plant documentation? YE NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yi N[E UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-49

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # M1'3-WD-SV J-039 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y9 NE UQI N/AQ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0M NE UQ N/AO and masonry block walls not likely: to collapse onto the equipment?

Overheadfluorescentlightfixtures were reviewed and are adequately restrainedby chain with securedS-hooks, therefore no adverse interactionconcerns.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI U[I N/AO 10; Based on the above seismic interaction evaluations, is equipment free YO NEI U of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y12 Nil UU1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

References:

DrawingNo. 12179-C.L-MSS-33 Sht. 3 of.7 DrawingNo. 12179-12P-2G-11 DrawingNro. 12179-EP-2D-12 DrawingNo. 12179-2472,110-180-255 Evaluated by: James Pelroskt f v Date: 08-07-2012 Evaluated by: L Jack DiLuna Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-50

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-040 AWC # MP3-W]B-027 Status YO NEI UE1 Equipment ID No. M33MSS*RV23C Equip. Clas, Equipment Description C Steam GeneratorSafety Valwe Location: Bldg. MS Floor El. 76' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checkdist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YE] NO of the 50% of SWEL items requiring such verification)? In-line Component (valve)

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NEI UE- N/AI
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE3 N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI U0' N/A[
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UI0 N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-51

Page 2 of 2 SeismlcWalkdown Checklist (SWC) SWC # MP3-WD-SWEL0404 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UEI N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo NEI UD N/AC]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? TY NI] U-I N/AD.
10. Based on the above seismic interaction evaluations, is equipment free YZ NE uIJ of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UEJ adversely affect the safety functions of the equipment?

Comments (Additidnal pages may be added as necessary) Overheadfluorescentlightfixtires were reviewed andare adequately restrainedby chain with securedS-hooks, therefore no adverse interactionconcerns.

References:

DrawingNo. 1279-EP-2D-12 DrawingNo. 12179-EP-2G-11 DrawingNo. 12179-C1.-MSS-33 Sht, 4 of 7 Evaluated by: James Petroslm Date: 08-07-2012 Evaluated by- L. Aack Ma Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-52

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-042 AWC # MP3-WB-025 Status YO N[] ULI Equipment ID No. M33RHS*FCV619 Equip. Class 7 Equipment Description ResidualHeat Removal B HX Total Flow CNTL Location: Bldg. ES Floor El. 21 '-6" Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[O NE] UE- N/A[D
3. Is the anchorage free of corrosion that is more than mild surface YOl- NO] U-] N/AIZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO] NI] UI N/A0
5. Is the anchorage configuration consistent with plant documentation? YO- NEl UEl N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

In-line air operatedvalve, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-53

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-042 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[- N/AU Copper air lines are soft targets, no interactions in vicinity.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U"I N/AEJ and masonry block walls not likely to collapse onto the equipment?

Fluorescentlight are hung using closed S-hooks and areproperly supported.

9. Do attached lines have adequate flexibility to avoid damage? YN NEI ULI N/AU
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NEI U[-

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: James Petrosk, Date: 08-14-2012 Evaluated by: James McKinnev 5~10ýýýL 7L*ZS Date: 08-14-2012 (J 0) Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-54

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-043 AWC # MP3-WB-004 Status YZI NE] U[] Equipment ID No. M33CHS*CV8152 Equip. Class 7 Equipment Description Letdown heat exchangerE2 outer CTMT isolation Location: Bldg. AB Floor El. 4'-6" Room, Area MEZZ Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE"I N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NEI UE1 N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE]1 NEI UE1 N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE1 N/AN
5. Is the anchorage configuration consistent with plant documentation? YEI NE] UE] N/AM (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NE UE1 potentially adverse seismic conditions?

In-line valve, no arrangement. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-55

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E3-WD-SWEL-043 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI U[I N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YED NEI UI- N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN N[- U[-] N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NE LU-I of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[:E UI1 adversely affect the safety functions of the equipment?

Surface corrosionpresent on bottom surface ofyoke, however studs and bolts are okay. Comments (Additional pages may be added as necessary) Evaluated by: James McKinney ,Y-6 2 - Date: 08-16-2012 Evaluated by: James Petrosklv Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-56

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP3WD-SWEL-044 AWC # MP3-WB-004 Status YM NE] UM] Equipment ID No. M33CHS*HCV190A Equip. Class 8 Equipment Description ChargingHeaderFlow Control Location: Bldg. AB Floor El. 4'-6" Room, Area CTMTPipe Penetration Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI N] UE] N/A0
3. Is the anchorage free of corrosion that is more than mild surface YEI] NEI UE] N/AS oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/AN
5. Is the anchorage configuration consistent with plant documentation? YEI NE] UE] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE1 potentially adverse seismic conditions?

No anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-57

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3WD-SWEL-044 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U-I N/AE'
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE UL" N/A--

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UEl N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YN NO UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NE UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) A K Evaluated by: James McKinnev Date: 08-08-2012 Evaluated by: William Price Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-58

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-045 AWC # MP3-WB-029 Status YN NEI UI] Equipment ID No. M33CHS*LCV112B Equip. Class 8 Equipment Description VCT Outlet Isolation Location: Bldg. AB Floor El. 45'6" Room, Area VCT Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checkdist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YLI NEI UEi N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YO NI] Ut] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI1 NEI UE] N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI NiO UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEUI-1 potentially adverse seismic conditions?

In-line MOV, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-59

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Mf3-WD-SWEL-045 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N[I UI] N/AI]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UlI N/Al]

and masonry block walls not likely to collapse onto the equipment? Grating overheadand light bulb with protective coverfound to be adequate.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UI1 N/Al]
10. Based on the above seismic interaction evaluations, is equipment free YO N[-] Ur-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UM]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: James Petrosla

                                         >,ý (2--+

Date: 08-14-2012 Evaluated by: James McKinney Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-60

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-046 AWC # MP3-WB-004 Status YZ NEI UF1 Equipment ID No. M33CHS*MV8105 Equip. C1 Equipment Description ChargingHeaderIsolation Location: Bldg. AB Floor El. 4 '-6" Room, Area Mezzanine Penet #16 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO- N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y] NO] UE- N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U] N/A[D oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NE UE N/AlZ
5. Is the anchorage configuration consistent with plant documentation? YE NE U- N/A9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE potentially adverse seismic conditions?

No anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-61

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-046 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[I N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE UL N/A5' and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YED NEI UEF of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YlM NE UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: James McKinney ~ A Date: 08-08-2012 Evaluated by: William Price Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-62

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-047 AWC # MP3-WB-004 Status YZ NEI UO Equipment ID No. M33CHS*MV8109D Equip. Class 8 Equipment Description RCP 'D' Seal Supply Isolation Location: Bldg. AB Floor El. 4'-6" Room, Area Mezzanine Penet #16 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO- NO UE- N/AI
3. Is the anchorage free of corrosion that is more than mild surface YO- NEi U-] N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO- NEI U' N/AZ
5. Is the anchorage configuration consistent with plant documentation? Y[-E NEI UI- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ N' U-potentially adverse seismic conditions?

No anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-63

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-047 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO UE N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE UEl N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI ULI N/ADl
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE3 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinney Date: 08-08-2012 Evaluated by: William Price Date: 08-08-2012 p Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-64

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-048 AWC # MP3-WB-003 Status YO NE] UFI Equipment 1D No. M33CHS*MV8110 Equip. Class 8 Equipment Description ChargingRecirc Isol to Seal Water Location: Bldg. AB Floor El. 24'6" Room, Area ChargingPump Room 'A" Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIO NEI U0 N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YIO NI] UI] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI] NEI UI] N/AO
5. Is the anchorage configuration consistent with plant documentation? YI] NEI UI] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NO Ui potentially adverse seismic conditions?

No anchoragetherefore OK Millstone Power Station Unit 3 NITF 2.3 Seismic Walkdown Summary Report Appendix C C-65

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP3-WD-SWEL-048 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE-I UI- N/A[I
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UD1 N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE1 N/AS
10. Based on the above seismic interaction evaluations, is equipment free YO NEI US of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UEi adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

                                                              -N'/

Evaluated by: James McKinnev .q - Date: 08-08-2012 Evaluated by: William Price C] Date: 08-08-2012 K) Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-66

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-050 AWC # MP3-WB-004 Status YZ NE] UI] Equipment ID No. M33CHS*MV8116 Equip. I Equipment Description Safety Grade S/D ChargingIsol Location: Bldg. AB Floor El. 7' Room, Area Mezzanine Pen Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE] UE1 N/AE1
3. Is the anchorage free of corrosion that is more than mild surface YN NEI U'- N/AE]

oxidation? Boric acid evident between stem andpacking. Already being tracked via CR417270 and CR470400, as well as MP-24-BACC-FAP03-001 Boric Acid CorrosionEvaluation.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YED NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? Y[0 NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Operatorhas tube steel box frame. Support mark # CP-374524-H014 welded to floor embeddedplate (ref Drawing No. 12179-BZ-74S-256-1 ad Drawing No. 12179-CP-374524,Rev. 3) CR484242 initiatedunder the Area Walk-by Checklist No. MP3- WB-004for moderate corrosion.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-67

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-050 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NE] UL1 N/AUl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI U[I N/AUI and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NE] UJ] N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NU UU-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinney fl Date: 08-08-2012 Evaluated by: William Price Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-68

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-051 AWC # MP3-WB-003 Status YO NEI UE] Equipment ID No. M33CHS*MV8438A Equip. Equipment Description ChargingPump A/C Discharge Isol Location: Bldg. AB Floor El. 24'6" Room, Area ChargingPump Room "A" Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YtZ NEI UE- N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE- N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE- N/AO
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE1 N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U0 potentially adverse seismic conditions?

