Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A3671998-07-14014 July 1998 LER 98-002-00:on 971019,CR Emergency Air Treatment Sys Actuating Function Was Not Operable.Caused by Mispositioned Switch.Revised Procedure CPI-MON-R37.W/980714 Ltr ML17265A1921998-03-11011 March 1998 LER 98-001-00:on 980209,discovered That Boraflex Degradation in SPF Was Greater than Was Assumed.Caused by Dissolution of Boron on Boraflex Matrix,Per 10CFR50.21.Removed Spent Fuel Assemblies from Selected Degraded Storage Rack Cells ML17265A1641998-02-0606 February 1998 LER 97-007-01:on 971117,reactor Engineer Recognized That Neutron Flux Low Range Trip Circuitry for Channel Was Not in Tripped Condition as Required.Caused by Technical Inadequacies.Channel Defeat Will Be Identified ML17265A1601998-02-0606 February 1998 LER 97-006-01:on 971103,verification of B Concentration Was Not Performed Due to Misinterpretation of Event Sequence. Audible Count Rate Function Was Restored to Operable Status ML17264B1441997-12-17017 December 1997 LER 97-007-00:on 971117,NF Low Range Trip Circuitry for Channel N-44 Was Not Placed in Tripped Condition.Caused by Technical Inadequacies in Procedures.Implemented EWR 4862 to Resolve Design deficiency.W/971217 Ltr ML17264B1291997-12-0303 December 1997 LER 97-006-00:on 971103,NIS Audible Count Rate Function Was Inoperable.Caused by Misinterpretation of Event Sequence Due to Not Verifying Boron Concentration.B Verification Occurred Every 12 H Per ITS LCO Action 3.9.2.C.3.W/971203 Ltr ML17264B1271997-12-0101 December 1997 LER 97-005-00:on 971031,undetected Unblocking of SI Actuation Signal Occurred at Low Pressure Condition,Due to Faulty Bistable Which Resulted in Inadvertent SI Actuation Signal.Sias,Ci & CVI Signals Were Reset ML17264B1211997-11-24024 November 1997 LER 97-004-00:on 971024,radiation Monitor Alarm Were Noted Due to Higher than Normal Radioactive Gas Concentration Resulted in Cvi.New R-12 Alarm Setpoint Was Maintained for Duration of Refueling Outage ML17264B0461997-09-29029 September 1997 LER 97-003-01:on 970730,bistable Instrument Trip Setpoint Could Have Exceeded Allowable Value.Caused by Insufficient Existing Margin Between Trip Setpoint & Allowable Value. Held Switches in Tripped configuration.W/970929 Ltr ML17264B0111997-08-27027 August 1997 LER 97-003-00:on 970730,high Steam Flow Bistable Instrument Setpoint Plus Instrument Uncertainty Could Exceed Allowable Value in ITS Was Identified.Caused by Entry Into ITS LCO 3.0.3.Switches Placed in Tripped configuration.W/970827 Ltr ML17264A9941997-08-19019 August 1997 LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr ML17264A9911997-08-11011 August 1997 LER 96-009-02:on 960723,determined That Leak Rate Outside Containment Was Greater than Program Limit.Caused by Weld Defect.Isolated Leak & Cut Out & Replaced Leaking Pipe ML17264A8271997-03-0303 March 1997 LER 97-001-00:on 970131,discovered Service Water Temp Was Less than Specified Value.Caused by non-representative Method of Monitoring.Increased Water Temp in Screenhouse Bay to Greater than 35 Degrees F.W/970303 Ltr ML17264A8071997-01-22022 January 1997 LER 96-015-00:on 961223,discovered Thermally Induced Overpressure Transient Could Occur.Caused by Thermal Expansion of Fluid During Design Basis Accident Condition. Installed Relief Valve on Affected line.W/970122 Ltr ML17264A7471996-11-27027 November 1996 LER 96-013-00:on 961029,circuit Breakers Closed While in Mode 3 & Resulted in Condition Prohibited by TS Due to Personnel Error.Circuit Breakers for MOV-878B & MOV-878D Were re-opened.W/961127 Ltr ML17264A6051996-09-19019 September 1996 LER 96-012-00:on 960820,feedwater Transient Occurred,Due to Closure of Feedwater Regulating Valve,Causing Lo Lo Steam Generator Level Reactor Trip.Sgs Were Restored & Missing Screw in 1/P-476 Was replaced.W/960919 Ltr ML17264A6061996-09-19019 September 1996 LER 96-009-01:on 960723,leakage Outside Containment Occurred,Due to Weld Defect,Resulting in Leak Rate Greater than Program Limits.Source of Leakage Isolated from RWST by Freeze Seal,Allowing Exit from ITS LCO 3.0.3.W/960919 Ltr ML17264A5911996-09-0505 September 1996 LER 96-011-00:on 960807,improper Configuration of Circuit Breaker Occurred,Due to Undetected Internal Interference, Resulting in Automatic Start of Both Auxiliary Feedwater Pumps.Running AFW Pumps Were secured.W/960905 Ltr ML17264A5921996-09-0505 September 1996 LER 96-010-00:on 960806,latching of Main Turbine While in Mode 4 Occurred,Due to Defective Procedure,Resulting in Automatic Start of Auxiliary Feedwater Pump.Caused by Defective Maint Procedure.Procedure revised.W/960905 Ltr ML17264A5891996-08-22022 August 1996 LER 96-009-00:on 960723,determined Leak on Piping Sys Outside Containment Greater than Program Limit.Caused by Weld Defect.Pipe & Socket Welds Were Cut Out & Replaced. W/960822 Ltr ML17264A5781996-08-0606 August 1996 LER 96-008-00:on 960707,main Feedwater Pump Breakers Opened. Caused by Change in Seal Water Differential Pressure Occurred During Sys Realignment.Afw Flow Controlled as Desired to Maintain S/G level.W/960806 Ltr ML17264A5561996-07-12012 July 1996 LER 96-007-00:on 960612,CR Operators Identified Control Rods Misaligned & Not Moving in Proper Sequence.Caused by Faulty Firing Circuit Card in Rod Control Sys.Faulty Firing Circuit Card in 1BD Power Cabinet replaced.W/960712 Ltr ML17264A5421996-06-20020 June 1996 LER 96-006-00:on 960521,discovered Containment Penetration Not in Required Status.Caused by Personnel Error.Installed Flange Inside Containment Penetration 2.W/960620 Ltr ML17264A5411996-06-17017 June 1996 LER 96-005-00:on 960516,PORC Determined Deficient Procedures Do Not Meet SRs for Testing safety-related Logic Circuits. Caused by Inadequancies in Individual Testing Procedures. Procedures Re Improved TSs revised.W/960617 Ltr ML17264A5051996-05-17017 May 1996 LER 96-003-01:on 960308,identified That Both Pressurizer PORVs Inoperable Concurrently Due to Disconnection of Flex Hose to Both PORV Actuators to Install air-sets for Benchset & Limit Switch Activities.Hpes Completed ML17264A4481996-04-0808 April 1996 LER 96-003-00:on 960308,both Pressurizer Relief Valves Inoperable.Hpes Evaluation Is Being Conducted to Determined Cause of Event.C/As:Both PORVs restored.W/960408 Ltr ML17264A4471996-04-0808 April 1996 LER 96-002-00:on 960307,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump.C/As: Thermography performed.W/960408 Ltr ML17264A4101996-03-18018 March 1996 LER 96-001-00:on 950504,inservice Test Not Performed During Refueling Outage.Caused by Inadequate Tracking of Surveillance Frequency.Valve Test Performed & Disassembled. W/960318 Ltr ML17264A2971995-12-14014 December 1995 LER 95-009-00:on 950817,surveillance Was Not Performed Due to Improper Application of TS Requirements Resulting in TS Violation.Testing of MOV-515 Was Performed on 951115.W/ 951214 Ltr ML17264A1711995-09-25025 September 1995 LER 95-008-00:on 950825,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump That Resulted in Manual Rt.Returned S/G Levels to Normal Operating levels.W/950925 Ltr 1999-09-22
[Table view] Category:RO)
MONTHYEARML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A3671998-07-14014 July 1998 LER 98-002-00:on 971019,CR Emergency Air Treatment Sys Actuating Function Was Not Operable.Caused by Mispositioned Switch.Revised Procedure CPI-MON-R37.W/980714 Ltr ML17265A1921998-03-11011 March 1998 LER 98-001-00:on 980209,discovered That Boraflex Degradation in SPF Was Greater than Was Assumed.Caused by Dissolution of Boron on Boraflex Matrix,Per 10CFR50.21.Removed Spent Fuel Assemblies from Selected Degraded Storage Rack Cells ML17265A1641998-02-0606 February 1998 LER 97-007-01:on 971117,reactor Engineer Recognized That Neutron Flux Low Range Trip Circuitry for Channel Was Not in Tripped Condition as Required.Caused by Technical Inadequacies.Channel Defeat Will Be Identified ML17265A1601998-02-0606 February 1998 LER 97-006-01:on 971103,verification of B Concentration Was Not Performed Due to Misinterpretation of Event Sequence. Audible Count Rate Function Was Restored to Operable Status ML17264B1441997-12-17017 December 1997 LER 97-007-00:on 971117,NF Low Range Trip Circuitry for Channel N-44 Was Not Placed in Tripped Condition.Caused by Technical Inadequacies in Procedures.Implemented EWR 4862 to Resolve Design deficiency.W/971217 Ltr ML17264B1291997-12-0303 December 1997 LER 97-006-00:on 971103,NIS Audible Count Rate Function Was Inoperable.Caused by Misinterpretation of Event Sequence Due to Not Verifying Boron Concentration.B Verification Occurred Every 12 H Per ITS LCO Action 3.9.2.C.3.W/971203 Ltr ML17264B1271997-12-0101 December 1997 LER 97-005-00:on 971031,undetected Unblocking of SI Actuation Signal Occurred at Low Pressure Condition,Due to Faulty Bistable Which Resulted in Inadvertent SI Actuation Signal.Sias,Ci & CVI Signals Were Reset ML17264B1211997-11-24024 November 1997 LER 97-004-00:on 971024,radiation Monitor Alarm Were Noted Due to Higher than Normal Radioactive Gas Concentration Resulted in Cvi.New R-12 Alarm Setpoint Was Maintained for Duration of Refueling Outage ML17264B0461997-09-29029 September 1997 LER 97-003-01:on 970730,bistable Instrument Trip Setpoint Could Have Exceeded Allowable Value.Caused by Insufficient Existing Margin Between Trip Setpoint & Allowable Value. Held Switches in Tripped configuration.W/970929 Ltr ML17264B0111997-08-27027 August 1997 LER 97-003-00:on 970730,high Steam Flow Bistable Instrument Setpoint Plus Instrument Uncertainty Could Exceed Allowable Value in ITS Was Identified.Caused by Entry Into ITS LCO 3.0.3.Switches Placed in Tripped configuration.W/970827 