Proposed Tech Specs Re Containment Isolation Valves
ML18092A920
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/27/1985
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A919 List:
References
NUDOCS 8512110248
Download: ML18092A920 (15)


Text

CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containl'lent isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

Hith one or rrore of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:

a. Maintain at least one isolation valve.OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic_ valve secured in the isolation position, or
c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTffi5WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQJIREMENTS 4.6.3~1.1 The isolation.valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control or power circuit by perforl'lance of a cycling test and verification of isolation time.

  • SALEM - UN IT 1 3/4 6-12

~~~~~~-=::;:--~~~.,

8512110248 851127 II PDR ADOCK 05000272 p PDR

TABLE 3.6-1 Ul

~ CONTAINMENT 1SOLATION VALVES t'i l::t:l

~

I c VALVE* NUMBER FUNCTION ISOLATION TIME (Seconds) z H

8 A. PHASE 11 AII ISOLATION I-'

1. 1 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn. ,<lOSec.
2. 1 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. <10 Sec.
3. 1 NT 25* Pressurizer Relief Tk.-N2 Connection* < 10 Sec~
4. 1 WR 80* Pressurizer Relief Tk.-Primary Water Conn. < 10 Sec.
5. 1 CV 3 CVCS - Letdown Line <1,1 Sec.
6. 1 CV 4 CVCS - Letdown Line < 10 Sec.
7. 1 CV 5 CVCS - Letdown Line < 10 Sec.
8. 1 CV 7 CVCS - Letdown Line < 10 Sec.
9. 1 CV 68## CVCS - Charging line < 10 Sec.
10. 1 CV 69## CVCS - Charging Line < 10 Sec.
11. 1 CV 284 eves - RCP Seals < 10 Sec.

w

12. 1 CV 116 CVCS - RCP Seals < 10 Sec.

'h.,. 13. 1 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.

O'I 14. 1 cc 113 Comp. Cooling to Excess Letdown Hx < 10 Sec.

I-'

I 15. 1 WL 96* RC Drain Tk. Gas. Analyzer Conn. . <10 Sec.

""' 16. 1 WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.

17. 1 WL 98* RC Drain Tk. - Vent Header Conn. < 10 Sec.
18. 1 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.
19. 1 WL 108* RC Drain. Tk. - N2 Connection (IO Se,c.
20. 1 WL 12* RC Drain Tank Pumps < *10 Sec.
21. 1 WL 13* RC Drain Tank Pumps < 10 Sec.
22. 1 NT 32* Accumulator N2 Connection < 10 Sec.
23. 1 SJ 123* SI Test Line < 10 Sec.
24. 1 SJ 60* SI Test Line < 10 Sec.
25. 1 SJ 53* SI Test Line < 10 Sec.
26. 1 SS 103* Accumulator Sampling < 10 Sec.
27. 1 SS 27* Accumulator Sampling < 10 Sec.
28. 1 SS 104* RC Sampling < 10 Sec.
29. 1 SS 33* RC Sampling < 10 Sec.

TABLt 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES Ul

~ ISOLATION TIME (Seconds) tc:l VALVE NUMBER FUNCTION s:I c A. PHASE 11 AII ISOLATION (Cont<l.)

z H

1-3

30. 1 SS 107* Pressurizer Liquid Sampling < 10 Sec.
31. 1 SS 49* Pressurizer Liqui~ Sampling < 10 Sec.
32. 1 SS 110* Pressurizer Steam Sampling < 10 Sec.
33. 1 SS 64* Pressurizer Steam Sampling < 10 Sec.
34. 1 vc 7 Containment Radiation Sampling .< 10 Sec. A
35. 1 vc 8 Containment Radiation Sampling < 10 Sec. ,.,.
36. 1 vc 11 Containment Radiation Sampling <10 Sec.
37. 1 vc 12 Containment Radiation Sampling < 10 Sec.
38. 11 CA 330 Instrument. Air Supply < 10 Sec.
39. 12 CA 330 Instrument Air Supply < 10 sec.
40. 1 DR 29 Demineralized Water Sup~ly <10 Sec.
41. 1 ~JL 16 Containment Sump Discharge < 10 Sec.