No anchorage,therefore okay. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-69

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-051 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NE U-1 N/AU 8., Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEJ N/AU]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UD N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI Uil adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Date: 08-08-2012 Evaluated by: Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-70

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-052 AWC # MP3-WB-007 Status YNl NEI UE Equipment ID No. M33CHS*MV8507B Equip. Class 8 Equipment Description BAT B Gravity Boration Location: Bldg. AB Floor El. 49'6" Room, Area BA4T (B) Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI- NEI UL- N/AO
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI ULI N/A[D oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UI- N/AN
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE potentially adverse seismic conditions?

In-line valve, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-71

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E3-WD-SWEL-052 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YID NEI U- N/AE-Overheadpiping (4 " line) adequately supported to preclude interaction.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UEI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NE] UL N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UM of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO* NEI UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroslgv Date: 08-14-2012 Evaluated by: James McKinnev 4:X Kl'-t4' Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-72

Page l of 2 Seismic Walkdown Checklist (SWC) SWC # MP3WD-SWEL-053 AWC # MP3-WB-023 Status Y[ NEi UL] Equipment ID No. M33FWA*HV31A Equip. Class 8 Equipment Description Auxiliar Feedwater Control Valve Location: Bldg. ES Floor El. 24' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NE] U-1 NWAS 3.. Is the anchorage free of corrosion that is more than mild surface YE] Nn] UEi N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UD- N/AN
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UDO N/A (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[* NEI UE-potentially adverse seismic conditions?

No anchorage therefore OK Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-73

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3WD-SWEL-053 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[* NEI U0 N/ALI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NO U[] N/AE[

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YN NE U[I N/A[l
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NE ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: William Price Date: 08-07-2012 Evaluated by: James McKinnev Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-74

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-054 AWC # MP3-WB-023 Status YZ Ni] UM] Equipment ID No. M33FWA*HV32A Equip. Class 8 Equipment Description Turbine Driven Auxiliary FeedwaterControl Valve Location: Bldg. ES Floor El. 21' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y0 NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE[ NEI UI- N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE] N/AZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE[ N/AO
5. Is the anchorage configuration consistent with plant documentation? YE- NEI UE] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-75

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-054 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE UL-- N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UEI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE1 N/AU
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UEU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) In-line Mounted Valve Evaluated by: Stephen Superson -.? I ". u- Date: 08-13-2012 Evaluated by: William Price AQ-\I) i Date: 08-13-2012 0 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-76

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-055 AWC # MP3-WB-023 Status YN NEI UE-Equipment ID No. M33FWA*HV32D Equip. Class 8 Equipment Description Turbine Driven Auxiliarv FeedwaterControl Valve Location: Bldg. ES Floor El. 21' Room, Area Terry Turbine Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI] N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE] UE" N/A0
3. Is the anchorage free of corrosion that is more than mild surface YEI NEi UE] N/A[D oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE UE1 N/A[
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/Az@

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y NE"I UE3 potentially adverse seismic conditions?

In-line valve, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-77

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-055 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEI UI] N/Al
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI U-1 N/A[-

and masonry block walls not likely to collapse onto the equipment? Fluorescent lights are OK. Fire detector is OK.

9. Do attached lines have adequate flexibility to avoid damage? YN NI] UI- N/AL
10. Based on the above seismic interaction evaluations, is equipment free YN NI] UE of potentially adverse seismic interaction effects?

Rope, tool bucket and coiledpower cable have no seismic interaction impact. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI] UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroslgv Date: 08-14-2012 Evaluated by: James McKinney C2V Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-78

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-056 AWC # MP3-WB-024 Status YO Ni] U"I Equipment ID No. M33FWA*MOV35A Equip. Class 8 Equipment Description Steam GeneratorAuxilatv FDWIsolationValve Location: Bldg. ES Floor El. 40' Room, Area A/CRHR HX Cubicle Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI- N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YDI NI] UI] N/AE
3. Is the anchorage free of corrosion that is more than mild surface YEI NI UI]- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI NE] UI] N/AE
5. Is the anchorage configuration consistent with plant documentation? Y-I NEI UE] N/ANZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NiUI'-E potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-79

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-056 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO! UL N/AE!
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UE] N/AOl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NF! UF- N/AE]
10. Based on the above seismic interaction evaluations, is equipment free Y0 N- U!-

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI U-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) In-line mounted valve. Evaluated by: Stephen Superson Date: 08-13-2012 Evaluated by: William Price Date: 08-13-2012 U - Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-80

Page I of 2 Seismic Walkdown Checklist (SWC) SWC #~M3-WD-SWEL-057 AWC # MP3-WB-027 Status YED NE U[] Equipment ID No. M33MSS*MOV74A Equip. Class 8 Equipment Description Main Steam PressureReliefIsolation Valve Bypass Location: Bldg. MS Floor El. 68' Room, Area OffMS line A Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?

In-line component (valve).

2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UE' N/AN
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE" N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UF- N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI] NOI U- N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-81

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Y2fl3-W-SWEL-O57 Interaction Effects

7. Are soft targets free fiom impact by nearby equipment or structures? YO NEI UI N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YS NO UQ N/AE3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y* NEI UD N/A0
10. Based on the-above seismic interaction evaluations, is equipment free YO ND lUO ofpotentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditins that could 'Y NEI UE' adversely affect the safety functions of' the equipment?

Comments (Additional pages may be added as necessary) OverheadfluorescentLightfixtures were reviewed and adequately restrainedby chain with securedS-hooks, therefore no adverse interactionconcerns.

References:

DrawingNo. 121790CI-MSS 29, SAl. 2 of2 DrawingNo. 12179-EP-2D-12 DrawingNo. 12179-EP-2G-11 Evaluated by: James Petroskt Date: 08-07-2012 Evaluated by: L. JaclcDtLuna Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-82

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-058 AWC # MP3-WB-022 Status YZ NE] UL] EquipmentID No. M33RHS*FCV610 Equip. Class 8 Equipment Description ResidualHeat Removal Pump PJA Miniflow Recirc Location: Bldg. ES Floor El. 4' Room, Area (A4R" Pump Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?

In-line component (valve).

2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UE- N/A[
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE- N/A oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE- N/A
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE N/A[R (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE' potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-83

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # on EfecsW Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U- N/AlD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YONEI -U[I: N/AEI and masonry block walls not likely to collapse onto the equipment?

Lightfixtures are suspended &ychain with secured S-hoolk fixture and fluorescent bulbs will not pose any adverseseismic interaction. Y[@ NO UUI N/A[]

9. Do attached lines have adequate flexibility to avoid damage?

Y9 NEI UON

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions 11, Have you looked for and found no other seismic conditions that could YO NDJ UI adversely affect the safety functions of the equipment? Cgomments (Additional pages may be added as necessary)

Reference:

DrawingNo. 12179-CP-371500Aht, 3 of3 Evaluated by: JamesPetrosh ý2ý- ---2--ý Date: 08-08-2012 Evaluated by: L.Jack DiLuna C. Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-84

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-059 AWC # MP3-WB-025 Status YO Ni] U-] Equipment ID No. M33RHS*MV8716B Equip. i Equipment Description 'B' RHR Dischargeto Hot Legs andRWST Location: Bldg. ES Floor El. 21' Room, Area RHR B CUB Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI- N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI ULI N/AN
3. Is the anchorage free of corrosion that is more than mild surface YI- NEI U[1 N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI] NI- UI1 N/AZ
5. Is the anchorage configuration consistent with plant documentation? YEI NI] UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NI] UE potentially adverse seismic conditions?

In-line MOV, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-85

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MEP3-WD-SWEL-059 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIO NEI ULI N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting,, YIO NEI UEr N/AU1 and masonry block walls not likely to collapse onto the equipment?

Fluorescentlightingfixture properly restrained.

9. Do attached lines have adequate flexibility to avoid damage? YV NEI UE- N/AUl
10. Based on the above seismic interaction evaluations, is equipment free YZ NE UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED N[E] U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) none Evaluatedby: James Petroskv Date: 08-14-2012 o14~ Evaluated by: James McKinnev J ! l . Date: 08-14-2012 (J J Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-86

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-061 AWC # MP3-WB-022 Status YO NEI UO Equipment ID No. M33SIL*MV8812A Equip. Class 8 Equipment Description "A"RHR Pump Suction From RWST Location: Bldg. ES Floor El. 8' Room, Area (A)RUR Pump Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NO of the 50% of SWEL items requiring such verification)?

In-line component (valve)

2. Is the anchorage free of bent, broken, missing or loose hardware? YE- NEI UI1 N/AN
3. Is the anchorage free of corrosion that is more than mild surface YED NEI UI] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NI] UI] N/AO
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UI N/AM (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NI U-]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-87

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WJR-SWEL-061 Intraction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO UL- N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NO UO N/AU and masonry block walls not likely to collapse onto the equipment?

Lightfixtures are suspended by chain with secured S-hooks,fixturev andfluorescent bulbs will not pose any adverseseismni Interaction.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE] N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y* NEI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NDI U-'

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) See A WC# MP3- WB-022 for corrosionnoted on nearby supportPSROJ6.

Reference:

DrawingNo. 122179-EP-82D DrawingNo, 12179-C.L.SIL-9TSht. 3 Evaluated by: James Pefrosk Date: 08-08-2012 Evaluated by: L. Jack DiLuna Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-88

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-062 AWC # MP3-WB-004 Status YN NEI U[] Equipment ID No. M33S-I*MV8801A Equip. Class 8 Equipment Description ChargingPump SI Header ISOL Location: Bldg. AB Floor El. 4'6" Room, Area MEZZ Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI] N of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NE] UE N/AS
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE] N/A[

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI] NEI UE] N/A[
5. Is the anchorage configuration consistent with plant documentation? Y[E] NE] UE] N/Az (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE potentially adverse seismic conditions?

