Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
The following pages are proposed changes to the Unit 2 Technical Specifications:
1----
Scnlor Vice f'rnAident -
Dlel"9Y suwly ard Erqineerinq Gmeral Manaqer - General HaMqer -
Vice Presid!lit - Corporate Vice President- ro.aJuctioo IJ.oenai..ng !Ind ruel SUWlY C)illli ty Assunuce Envirament r--------
1 On-Site r--- 1-------' I Safety Reviev IL ______
Group **
General ~r "51'1aqer - Qi\ Manooer-a>
ruel suwty Servi .... Aaditl!I and Tralninq Asst. Vice Preeident -
Production
~. - Per9alnel Mfaira
- ldninistratiml Training Manaqer Gereral K!riaqer - General~ -
Prob:t.im $1.sJDort !b:'lear Prcxluctioo ft:fr. - M.icle&r ~-SalSTI (l11e1". support Gererat..irq Statim
- Dl.n!ct """""" !or,__ _....,..._.
rt.X"lenrf\Jel Jltrrq. rlamirq
~r.. Plant Fnu*. Health l'hy!llr.bt Cyr.le DYJr. ' Security Frqr. Fire Protection SUJvirt FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT
l I MANAGER-I SALEM I I .
GENERATING I
I Ol'fo-4m I STATION
~ .. _.I I Ot:°F S1rE. 1 I I -*
I I
ASSISTANT TO MANAGER CHIEF ENGINEER I t----- - - - - I -- - --
T I
MAINTENANCE EHGINEER I
I I
l STATION I I OFFICE~
DUALITY STATION STATION REACTOR RADIATION ASSURANCE
- OPERATING PUUOHMANCE l'ROTECTION ADMIM
~1111muA - ...,If. ENGINEER ENGINEER t ENGINEER ENGINEER TRAJOR
- w I I I SHIFT SENIOR SENIOR "--"'1>*
IENIOR ~OT.
SECURITY SAFETY TECHNICAL SENIOR SHIFT
- r ... c. e>1~1~nty SENIOR SUl'E RVISOR su.£RV~
ADVISORS SUPERVISOR-SRO ..,._
SUl'ERVISOR- SUPERVISOR -
QHiMlli'JA¥ SUPERVISOR -
ftAB. PROT.
MAIN TE NANCE SUI'£ RVISOR I
SHIFT ..c MAINTENANCE OFFICE STAFF SUPERVISOR- SUPERVISOR IUl'ERVISOR IUl'ERVISOR CHEMISTRI' RAD. PROT.
SRO I SVP~ StJPt'*
SRO - lf.llllOR REACTOfl Of'ERATOR I
a.----- . . __,.._____ _
RO - REACTOR OPERATOR BOILER REl'AIR t 1..- ... i : . - 1 _ ..... 1u1-a.-_1 _ _ CONTROL 16C CHEMISTRY RAD. l'ROT. W:CHANIC oPERATORS- STAFF
-*--~--~-----*IANs.1911111. I t*J1t*rtll.....- .. TECHNICIANS TECHNICIAN& TECHNICIANS RO
............ _.._ *
s........ ...~
05191 . . . .* * . . . . . . . . .
............. ,_....... . - ....... ** .,...,(19 ......... .
_.,._,,_,_. ........ .._.,._, .... __ a
- - - - . . . . . . . . . . .- - - - . .... y . . . . . , . _ . . . . . . . . . .
...,._ EOUll'MfNT lllrC I
CHEMISTRY RAO.l'ROT.
ELECTRICIANS MACHINISTS STATION OPERATOR ASSIST ANTI ASSISTANT& ASSISTANTS MECHANICS
- R - I M lor Ille F .. l'1ollc- Protr*m
........ .c..... I 1 UTILITY MECHANICS
____ Sp11r1~1*s UTILITY OPERATORS TECH. HEU'ER - NUCLEAR RAOl'ROT.
HELl'ER
.-"1~e,. o.~J
'#.f!. .S ftON "'* FIGURE 6.2.2 FACILITY ORGANIZATION - SALEM GENERATING STATION
ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF QUALIFICATIONS 6.3. 1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18. 1-1971 for comparable positions. except for the Radiation Protection Enginee~ who shall meet or exceed tne qualifications of Regulatory Guide 1.8, September 1975.
- 6. 4 TRAINING r; fllcA rVJJC.T/oAJllL l.'~1/£.L h1II.A/~6e IC (
- c~l>) '1 T TH£. r-Ho11.t'ry 6.4. l A retraining and replacement training program for the facility staff DE.P/llR.l1t1E.AJT shal 1 be coordinated by ~ss istant to Maftager and mafntained under the direction of the Training~~a~~~nd shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8. 1-1971 and Appendix 11 A11 of 10 CFR Part 55.