Ltr ML17264A9941997-08-19019 August 1997 LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr ML17264A9911997-08-11011 August 1997 LER 96-009-02:on 960723,determined That Leak Rate Outside Containment Was Greater than Program Limit.Caused by Weld Defect.Isolated Leak & Cut Out & Replaced Leaking Pipe ML17264A8271997-03-0303 March 1997 LER 97-001-00:on 970131,discovered Service Water Temp Was Less than Specified Value.Caused by non-representative Method of Monitoring.Increased Water Temp in Screenhouse Bay to Greater than 35 Degrees F.W/970303 Ltr ML17264A8071997-01-22022 January 1997 LER 96-015-00:on 961223,discovered Thermally Induced Overpressure Transient Could Occur.Caused by Thermal Expansion of Fluid During Design Basis Accident Condition. Installed Relief Valve on Affected line.W/970122 Ltr ML17264A7471996-11-27027 November 1996 LER 96-013-00:on 961029,circuit Breakers Closed While in Mode 3 & Resulted in Condition Prohibited by TS Due to Personnel Error.Circuit Breakers for MOV-878B & MOV-878D Were re-opened.W/961127 Ltr ML17264A6051996-09-19019 September 1996 LER 96-012-00:on 960820,feedwater Transient Occurred,Due to Closure of Feedwater Regulating Valve,Causing Lo Lo Steam Generator Level Reactor Trip.Sgs Were Restored & Missing Screw in 1/P-476 Was replaced.W/960919 Ltr ML17264A6061996-09-19019 September 1996 LER 96-009-01:on 960723,leakage Outside Containment Occurred,Due to Weld Defect,Resulting in Leak Rate Greater than Program Limits.Source of Leakage Isolated from RWST by Freeze Seal,Allowing Exit from ITS LCO 3.0.3.W/960919 Ltr ML17264A5911996-09-0505 September 1996 LER 96-011-00:on 960807,improper Configuration of Circuit Breaker Occurred,Due to Undetected Internal Interference, Resulting in Automatic Start of Both Auxiliary Feedwater Pumps.Running AFW Pumps Were secured.W/960905 Ltr ML17264A5921996-09-0505 September 1996 LER 96-010-00:on 960806,latching of Main Turbine While in Mode 4 Occurred,Due to Defective Procedure,Resulting in Automatic Start of Auxiliary Feedwater Pump.Caused by Defective Maint Procedure.Procedure revised.W/960905 Ltr ML17264A5891996-08-22022 August 1996 LER 96-009-00:on 960723,determined Leak on Piping Sys Outside Containment Greater than Program Limit.Caused by Weld Defect.Pipe & Socket Welds Were Cut Out & Replaced. W/960822 Ltr ML17264A5781996-08-0606 August 1996 LER 96-008-00:on 960707,main Feedwater Pump Breakers Opened. Caused by Change in Seal Water Differential Pressure Occurred During Sys Realignment.Afw Flow Controlled as Desired to Maintain S/G level.W/960806 Ltr ML17264A5561996-07-12012 July 1996 LER 96-007-00:on 960612,CR Operators Identified Control Rods Misaligned & Not Moving in Proper Sequence.Caused by Faulty Firing Circuit Card in Rod Control Sys.Faulty Firing Circuit Card in 1BD Power Cabinet replaced.W/960712 Ltr ML17264A5421996-06-20020 June 1996 LER 96-006-00:on 960521,discovered Containment Penetration Not in Required Status.Caused by Personnel Error.Installed Flange Inside Containment Penetration 2.W/960620 Ltr ML17264A5411996-06-17017 June 1996 LER 96-005-00:on 960516,PORC Determined Deficient Procedures Do Not Meet SRs for Testing safety-related Logic Circuits. Caused by Inadequancies in Individual Testing Procedures. Procedures Re Improved TSs revised.W/960617 Ltr ML17264A5051996-05-17017 May 1996 LER 96-003-01:on 960308,identified That Both Pressurizer PORVs Inoperable Concurrently Due to Disconnection of Flex Hose to Both PORV Actuators to Install air-sets for Benchset & Limit Switch Activities.Hpes Completed ML17264A4481996-04-0808 April 1996 LER 96-003-00:on 960308,both Pressurizer Relief Valves Inoperable.Hpes Evaluation Is Being Conducted to Determined Cause of Event.C/As:Both PORVs restored.W/960408 Ltr ML17264A4471996-04-0808 April 1996 LER 96-002-00:on 960307,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump.C/As: Thermography performed.W/960408 Ltr ML17264A4101996-03-18018 March 1996 LER 96-001-00:on 950504,inservice Test Not Performed During Refueling Outage.Caused by Inadequate Tracking of Surveillance Frequency.Valve Test Performed & Disassembled. W/960318 Ltr ML17264A2971995-12-14014 December 1995 LER 95-009-00:on 950817,surveillance Was Not Performed Due to Improper Application of TS Requirements Resulting in TS Violation.Testing of MOV-515 Was Performed on 951115.W/ 951214 Ltr ML17264A1711995-09-25025 September 1995 LER 95-008-00:on 950825,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump That Resulted in Manual Rt.Returned S/G Levels to Normal Operating levels.W/950925 Ltr 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17265A7601999-10-0505 October 1999 Part 21 Rept Re W2 Switch Supplied by W Drawn from Stock, Did Not Operate Properly After Being Installed on 990409. Switch Returned to W on 990514 for Evaluation & Root Cause Analysis