1n-line valve, no anchorage. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-89

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E3-WD-SWEL-062 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UE' N/AE!
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YIO NEI U-- N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE! UE' N/AE!
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE!

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NE! U-1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev qltcý Xýý Date: 08-16-2012 Evaluated by: James Petroskv U'ý-Oý L/11ý Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-90

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-063 AWC # MP3-WB-021 Status YZ NEI UE-Equipment ID No. M33HVP*FN1B Equip. Class 9 Equipment Description Emergency GeneratorBuilding Supply Fan Location: Bldg. DG Floor El. 44' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE] UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface Y[D NE] UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UEI N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference DWG No. 25212-22767 Rev. 2.

6. Based on the above anchorage evaluations, is the anchorage free of V NEI UE"]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-91

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # E3-WD-SWEL-063 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U- N/AUJ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UEl N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NOl UL] N/Al
10. Based on the above seismic interaction evaluations, is equipment free YZ NEl UE) of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UF' adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert -&'4-ý 96"c"v- Date: 08-13-2012 Evaluated by: Thomas Steahr Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-92

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-064 AWC # MP3-WB-006 Status YN NEI ULI Equipment ID No. M33HVR*FN13A Equip. Class 9 Equipment Description ChargingPump ExhaustFan Location: Bldg. AB Floor El. 66' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NE!

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI U-- N/AE
3. Is the anchorage free of corrosion that is more than mild surface Y0 NEI UE- N/AE!

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[ NE! UE! N/AE!
5. Is the anchorage configuration consistent with plant documentation? Y[ NE! UE1 N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference DrawingNo. 25212-22642 Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UE potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-93

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-064 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YlZ NI] UL- N/Al
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UI- N/Al]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEO U-I N/AU
10. Based on the above seismic interaction evaluations, is equipment free YM NOi UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas A. Steahr 33 Date: 08-09-2012 Evaluated by: Stenhen F. Sunerson S+z-L- rý 5'4 Date: 08-09-2012 I Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-94

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-065 AWC # MP3-WB-006 Status YIE NI UMI Equipment ID No. M33HVR*FN14A Equip. C Equipment Description Chargingand Component Cooling Pump Exhaust Fan Location: Bldg. AB Floor El. 74' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YIZ NEI Ui N/AU
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UI-I N/Afl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UU N/AU-
5. Is the anchorage configuration consistent with plant documentation? YO NEI UJ- N/AUl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing no. 25212-22642 Sheets 1-4 (Rev. 4)

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UEi potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-95

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP3-WD-SWEL-065 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YI NEI UI- N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UEI N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UI- N/AI-
10. Based on the above seismic interaction evaluations, is equipment free YO NEl U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE Ul' adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas A. Steahr z4, ~ Date: 08-09-2012

                                                               . V Evaluated by: Stephen F. Superson                                                       Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-96

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-066 AWC # MP3-WB-031 Status YO NO1 ULI Equipment D No. M33HVR*FN1OB1 Equip. Class 9 Equipment Description Fuel Bldg Exhaust Fan Location: Bldg. Fuel Floor El. 66'-6" Room, Area Manufacturer, Model, Etc. (optional but recommended) N/A Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE1 N/AE
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UL1 N/AE[

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE1 N/AE
5. Is the anchorage configuration consistent with plant documentation? YZ NE] UE[ N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Drawing 25212-29140-00020.

6. Based on the above anchorage evaluations, is the anchorage free of YN NO1 U potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-97

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-066 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE UE[ N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U- N/AE and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NE UE N/AEI
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UE1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Connected in series with 3HVR *FNIOB2 Evaluated by: James McKinnev Date: 08-14-2012 Evaluated by: James Petroslcy Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-98

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-067 AWC # MP3-WB-012 Status YO NEI U[] Equipment ID No. M33HVC*ACUIB Equip. Class 10 Equipment Description ControlRoom A/C Unit Supply Location: Bldg. CB Floor El. 64' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YONIEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO UE1 N/Al]
3. Is the anchorage free of corrosion that is more than mild surface YE NEI U-] N/All oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YED NO] UD N/Al]
5. Is the anchorage configuration consistent with plant documentation? YE NI] UI' N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

DrawingNo. 25212-29648 SH 535, Rev. 5 CalculationNo. 12179-CIO.618Rev. 0 S&WDrawing no. 12179-EC-1OL-2, Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of YONIEI UD potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-99

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-067 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIZ NEI ULI N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI[ NE ULI N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI U[[ N/AU]
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombat Pornprasert -- _.'.-- Date: 08-13-2012 Evaluated by: Thomas A. Steahr Date: 08-13-2012 Millstone Power Station Unit 3 NTITF 2.3 Seismic Walkdown Summaly Report Appendix C C-100

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-068 AWC # MP3-WB-024 Status YO NEl UEL EquipmentIDNo. M33HVQ*ACUS1A Equip. Class 10 Equipment Description ESF Self-ContainedAir Conditioning Unit Location: Bldg. ES Floor El. 36'-6" Room, Area Above "A" SIH Pump Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEl U-1 N/All
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UEl N/AlE oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UEl N/Al[
5. Is the anchorage configuration consistent with plant documentation? YZ NEi U-1 N/All (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

ACU Unit is Supported by an equipmentpad shown on Drawingno. 12179-EC-32D.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEl U--

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-101

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # io3-WD-SWEe068 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI U[] N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NE] UQ[" N/AU, and masonry block walls not likely to collapse onto the equipment?

Fluorescentlight supportedby chain S-hooks (secured),based on size and weight there is no potentialfor adverse seismic interaction.

9. Do attached lines have adequate flexibility to avoid damage? YO NO UO N/AUI
10. Based on the above seismic interaction evaluations, is equipment firee Y NEI U[E of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NO UD" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

References:

DrawingNo. 12179-2178.430-144-034 DrawingNo. 12179-EC-32D DrawingNo. 12179-EP-19M

                                       $*býX-J-Evaluated by: James PetrosLcy                                                       Date: 08-08-2012 Evaluated by; L.JackD Luna.                                       L                 Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summar Report  Appendix C C-1 02

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MiP3-WD-SWEL-069 AWC # MP3-WB-012 Status YZ NE] UIZ Equipment ID No. M33HVK*CHL1B Equip. Class 11 Equipment Description ControlBLDG Water Chiller Location: Bldg. CB Floor El. 64' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YONIEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NiO UI- N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YO NIl UE] N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NI] UI- N/AEI
5. Is the anchorage configuration consistent with plant documentation? YN NI] U-] N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference S&WDrawing No. 1217902176-430-061-014,4.

6. Based on the above anchorage evaluations, is the anchorage free of Y NIE] U-]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-103

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-069 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y9 NEI UO N/AU"
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UO N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UE' N/A-
10. Based on the above seismic interaction evaluations, is equipment free YO NEI Ur-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Sombataorn-rasert Date: 08-13-2012 p Evaluated by: Thomas A.Steahr ef A'-K ~ Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-104

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-070 AWC # MIP3-WIB-008 Status YO NEI UI-Equipment ID No. 3BYS*PNL2V Equip. Class 14 Equipment Description 'B' Trtain DC Distribution Panel Location: Bldg. CB Floor El. 4'-6" Room, Area West SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checkdist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checkdist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UE] N/AU
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE] N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE- N/Al]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE] N/Al]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference E&DCR FE-12720forpanelanchorageand wall mounted EMBED plate.

6. Based on the above anchorage evaluations, is the anchorage free of YO NOl UE potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-105

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-070 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE UE- N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE' N/AEl and masonry block walls not likely to collapse onto the equipment?

Seismic cable trays and ductwork.

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE- N/AU 4flex conduit.
10. Based on the above seismic interaction evaluations, is equipment free YM NEI U--

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI- U-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroslk Date: 08-17-2012

                                                                           /

Evaluated by: James McKinnev

           *,                    t        ,!                ,J           l Date: 08-17-2012 (J                             J Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-106

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-071 AWC # MP3-WB-010 Status YIN NO] UE] Equipment ID No. 3SCV*PNLRIO Equip. Equipment Description '120 Volt Vital Panel Location: Bldg. CB Floor El. 4'-6" Room, Area East SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checldist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checldist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NE] UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YE NE] UE] N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YIZ NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

DrawingNo. 25212-33075 (EE-38ZA).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-107

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-071 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NE UL1 N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE UWI N/AU1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI UE- N/AUI 1 Flex conduit connection. 1 Rigid conduit anchor to wall adjacent to panel anchorage. Acceptable.
10. Based on the above seismic interaction evaluations, is equipment free YN NO UU-1 of potentially adverse seismic interaction effects?

No adverse interactions. Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YED NEI UW adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv ýý-P-Jý .. Date: 08-22-2012 Evaluated by: Tom Steahr ,/6-r 1114 - Date: 08-22-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-108

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-073 AWC # MP3-WB-009 Status YI* NE] UL Equipment ID No. M3301B-2 Equip. , Equipment Description Battery 4 (301B-2) Location: Bldg. CB Floor El. 4' Room, Area Battey / West SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE ULJ N/ADl
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UI- N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U-] N/A[
5. Is the anchorage configuration consistent with plant documentation? YN NO UO N/A[l (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference CalculationNo. 12179-SEO-SE34.133, Rev. 2.