42. 1 WL 17 Containment Sump Discharge <10 Sec.
43. 1 FP 147* Fire Protection System < 10 Sec.

B. PHASE 11 B II ISOLATION

1. 1 cc 118tt Component Cooling to RCP < 10 Sec.
2. 1 cc 117tt Component Cool i n*g to RCP (10 Sec.
3. 1 cc 187 Component Cooling to RCP < 10 Sec.
4. 1 cc 136 Component Cooling to RCP (10 Sec.

< 10 5.

6.

1 1

cc cc 190 131 Component Component Cooling Cooling to.

to RCP RCP Sec.*

<10 Sec. e

c. MAIN STEAM ISOLATION
1. 11 MS 7# Main Steam Drain * < 10 Sec.
2. 12 MS 7# Main Steam Drain < 10 Sec.
3. 13 MS 7# Main Steam Drain < 10 Sec.
4. 13 MS 7# Main Steam Drain < 10 Sec.
5. 13 MS 7# Main Steam Bypass < 10 Sec.
6. 12 MS 18# Main Steam Bypass < 10 Sec.
7. 13 MS 18# Main Steam Bypass < 10 Sec.
8. 14 MS 18# Main Steam Bypass* < 10 Sec.

TABLE 3.6-1 '(Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTI'ON ISOLATION TIME (Seconcts) c D. FEEDWATER ISOLATION z

H

-< 8 Sec.

1-3

1. 11 BF 19# Main Feed\-Jater I s0 lat ion
2. 12 BF 19# Main Feedwater I so 1at ion -

< 8 Sec.

3. 13 BF 19# Main Feedwater I so 1at ion < 8 Sec.
4. 14 BF 19# Main Feedwater Isolation -< 88 Sec.

Sec.

5. 11 BF 40# Main Feeclwater *1 sol at ion -<
6. 12 BF 40# Main Feedwater Isolation < 8 Sec.
7. 13 BF 40# Main Feedwater I sol at ion -< 8 Sec.
8. 14 BF 40# Main Feedwater Isolation < 8 Sec-.

E. STEAM GENERATOR BLOWDOWN ISOLATION

1. 11 GB 4# *steam Generator Blowaown < 10 Sec.

w

'-.. 2. 12 GB 4# Steam Generator *Blowdown < 10 Sec.

"'" 3. 13 GB 4# Stearn Generator Blowclown < 10 Sec.

O'I

4. 14 GB 4# Stearn Generator Blowdown < 10 Sec.

I I-' 5. 11 SS 94# SG Blowdown Sampling < 10 Sec.

Ul

6. 12 SS 94# SG Blowdown Sampling < 10 Sec.
7. 13 SS 94# SG Blowdown Sampling < 10 Sec.
8. 14 SS 94# SG Blowdown Samplyng < 10 Sec.

F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF

1. 1 vc 1 Purge Supply -<

2 Sec.

2. 1 vc 2 Purge Supply < 2 Sec.
3. 1 vc 3 Purge Exhaust < 2 Sec.

4.* 1 vc 4 Purge Exhaust < 2 Sec.

5. 1 vc 5* Pressure-Vacuum Relief < 2 Sec.
6. 1 vc 6* Pressure-Vacuum Relief < 2 Sec.

(/) TABLE 3.6-1 (Contd.)

t::'

t'i t:Ij CONTAINMENT ISOLATION VALVES

3::

c:: VALVE NUMBER FUNCTION I SOLATI ON TI ME (Seconds) z H

8 G. MANUAL I-'

1. 1 SS 900# Pressurizer Dead-Weight Calibrator Not Applicable
2. 1 SS 901# Pressurizer Dead-Weight Calibrator Not Applicable
3. 11 CV 98# eves - RCP seals Not Applicable
4. 12 CV 98# CVCS - RCP Seals Not Applicable
5. 13 CV 98# eves - RCP Seals Not Applicable
6. 14 CV 98# eves - RCP Seals Not Applicable
7. 1 SJ 71# CVCS Flushing Connection Not Applicable
8. 1 SA 118 Compressed Air Supply
  • Not Applicable
9. 1 WL 190 Refueling Canal Supply Not Applicable
10. 1 SF 36 Refueling Canal Supply Not Applicable w 11. 1 WL 191 Refueling Canal Discharge Not Applicable ii':>
12. 1 SF 22 Refueling Canal Discharge Not Applicable
13. 1 vc 9* Containment Radiation Sampling Not Applicable O"I I 14. 1 vc 10* Containment Radiation Sampling Not Applicable I-'

O"I

15. 1 vc 13* Containment Radiation Sampling Not Applicable
16. 1 vc 14* Containment Radiation Sampling Not Applicable
17. # Fuel Transfer Tube Not Applicable
18. 1 cs 900 Containment Instrumentation Fi 11 Conn. Not Applicable
19. 1 cs 901 Containment Instrumentation Fil 1 Conn. Not Applicable cs 20.