ML17265A7621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Re Ginna Npp.With 991008 Ltr ML17265A7531999-09-23023 September 1999 Part 21 Rept Re Corrective Action & Closeout of 10CFR21 Rept of Noncompliance Re Unacceptable Part for 30-4 Connector. Unacceptable Parts Removed from Stock & Scrapped ML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7471999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Re Ginna Npp.With 990909 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Re Ginna Npp.With 990806 Ltr ML17265A7291999-07-29029 July 1999 Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7131999-07-22022 July 1999 Special Rept:On 990407,radiation Monitor RM-14A Was Declared Inoperable.Caused by Failed Communication Link from TSC to Plant Process Computer Sys.Communication Link Was re-established & RM-14A Was Declaed Operable on 990521 ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7211999-07-19019 July 1999 ISI Rept for Third Interval (1990-1999) Third Period, Second Outage (1999) at Re Ginna Npp. ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A7661999-06-30030 June 1999 1999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With 991020 Ltr ML17265A7011999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6761999-06-16016 June 1999 Part 21 Rept Re Defects & noncompliances,10CFR21(d)(3)(ii), Which Requires Written Notification to NRC on Identification of Defect or Failure to Comply. Relays Were Returned to Eaton for Evaluation & Root Cause Analysis ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17265A6681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Re Ginna Nuclear Power Plant.With 990608 Ltr ML17265A6651999-05-27027 May 1999 Interim Rept Re W2 Control Switch,Procured from W,Did Not Operate Satisfactorily When Drawn from Stock to Be Installed in Main Control Board for 1C2 Safety Injection Pump. Estimated That Evaluation Will Be Completed by 991001 ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6591999-05-17017 May 1999 Part 21 Rept Re Relay Deficiency Detected During pre-installation Testing.Caused by Incorrectly Wired Relay Coil.Relays Were Returned to Eaton Corp for Investigation. Relays Were Repaired & Retested ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6381999-05-0707 May 1999 Part 21 Rept Re Replacement Turbocharger Exhaust Turbine Side Drain Port Not Functioning as Design Intended.Caused by Manufacturing Deficiency.Turbocharger Was Reaasembled & Reinstalled on B EDG ML17265A6391999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Re Ginna Nuclear Power Plant.With 990510 Ltr ML17265A6361999-04-23023 April 1999 Part 21 Rept Re Power Supply That Did Not Work Properly When Drawn from Stock & Installed in -25 Vdc Slot.Power Supply Will Be Sent to Vendor to Perform Failure Mode Assessment.Evaluation Will Be Completed by 991001 ML17265A6301999-04-18018 April 1999 Rev 1 to Cycle 28 COLR for Re Ginna Npp. ML17265A6251999-04-15015 April 1999 Special Rept:On 990309,halon Systems Were Removed from Svc & Fire Door F502 Was Blocked Open.Caused by Mods Being Made to CR Emergency Air Treatment Sys.Continuous Fire Watch Was Established with Backup Fire Suppression Equipment ML17265A6551999-04-0909 April 1999 Initial Part 21 Rept Re Mfg Deficiency in Replacement Turbocharger for B EDG Supplied by Coltec Industries. Deficiency Consisted of Missing Drain Port in Intermediate Casing.Required Oil Drain Port Machined Open ML17265A6291999-03-31031 March 1999 Rev 0 to Cycle 28 COLR for Re Ginna Npp. ML17265A6241999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ginna Station.With 990409 Ltr ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A5661999-03-0101 March 1999 Rev 26 to QA Program for Station Operation. ML17265A5961999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ginna Nuclear Power Plant.With 990310 Ltr ML17265A5371999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Re Ginna Nuclear Power Plant.With 990205 Ltr ML17265A5951998-12-31031 December 1998 Rg&E 1998 Annual Rept. ML17265A5001998-12-21021 December 1998 Rev 26 to QA Program for Station Operation. ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4761998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Re Ginna Nuclear Power Plant.With 981210 Ltr ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4531998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Re Ginna Nuclear Power Plant.With 981110 Ltr ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A4291998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr 1999-09-30
[Table view] |
Text
' CATEGORY 1 0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9812290115 DOC.DATE: 98/12/21 NOTARXZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.'NAME AUTHOR AFFILIATION ST MARTIN,J. Rochester Gas &. Electric Corp.
MECREDY,R.C. Rochester Gas 6 Electric Corp.