6. Based on the above anchorage evaluations, is the anchorage free of YO Nn UO-1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-109

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-073 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEI NEI UE- N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE UE1 N/A[l and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UEl N/AE3
10. Based on the above seismic interaction evaluations, is equipment free YO NEI U1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI UE-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Stephen F. Superson Date: 08-16-2012 Evaluated by: William Price Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-110

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-074 AWC # MP3-WB-009 Status YED NO] UO] Equipment ID No. M3301B-1 Equip. Class 15 Equipment Description Battery 2 (3011B-1) Location: Bldg. CB Floor El. 4' Room, Area Battery/ West SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of'an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] Ut N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YN NI] U-- N/Atl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YIO NE] Ut] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE NEI UE] N/At]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Calculation 12179-SEO-SE34.133, Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI Ut]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summaiy Report Appendix C C-111

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-074 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NE] U-] N/Alt
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UF' N/AOl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UI] N/AFl
10. Based on the above seismic interaction evaluations, is equipment free Y[ NO UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE] UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) Evaluated by: Stephen F Superson Date: 08-16-2012 I Evaluated by: William Price <J~fw-~ Date: 08-16-2012 (9 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-112

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-079 AWC # MP3-WB-020 Status YO NEI UF] Equipment ID No. M3EGS*EGB Equip. Equipment Description Emergency Diesel Generat Location: Bldg. DG Floor El. 24' Room, Area D/G B' Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YER NE]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UE N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UE-1 N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UED N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference Drawing 25212-11339 (Rev. 8).

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE3 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-113

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-079 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI ULI N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZI NEI UDI N/AEJ and masonry block walls not likely to collapse onto the equipment?

YO NI UOI- N/Al]

9. Do attached lines have adequate flexibility to avoid damage?

YM NI] UEN

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UEl adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

       'A' trainprotected at time of walkdown.

Evaluated by: Stephen Superson - -- -I - - - - Date: 08-13-2012

                                                                 /

Evaluated by: William Price LaxfA9--(9 I Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-114

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-080 AWC # MP3-WB-011 Status YN NEI U[-1 Equipment lID No. M33CES*IPNLI01 Equip. Class Equipment Description Instrument Panel Orange Location: Bldg. CB Floor El. 43'-6" Room, Area Instrument Rack Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checidist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI Ul N/AZI
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UE1 N/A[

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UD1 N/AF
5. Is the anchorage configuration consistent with plant documentation? YED NO UD N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage consistent with Dwg. 25212-3932 SH 175 Rev. D.

6. Based on the above anchorage evaluations, is the anchorage free of YN NE UE-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-115

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MW3-WD-SWEL-080 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI ULI N/AL!
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] U-I N/AL!

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NEl U-1 N/AL!
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UL!

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI U[-

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)

       .None Evaluated by: Tom Steahr                                                                Date: 08-16-2012 Evaluated by: Sombat Pornprasert                - \@     6      -N      §               Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-1 16

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-081 AWC # MP3-WB-011 Status YZ NE] UE] Equipment ID No. M33CES*IPNLI20 Equip. Class 18 Equipment Description Instrument Panel Orange Location: Bldg. CB Floor El. 43'-6" Room, Area Instrument Rack Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorane

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[- UE N/AE
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UEi N/AE1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NE UE1 N/AE3
5. Is the anchorage configuration consistent with plant documentation? YN NEI U- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Bolted anchorage consistent with Dwg. 25212-3932 SH 483, Rev. B, DWG. 25212-51298 SH 2, Rev. 2 and Dwg. 25212-39392 SH'17, Rev. D.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE7 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-117

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # Efc3-WD-SWEL-O81 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO UFIZ N/AE1
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE1 U[D] N/A[D1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NE UD N/AD'
10. Based on the above seismic interaction evaluations, is equipment free YZ NE UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UD-]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary)

      .None Evaluated by: Tom Steahr          ýV/           -"/ ak                                  Date: 08-16-2012 Evaluated by: Sombat Pornprasert           1k-4           6-3                           Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-1 18

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-083 AWC # MP3-WB-011 Status YO NEI Ur] Equipment ]D No. M33RPS*RAKSET] Equip. Class 18 Equipment Description ReactorProtectionSystem Rack Set I Location: Bldg. CB Floor El. 43'-6" Room, Area InstrumentationRack Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y10 NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE UO N/AE]
3. Is the anchorage free of corrosion that is more than mild surface Y NEI UI- N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NE] UD N/AU
5. Is the anchorage configuration consistent with plant documentation? YN NEI U[] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Cabinet is welded tofloor consistent with E&DCR F-S-9378. Reference DWG 2512-33031, Rev. 28for location.

6. Based on the above anchorage evaluations, is the anchorage free of YO NI UEI potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-119

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-083 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NDI U-1 N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YNJ NDI UDI N/A[D and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NDI UDl N/ADl
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NDI UD1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr I/41 d'-I Date: 08/16/2012 Evaluated by: SombatPornprasert Date: 08/16/2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-120

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-084 AWC # MP3-WB-011 Status YO NI] UF] Equipment ID No. M33RPS*RAKSET3 Equip. Class 18 Equipment Description Reactor ProtectionSystem Rack Set 3 Location: Bldg. CB Floor El. 43'-6" Room, Area Instrument Rack Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] UE N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UE- N/AE-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[D NEI UE] N/AD]
5. Is the anchorage configuration consistent with plant documentation? Y[ NEI UEI N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Cabinet is welded to floor consistent with E&DCR F-S-9378. Reference DWG 2512-33031, Rev. 28for location.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI UE]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-121

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-084 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NI UI-1 N/AL
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI Ur- N/All and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UL] N/AUI
10. Based on the above seismic interaction evaluations, is equipment free YO NEl UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI ULl adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr Date: 08-16-2012 Evaluated by: Sombat Pornprasert <t7- I JA/*- Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summaiy Report Appendix C C-122

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-085 AWC # MP3-WB-011 Status YO NO] UI] Equipment ID No. M33RPS*RAKSET5 Equip. Class 18 Equipment Description Reactor ProtectionSystem Rack Set 5 Location: Bldg. CB Floor El. 43 '-6" Room, Area InstrumentRack Roonm Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE[ N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NE] UDI N/AEl
5. Is the anchorage configuration consistent with plant documentation? YI NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Cabinet is welded to floor consistent with E&DCR F-S-9378. Reference DWG 2512-33031, Rev. 28for location.

6. Based on the above anchorage evaluations, is the anchorage free of YI N[L UE]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-123

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-085 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YM NEI U-1 N/AL]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE] N/AL]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YOI NEI U-] N/A[]
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[3 NE UL]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr i,Y-a el,6jA Date: 08/16/2012 Evaluated by: Sombat Pornprasert 6=ý 0 Date: 08/16/2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-124

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-086 AWC # MP3-WB-011 Status YN NO] Uli] Equipment ID No. M33CES*MCB-MB1 Equip. Class 20 Equipment Description Main Control Board Location: Bldg. CB Floor El. 47'-6" Room, Area ControlRoom, Area 6 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE1 NIAEl
3. Is the anchorage free of corrosion that is more than mild surface YN NEI ULI N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEIUE] N/A[]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE] N/A[]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) As-installed configurationsare consistent with E&DCR No. F-S-12408.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UL-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-125

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-086 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIZ NE] U-] N/AL]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UL] N/AUl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UD N/AL]
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NE] U--

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr ,ff'/ ¢iZ 6, - Date: 08-16-2012 Evaluated by: Sombat Pornprasert o -Jcy Date: 08-16-2012 Millstone Power Station Unit 3 N'FF 2.3 Seismic Walkdown Summary Report Appendix C C-126

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-087 AWC # MP3-WB-011 Status YO NE] U[] Equipment ID No. M33CES*MCB-MB3 Equip. Class 20 Equipment Description Main ControlBoard Location: Bldg. CB Floor El. 47'-6" Room, Area ControlRoom, Area 6 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YOI NEI UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YED NEI UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YED NE] UE] N/AE
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) As-installed configurationsare consistentwith E&DCR No. F-S-12468.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI U-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-127

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-087 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO] N[I UL1 N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE1 N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YE NEI UD N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UL-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr

  • I'! Date: 08-16-2012 Evaluated by: Sombat Pornprasert -' . 9"-14 Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-128

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-088 AWC # MP3-WB-011 Status YZ NE] U[] Equipment ID No. M33CES*MCB-MB5 Equip. Class 20 Equipment Description Main Control Board Location: Bldg. CB Floor El. 47'-6" Room, Area ControlRoom. Area 6 Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI UE] N/A[]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UE] N/A-]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YIO NEI UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YN NEI UE] N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) As-installed configurationsare consistent with E&DCR No. F-S-12468.

6. Based on the above anchorage evaluations, is the anchorage free of YN NE] UE]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-129

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-088 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NI] UE] N/AL
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UEI N/AL and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YEA NI] U-1 N/AL-
10. Based on the above seismic interaction evaluations, is equipment free YN NEL UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NI] U-1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr Xf, 4 ,, " Date: 08-16-2012 Evaluated by: Sombat Pornprasert - *)0 Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-130

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-089 AWC # MP3-WB-010 Status Y[ NE] U[- Equipment ID No. 3CES*PNLFTSP Equip. Class 20 Equipment Description Fire Transfer Switch Panel Location: Bldg. CB Floor El. 4'-6" Room, Area East SWGR Room Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI U-] N/AE3
3. Is the anchorage free of corrosion that is more than mild surface YE N[-] U-] N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI U-] N/AL]
5. Is the anchorage configuration consistent with plant documentation? YE NEI U[] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

References:

Drawing no.25212-39245 SH. 660, CalculationSEO-CJO.30,Rev. 1

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEL U-]

potentially adverse seismic conditions? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-131

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # M[P3-WD-SWEL-089 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ Nil U-IZ N/A[[
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] UE N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEl UE] N/AZl
10. Based on the above seismic interaction evaluations, is equipment free YO NEl UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UL1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr ý//Zf~C 4/L-ýý Date: 08-16-2012 Evaluated by: Sombat Pornprasert ,-"', " Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-132

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-090 AWC # MP3-WB-008 Status YE NEI UD] Equipment ID No. 3RPS*PNLAS Equip. Equipment Description Aux Shutdown Panel - B Location: Bldg. CB Floor El. 4'-6" Room, Area West SWGR Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checldist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YM NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] UE] N/AE]
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U[] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZl NEI U-- N/AE]
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE1 N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) Reference DrawingNo. 25212-33046 Bolted Together Consistentwith 12179.2424.300-246-013F.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-133

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-090 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NOI UE N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI ULI N/AU and masonry block walls not likely to collapse onto the equipment?

