ML18092A920
ML18092A920 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 11/27/1985 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18092A919 | List: |
References | |
NUDOCS 8512110248 | |
Download: ML18092A920 (15) | |
Text
CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containl'lent isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.
APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:
Hith one or rrore of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:
- a. Maintain at least one isolation valve.OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
- b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic_ valve secured in the isolation position, or
- c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
- d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTffi5WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQJIREMENTS 4.6.3~1.1 The isolation.valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control or power circuit by perforl'lance of a cycling test and verification of isolation time.
- SALEM - UN IT 1 3/4 6-12
~~~~~~-=::;:--~~~.,
TABLE 3.6-1 Ul
~ CONTAINMENT 1SOLATION VALVES t'i l::t:l
~
I c VALVE* NUMBER FUNCTION ISOLATION TIME (Seconds) z H
8 A. PHASE 11 AII ISOLATION I-'
- 1. 1 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn. ,<lOSec.
- 2. 1 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. <10 Sec.
- 3. 1 NT 25* Pressurizer Relief Tk.-N2 Connection* < 10 Sec~
- 4. 1 WR 80* Pressurizer Relief Tk.-Primary Water Conn. < 10 Sec.
- 5. 1 CV 3 CVCS - Letdown Line <1,1 Sec.
- 6. 1 CV 4 CVCS - Letdown Line < 10 Sec.
- 7. 1 CV 5 CVCS - Letdown Line < 10 Sec.
- 8. 1 CV 7 CVCS - Letdown Line < 10 Sec.
- 9. 1 CV 68## CVCS - Charging line < 10 Sec.
- 10. 1 CV 69## CVCS - Charging Line < 10 Sec.
- 11. 1 CV 284 eves - RCP Seals < 10 Sec.
w
'h.,. 13. 1 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.
O'I 14. 1 cc 113 Comp. Cooling to Excess Letdown Hx < 10 Sec.
I-'
I 15. 1 WL 96* RC Drain Tk. Gas. Analyzer Conn. . <10 Sec.
""' 16. 1 WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.
- 17. 1 WL 98* RC Drain Tk. - Vent Header Conn. < 10 Sec.
- 18. 1 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.
- 19. 1 WL 108* RC Drain. Tk. - N2 Connection (IO Se,c.
- 20. 1 WL 12* RC Drain Tank Pumps < *10 Sec.
- 21. 1 WL 13* RC Drain Tank Pumps < 10 Sec.
- 22. 1 NT 32* Accumulator N2 Connection < 10 Sec.
- 23. 1 SJ 123* SI Test Line < 10 Sec.
- 24. 1 SJ 60* SI Test Line < 10 Sec.
- 25. 1 SJ 53* SI Test Line < 10 Sec.
- 26. 1 SS 103* Accumulator Sampling < 10 Sec.
- 27. 1 SS 27* Accumulator Sampling < 10 Sec.
- 28. 1 SS 104* RC Sampling < 10 Sec.
- 29. 1 SS 33* RC Sampling < 10 Sec.
TABLt 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES Ul
~ ISOLATION TIME (Seconds) tc:l VALVE NUMBER FUNCTION s:I c A. PHASE 11 AII ISOLATION (Cont<l.)
z H
1-3
- 30. 1 SS 107* Pressurizer Liquid Sampling < 10 Sec.
- 31. 1 SS 49* Pressurizer Liqui~ Sampling < 10 Sec.
- 32. 1 SS 110* Pressurizer Steam Sampling < 10 Sec.
- 33. 1 SS 64* Pressurizer Steam Sampling < 10 Sec.
- 34. 1 vc 7 Containment Radiation Sampling .< 10 Sec. A
- 35. 1 vc 8 Containment Radiation Sampling < 10 Sec. ,.,.
- 36. 1 vc 11 Containment Radiation Sampling <10 Sec.
- 37. 1 vc 12 Containment Radiation Sampling < 10 Sec.
- 38. 11 CA 330 Instrument. Air Supply < 10 Sec.
- 39. 12 CA 330 Instrument Air Supply < 10 sec.