6.5 REVIEW AND AUDIT 6.5. 1 STATION OPERATIONS REVIEW COMMITTEE (SORC)
FUNCTION 6.5. 1. 1 The Station Operations Review Committee shall function to advise the Station Manager on all matters related to nuclear safety.
COMPOSITION 6.5. 1.2 The Station Operations Review Committee shall be composed of the:
Chairman: Chief Engineer Vice Chairman: Assistant to Manager Member: Station Operating Engineer
-Membet: v.*.::..e.. C.J..a..;rPJAJ!): Station Performance Engineer Member: Reactor Engineer Member: Senior Shlf~;:;visor Member: Senior ~f Supervisor - i&i""
Member: Senior ~~e Supervisor - CAemi~try Member: Radiation i>'ro1eciion Engineer Member: Senior Maintenance ~upervisor
- Memher: V*ce.C~a.;r-,,.A-i : Maintenance Engineer I ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; *however, no more than two alternates shall participate as voting members in SORC activities at any one time.
MEETING FREQUENCY 6.5. 1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
SALEM - UNIT Z 6-6 AMENDMENT NO. I
ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
RESPONSIBI LIT! ES
£.5. 1.6 The Station Operations Review Committee shall be responsible for:
- a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety.
- b. Review of all proposed tests and experiments that affect nuclear safety.
- c. Review of all proposed changes to Appendix 11 A11 Technical Specifications. *
- d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.
- e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence to the General Manager - ~ Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue..
- f. Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
- g. Review of facility operations to detect potential nuclear safety hazards.
- h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board.
- i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.
- j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.
SALEM - UNIT 2 6-7
ADMINISTRATIVE CONTROLS AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall:
- a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above.
- b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
- c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the General Manager-
.A/lie~~ fl ' 1Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such disagree-ments pursuant to 6. 1. 1 above.
RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications. Copies shall be provided to the General Manager-il;;1r*c )JvelE.14~
Production and Chairman of the Nuclear Review Board. )
6.5.2 NUCLEAR REVIEW BOARD (NRB)
FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of:
- a. nuclear power _plant operations
- b. nuclear engineering
- c. chemistry and radiochemistry
- d. meta 11 urgy
- e. instrumentation and control
- f. radiological safety
- g. mechanical and electrical engineering
- h. quality assurance practices SALEM - UNIT 2. 6-8
ADMINISTRATIVE CONTROLS COMPOSITION 6.5.2.2 The NRB shall be composed of the: .
- /1SS1Sl"1>.1I Vic.£ PR.e.S1D£>Jr-Ftco1uc.r10A/ l Chairman: S@~e11l H1111a9e1 fhi,L1 i& PPedw*ti'C>n ~
Vice Chairman: Assistant to General Manager-Fuel Supply Member: General Manager-Licensing and Environment Member: Manager-Nuclear Ope rat ions S'v PPoR. r Member: Mana~e¥' Qbtalit, Ass1.11 at'lee GEJ1£ML Ml9~A6m - Co~fbe.ATL r;:>A Member: P-rajeet Mn11ege1 f:tgpe 8PeekG£NEML 111llJl/AGU2. -fl}tJc.UAR. P~ouc:noN Member: Manager-Salem Generating Station Member: Principal Engineer Member: Manager-Hope Creek Generating Station ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NRB activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB.
MEETING FREQUENCY 6.5.2.5 The NRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.
QUORUM 6.5.2.6 T~e minimum quorum of NRB necessary for the performance of the NRB review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 NRB members including alternates. No more than a minority of the quorum shall have line responsi-bility for operation of the facility.
REVIEW 6.5.2.7 The NRB shall review:
- a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
SALEM .;, UNIT 2 6-9
ADMINISTRATIVE.CONTROLS
- g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
- h. The Facility Fire Protection Program and implementing procedures at least once per 24 months.
- i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
- j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months.
AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below:
- a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting.
- b. Reports of reviews encompassed by Section 6.5.2~7 above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review.
- c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit.
6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:
- a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9.
- b. Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Manager-~teet14c Production.
NVe.iEl4R.,
SALEM - UNIT 2 6-11
L. ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated:
- a. The unit shall be placed in at least HOT STANDBY within one hour.
- b. The Safety Limit violation shall be reported to the Commission, the General Manager-iiheti:~c Production and to the NRB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
)Juc.LLAe. .
- c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.
- d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. . }IJuc.l..M~
6.8 PROCEDURES 6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below:
- a. The applicable procedures recommended in Appendix 11 A11 of Regulatory Guide 1.33, Revision 2, February 1978.
- b. Refueling operations.
- c. Surveillance and test activities of safety related equipment.
- d. Security Plan implementation.
- e. Emergency Plan implementation.
- f. F_ire Protection Program implementation.
6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures. *
- 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
- a. The intent of the original procedure is not altered.
- b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
SALEM - UNIT 2. 6-12