Seismic restrainedcable trays and ductwork

9. Do attached lines have adequate flexibility to avoid damage? YN NEI UL- N/AU Flex conduit electricalconnections.
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI U[:]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) Evaluated by: James PetroslW Date: 08-17-2012 Evaluated by: James McKinnev /I- I " Date: 08-17-2012 U U Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-134

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-091 AWC # MP3-WB-001 Status YO NE] U[] Equipment ID No. M33CCP*E1A Equip. Class 21 Equipment Description RBCCW Heat ExchangerA Location: Bldg. AB Floor El. 24 Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YS NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NI] UI' N/A[]
3. Is the anchorage free of corrosion that is more than mild surface Y[O NEI U[I- N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NE] UI- N/AE]
5. Is the anchorage configuration consistent with plant documentation? YO NEI UI- N/AE3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing No. 25212-22218 Rev. 08 and DrawingNo. 25212-22219 Rev. 08

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-135

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-091 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UFJ N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UE N/AE[

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UE" N/AE
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UE of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI U--

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None Evaluated by: Thomas A. Steahr Date: 08-07-2012 q ll-h-T7-n hi-trýA k., a2to V,q,nrn Date: 08-07-2012 LJ &U-ltl WLJ .l T1Ll&U - 7 - Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-136

Page I of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-092 AWC # MP3-WB-001 Status YO N[E UM-J Equipment ID No. M33CHS*E4 Equip. Class 21 Equipment Description Seal Water Heat Exchanger Location: Bldg. AB Floor El. 24 Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YOI NE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE U-1 N/AIZ
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UL- N/All oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI ULJ N/AU1
5. Is the anchorage configuration consistent with plant documentation? YO NO UE1 N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See Drawing No. 25212-29001 SH 2047 Rev. 4

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C .C-137

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MIP3-WD-SWEL-092 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI- UL] N/A-I
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UE3 N/A[]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] UE- N/AUJ
10. Based on the above seismic interaction evaluations, is equipment free YM NEI UEi of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEil ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) None Evaluated by: Thomas Steahr Date: 08-08-2012 Evaluated by: Stephen F. Superson

  • i - Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-138

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SEWL-093 AWC # MP3-WB-005 Status YZ NE] UE] Equipment ID No. M33CHS*TK5A Equip. Class 21 Equipment Description A Boric Acid Tank Location: Bldg. AB Floor El. 43' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NLE of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NE! U-- N/AEl
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U"] N/Al-oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UL] N/Al]
5. Is the anchorage configuration consistent with plant documentation? YN NEI U-] N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) See drawing 25212-11134 (Rev. 7).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UL-I potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-139

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SEWL-093 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UE- N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE] UI" N/A[l and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NE] UE1 N/AEI
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr Date: 08-08-2012 Evaluated by: Stephen Superson Date: 08-08-2012 I Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-140

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-094 AWC # MP3-WB-020 Status YN No] U-] Equipment ID No. M3EGS*TK1B Equip. Class 21 Equipment Description Diesel StartAir Receiver Tank Location: Bldg. DG Floor El. 24' Room, Area DIG 'B' Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UE1 N/AE
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UI- N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UE- N/AEIl
5. Is the anchorage configuration consistent with plant documentation? Y0 NEI UE- N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing25212-11339 (Rev. 8).

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixC C-141

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-094 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YED NE UL N/All
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI U-- N/AU3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YIE NEI UL N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YE Nil UW of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NE UL adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

       'A' trainprotected at time of walkdown.

Evaluated by: Stephen Superson Date: 08-13-2012 Evaluated by: William Price Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-142

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # Mi3-WD-SWEL-095 AWC # MP3-WB-021 Status Y9 NEI UE1 Equipment ID No. M33EGF*TK2B Equip. Class 21 Equipment Description Emergency GeneratorFuel Oil Day Tank Location: Bldg. DG Floor El. 37'6" Room, Area D/G "B" Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UI] N/AI1
3. Is the anchorage free of corrosion that is more than mild surface YN NI] UI- N/AI]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NI] UI- N/A[]
5. Is the anchorage configuration consistent with plant documentation? YNI NEI UI] N/AI1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference:

DWG 25212-29022, Rev. 0 DWG 25212-11477, Rev. 0

6. Based on the above anchorage evaluations, is the anchorage free of YZ NF] Ur potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-143

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-095 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI ULI N/Al]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U[] N/A-]

and masonry block walls not likely to collapse onto the equipment? Observed last supportfor 1 " diameterfire piping is hung by threaded rod by beam clamp. The piping is cantileveredapproximately 4'. The remainingsupports are supportedoff the ceiling using Hilti drop-in anchor. Therefore even if the beam clampfails the cantileverpiping portion will notfall on top of the tank

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UEI N/AE]
10. Based on the above seismic interaction evaluations, is equipment free YZ NO UE]

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE]

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert Sý7 *-A *- ..... Date: 08-13-2012 Evaluated by: Thomas Steahr K Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-144

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-096 AWC # M p3-WB-028 Status YO NE] U[] Equipment ID No. M33FWA*TK1 Equip. Class 21 Equipment Description Demin Water Storage Tank Location: Bldg. YD Floor El. 24'-4" Room, Area Yard Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checkdist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YLI Nil UI] N/An No visible anchoragefor tank to pad.
3. Is the anchorage free of corrosion that is more than mild surface YEI NEI UE3 N/A2 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE] N/AE
5. Is the anchorage configuration consistent with plant documentation? YE1 NI] U-] N/A[D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE-potentially adverse seismic conditions?

Anchorage is not visible, however there are no indications of potential adverse seismic conditions Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summart Report Appendix C C-145

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-096 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y9 NEI U" N/AD]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI U'] N/AD and masonry block walls not likely to collapse onto the equipment?

Note: lights appearto be adequatelysupported vertically (chain hung).

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UrD N/AD-
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NiD U-adversely affect the. safety functions of the equipment?

Inside tank room okay. Comments (Additional pages may be added as necessary) Evaluated by: William Price Date: 08-07-2012 Evaluated by: JamesMcKinnev Date: 08-07-2012 ( t v Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-146

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-097 AWC # MP3-WB-012 Status YIZ NEI UE1 Equipment ID No. M33HVK*ElB Equip. Class 21 Equipment Description Heat Exchangerfor ControlBLDG Water Chiller Location: Bldg. CB Floor El. 64' Room, Area Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UE1 N/AU]
3. Is the anchorage free of corrosion that is more than mild surface YN NEI UL N/AU1 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI UE- N/AUl
5. Is the anchorage configuration consistent with plant documentation? YED NEI UE- N/AU1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing No. 25212-24209 SH 1 Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of YO NO UE-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-147

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-097 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UE" N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(O NEI UE' N/A[]

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? YO NEI UL N/AU
10. Based on the above seismic interaction evaluations, is equipment free YN NI UEI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE-"

adversely affect the safety functions of the equipment? Comments (Additional pages may be added as necessary) 1" waterpipe located above with beam clamp support 5 'from chiller. Structuralsupport 3 'from chiller. 1 "pipe is captured between large bore chiller supply and returnpiping. 1 "pipe cannot contact chiller if beam clamp were tofail. Evaluated by: Sombat Pornprasert ,= -,-- .4 (Po, =-'-A:: - Date: 08-13-2012 Evaluated by: Thomas A. Steahr I - . 1; 17 Date: 08-13-2012 r- 0-Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-148

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-098 AWC # MP3-WB-032 Status YE ND UI-1 Equipment ID No. M33CCE*TK1 Equip. Class 21 Equipment Description CCE Surge Tank Location: Bldg. AB Floor El. 43' Room, Area Manufacturer, Model, Etc. (optional but recommended) N/A Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YED NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NO UD N/AD
3. Is the anchorage free of corrosion that is more than mild surface YN NDI U- N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y! ND U" N/AD
5. Is the anchorage configuration consistent with plant documentation? YZ NDI UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Reference Drawing no. 25212-29022, Sht. 10 and 11.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-1 potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-149

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-098 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE- N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting,, Y9 NEI- UI- N/AEl and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UI" N/AEl
10. Based on the above seismic interaction evaluations, is equipment free YO N[-- U--

of potentially adverse seismic interaction effects? Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YO NEI UE1 adversely affect the safety functions of the equipment?

Potentialinteraction with Category Ipipe support CP-372500-HOOI addressedin CR 484958, Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev J I m' l Date: 08-14-2012 (-) Evaluated by: James Petroskv Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-150

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-099 AWC # MP3-WB-022 Status YO No U['] Equipment ID No. M33RHS*E1A Equip.( Equipment Description Residual HeatExchanger Location: Bldg. ES Floor El. 8' Room, Area LAMRMR Pump Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NO of the 50% of SWEL items requiring such verification)?

PerDrawingNo. 12179-EC-7448-8 wall suppotplates are 2-Det. J, 1-Det.H. PerDrawingNo. 12179-EC-149D-3,Det. H has 20 bolts, Det. Jhas 16 bolts. Total 2x16 +20 =52 bolts, 8 bolts are not visible, greaterthan 80% were verified.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI U- N/ALU
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UZ1 N/AUl oxidation?

Some surface corrosion noted. Tracked in the B.A. C.program, reference CR 484254.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YOI NEI U-- N/AUJ
5. Is the anchorage configuration consistent with plant documentation? YN NEI UI N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NE UUE potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summar/ Report Appendix C C-151

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC #tP3-WD-Sfe099 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NEI UII N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NO U10 N/AU and masonry block walls not likely to collapse onto the equipment?