- 40. 1 DR 29 Demineralized Water Sup~ly <10 Sec.
- 41. 1 ~JL 16 Containment Sump Discharge < 10 Sec.
- 42. 1 WL 17 Containment Sump Discharge <10 Sec.
- 43. 1 FP 147* Fire Protection System < 10 Sec.
B. PHASE 11 B II ISOLATION
- 1. 1 cc 118tt Component Cooling to RCP < 10 Sec.
- 2. 1 cc 117tt Component Cool i n*g to RCP (10 Sec.
- 3. 1 cc 187 Component Cooling to RCP < 10 Sec.
- 4. 1 cc 136 Component Cooling to RCP (10 Sec.
< 10 5.
6.
1 1
cc cc 190 131 Component Component Cooling Cooling to.
to RCP RCP Sec.*
<10 Sec. e
- c. MAIN STEAM ISOLATION
- 1. 11 MS 7# Main Steam Drain * < 10 Sec.
- 2. 12 MS 7# Main Steam Drain < 10 Sec.
- 3. 13 MS 7# Main Steam Drain < 10 Sec.
- 4. 13 MS 7# Main Steam Drain < 10 Sec.
- 5. 13 MS 7# Main Steam Bypass < 10 Sec.
- 6. 12 MS 18# Main Steam Bypass < 10 Sec.
- 7. 13 MS 18# Main Steam Bypass < 10 Sec.
- 8. 14 MS 18# Main Steam Bypass* < 10 Sec.
TABLE 3.6-1 '(Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTI'ON ISOLATION TIME (Seconcts) c D. FEEDWATER ISOLATION z
H
-< 8 Sec.
1-3
- 1. 11 BF 19# Main Feed\-Jater I s0 lat ion
- 2. 12 BF 19# Main Feedwater I so 1at ion -
< 8 Sec.
- 3. 13 BF 19# Main Feedwater I so 1at ion < 8 Sec.
- 4. 14 BF 19# Main Feedwater Isolation -< 88 Sec.
Sec.
- 5. 11 BF 40# Main Feeclwater *1 sol at ion -<
- 6. 12 BF 40# Main Feedwater Isolation < 8 Sec.
- 7. 13 BF 40# Main Feedwater I sol at ion -< 8 Sec.
- 8. 14 BF 40# Main Feedwater Isolation < 8 Sec-.
E. STEAM GENERATOR BLOWDOWN ISOLATION
- 1. 11 GB 4# *steam Generator Blowaown < 10 Sec.
w
'-.. 2. 12 GB 4# Steam Generator *Blowdown < 10 Sec.
"'" 3. 13 GB 4# Stearn Generator Blowclown < 10 Sec.
O'I
- 4. 14 GB 4# Stearn Generator Blowdown < 10 Sec.
I I-' 5. 11 SS 94# SG Blowdown Sampling < 10 Sec.
Ul
F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF
- 1. 1 vc 1 Purge Supply -<
2 Sec.
- 2. 1 vc 2 Purge Supply < 2 Sec.
- 3. 1 vc 3 Purge Exhaust < 2 Sec.
4.* 1 vc 4 Purge Exhaust < 2 Sec.
- 5. 1 vc 5* Pressure-Vacuum Relief < 2 Sec.
- 6. 1 vc 6* Pressure-Vacuum Relief < 2 Sec.
(/) TABLE 3.6-1 (Contd.)