21.

22.

1 1

1 cs SA 902 903 262 Containment Instrumentation Fill Conn.

Containment Instrumentation Fil 1 Conn.

Containment Pressure Test Conn.

Not Not Not Applicable Applicable Applicable e

23. 1 SA 2n4 Co nt a i nme nt Pres s ure Te st Co nn * , Not Applicable
24. 1 SA 265 Containment Pressure Test Conn. Not Applicable
25. 1 SA 267 Containment Pressure Test Conn. Not Applicable
26. 1 SA 268 Containment Pressure Test Conn. Not Appl i cah 1e
27. 1 SA 270 Containment Pressure Test Conn. Not Applicable
28. 1 CA 1714 Containment Air Lock Instrument Conn. Not Applicable
29. 1 CA 1715 Containment Air* Lock Instrument Conn. Not Applicable

TABLE 3.6-1 (Contd.)

[fl

~ CONTAINMENT ISOLATION VALVES t"i l:rj

~

VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) d z G. MANUAL H

1-3 f-' 30. 11 SS 181* Post LOCA Sampling Not Applicable

31. 11 SS 182* Post LOCA Sampling Not Applicable
32. 11 SS 188* Post LOCA Sampling Not Applicable
33. 11 SS 189* Fbst LOCA Sampling Not Applicable
34. 13 SS 181* Post LOCA Sampling Not Applicable
35. 13 SS 182* Post LOCA Sampling Not Appl i cable
36. 13 SS 184* Post LOCA Sampling Not Applicable
37. 13 SS 185* Post LOCA Sampling Not Appl i cab l e
38. 11 vc 17* Post LOCA Sampling Not Applicable
39. 11 vc 18* Post LOCA Sampling No t Appl i cab l e
40. 11 vc 19* Post LOCA Sampling Not Applicable w 41. 11 SF 20* Post LOCA Sampling Not Applicable

""' 42. 12 vc 17* Post LOCA Safllpling Not Applicable CJ'\ 43. 12 vc 18* Post LOCA Sampling Not Appl i cahl e I

f-' 44. 12 vc 19* *Post LOCA Sampling Not Applicable

.....J 45. 12 vc 20* Post LOCA Sampling Not Appl i cab l e

46. 11 cs 2t Containment Spray Not Applicable
47. 12 cs 2t Containme~t Spray Not Applicable H. CHECK 1.

2.

3 *.

1 1

1 CV 74 CV 296 cc 119 CVCS-Charging Line CVCS-RCP Seals Component Cooling to RCP Not Not Not Applicable Applicable Applicable I

4. 1 cc 186 Component Cooling to RCP Not Applicable
5. 1 cc 208 Component Cooling to RCP Not Applicable
6. 11 cs 48 Containment Spray Not Applicable
7. 12 cs 48 Containment Spray No t App l i ca bl e
8. 1 DR 30 Demineralized Water System Not Applicable
9. 1 FP 148 Fire Protection System Not Applicable
10. 1 NT 26 Pressurizer Relief Tk.--Nitrogen Conn. Not Applicable
11. 1 NT 34 Accumulator Nitrogen Supply Not Applicable
12. 1 SA 119 Compressed Air Supply Not Applicable

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

H. CHECK (Contd.)

13. 1 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable
14. 11 CA 360 Instrument Air Supply Not Applicable
15. 12 CA 360 Instrument Air Not Applicable
  • May be opened on an intermittent basis under administrative control.