Lightfixtures are suspendedby chain with securedS-hooks,fixtures and bulbs will not pose any threat to heat exchanger.

9. Do attached lines have adequate flexibility to avoid damage? Y[@ NO UQ N/AU
10. Based on the above seismic interaction evaluations, is equipment free YO NO U1 of potentially adverse seismic interaction effects?.

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YIZ NO U11 adversely affect the safety functions of the equipment?

See A WC# MP3-WB-022 for general housekeeping issues none of which adversely affect the RJ-R heatexchanger. C.ommets (Additional pages may be added as necessary) A shieldingscaffold was noted at elev. 24 "-6' It was evaluatedby a lead shielding review, and assessedaspart ofthis walkdown, concludingno adverseseismic interaction.

Reference:

DrawingNo. 12179-EC-749D-3 DrawingNo, 12179-EC-749B-8 DrawingNo. 12179-2214.303-001-002B DrawingNo. 12179-EM-2B DrawingNo. 25212-29001 Sh. 1007 DrawingNo. 12179-BV-58C DrawingNo. 12179-EV-58A DrawingNo. 12179-BV-58B Evaluated by: James Petroskv Date: 08-08-2012 e-N ( Evaluated by: L .JackDiLyna I, ) Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-152

Page 1 of 2 Seismic Walkdown Checklist (SWC) SWC # MP3-WD-SWEL-100 AWC # MP3-WB-026 Status YO NEI ULI Equipment ID No. M33SFC*ElA Equip. Class 21 Equipment Description Fuel Pool Cooler Location: Bldg. FB Floor El. 24' Room, Area SFP Pumps & Hx Manufacturer, Model, Etc. (optional but recommended) Instructions for Completing Checklist This checklist shall be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEl of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI NO UF- N/Al
3. Is the anchorage free of corrosion that is more than mild surface YO NEI UE- N/AEl oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE NEI UE' N/AL!
5. Is the anchorage configuration consistent with plant documentation? YO NEI ULI N/AEl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEl U-potentially adverse seismic conditions?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-153

Page 2 of 2 Seismic Walkdown Checklist (SWC) SWC # MA3-WD-SWEL-100 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO U[i N/AEl
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI UQ3 N/AUI and masonry block walls not likely to collapse onto the equipment?

Overheadfluorescent lightfixtures were reviewed andare adequately restrainedby chain with secureds-hooks, therefore no adverse interactionconcerns.

9. Do attached iines have adequate flexibility to avoid damage? YlO NEI UEJ N/AQI
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YI9 NO U1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Reference:

DrawingNo.12179-EM-7A, 12179-EM-7C DrawingNo. 12179-ES-38CY-2 DrawingNo. 25212-29005 SH I CalculationNo. 12179-838-322 (anchorage). Evaluated by: James Petro&k Date: 08-07-2012 Evaluated by: JackDILtua -z"_641- Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix C C-154

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D Area Walk-by Checklists (58 pages) D-1

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-001 Status Yo NO UI-Location: Bldg. AB Floor El. 24' Room, Area Misc. Mech Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI UI N/ALD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YEl NEI UL N/AUl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit Y0 NEI U- N/AU raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NE U- N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YI NE UU N/AU interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-2

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-001

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UEI N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NEI UEI N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NEIl UI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Thomas Steahr - Date: 08-07-2012 Evaluated by: Stephen F. Superson Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-3

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-002 Status YN NE] U[" Location: Bldg. AB Floor El. 24' Room, Area MCC Rod Drive (Misc. Elec.) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UE] N/A[

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI UE1 N/AU degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NE] UE] N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVAC and cable trays are well supported and do not have potentially adverse interactionwith equipment.

4. Does it appear that the area is free of potentially adverse seismic spatial YEI NE] UJE N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightfixtures are hung by chain with secured S-hooks and do not pose a potentialadverse interaction with equipment.

5. Does it appear that the area is free of potentially adverse seismic YED NE] UE1 N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-4

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-002

6. Does it appear that the area is free of potentially adverse seismic YO NEI UI- N/AEI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UEI N/AEI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Ladders, MCC lift device, boxes and hand truck are tied off in accordance with ProcedureOA 8. Thus no potentialadverse interactionwith equipment. Hose rack 1131 is well supported. Housekeeping is very good in the area

8. Have you looked for and found no other seismic conditions that could YZ NEIUEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James Petrosky Date: 08-09-2012 Evaluated by: Jack DiLuna 63 , P, Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-5

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-003 Status YED NEI Ut] Location: Bldg. AB Floor El. 24' Room, Area Chrg. Pump Cubicles "A" Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YNl NtI Ut] N/AE3 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI Ut] N/At]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YN NEI Ur- N/At]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YED NEI Ut] N/At]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YE NEI Ut] N/At]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-6

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-003

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U[I- N/AUl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN Nil UF- N/ALU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NE UUU adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev Date: 08-08-2012

                                                              ~1~1~-

Evaluated by: Bill Price Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-7

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-004 Status Y0 N-] UI-Location: Bldg. AB Floor El. 4'-6" Room, Area PenetrationArea (near3CHS*MV8116 (V701) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YIS NO] UL- N/AO potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YE:] NO UD N/AL degraded conditions?

Refer to CR484242 moderate corrosionon pipe supportfor valve 3CHS*MV8116

3. Based on a visual inspection from the floor, do the cable/conduit YE] NEI UE] N/AZ raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YE NEI UE] N/AO interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YZ NE] UD N/Al]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-8

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-004

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UEI N/AE]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AI-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEI UE1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary)

1. Supportsfor valve 3SSR- V785, 3SSR- V794, and 3SSR- V791 have moderate corrosion atfloor plate. Supports are located in the housekeeping water collection trough (ref.CR484242)

Auxiliary Building elevation 4 '-6". Per the engineering evaluation of the corroded components, there is sufficient effective throat and weld length, therefore the support is functional and not an operabilityconcern. Evaluated by: Bill Price Date: 08-08-2012 Evaluated by: James McKinnev Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-9

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-005 Status YO NO UI" Location: Bldg. AB Floor El. 43' Room, Area Fans Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UI- N/AU potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI UE N/AU degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit Y0 NEI U-1 N/AUl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YE NEI U"] N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO N[E] UE- N/AUl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 N-TTF 2.3 Seismic Walkdown Summary Report Appendix D D-10

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-005

6. Does it appear that the area is free of potentially adverse seismic YZ NI:] U1- N/AEI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YI N[L UI- N/AL!

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YE NE UM adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by performed in areasouth of "B" Boric Acid Tank, 3CHS*TK5B. Evaluated by: Thomas Steahr Date: 08-08-2012 Evaluated by: Stephen F. Superson Date: 08-08-2012

                                                                /

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-1 1

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-006 Status YO* NEI U' Location: Bldg. AB Floor El. 66' Room, Area -- Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NE UE7 N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YE NEI UE N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YIN NEI UE1 N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YER NEI UE3 N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE N/AE' interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-12

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # M[P3-WB-006

6. Does it appear that the area is free of potentially adverse seismic YZ NE] ULI N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YE Nil Ul] N/Al]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YZ NEI UI-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by conducted at the chargingpump exhaustfan (M33HVR*FNJ13A). Evaluated by: Tom Steahr Date: 08-09-2012 Evaluated by: Stephen Superson Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-13

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-007 Status YE NE] UL] Location: Bldg. AB Floor El. 43' Room, Area 'A'BAST Tanks Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI UE] N/AU potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NE] UE] N/A-]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE- N/AE3 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial Y[D NE] UE1 N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NEI Uf- N/A[]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-14

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-007

6. Does it appear that the area is free of potentially adverse seismic YED NEI UE1 N/AEI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEl U-I N/AE3 interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YED NEl UI-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area Walk-By performed in Boric Acid Tank 3CHS*TK5A cubicle. Evaluated by: Thomas Steahr aA'E2 _ - Date: 08-08-2012 Evaluated by: Stephen Superson Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-15

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-008 Status YE NEI U-1 Location: Bldg. Control Floor El. 4'-6" Room, Area West SWGR Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NEI UL N/AZ potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI UZ N/AU1 degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UZ N/AZ raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Seismically designed raceways and duct work.

4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI U-- N/AZ interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YE NEI UZ N/AZ1 interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-16

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-008

6. Does it appear that the area is free of potentially adverse seismic YE NEI UE] N/A[]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YED NEI ULI N/AFl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Tool boxes properly restrained.

8. Have you looked for and found no other seismic conditions that could YO NEI UI"]

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) Evaluated by: James McKinney ý1ý Date: 08-17-2012 U Evaluated by: James Petroslk Date: 08-17-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-17

Page I of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-009 Status YZ NEI U-' Location: Bldg. CB Floor El. 4' Room, Area Battery Rooms 2+4 / West SWGR Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UE1 N/A[]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YEJ NEI U-E- N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE- N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UE1 N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YED NEI UE N/AE' interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-18

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-009

6. Does it appear that the area is free of potentially adverse seismic YN NEI Ut] N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YO NEI UI- N/Al]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YO NEIUEJ adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by conducted in battery room No. 2 [Battery 2 (301B-1)] and in battery room No. 4 [Battery 4 (301B-2)]. Evaluated Date: 08-16-2012 Evaluated Date: 08-16-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-19

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-010 Status YN NE UM-Location: Bldg. CB Floor El. 4'6" Room, Area East Switch ear Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UL N/All potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YE NEI UL N/AL degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEL UL- N/AlE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

HVAC ducts, cable trays, FPpipingwell supportedin overhead and do not adversely impact any equipment in room.