- t::'
t'i t:Ij CONTAINMENT ISOLATION VALVES
- 3::
c:: VALVE NUMBER FUNCTION I SOLATI ON TI ME (Seconds) z H
8 G. MANUAL I-'
- 1. 1 SS 900# Pressurizer Dead-Weight Calibrator Not Applicable
- 2. 1 SS 901# Pressurizer Dead-Weight Calibrator Not Applicable
- 3. 11 CV 98# eves - RCP seals Not Applicable
- 5. 13 CV 98# eves - RCP Seals Not Applicable
- 6. 14 CV 98# eves - RCP Seals Not Applicable
- 7. 1 SJ 71# CVCS Flushing Connection Not Applicable
- 8. 1 SA 118 Compressed Air Supply
- Not Applicable
- 9. 1 WL 190 Refueling Canal Supply Not Applicable
- 10. 1 SF 36 Refueling Canal Supply Not Applicable w 11. 1 WL 191 Refueling Canal Discharge Not Applicable ii':>
- 12. 1 SF 22 Refueling Canal Discharge Not Applicable
- 13. 1 vc 9* Containment Radiation Sampling Not Applicable O"I I 14. 1 vc 10* Containment Radiation Sampling Not Applicable I-'
O"I
- 15. 1 vc 13* Containment Radiation Sampling Not Applicable
- 16. 1 vc 14* Containment Radiation Sampling Not Applicable
- 17. # Fuel Transfer Tube Not Applicable
- 18. 1 cs 900 Containment Instrumentation Fi 11 Conn. Not Applicable
- 19. 1 cs 901 Containment Instrumentation Fil 1 Conn. Not Applicable cs 20.
21.
22.
1 1
1 cs SA 902 903 262 Containment Instrumentation Fill Conn.
Containment Instrumentation Fil 1 Conn.
Containment Pressure Test Conn.
Not Not Not Applicable Applicable Applicable e
- 23. 1 SA 2n4 Co nt a i nme nt Pres s ure Te st Co nn * , Not Applicable
- 24. 1 SA 265 Containment Pressure Test Conn. Not Applicable
- 25. 1 SA 267 Containment Pressure Test Conn. Not Applicable
- 26. 1 SA 268 Containment Pressure Test Conn. Not Appl i cah 1e
- 27. 1 SA 270 Containment Pressure Test Conn. Not Applicable
- 28. 1 CA 1714 Containment Air Lock Instrument Conn. Not Applicable
- 29. 1 CA 1715 Containment Air* Lock Instrument Conn. Not Applicable
TABLE 3.6-1 (Contd.)
[fl
~ CONTAINMENT ISOLATION VALVES t"i l:rj
~
VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) d z G. MANUAL H
1-3 f-' 30. 11 SS 181* Post LOCA Sampling Not Applicable
- 38. 11 vc 17* Post LOCA Sampling Not Applicable
- 39. 11 vc 18* Post LOCA Sampling No t Appl i cab l e
""' 42. 12 vc 17* Post LOCA Safllpling Not Applicable CJ'\ 43. 12 vc 18* Post LOCA Sampling Not Appl i cahl e I
f-' 44. 12 vc 19* *Post LOCA Sampling Not Applicable
.....J 45. 12 vc 20* Post LOCA Sampling Not Appl i cab l e
- 46. 11 cs 2t Containment Spray Not Applicable
- 47. 12 cs 2t Containme~t Spray Not Applicable H. CHECK 1.
2.
3 *.
1 1
1 CV 74 CV 296 cc 119 CVCS-Charging Line CVCS-RCP Seals Component Cooling to RCP Not Not Not Applicable Applicable Applicable I
- 4. 1 cc 186 Component Cooling to RCP Not Applicable
- 5. 1 cc 208 Component Cooling to RCP Not Applicable
- 6. 11 cs 48 Containment Spray Not Applicable
- 7. 12 cs 48 Containment Spray No t App l i ca bl e
- 8. 1 DR 30 Demineralized Water System Not Applicable
- 9. 1 FP 148 Fire Protection System Not Applicable
- 10. 1 NT 26 Pressurizer Relief Tk.--Nitrogen Conn. Not Applicable
- 11. 1 NT 34 Accumulator Nitrogen Supply Not Applicable
- 12. 1 SA 119 Compressed Air Supply Not Applicable
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
H. CHECK (Contd.)
- 13. 1 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable
- 14. 11 CA 360 Instrument Air Supply Not Applicable
- 15. 12 CA 360 Instrument Air Not Applicable
- May be opened on an intermittent basis under administrative control.
- Not subject to Type C leakage tests. *
- Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
tNormally closed rmtor operated containment isolation valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE. l
REVISED PAGES - UNIT NO. 2 CONTAINMENT*SYSTEMS CONTAINMENT ISOLATION VALV-ES .