  1. Not subject to Type C leakage tests. *
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

tNormally closed rmtor operated containment isolation valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE. l

REVISED PAGES - UNIT NO. 2 CONTAINMENT*SYSTEMS CONTAINMENT ISOLATION VALV-ES .

LIMITING CONDITION FOR OPERATION 3 .6 .3 The containment isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:

a. Maintain at least one isolation valve OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or
c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDO~ within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQJIREMENTS

.4.6.3.1 The isolation val'ves specified in "'Fable 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associ a't;ed actuator, control or power circuit by performance of a cycling test and verificatio*n of isolation time.

SALEM - UN IT 2 3/4 6-14

.i TABLE 3~6-1 CJ) CONTAINMENT ISOLATION VALVES

~

1:-1 tx:l

s: FUNCTION ISOLATION TIME (Seconds)

VALVE NUMBER c:: A. PHASE 11 A11 ISOLATION z

H f-:3 < 10 Sec.

1. 2 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn.

N

2. 2 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. < 10 Sec.
3. 2 NT 25* Pressurizer Relief Tk.-N2 Connection < 10 Sec.
4. 2 WR 80* Pressurizer Relief Tk. -Primary Water Conn. < 10 Sec.
5. 2 CV 3 CVCS - Let<lown Line < 10 Sec.
6. 2 CV 4 CVCS - Let<lown Line < 10 Sec.
7. 2 CV 5 CVCS - Letdown Line < 10 Sec.
8. 2 CV 7 CVCS - Letdown Line < 10 Sec.
9. 2 CV 68## CVCS - Charging Line < 10 Sec.
10. 2 CV 69## CVCS - Charging Line < 10 Sec.
11. 2 CV 284 CVCS - RCP Seals < 10 Sec.
12. 2 CV 116 eves - RC P Seals < 10 Sec.

w 13. 2 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.

14. 2 cc 113 Comp. Coo 1 i ng to Excess Letdown Hx < 10 sec.

"'" 15. 2 WL 96* RC Drain Tk. - Gas Analyzer Conn. <10 Sec.

°'I 16. 2* WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.

I-'

17. 2 WL 98* RC Drain Tk. - Vent HeaCler Conn. <.io Sec.

°' 18. 2 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.

19. 2 WL 108* RC Drain Tk. - N2 Connection < 10 Sec.
20. 2 WL 12* RC Drain Tank Pumps < 10 Sec.
21. 2 WL 13* RC Drain Tank Pumps < 10 Sec.
22. 2 NT 32* Accumulator N2 Connection* < 10 Sec.
23. 2 SJ 123* SI Test Line <10 Sec.
24. 2 SJ 60* SI Test Line < 10 Sec.
25. 2 SJ 53* SI Test Line <10 Sec.
26. 2 SS 103* Accumulator Sampling < 10 Sec.
27. 2 SS 27* Accumulator Sampling < 10 Sec.
28. 2 SS 104* RC Sampling < 10 Sec.
29. 2 SS 33* RC .Sampling <10 Sec.

., ]

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

A. PHASE "A" ISOLATION (Contd.)

30. 2 SS 107* Pressurizer Liquid Sampling < 10 See.
31. 2 SS 49* Pressurizer Liquid Sampling < 10 Sec.
32. 2 SS 110* Pressurizer Steam Sampli°ng < 10 Sec.
33. 2 SS 64* Pressurizer Steam Sampling < 10 Sec.
34. 2 vc 7 Containment Radiation Sampling < 10 Sec.
35. 2 vc 8 Containment Radiation Sampling < 10 Sec.
36. 2 vc 11 Containment Radiation Sampling < 10 Sec.
37. 2 vc 12 Containment Radiation Sampling < 10 Sec.
38. 21 CA 330 Instrument Air Supply < 10 Sec.
39. 22 CA 330 Instrument Air Supply < 10 Sec.
40. 2 DR 29 Demineralized Water Supply < 10 Sec.
41. 2 WL 16 Containment Sump Discharge < 10 Sec.
42. 2 WL 17 Containment Sump Discharge <10 Sec.
43. 2 FP 147* Fire Protection System < 10 Sec.

