ML18102A738

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Revising Eighteen Month Surveillance Performed to Measure RCS Total Flow Rate to Account for Necessary Plant Conditions for Performing Test in Mode 1 & Current Extended Plant Outages
ML18102A738
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/07/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102A737 List:
References
NUDOCS 9701100263
Download: ML18102A738 (3)


Text

POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMIT I NG CONDI TI ON FC'~Q~O~PE~RA=TI=O=N:=:=:=:===================

3.2.5 The following Drm related parameters shall be maintained within

. .... the limits shown on Table 3.2-1:

a. Reactor Coolant System Tavg*
b. Pressurizer Pressure
c. ~ed~tor Coolant System Total Flow Rate APPLICABILITY: MODE l ACTION:

With any of the above parameters exceeding its limit, restore the param-eter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than S' of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.5. l Each of the parameters of Table 3.2-1 shall be verified to ~

within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Cool~nt System total flow rate shall be detennintd to be within

  • .*.*=
    • ~: .

. *~

  • _.*the limits of Table 3.2-1 by performing-a precision heat balance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state conditions ~90%

RATED THERMAL POWER at least once per 18 months. The provisions of Specification 4.0.4 are not applicable.

SAlEJ1 - UNIT 1 3/4 2-13 9701100263 970107 PDR ADOCK 05000272 p PDR

Reactor Coolant System ~ 357,200 gpm/I i

\ ..

  • Limit not applicable during either THERMAL POWER ramp increase in excess of 5% RATED THERMAL POWER per minute or a THERMAL POWER ~tep increase in excess of 10% RATED THERMAL POWER.
  1. Includes a 2.2% flow measurement uncertainty plus a 0.1% measurement uncertainty due to feedwater venturi fouling.

SALEM - UNIT l 3/4 2-14 Amendment No.96

PO~"ER DISTRIB~"I'ION LIMITS LIMITING CO~"DITION FOR OPERATION 3.2.5 The following DNB related parameters shall be maintained within the limits shown on~Table 3.2-1:

a. Reactor Coolan~ System T
  • avg
b. Pressurizer.Pressure.
c. Reactor Coolant System Total Flow Rate.

APPLICABILI'I"i: MODE 1 ACTION:

With any of the above parameters exceeding its limit, restore the parameter to within its "limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVE!LLA..~CE REQUIREMENTS 4.2.5.l Each of the parameters of Table 3.2-1 shall be verified to be within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Coolant System Total Flow Rate shall be determined to be within its limit b' meas~te:ment at least onee per 18 months.

the limits of Table 3.2-1 by performing a precisi~n.heat ba~ance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state condit~ons ~9?o'ons RATED THERMAL POWER at least once p7r 18 months. T e provisi of specification 4.0.4 are not applicable.

Amendment No. 72 SAL.EM - UNIT 2 3/4 2-16