LIMITING CONDITION FOR OPERATION 3 .6 .3 The containment isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.
APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:
With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:
- a. Maintain at least one isolation valve OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
- b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or
- c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
- d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDO~ within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQJIREMENTS
.4.6.3.1 The isolation val'ves specified in "'Fable 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associ a't;ed actuator, control or power circuit by performance of a cycling test and verificatio*n of isolation time.
SALEM - UN IT 2 3/4 6-14
.i TABLE 3~6-1 CJ) CONTAINMENT ISOLATION VALVES
~
1:-1 tx:l
- s: FUNCTION ISOLATION TIME (Seconds)
VALVE NUMBER c:: A. PHASE 11 A11 ISOLATION z
H f-:3 < 10 Sec.
- 1. 2 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn.
N
- 2. 2 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. < 10 Sec.
- 3. 2 NT 25* Pressurizer Relief Tk.-N2 Connection < 10 Sec.
- 4. 2 WR 80* Pressurizer Relief Tk. -Primary Water Conn. < 10 Sec.
- 5. 2 CV 3 CVCS - Let<lown Line < 10 Sec.
- 6. 2 CV 4 CVCS - Let<lown Line < 10 Sec.
- 7. 2 CV 5 CVCS - Letdown Line < 10 Sec.
- 8. 2 CV 7 CVCS - Letdown Line < 10 Sec.
- 9. 2 CV 68## CVCS - Charging Line < 10 Sec.
- 10. 2 CV 69## CVCS - Charging Line < 10 Sec.
- 12. 2 CV 116 eves - RC P Seals < 10 Sec.
w 13. 2 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.
- 14. 2 cc 113 Comp. Coo 1 i ng to Excess Letdown Hx < 10 sec.
"'" 15. 2 WL 96* RC Drain Tk. - Gas Analyzer Conn. <10 Sec.
°'I 16. 2* WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.
I-'
- 17. 2 WL 98* RC Drain Tk. - Vent HeaCler Conn. <.io Sec.
°' 18. 2 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.
- 19. 2 WL 108* RC Drain Tk. - N2 Connection < 10 Sec.
- 20. 2 WL 12* RC Drain Tank Pumps < 10 Sec.
- 21. 2 WL 13* RC Drain Tank Pumps < 10 Sec.
- 22. 2 NT 32* Accumulator N2 Connection* < 10 Sec.
- 23. 2 SJ 123* SI Test Line <10 Sec.
- 24. 2 SJ 60* SI Test Line < 10 Sec.
- 25. 2 SJ 53* SI Test Line <10 Sec.
- 26. 2 SS 103* Accumulator Sampling < 10 Sec.
- 27. 2 SS 27* Accumulator Sampling < 10 Sec.
- 28. 2 SS 104* RC Sampling < 10 Sec.
- 29. 2 SS 33* RC .Sampling <10 Sec.
., ]
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
A. PHASE "A" ISOLATION (Contd.)
- 30. 2 SS 107* Pressurizer Liquid Sampling < 10 See.
- 31. 2 SS 49* Pressurizer Liquid Sampling < 10 Sec.
- 32. 2 SS 110* Pressurizer Steam Sampli°ng < 10 Sec.
- 33. 2 SS 64* Pressurizer Steam Sampling < 10 Sec.
- 34. 2 vc 7 Containment Radiation Sampling < 10 Sec.
- 35. 2 vc 8 Containment Radiation Sampling < 10 Sec.
- 36. 2 vc 11 Containment Radiation Sampling < 10 Sec.
- 37. 2 vc 12 Containment Radiation Sampling < 10 Sec.
- 38. 21 CA 330 Instrument Air Supply < 10 Sec.
- 39. 22 CA 330 Instrument Air Supply < 10 Sec.
- 40. 2 DR 29 Demineralized Water Supply < 10 Sec.
- 41. 2 WL 16 Containment Sump Discharge < 10 Sec.
