Proposed Tech Specs,Revising Eighteen Month Surveillance Performed to Measure RCS Total Flow Rate to Account for Necessary Plant Conditions for Performing Test in Mode 1 & Current Extended Plant Outages
ML18102A738
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/07/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102A737 List:
References
NUDOCS 9701100263
Download: ML18102A738 (3)


Text

POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMIT I NG CONDI TI ON FC'~Q~O~PE~RA=TI=O=N:=:=:=:===================

3.2.5 The following Drm related parameters shall be maintained within

. .... the limits shown on Table 3.2-1:

a. Reactor Coolant System Tavg*
b. Pressurizer Pressure
c. ~ed~tor Coolant System Total Flow Rate APPLICABILITY: MODE l ACTION:

With any of the above parameters exceeding its limit, restore the param-eter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than S' of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.5. l Each of the parameters of Table 3.2-1 shall be verified to ~

within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Cool~nt System total flow rate shall be detennintd to be within

  • .*.*=
    • ~: .

. *~

  • _.*the limits of Table 3.2-1 by performing-a precision heat balance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state conditions ~90%

RATED THERMAL POWER at least once per 18 months. The provisions of Specification 4.0.4 are not applicable.

SAlEJ1 - UNIT 1 3/4 2-13 9701100263 970107 PDR ADOCK 05000272 p PDR

Reactor Coolant System ~ 357,200 gpm/I i

\ ..

  • Limit not applicable during either THERMAL POWER ramp increase in excess of 5% RATED THERMAL POWER per minute or a THERMAL POWER ~tep increase in excess of 10% RATED THERMAL POWER.
  1. Includes a 2.2% flow measurement uncertainty plus a 0.1% measurement uncertainty due to feedwater venturi fouling.

SALEM - UNIT l 3/4 2-14 Amendment No.96

PO~"ER DISTRIB~"I'ION LIMITS LIMITING CO~"DITION FOR OPERATION 3.2.5 The following DNB related parameters shall be maintained within the limits shown on~Table 3.2-1:

a. Reactor Coolan~ System T
  • avg
b. Pressurizer.Pressure.
c. Reactor Coolant System Total Flow Rate.

APPLICABILI'I"i: MODE 1 ACTION:

With any of the above parameters exceeding its limit, restore the parameter to within its "limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVE!LLA..~CE REQUIREMENTS 4.2.5.l Each of the parameters of Table 3.2-1 shall be verified to be within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Coolant System Total Flow Rate shall be determined to be within its limit b' meas~te:ment at least onee per 18 months.

the limits of Table 3.2-1 by performing a precisi~n.heat ba~ance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state condit~ons ~9?o'ons RATED THERMAL POWER at least once p7r 18 months. T e provisi of specification 4.0.4 are not applicable.

Amendment No. 72 SAL.EM - UNIT 2 3/4 2-16