RECXP.NAME RECXPIENT AFFILIATION VISSING, G. S.
SUBJECT:
LER "98-005-00:on 981120,loss of 34.5 KV offsite power circuit 751,resulted in automatic start of "B" EDG.Caused by faulted cable splice. Performed appropriate actions of Abnormal Procedure AP-ELEC.1.With 981221 ltr.
DISTRIBUTION CODE: IE22T COPIES RECEIVED: LTR ENCL SIZE: E TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 0500024$
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD '
1 VXSSXNG,G. 1 1 INTERNAL: AEOD/SPD RAB 2 2 AEOD/SPD/RRAB 1 1 CE ER 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HZCB 1 1 NRR/DRCH/HOHB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 RES/DET/EXB 1 1 D RGN1 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE, J H 1 1 NOAC POORE,W. 1 1 NOAC QUEENER ~ DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSZON REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
s r
AND 0
89 FAST AVENIJE, ROCHESTER N.Y. Id6d9 0001 AREA CODE 716 546-2700 ROCHESTER GAS AND EIECTRIC CORPORATION ~
ROBERT C. MECREDY Vice President Nvctear Operations December 21, 1998 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555
Subject:
LER 1998-005, Loss of 34.5 KV Offsite Power Circuit 751, Due to Faulted Cable Splice, Results in Automatic Start of "B" Emergency Diesel Generator R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Vissing:
In accordance with 10 CFR 50.73, Licensee Event Report Syst;em, item (a) (2) (iv), which requires a report of, "Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF), including the reactor protection system (RPS)", the attached Licensee Event Report LER 1998-005 is hereby submitted.
This event has in no way affected the public's health and safety.
Ve truly yours, Robert C. Me re xc: Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior 'Resident Inspector Psi2290115 PSi22i PDR ADQCK 05000244, S poa f:
NRC FORM 3BB U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3160-010iXPIRES OB/30/2001 (6-1998) Estimated burden per response to comply with this mandato Informalion collection request: 50 hrs. Re ed lessons teamed ar incorporated into lhe licensing and fed back to industry Fonvard comments regarding burden estimate to the Recoro LICENSEE EVENT REPORT (LER) Managemenl Branch (TW F33) UB. Nuclear Regulatory Commission
~
Washegton, OC 2 I and to the Paperwork Reduction Projec (See reverse for required number of
~
315(h0104) Oflice of Management and Budget, Washington,
~
digits/characters for each block) 0503. If an information collection does not display a currently vali OMB conlrol number. the NRC may not conduct or sponsor. and person Is not required to respond to. Ihe information collection.
DOCKET NUMBER (2) PAGE (3)
FACILITYNAME I'I)
R. E. Ginna Power Plant 05000244 1 OF 7 TITLE (4)
Loss of 34.5 KV OQsite Power Circuit 751, Due to Faulted Cable Splice, Results in Automatic Start of "B"Emergency Diesel Generator IFR U n R FPO TDATF. OTIIFRFAC(l IT FS 0 VF,D II FACILRYNAME DOCKEr NUMBER SKQUENRAL REVISION MONnt DAY MONDI DAY YEAR NUMBER NUMBER 05000 PACILRY NAME DOCKEI'UMBER 11 20 1998 1998 005 00 12 21 1998 05000 OPERATING MODE (9)
T S 0 . ~ U D PU .U 0 F UIRFh F SOF 0 'h c on 50.73(a)(2)(viii) 20.2201(b) 20.2203(ax2)(v) 50.73(a)(2)(i)
POWER 20.2203 a I 20.2203 a 3 i 50.73 a 2 ii 50.73 a 2 x LEVEL(10) 20.2203(a)(2)(i) 20.2203(a)(3)(ii) 50.73(a)(2xiii) 73.71 20.2203 a 2 ii 20.2203 5 4 50.73 a 2 iv OTHER 20.2203(a)(2)(iii) 50.36(c)(l) 50.73(a)(2)(v) S or in
'n Absuset below C Form 366A 20.2203(a)(2)(iv) 5036(cx2) 50.73(a)(2)(vii)
S F CO . 0 IIS TKI.EP NONE NUMBER gnehde Ares Code)
John SLMartin - Technical Assistant (716)771-3641 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 13 REPORTABLK REPORTABLE CAUSE SYSTEM COMPONENr MANVPACIVRER TO EPIX SYSIKM COMPONKNI'ANVPACIVRER TO EPIX N
SUPPLEMENTAL REPORT EXPECTED 14 MONIH DAY EXPECTED YES SUBhIISSION (Ifyes, complete EXPECTED SUBMISSION DATE). X NO DATE (15)
ABSTRACI'Limitto 1400 spaces, i.e., approximately 15 sing)~ typewritten lines) (16)
On November 20, 1998, at approximately 2259 EST, the plant was in Mode 1 at approximately 100% steady state power. Power from Circuit 751 (34.5 KV"B" offsite power source) was lost.
This resulted in "B" deenergization of 4160'Volt bus 12B and train 480 Volt safeguards buses 16 and 17. The Emergency Diesel Generator automatically started and reenergzzed buses 16 and 17 as per design. There was no change in reactor power or turbine load.