- 42. 2 WL 17 Containment Sump Discharge <10 Sec.
- 43. 2 FP 147* Fire Protection System < 10 Sec.
B. PHASE "B II ISOLATION
- 1. 2 cc 118tt Component Cooiing to RCP < 10 Sec.
- 2. 2 cc 117tt Component Cooling to RCP < 10 Sec.
- 3. 2 cc 187 Compbnent Cooling to RCP < 10 Sec.
- 4. 2 cc 136 Component Cooling to RCP < 10.Sec.
cc < 10 Sec.
5.
6.
2 2 cc 190 131 Component Component Cooling Cooling to. RCP to RCP < 10 Sec. e
- c. MAIN STEAM ISOLATION
- 1. 21 MS 7# Main Steam Drain < 10 Sec.
- 2. 22 MS 7# Main Steam Drain < 10 Sec.
- 3. 23 MS 7# Main Steam Drain <10 Sec.
- 4. 23 MS 7# Main Steam Drain < 10 Sec.
- 5. 23 MS 7# Main Steam Bypass < 10 Sec.
- 6. 22 MS 18# Main Stea~ Bypass < 10 Sec.
- 7. 23 MS 18# Main Steam Bypass < 10 Sec.
- 8. 24 MS 18# Main Steam Bypass < 10 Sec.
TARLE 3.6-1 {Contd.) ..
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
~
H t-3 D. FEEDWATER ISOLATION N
- 1. 21 BF 19# Main Feedwater I so 1at ion -< 55 Sec.
Sec.
- 2. 22 BF 19# Main Feedwater Isolation <
- 3. 23 BF 19#
- 4. 24 BF 19#
- 5. 21 BF 40#
Main Main Main Feedw.ater Feenwater Feedwater I sol at ion Isolation I sol at ion
< 5 Sec.
< 5 Sec.
< 5 Sec. :
e 6 *. 22 BF 40# Main Feedwater I sol at ion < 5 Sec.
- 7. 23 BF 40# Main Feedwater Isolation -
<* 5 Sec.
- 8. 24 BF 40# Main Feedwater Isolation < 5 Sec.
E. STEAM GENERATOR BLOWDOWN ISOLATION
- 1. 21 GB 4# Steam Generator Blowdown < lf) Sec.
O'I 2. 22 GB 4# Steam Generator Blowdown < 10 Sec.
I I-' 3.23GB4# Steam Generator Blowdown < 10 Sec.
-...)
- 4. 24 GB 4# Steam Generator Blowdown < 10 Sec.
F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF
- 1. 2 vc 1 Purge Supply < 2 Sec.
- 2. 2 vc 2 Purge Supply < 2 Sec.
- 3. 2 vc 3 Purge Exhaust* < 2 Sec.
- 4. 2 vc 4 Purge Exhaust -< 2 Sec.
- 5. 2 vc 5* Pressure-Vacuum Relief < 2 Sec.
- 6. 2 vc 6* Pressure-Vacuum Relief < 2 Sec.
TABL[ 3.6-1 (Contd.)
(/)
~
.CONTAINMENT ISOLATION VALVES t;i tr::!
- s: ISOLATION TIME (Seconds)
VALVE NUMBER FUNCTION d
.z G. MANUAL H
8 Not Applicable
- 1. 2 SS 900# Pressurizer Dead-Weight Calibrator Not Applicahle
'"' 2. 2 SS 901# Pressurizer Dearl-Weight Calibrator Not Applicable
- 3. 21 CV 98# eves - RCP Seals Not Applicable
- 5. 23 CV 98# eves - RCP Seals Not Applicable
- 6. 24 CV 98# eves - RCP Seals Not Applicable
- 7. 2 SJ 71# CVCS Flushing Connection Cornpresserl Air Supply Not Applicable
- 8. 2 SA 118 Not Applicable*
- 9. 2 WL 190 Refueling Canal Supply Refueling Canal Supply Not Applicahle
- 10. 2 SF 36 Not Applicable
- 11. 2 WL 191 Refueling Canal Discharge w Refueling Canal* Discharge Not Applicable
.......... 12. 2 SF 22 Not Applicable
""' 13. 2 vc 9* Containment Radiation Sampling Containment ~adiation Sampling Not Applicable
"'t--'I 14. 2 vc 10* NO't Applicable
- 15. 2 vc 13* Containment Rarliation Sampling Containment Radiation Sampling Not Applicable 2 vc OJ
- 16. 14* Not Applicable
- 17. # Fuel Transfer Tube Containment Instrumentation Fill Conn. Not Applicahle
- 18. 2 cs 900 Containment Instrumentation Fill Conn. Not Applicable
- 19. 2 cs 901 Not Applicable
- 20. 2 cs 902 Containment Instrumentation Fill Conn.
