POWER DISTRIBUTION LIMITS DNB PARAMETERS LIMIT I NG CONDI TI ON FC'~Q ~O~PE~RA=TI=O=N:=:=:=:===================
3.2.5 The following Drm related parameters shall be maintained within the limits shown on Table 3.2-1:
- a.
- b.
- c.
Reactor Coolant System Tavg*
Pressurizer Pressure
~ed~tor Coolant System Total Flow Rate APPLICABILITY:
MODE l ACTION:
With any of the above parameters exceeding its limit, restore the param-eter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than S' of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.5. l Each of the parameters of Table 3.2-1 shall be verified to ~
within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.2.5.2 The Reactor Cool~nt System total flow rate shall be detennintd to be within
- ~:.
- _.*the limits of Table 3.2-1 by performing-a precision heat balance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state conditions ~90%
RATED THERMAL POWER at least once per 18 months.
The provisions of Specification 4.0.4 are not applicable.
SAlEJ1 - UNIT 1 3/4 2-13 9701100263 970107 PDR ADOCK 05000272 p
PARAMETER Reactor Coolant System Tavg Pressurizer Pressure Reactor Coolant System 4 Loops In Operation
~ ss2°F
~ 2220 psia*
L!~I7S
~ 357,200 gpm/I
- Limit not applicable during either THERMAL POWER ramp increase in excess of 5% RATED THERMAL POWER per minute or a THERMAL POWER ~tep increase in excess of 10% RATED THERMAL POWER.
- Includes a 2.2% flow measurement uncertainty plus a 0.1% measurement uncertainty due to feedwater venturi fouling.
SALEM - UNIT l 3/4 2-14 Amendment No.96 i
\\..
PO~"ER DISTRIB~"I'ION LIMITS LIMITING CO~"DITION FOR OPERATION 3.2.5 The following DNB related parameters shall be maintained within the limits shown on~Table 3.2-1:
- a.
Reactor Coolan~ System T avg
- b.
Pressurizer.Pressure.
- c.
Reactor Coolant System Total Flow Rate.
APPLICABILI'I"i: MODE 1 ACTION:
With any of the above parameters exceeding its limit, restore the parameter to within its "limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVE!LLA..~CE REQUIREMENTS 4.2.5.l Each of the parameters of Table 3.2-1 shall be verified to be within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.2.5.2 The Reactor Coolant System Total Flow Rate shall be determined to be within its limit b' meas~te:ment at least onee per 18 months.
the limits of Table 3.2-1 by performing a precisi~n.heat ba~ance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after achieving steady state condit~ons ~9?o'ons RATED THERMAL POWER at least once p7r 18 months.