4. Does it appear that the area is free of potentially adverse seismic spatial YOl NEl UL- N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightingfixtures are supportedfrom ceiling with chain and secureds-hooks and do not adversely impact any equipment in room.

5. Does it appear that the area is free of potentially adverse seismic YO NEl UL- N/ALl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-20

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-010

6. Does it appear that the area is free. of potentially adverse seismic YO NIO UD- N/A[l interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI UO3N/AC interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Items stored in room including ladders, toolbox and cart are secured in accordancewith OA 8. Air bottles 3FPB-5CB1 aresecured to a rack Housekeeping in room is very good overall

8. Have you looked for and found no other seismic conditions that could YZ NEI U" adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Pva~nat~d hv~ .!arn~os Pi~tra.~.Av Date: 08-09-2012 Evaluated hv: James Potre)-dhi Evaluated by: Jack DiLuna Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-21

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-011 Status YI NEJ U-- Location: Bldg. CB Floor El. 47'-6" Room, Area ControlRoom, Area 6 Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI U-I N/AUl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI UL N/AUl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO* NEI UU N/A[[

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YEI NEI UE1 N/AU interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YIO NE U'- N/AU interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-22

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-011

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UI- N/AEl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI ULI N/AEI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NED UE]

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) None. Evaluated by: Sombat Pornprasert W/d-f 11,4 "'1.-C/!) X Date: 08-16-2012 Evaluated by: Thomas Steahr

                                                )     ~                                  Date: 08-16-2012 Millstone Power Station Unit 3  N'TTF 2.3 Seismic Walkdown Summary Report Appendix D D-23

Page I ot 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-012 Status YN NEI UL]1 Location: Bldg. CB Floor El. 64' Room, Area CB HVAC Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NE] UE] N/Al3 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NE] UE] N/AE]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YZ NE] UE] N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO* NEI UE] N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YM NE] UE N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-24

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-012

6. Does it appear that the area is free of potentially adverse seismic YO NIZ UE- N/An interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NIh U- N/AEI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEIUEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Area walk-by performed in vicinity of boosterpump M33SUP*P2B. Evaluated by: Sombat Pornprasert ~p4J~r Im P~-~JŽr

  • T Date: 08-13-2012 Evaluated by: Thomas Steahr 'Z,-ell A__OY+/-!__:!f 42 Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-25

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-013 Status YED NEI UE] Location: Bldg. AB Floor El. 24' Room, Area MCC Drive (West) Instructions for Completing Checklist This checkdist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZI NEI UE] N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YlZ NE] UE] N/AE]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NE] UE] N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVAC and cable trays are well supported and do not have potentially adverse interactionwith equipment.

4. Does it appear that the area is free of potentially adverse seismic spatial YO NE] UE] N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Lightfixtures are hung by chain with secureds-hooks anddo not pose a potentialadverse interactionwith equipment.

5. Does it appear that the area is free of potentially adverse seismic YO NE] UE] N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-26

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MJ.3-WB-013

6. Does it appear that the area is frec of potentially adverse seismic 'YER ND U1' N/AD interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NOD U1 N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Housekeepingis veay good in this area,tempormay equipment is restrainedin accordanceu,1ith OA-8.

8. Have yotu looked for and found no other seismic conditions that could YO NEI u10 adversely affect the safety functions of the equipmentin the area?

Comments (Additional pages may be added as necessaiy) Evaluated by: Jack DiLuna mldf-11. G;ý Date: 08-09-2012 Evaluated by: James PetrosktO -- N Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-27

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-014 Status YN NEI UEI Location: Bldg. AB Floor El. 45' Room, Area MCC Rod Drive (West) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NE UE N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y[ NEI UD N/AD degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NEI UEi N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

HVAC and cable trays are well supported and do not have a potentially adverse interactionwith equipment.

4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UD N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightfixtures are hung by chain with secureds-hooks and do not pose a potentialadverse interactionwith equipment.

5. Does it appear that the area is free of potentially adverse seismic YO N[-] UD N/AD interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-28

Page .2 of 2 Area Walk-By Checklist (AWC) AWC # MN3-WB-014

6. Does it appear that the area is free of potentially adverse seismic YN NEI U- N/Al interactions that could cause a fire In the area?

7, Does it appear that the area is free of potentially adverse seismic YZ NE U[j N/AUI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g,, scaffolding, lead shielding)? Ternporany eqidpinentis resirainedin accordashewith 0.4-8 tinis no potentialinteraction with equipment. Housekeeping is very good in this area.

8. Have you looked for"and found no other seismic, conditions that could "YN[ NO1 E adversely affect the safety functions of the equipment in the area?

Coumments (Additional pages may be added as necessary) Evaluated by: JackDiLwna Date: 08-09-2012 Evaluated by: J!azes Petroslcv Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-29

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MiP3-WB-015 Status YO NEI UL-Location: Bldg. AB Floor El. 45' Room, Area MCC Rod Drive (Elec) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI ULI N/AL!

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI U-- N/AL!

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NEI U!] N/AE!

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? HVA C and cable trays are well supported and do not have a potentially adverse interactionwith equipment.

4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UE- N/AE!

interactions with other equipment in the area (e.g.,.ceiling tiles and lighting)? Lightfixtures are hung by chain with securedS-hooks and do not pose apotentialadverse interactionwith equipment. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-30

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-015

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UL N/Al]

interactions that could cause flooding or spray in the area?

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UI- N/Al]

interactions that could cause a fire in the area? Ladders,MCC lift device and boxes are tied off in accordance with Procedure OA 8, thus no potential interactionwith equipment. Housekeeping is very good in this area.

7. Does it appear that the area is free of potentially adverse seismic Y] NE UE] N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YE! NEI UE-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James Petrosky Date: 08-09-2012 Evaluated by: JackDiLuna 4fi)' PA, Date: 08-09-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-31

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-019 Status YO NE] U-] Location: Bldg. CW Floor El. 14"'6" Room, Area CWPump House (Service Water) Intake Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI U'] N/AL]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YZ NEI U[I N/ALl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI U"] N/AL]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEL Ull N/AL]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)? There arefive overhead chain-hunglights in the area.Each was evaluated.In some cases the lights could swing and interact with adjacent seismically supportedduct work with no adverse effects. If the lightfixture was tofall, safety relatedtargets, such as 3SWP-PS27A may be impacted, but were alljudgedto be sufficiently ruggedso that there would be no adverse effects. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-32

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-019

5. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AEl interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YE NEI UE- N/AEI interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI UL1 N/AZl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NO UIZ adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) A water leakfrom 3SWP*STR1C was noted, a trouble reportwas previously submitted, no further action is required. Evaluated by: James PetroskX Date: 08-06-2012 Evaluated by: Jack DiLuna 'zý" (,:), -a- Date: 08-06-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-33

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-020 Status YN NEI UE1 Location: Bldg. DG Floor El. 24' Room, Area 'B' EDG Equipment Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UE- N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NEI UE] N/AE]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YZ NE] UE1 N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO NE] UE] N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YN NEI UE] N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-34

Page 2 of 2

                                       .Area Walk-By Checklist (AWC)

AWC # MP3-WB-020

6. Does it appear that the area is free of potentially adverse seismic YO Nil UI- N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic Y[E NEI UI N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YN NEI UF adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: Stephen Superson Date: 08-13-2012 Evaluated by: William Price ~ALQ9&ACN~\ Date: 08-13-2012 0) Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-35

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-021 Status YO NI: UiM Location: Bldg. DG Floor El. 37' Room, Area EDG Enclosure & Day Tank ('B' Train) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI U-1 N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NI: UEI N/AZl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NI: UI: N/AI:

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YN NI: U-1 N/AZ1 interactions with other equipmerit in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NI: UI- N/AZl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-36

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-021

6. Does it appear that the area is free of potentially adverse seismic YO NEI UE' N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AEf interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YM NEIUE1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) None. Evaluated by: SombatPornprasert S a.46y-¢ -V - Date: 08-13-2012 Evaluated by: Thomas Steahr Date: 08-13-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-37

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MNP3-WB-022 Status YN NE UEI Location: Bldg. ESF Floor El. 4' Room, Area RHR Pump and HeatExchanger Cubicle Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NO UO N/AO potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

See MP-WD-SEWL-099 for A RHR HeatExchanger bolting corrosion issue.

2. Does anchorage of equipment in the area appear to be free of significant YZ NEI UO N/AD degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YER NOI UO1 N/A[!

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YO NOI UL1 N/AO interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lightfixtures are suspended by chain with secured s-hooks,fixtures and bulbs will not pose any threatto equipment.

5. Does it appear that the area is free of potentially adverse seismic YO NO U'- N/A[-

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-38

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-022

6. Does it appear that the area is free of potentially adverse seismic YN NIl UTf N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic Y NEI UE3 N/AU interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Overall housekeeping In the RHR A.cubicle did not meet procedureOA

8. Specificallyjacketed insulationsegments were stored on thefloor throughoutthe room, along with other items. Most were not secured per OA 8. None of these Items createdan adverse seismic interaction condition. See CR484235.
8. Have you looked for and tbund no other seismic conditions that could YO NEIU0 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Water was drippingfrom above near the HP bounday step-offpad. Water was accumulatingon the floor and appearsto be causingpcorrosionofsipportPSR016 near SIL**MV8812A. Corrosionwas not significantand does not affect seismic adequacy ofpipe support.HP was notified, see CRs, CR484243,and CR484235, Evaluated by: JamesPetrok

                                                    ý24                           Date: 08-08-2012 Evaluated bv. JackDiL ma                AS).                                       Date: 08-08-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-39

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-023 Status YN NEI UE] Location: Bldg. ESF Floor El. 21' Room, Area Motor Driven Aux. Feed Pump Room "A " and Turbine Driven Aux. Feed Pump Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI U-- N/Al!