Containment Instrumentation Fill Conn. Not Appl i cable
- 21. 2 cs 903 Not Applical>le
- 22. 2 SA 262 Containment Pressure Test Conn.
Containment Pressure Test Conn. Not Appl i cahl e
- 23. 2 SA 264 Not Applicable
- 24. 2 SA 265 Containment Pressure Test Conn *.
Containment Pressure Test Conn. Not Applicable
- 25. 2 SA 267 Not Applicable
- 26. 2 SA 208 Containment Pressure Test Conn.
Containment Pressure Test Conn. Not Applicable
- 27. 2 SA 270 Not Applicable
- 28. 2 CA 1714 Containment Air Lock Instrument Conn.
Containrnent Air Lock Instrument Conn. Not Applicable
- 29. 2 CA 1715
'11 TABLE 3.6-1 {Contd.)
(/)
- i:.- CONTAINMENT ISOLATION VALVES ti 1:7:1
- s:
VALVE NUMBER FUNCTION ISOLATION TIME (Seco.nds) c:::
z G. MANUAL H
t-3 N 30. 21 SS 181* Post LOCA Sampling Not ~pplicable
34.
21 23 SS SS 189*
181*
Post LOCA Sampling Post LOCA Sampling Not Not Applicable Applicable e
- 38. 21 vc 17* Post LOCA Sampling Not Applicable
- 39. 21 vc 18* Post LOCA Sampling Not Applicable
- 40. 21 vc 19* Post LOCA Sampling Not Applicable
- 41. 21 SF 20* Post LOCA Sampling Not Applicable
- 42. 22 vc 1°7* Post LOCA Sampling Not Applicable*
w 43. 22 vc 18* *Post LOCA Sampling Not Applicable
- 44. 22 vc 19* Post LOCA Sampling Not Applicable
- 0) 45. 22 vc 20* Post LOCA Sampling Not Applicable I
I-'
- 46. 21 cs 2t Containment Spray Not Applicable w 47. 22 cs 2t Containment Spray Not Applicable H. CHECK
- 1. 2 CV 74 CVCS-Charging Line Not Applicable
- 2. 2 CV 296 CVCS-RCP Seals Not Applicable
- 3. 2 cc 119 Component Cooling to RCP Not Applicable
- 4. 2 cc 186 Component Cooling to RCP Not Applicable
- 5. 2 cc 208 *component Coo 1 i ng to RCP Not Applicahle
- 6. 21 cs 48 Containment Spray Not Applicable '.
- 7. 22 cs 48 Contain111ent Spray Not Applicable
- 8. 2 DR 30 Demineralized Water System Not Applicahl~
- 9. 2 FP 148 Fire P'rotection System Not Applicable
- 10. 2 NT 26 Pressurizer Relief Tk. -Nitrogen Conn. Not Applicable
- 11. 2 NT 34 Accumulator Nitrogen Supply Not Applicable
- 12. 2 SA 119 Compressed Air Supply Not Applicable
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) c:
~ H. CHECK (Contd.}
8
- 13. 2 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable N
- 14. 21 CA 360 Instrument Air Supply Not Applicable
- 15. 22 CA 360 Instrurrent Air Not Applicable
°'NI 0
- May be opened on an intermfttent basis under administrative control.
- Not subject to Type C leakage tests.
- Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
tNormally closed rTDtor operated containment isolatio*n valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.