Zmmediate corzective action was to perform the appropriate actions of Abnormal Procedure AP-ELEC.1 (Loss of 12A And/Or 12B Buses) to stabilize the plant and to verify that the "B" Emergency D/G had started and reenezgized buses 16 and 17.
Circuit faulted splice in The cause of the loss of power from underground cable for Circuit 751 'his 751 was faulted splice determined to was be a subsequently reconstructed.
Corrective action to prevent recurrence is outlined in Section V.B.
NRC rORN 366 (6-199K)
1, NR F RM A U. o N <LEAR REGULATORY OMMISSION (6-1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION A ILITY NAME 1 DOCKET LER NUMBER PA E 3 SEOUENTIAL REVISiON NUMBER NUMBER R. E. Ginna Nuclear Power Plant 05000244 1998 -- 005 -- 00 2 OF 7 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)
PRE-EVENT PLANT CONDITIONS On November 20, 1998, at approximately 2259 EST, the plant was in Mode 1 at approximately 100% steady state reactor power. There were no significant activities in progress. The offsite power configuration to the plant was in the alternate "50'8 / 50%" offsite power lineup:
o Circuit 751 (34.5 KV offsite power source) was supplying power to the "B" train 480 Volt safeguards buses 16 and 17 through 34.5 KV to 4160toVolt transformer 12A (12A transformer), via circuit breaker 52/12AX, 4160 Volt bus 12B, and through the safeguards bus 4160 Volt to 480 Volt transformers 16 and 17.
o Circuit 767 (34.5 KV offsite power source) was supplying power to the "A" train 480 Volt safeguards buses 14 and 18 through 34.5 KV to 4160 Volt transformer 12B (12B transformer), via circuit breaker 52/12BY, to 4160 Volt bus 12A, and through the safeguards bus 4160 Volt to 480 Volt transformers 14 and 18.
See the attached sketch of the offsite power distribution system.
II. DESCRZPTZON OF EVENT A. DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:
November 20, 1998, 2259 EST: Event date and time.
November 20, 1998, 2259 EST: Discovery date and time.
J November 20, 1998, 2259 EST: Control Room operators verify the "B" Emergency Diesel Generator (D/G) operation and that safeguards buses 16 and 17 are energized.
November 20, 1998, 2314 EST: Safeguards buses 16 and 17 were transferred to Circuit 767 from the "B" Emergency D/G.
November 20, 1998, 2319 EST: The "B" Emergency D/G was stopped and realigned for auto standby.
November 22, 1998, 0052 EST: Offsite power configuration was restored to the alternate "50'8 / 50%" lineup.
November 22, 1998, 0059 EST: Circuit 751 was declared operable.
B. EVENT:
On November 20, 1998, at approximately 2259 EST, the plant was in Mode 1 at approximately 100% steady state full power. The Control Room operators received numerous Main Control Board annunciator alarms. Among these alarms were E-3 (INVERTER TROUBLE), .L-20 (12A XFMR OR 12A BUS TROUBLE), J-7 (480V MAIN OR TZE BREAKER TRIP ) g J 9 ( SAFEGUARD BREAKER TRI P ) g E 20 g (CV OR PLANT VENT MONITOR PUMP TRIP) and J-32 (EMERGENCY DIESEL GEN 1B PANEL). The Control Room operators determined that the following events had occurred:
NR F RM U. ~ N LEAR RE ULAT RY OMMZ I N (6-1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FA ILZTY NAME 1 DO KET LER NUMBER PAGE 3 SEOUENTIAL REVISION NUMBER NUMBER R. E. Ginna Nuclear Power Plant 05000244 -- -- 3 OF 7 1998 OOS 00 TEXT (if more space is required, use addirionai copies of hlRC Form 3661) (17) o Circuit 751 (34.5 KV offsite power source) was deenergized o "B," train 480 Volt safeguards buses 16 and 17 had lost their power supply from 4160 Volt bus 12B (buses 16 and 17 had been momentarily deenergized) o The "B" Emergency D/G had automatically started and was tied to safeguards buses 16 and 17 The Control Room operators verified that reactor coolant system temperature and pressure were stable, and that there was no change in reactor power or turbine load. They performed the appropriate actions of Abnormal Procedure AP-ELEC.1 (Loss of 12A And/Or 12B Buses) to stabilize the plant. They verified. that the "B" Emergency D/G was operating and that safeguards buses 16 and 17 were energized. The Control Room operators observed that Circuit 751 and bus 12B displayed zero (0) voltage. The loss of power from Circuit 751 resulted in undervoltage on safeguards buses 16 and 17, and the "B" Emergency D/G automatically started as per design and reenergized these buses.
The Control Room operators referred to Operating Procedure 0-6.9.2 (Establishing and/or Transferring Offsite Power to Bus 12A/Bus 12B) to restore offsite power to 4160 Volt bus 12B and 480 Volt safeguards buses 16'nd 17.
They referred to Equipment Restoration Procedure ER-ELEC.1 (Restoration of Offsite Power) to restore components to service as needed. The Control Room operators closed 4160 Volt circuit breaker 52/12BX to energize bus 12B from Circuit 767, via the 12B transformer. At approximately 2314 EST, safeguards buses 16 and 17 were transferred to Circuit 767 from the "B" Emergency D/G.