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YO NI] UI-] N/A[]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UL- N/AE1 raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE N/All interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-40

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-023

5. Does it appear that the area is free of potentially adverse seismic YN NEI UEI- N/AE interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YNI NE UO N/ADl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ NEI U[ N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO* NEI UE'-

adversely affect the safety functions of the equipment in the area? Comments (Additional pages may be added as necessary) _ *-O Evaluated by: William Price Date: 08-07-2012 Evaluated by: James McKinney Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-41

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-024 Status YZ NE] U-] Location: Bldg. ESF Floor El. 36' Room, Area Ventilation &Misc. Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YIZ NEI ULI N/Al1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y[ NEI U-1 N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NI] UE3 N/Al]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI UE] N/Al]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)? Lightingfixtures are supported by chain with secureds-hooks. No adverse seismic interactionsnoted.

5. Does it appear that the area is free of potentially adverse seismic YO NEI U-] N/Al]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-42

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-W13-024

6. Does it appear that the area is free of potentially adverse seismic YZ NE] UDI N/AU interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NO UE] N/AO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g,, scaffolding, lead shielding)?

Tenmorary scaffolding in ar'ea was reviewed anid in each case there was sufficient bracingand shake sparesuch that seismic interactionis precluded.

8. Have you looked for and found no other seismic conditions that could YN NOtUO adversely affect the safety functions of the equipment in the area?

_Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Date: 08-08-2012 Evaluated by: J'ackDiLuna Date: 08-08-2012 Millstone Power Station Unit 3 . -NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-43

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-025 Status YO Nil U-1 Location: Bldg. ESF Floor El. 15' Room, Area RHR Penetrations Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Yi NEI UE1 N/AE1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NEI ULI N/AE degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NE UE' N/AlE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Seismic HVAC duct overhead,fluorescent lightfixtureproperly restrained.

4. Does it appear that the area is free of potentially adverse seismic spatial YM NEI UE- N/AEI interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YO NE UE N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-44

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-025

6. Does it appear that the area is free of potentially adverse seismic YZ NE US- N/AEl interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN NEI UE- N/AEI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

See comments below.

8. Have you looked for and found no other seismic conditions that could YN NEI U-1 adversely affect the safety functions of the equipment in the area?

Fire line well supported. Comments (Additional pages may be added as necessary) Dress-outstation and Decontaminationequipment were present in this area. Cabinets and barrels were restrained.Loose hose, shieldingbarrels were not restrainedbut did not pose equipment interactionhazards. Ops cabinet was bolted to the wall, ladders were restrainedon bracket. Evaluated by: James Petroskv Date: 08-14-2012 Evaluated by: James McKinnev A~ cg~(. Date: 08-14-2012 U Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-45

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-026 Status YO NEI ULI Location: Bldg. FB Floor El. 24'6'- Room, Area Spent Fuel CoolingPumps & Hx Areas 45'6" Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NE UE N/AE1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NE UE- N/AU degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE' N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NEI UE N/AU1 interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Overheadfluorescent lightfixtures were reviewed and are adequately restrainedby chain with secured s-hooks, therefore no adverse interactionconcerns.

5. Does it appear that the area is free of potentially adverse seismic YZ NE UU N/AU1 interactions that could cause flooding or spray in the area?

FPPipingin corner of room is well restrainedand does not presentan adverse seismic interaction concern. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-46

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-026

6. Does it appear that the area is free of potentially adverse seismic YO NI] UEl N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YZ NI] U[I N/Al]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? Wrenches are stored in a support beside the ASFP Cooling Pump.They are not secured but are close to the floor and do not provide a seismic interactionconcern.

8. Have you looked for and found no other seismic conditions that could YIE NI] UMI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: Jim Petrosky I- Date: 08-07-2012 Evaluated by: JackDiLuna $4A 6'ýO"- Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-47

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-027 Status YN NEI UE-Location: Bldg. MS Floor El. 66' Room, Area Main Steam Valve Bldg Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEI UJE N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YZ NE] UE] N/AF1 degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NE] UE' N/AE]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

4. Does it appear that the area is free of potentially adverse seismic spatial YN NE] UE] N/AE]

interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UEr N/AE]

interactions that could cause flooding or spray in the area? Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-48

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # NT3-WB-027

6. Does it appear that the area is free of potentially adverse seismic YZl NO UO N/AD interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic' YN NEI UDI N/AUI interactions associated with housekeeping practices, Storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporawy heatersstored on the 49' 6" elevation of the MSVB are attachedto the floor with lanyards, but not restrainedto prevent tippingas requiredbyprocedure OA-8. Ref. CR 484067

8. Have you looked for and found no other seismic conditions that could YO NDI UJ" adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Overheadfluorescent lightfixtures were reviewed and are adequately restrainedby chain with secured s-hooks thereforeno adverse interactionconcerns. Evaluated by: Jim Petrosy Date: 08-07-2012 Evaluated by: JackDiLuna Date: 08-07-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report AppendixD D-49

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-028 Status YO NEI UI-Location: Bldg. YD Floor El. 24'-4" Room, Area Yard, DWSTEnclosure Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of'judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UI-- N/AEl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NEI UI] N/AE]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YZ NEl U-1 N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Water on floor, some minor surface rust on conduit supports. Conduit route to valves 3FWA *V928, V929, V930.

4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEI U[-i N/AEl interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Lighting hangerappearsto be adequate.

5. Does it appear that the area is free of potentially adverse seismic YN NEI UE- N/AEl interactions that could cause flooding or spray in the area?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-50

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-028

6. Does it appear that the area is free of potentially adverse seismic YE NEI ULI N/AE-interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YED NOI UOi N/A[l interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

(Rolledfire hose on floor in corner of room, no interaction).Observed temp mod to supply 3FWA after TK1.

8. Have you looked for and found no other seismic conditions that could YE NEIUEI adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: William Price Date: 08-07-2012 Evaluated by: James McKinnev J l

  • l Date: 08-07-2012 U J Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-51

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-029 Status YE NEl U[] Location: Bldg. AB Floor El. 43' Room, Area 3CHS*TK2 Room Instructions for Completing Checklist This checkdist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NEI UI- N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI U- N/AEl degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UE- N/AE raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UE' N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No interactionsfound.

5. Does it appear that the area is free of potentially adverse seismic Y[ NEI U[E N/AEZ interactions that could cause flooding or spray in the area?

No flooding or spray hazardsfound. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-52

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-029

6. Does it appear that the area is free of potentially adverse seismic YO NE! UI- N/Al]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YE NEI U- N/Al]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? No storage in room.

8. Have you looked for and found no other seismic conditions that could YO NEI UI-1 adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Tz5eý' ý)-ý - Date: 08-14-2012 Evaluated by: James McKinnev ýýý "k,7f"ý nwl T i *. Date: 08-14-2012 UJ K) Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-53

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-030 Status YO NI] UU Location: Bldg. AB Floor El. 43' Room, Area 'B'BoricAcid Tank Room Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UI] N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YOI NI] UO N/AI]

degraded conditions?

3. Based on a visual inspection from the floor, do the cable/conduit YO NI] UI- N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YED NO UI] N/All interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No interactionfound.

5. Does it appear that the area is free of potentially adverse seismic YO NEI Uli N/AI]

interactions that could cause flooding or spray in the area? No flooding or spray hazardsfound. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-54

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-030

6. Does it appear that the area is free of potentially adverse seismic YZ NEI UD N/AE interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NE UO N/AEI interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NE UD adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James Petroskv Date: 08-14-2012 Evaluated by: James McKinney ýý' ___X J I "N Date: 08-14-2012 C Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-55

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-VVB-031 Status YN NE UO Location: Bldg. Fuel Floor El. 66'-6" Room, Area Col. F to F.3 and54.4 to 52.3 FUEL BLDG. EXHFANAREA Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YM NL U- N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YN NEI UL N/AL degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YN NL UL N/AL raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ NEl UL N/AL interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic YN NEL UL N/AL interactions that could cause flooding or spray in the area?

Adjacent FPlines well supportedwith U-bolts. Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summaly Report Appendix D D-56

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-031

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U-] N/A!]

interactions that could cause a fire in the area?

7. Does it appear that the area is free of potentially adverse seismic YO NE UE] N/AD]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

8. Have you looked for and found no other seismic conditions that could YM NEI UM]

adversely affect the safety functions of the equipment in the area? Adjacent scaffolding (long term #1847) is well braced. Comments (Additional pages may be added as necessary) Evaluated by: James Petrosky Date: 08-14-2012 Evaluated Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-57

Page 1 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-032 Status YO NEI UE" Location: Bldg. Aux. Floor El. 43' Room, Area Col. 51.3 to .52.3 and F.3 to F (3CCE*TK1 Area) Instructions for Completing Checklist This checklist shall be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NE UE N/AE potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YO NEI UE3 N/AEl degraded conditions?

Adjacent SW valve andflanges have mild surface rustand valve 3SWP*V866 weeping slightly (alreadyaddressedby CR 460432).

3. Based on a visual inspection from the floor, do the cable/conduit YO NE UE1 N/AEl raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YO NEI UE" N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-58

Page 2 of 2 Area Walk-By Checklist (AWC) AWC # MP3-WB-032

5. Does it appear that the area is free of potentially adverse seismic YIZ NEI U-i N/An interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YO NEI UEI N/AU' interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YO NEI U- N/All interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could YO NEIUUL adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary) Evaluated by: James McKinnev  %.e'_ Date: 08-14-2012 9 Evaluated by: James Petrosky Date: 08-14-2012 Millstone Power Station Unit 3 NTTF 2.3 Seismic Walkdown Summary Report Appendix D D-59}}