B. PHASE "B II ISOLATION

1. 2 cc 118tt Component Cooiing to RCP < 10 Sec.
2. 2 cc 117tt Component Cooling to RCP < 10 Sec.
3. 2 cc 187 Compbnent Cooling to RCP < 10 Sec.
4. 2 cc 136 Component Cooling to RCP < 10.Sec.

cc < 10 Sec.

5.

6.

2 2 cc 190 131 Component Component Cooling Cooling to. RCP to RCP < 10 Sec. e

c. MAIN STEAM ISOLATION
1. 21 MS 7# Main Steam Drain < 10 Sec.
2. 22 MS 7# Main Steam Drain < 10 Sec.
3. 23 MS 7# Main Steam Drain <10 Sec.
4. 23 MS 7# Main Steam Drain < 10 Sec.
5. 23 MS 7# Main Steam Bypass < 10 Sec.
6. 22 MS 18# Main Stea~ Bypass < 10 Sec.
7. 23 MS 18# Main Steam Bypass < 10 Sec.
8. 24 MS 18# Main Steam Bypass < 10 Sec.

TARLE 3.6-1 {Contd.) ..

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

~

H t-3 D. FEEDWATER ISOLATION N

1. 21 BF 19# Main Feedwater I so 1at ion -< 55 Sec.

Sec.

2. 22 BF 19# Main Feedwater Isolation <
3. 23 BF 19#
4. 24 BF 19#
5. 21 BF 40#

Main Main Main Feedw.ater Feenwater Feedwater I sol at ion Isolation I sol at ion

< 5 Sec.

< 5 Sec.

< 5 Sec. :

e 6 *. 22 BF 40# Main Feedwater I sol at ion < 5 Sec.

7. 23 BF 40# Main Feedwater Isolation -

<* 5 Sec.

8. 24 BF 40# Main Feedwater Isolation < 5 Sec.

E. STEAM GENERATOR BLOWDOWN ISOLATION

1. 21 GB 4# Steam Generator Blowdown < lf) Sec.

O'I 2. 22 GB 4# Steam Generator Blowdown < 10 Sec.

I I-' 3.23GB4# Steam Generator Blowdown < 10 Sec.

-...)

4. 24 GB 4# Steam Generator Blowdown < 10 Sec.
5. 21 SS 94# SG Blowdown Sampling < 10 Sec.
6. 22 SS 94# SG Blowdown Sampling < Hl Sec.
7. 23 SS 94# SG Blowdown Sampling < 10 Sec.
8. 24 SS 94# SG Blowdown Sampling < 10 Sec.

F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF

1. 2 vc 1 Purge Supply < 2 Sec.
2. 2 vc 2 Purge Supply < 2 Sec.
3. 2 vc 3 Purge Exhaust* < 2 Sec.
4. 2 vc 4 Purge Exhaust -< 2 Sec.
5. 2 vc 5* Pressure-Vacuum Relief < 2 Sec.
6. 2 vc 6* Pressure-Vacuum Relief < 2 Sec.

TABL[ 3.6-1 (Contd.)

(/)

~

.CONTAINMENT ISOLATION VALVES t;i tr::!

s: ISOLATION TIME (Seconds)

VALVE NUMBER FUNCTION d

.z G. MANUAL H

8 Not Applicable

1. 2 SS 900# Pressurizer Dead-Weight Calibrator Not Applicahle

'"' 2. 2 SS 901# Pressurizer Dearl-Weight Calibrator Not Applicable

3. 21 CV 98# eves - RCP Seals Not Applicable
4. 22 CV 98# CVCS - RCP Seals Not Applicable
5. 23 CV 98# eves - RCP Seals Not Applicable
6. 24 CV 98# eves - RCP Seals Not Applicable
7. 2 SJ 71# CVCS Flushing Connection Cornpresserl Air Supply Not Applicable
8. 2 SA 118 Not Applicable*
9. 2 WL 190 Refueling Canal Supply Refueling Canal Supply Not Applicahle
10. 2 SF 36 Not Applicable
11. 2 WL 191 Refueling Canal Discharge w Refueling Canal* Discharge Not Applicable

.......... 12. 2 SF 22 Not Applicable

""' 13. 2 vc 9* Containment Radiation Sampling Containment ~adiation Sampling Not Applicable

"'t--'I 14. 2 vc 10* NO't Applicable

15. 2 vc 13* Containment Rarliation Sampling Containment Radiation Sampling Not Applicable 2 vc OJ
16. 14* Not Applicable
17. # Fuel Transfer Tube Containment Instrumentation Fill Conn. Not Applicahle
18. 2 cs 900 Containment Instrumentation Fill Conn. Not Applicable
19. 2 cs 901 Not Applicable
20. 2 cs 902 Containment Instrumentation Fill Conn.