(Circuit 767 had remained in operation, supplying "A" train 480 Volt safeguards buses 14 and 18, throughout the event.)
At approximately 2319 EST on November 20, the "B" Emergency D/G was stopped and realigned for auto standby.
Energy Delivery Department personnel inspected Circuit 751 and determined that Circuit 751 incurred a cable fault in "Manhole '¹ 2". The fault was in a splice on the "A" phase of the "B" cable for Circuit 751. The faulted cable splice was reconstructed. After the splice was reconstructed, Circuit 751 was lined up to supply plant loads and reenergized. The offsite power
't configuration was restored to the alternate "50% / 50%" offsite power lineup approximately 0052 EST on November 22. Following restoration, Circuit 751 was declared operable at approximately 0059 EST on November 22.
C~ INOPERABLE STRUCTURES i COMPONENTS i OR SYSTEMS THAT CONTRI BUTED TO THE EVENT None D. OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED:
None E. METHOD OF DISCOVERY:
This event was immediately apparent due to numerous Main Control Board alarms and other indications in the Control Room when power from Circuit 751 was lost.
O. L rd F
NR F RM A U.. N EAR REGULATORY OMMZ ION (6-1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTlNUATION FA I NAME 1 DO KET LER NUMBER PA E SEOUENTIAL REVISION NUMBER NUMBER R. E. Ginna Nuclear Power Plant 05000244 1998 - 005 -- 00 QF 7 TEXT (Ir more space Is requIred, use addIcionaI copIes or NRC form 366AP (17)
F. OPERATOR ACTION:
Following the undervoltage condition on buses '16 and 17, the "B" Emergency D/G automatically started and zeenergized these buses. The Control Room operators performed the appropriate actions to verify that the "B" Emergency D/G was operating and safeguards buses 16 and 17'ere energized.
The Control Room operators manually started the "D" containment recirculation fan to restore normal cooling to containment. Subsequently, they manually restarted the "B" containment recirculation fan, which had tripped due to the loss of bus,l6. The Control Room operators also started (or verified automatic start of) other plant equipment, including charging pumps, component cooling water pump, and service water pumps.
The Control Room operators restored offsite power (from Circuit 767) to buses 16 and 17, stopped the "B" Emergency D/G, and realigned it for auto standby.
The momentary loss of power to buses 16 and 17 caused the trip of the common sample pump for monitoring of the containment (CNMT) atmosphere by channels R-10A (iodine), R-ll (particulate) and R-12 (noble gas). The Control Room operator manually restarted the common sample pump.
Concurrent with events surrounding the undervoltage condition on buses 16 and 17, the 1B inverter Main Control Board Annunciator E-3 was received when power was lost to Bus 16. Control Room operators assumed that the E-3 alarm indicated a potential loss of the 1B inverter, and conservatively entered Ginna Station Improved Technical Specifications (ITS) Limiting Condition for Operation (LCO) 3.8.7 Condition A. In fact, the inverter was still operable, and the E-3 alarm only indicated that there had been a momentary loss of bypass power to the inverter. Upon resetting of the alarm for the 1B inverter (at approximately 2330 EST on November 20),
that the inverter was restored to service.
it was administratively documented The communications link between the Plant Process Computer System (PPCS) and the SPING radiation monitor console failed as per design on loss of power to Bus 16, and was automatically restored when, the "B" Emergency D/G reenergized the bus. The communications link failed again during the transfer of Bus 16 to offsite power. As per design, the link required manual action to reset after this fast bus transfer. The link was restored to service at approximately 2350 EST.
The Shift Supervisor notified higher supervision of the loss of offsite Circuit 751. Subsequently, the Shift Supervisor notified the NRC Headquarters Operations Officer (HOO) and Ginna Resident Inspector. The NRC HOO was notified per 10 CFR 50.72 (b) (2) (ii), non-emergency four hour notification, at approximately 2349 EST on November 20, 1998.
G. SAFETY SYSTEM RESPONSES:
All safeguards equipment functioned properly. The "B" Emergency D/G automatically started due to the undervoltage condition on buses 16 and 17, displayed proper voltage and frequency, and reenergized safeguards buses 16 and 17 to supply emergency power.
NR FORM A -1998
R F RM A LEAR RE LA R MMZ I (6-1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FA ILITY NAME 1 D KET LER NUMBER PA E SEOUENTIAL REVISION NUMBER NUMBER R. E. Ginna Nuclear Power Plant 05000244 1998 -- 005 00 5 OF 7 TEXT (lf more space ls required, use additional copies of NRC Form 366A) (17)
Running containment recirculation fans on bus 16,tripped as designed and fans were manually restarted as needed to restore normal cooling to the Containment. The running service water pump on bus 17 tripped as designed and the pump selected for autostart started when power was restored to bus 17.
III. CAUSE OF EVENT IMMEDIATE CAUSE:
The automatic actuation of the "B" Emergency D/G was due to undervoltage on safeguards buses 16 and 17.
B. INTERMEDIATE CAUSE:
The undervoltage on safeguazds buses 16 and 17 was due to the loss of power from Circuit 751.