Containment Instrumentation Fill Conn. Not Appl i cable

21. 2 cs 903 Not Applical>le
22. 2 SA 262 Containment Pressure Test Conn.

Containment Pressure Test Conn. Not Appl i cahl e

23. 2 SA 264 Not Applicable
24. 2 SA 265 Containment Pressure Test Conn *.

Containment Pressure Test Conn. Not Applicable

25. 2 SA 267 Not Applicable
26. 2 SA 208 Containment Pressure Test Conn.

Containment Pressure Test Conn. Not Applicable

27. 2 SA 270 Not Applicable
28. 2 CA 1714 Containment Air Lock Instrument Conn.

Containrnent Air Lock Instrument Conn. Not Applicable

29. 2 CA 1715

'11 TABLE 3.6-1 {Contd.)

(/)

i:.- CONTAINMENT ISOLATION VALVES ti 1:7:1
s:

VALVE NUMBER FUNCTION ISOLATION TIME (Seco.nds) c:::

z G. MANUAL H

t-3 N 30. 21 SS 181* Post LOCA Sampling Not ~pplicable

31. 21 SS 182* Post LOCA Sampling Not Applicable
32. 21 SS 188* Post LOCA Sampling Not Applicable 33.

34.

21 23 SS SS 189*

181*

Post LOCA Sampling Post LOCA Sampling Not Not Applicable Applicable e

35. 23 SS 182* Post LOCA Sampling Not Applicable
36. 23 SS 184* Post LOCA Sampling Not Applicable
37. 23 SS 185* Post LOCA Sampling Not Applicable
38. 21 vc 17* Post LOCA Sampling Not Applicable
39. 21 vc 18* Post LOCA Sampling Not Applicable
40. 21 vc 19* Post LOCA Sampling Not Applicable
41. 21 SF 20* Post LOCA Sampling Not Applicable
42. 22 vc 1°7* Post LOCA Sampling Not Applicable*

w 43. 22 vc 18* *Post LOCA Sampling Not Applicable

44. 22 vc 19* Post LOCA Sampling Not Applicable
0) 45. 22 vc 20* Post LOCA Sampling Not Applicable I

I-'

46. 21 cs 2t Containment Spray Not Applicable w 47. 22 cs 2t Containment Spray Not Applicable H. CHECK
1. 2 CV 74 CVCS-Charging Line Not Applicable
2. 2 CV 296 CVCS-RCP Seals Not Applicable
3. 2 cc 119 Component Cooling to RCP Not Applicable
4. 2 cc 186 Component Cooling to RCP Not Applicable
5. 2 cc 208 *component Coo 1 i ng to RCP Not Applicahle
6. 21 cs 48 Containment Spray Not Applicable '.
7. 22 cs 48 Contain111ent Spray Not Applicable
8. 2 DR 30 Demineralized Water System Not Applicahl~
9. 2 FP 148 Fire P'rotection System Not Applicable
10. 2 NT 26 Pressurizer Relief Tk. -Nitrogen Conn. Not Applicable
11. 2 NT 34 Accumulator Nitrogen Supply Not Applicable
12. 2 SA 119 Compressed Air Supply Not Applicable

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) c:

~ H. CHECK (Contd.}

8

13. 2 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable N
14. 21 CA 360 Instrument Air Supply Not Applicable
15. 22 CA 360 Instrurrent Air Not Applicable

°'NI 0

  • May be opened on an intermfttent basis under administrative control.
  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

tNormally closed rTDtor operated containment isolatio*n valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.