C. ROOT CAUSE:
The underlying cause of the loss of power from Circuit 751 was a cable fault, specifically a faulted cable splice at "Manhole'2" for Circuit 751. The faulted splice was on the "A" phase of the "B" cable for Circuit 751. The faulted splice is an original splice in the cable, installed approximately thirty (30) years ago, and is the only operational fault. of a splice on this circuit This event is NUREG-1022 Cause Code (B), "Design, Manufacturing, Construction / Installation".
IV. ANALYSIS OF EVENT:
This event is reportable in accordance with 10 CFR 50.73, Licensee Event Report System, item (a) (2) (iv), which requires a report of, "Any event or condition that resulted in a manual or automatic actuation of any engineered safety feature (ESF),
including the reactor protection system (RPS) ", in that the starting of the "B" Emergency D/G was an automatic actuation of an ESF system.
An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
There were no operational or safety consequences or implications attributed to the loss of Circuit 751 and start of the Emergency D/G because:
All reactor control and protection systems performed as designed.
The "B" Emergency D/G was available for operation and functioned as designed to reenergize "B" train safeguards buses 16 and 17.
While in this condition, the plant electrical power systems (offsite power sources and the Emergency D/Gs) remained within the requirements of ITS LCO Required Actions 3.8.1.A and 3.4.15.B.
NR FORM A U. o N LEAR RE ULAT RY MMI SIO (6.1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FA ILITY NAME 1 DO KET LER NUMBER PA E SEQUENTIAL REVISION Nl/MBER NUMSER R. E. Ginna Nuclear Power Plant 05000244 1998 -- 005 "- 00 6 OF 7 TEXT (If more space is required, use addi rionai copies of NRC Form 366A) (17) o Circuit 767 remained in operation supplying power to the'A" train safeguards buses; subsequently, Circuit 767 was lined up to supply power to the "B" train safeguards buses also.
o Radiation monitor channels R-10A, R-ll, and R-12 were temporarily lost.
The common sample pump was manually restarted within a few minutes.
This response complied with the requirements of ITS LCO Required Action 3.3.5.B.1.
Based on the above, that the public's health it canandbe safety concluded was that the plant operated assured at all times.
as designed, and V. CORRECTIVE ACTION A. ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS:
Offsite power was restored to safeguards buses 16 and 17 from Circuit 767, and the "B" Emergency D/G was stopped and realigned for auto standby.
The faulted splice was reconstructed by Energy Delivery Dep'ar'tment personnel.
Circuit 751 was cleared for use by Energy Operations and Circuit 751 was reenergized.
B. ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:
The cable for Circuit 751 tested satisfactorily, however, the cable will be replaced as part of the Energy Delivery Department cable replacement program.
ADDITZONAL INFORMATION A. FAILED COMPONENTS:
The failed component was a splice in a 34.5 KV 250 MCM electrical cable, with XLP insulation. The cable was installed approximately 30 years ago.
B. PREVIOUS LERs ON SIMILAR EVENTS'.
An historical search of LERs was conducted with the following results: LERs91-002, 92-007,94-012, 95-006,95-007 and 97-002 were similar events with similar root causes (start of an Emergency D/G due to loss of offsite power from external causes). However, none of the external causes for these LERs were due to faulted underground cables or faulted splices in the cable.
C. SPECIAL COMMENTS:
None
NR F R RE R MMI I (6-1998)
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION A I NAME 1 D K ER N MBE PA E SEQUENTIAL REVISION NUMBER NUMBER R. E. Ginna Nuclear Power Plant 05000244 1998 -- 00 7 OF 7 TEXT (If more space Is reqvlred, use add1r1onal cop1es of NRC Form 366Af (17)
SI 5 IV~+IIIlISC ll 5 IV IIWfl>>OIIIONIl>>C SIIINI Ill SIII>>51 IOI I I I I IO>>OI ts I 0 Stl St/
~
>>SIN tslsl ts I I I IC >>
SI II 55$ 5 SI II CJS I SII IIC ISO
~ ISO I>>IIOOIIA>>
~I III
<>>OICO Its>>
I I
~555/5 N/ Ots>>/O Sll ISN ISSI
~I N/
155 Ws Its/15 IISOII ~ CI/
ISO CS Ill/Il COOL SOCKS St/ CIs Its/I~ Stl a/$ 155/I I Sll aetts/$ 5 St/ CNIts/It N/ Cll I tl/IS Sl/ ~ 1>>sit>>/I ~
I tss IC 1555 IC ~ NN NI NI-I IC SeSS IC 15$ $ IC I>>'ISICNI I>> d I~
~IO>>
~
I IN N ~I SION>> ll&OCC IWltll>>CS IN I>>1>>OOOO I I>>
I~ d d
SIIII>>l IOIICO ICIIIOCS
~ IOO IOO>>
I>>IIICIOIO>>
I~
St/ Clsl 5/115 St/ SIIII/ISO I~ IC II IC ICCI SCS SNNC&51 WOSI ICSI CIO ststl SNS Sl/ CC I I/IIC stl cllII/IOC
$ 51 ~ I IOI OCI II OO Nl
$ 515$ IC QII~IOO 4 Sll Mls/lN I~ IC St/
COIN Csl tllSC III ll5 tllit CIS IO/lIC IC Stl I~
OIIII IC I/ll~
NRC FORD 366h (6-1998)