Category:E-Mail
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information 2024-09-09
[Table view] |
Text
NRR-DMPSPEm Resource From: Kim, James Sent: Wednesday, September 12, 2018 2:10 PM To: Duke, Paul R.; Thomas, Brian J.
Cc: Marabella, Lee A.
Subject:
Hope Creek AOT Final RAI-from PRA Branch Attachments: APLA RAIs Hope Creek Inverter AOT final.scd.docx By letter dated April 13, 2018 (Agencywide Documents Access management System (ADAMS) Accession No. ML18103A218), Public Service Enterprise Group Nuclear LLC (PSEG, the licensee), requested an amendment to the Renewed Facility Operating License NPF-57 for Hope Creek Generating Station (HCGS) Unit 1. The proposed license amendment request (LAR) would revise the Technical Specifications (TS) 3.8.3.1, Distribution - Operating, to increase the allowed outage time (AOT) for restoring inoperable alternate current (AC) inverter(s) to operable status from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
The NRC staff from PRA Branch has determined that the additional information is required for the staff to complete its review and the licensee has agreed to respond to this request within 30 days of the date of this email (i.e., by October 5, 2018).
A publicly available version of this RAI (attached) will be placed in the NRCs ADAMS.
Jim Kim Project Manager - Hope Creek Generating Station NRR/DORL/LPL1 301-415-4125 1
Hearing Identifier: NRR_DMPS Email Number: 562 Mail Envelope Properties (James.Kim@nrc.gov20180912140900)
Subject:
Hope Creek AOT Final RAI-from PRA Branch Sent Date: 9/12/2018 2:09:59 PM Received Date: 9/12/2018 2:09:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients:
"Marabella, Lee A." <Lee.Marabella@pseg.com>
Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>
Tracking Status: None "Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1018 9/12/2018 2:09:00 PM APLA RAIs Hope Creek Inverter AOT final.scd.docx 36000 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION BY THE PROBABILISTIC RISK ASSESSMENT LICENSING BRANCH, DIVISION OF RISK ASSESSMENT LICENSE AMENDMENT REQUEST FOR EXTENSION OF ALTERNATING CURRENT BUS INVERTER ALLOWED OUTAGE TIMES PSEG NUCLEAR LLC HOPE CREEK GENERATING STATION DOCKET NOS. 50-354 (EPID: L-2018-LLA-0101)
By letter dated April 13, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML18103A218), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee), submitted a license amendment request (LAR) regarding the Hope Creek Generating Station. The proposed amendment would revise Technical Specification (TS) 3.8.3.1, Distribution - Operating, to increase the allowed outage time (AOT) for one or both inverters inoperable in one channel from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days. The licensee states that the proposed change will allow increased flexibility in the scheduling and performance of corrective maintenance, allow better control and allocation of resources, and reduce the potential for unplanned plant shutdowns.
The Probabilistic Risk Assessment (PRA) Licensing Branch (APLA) of the Division of Risk Assessment (DRA) staff has reviewed the LAR and determined that additional information, related to PRA considerations described in the LAR, is required for the APLA staff to complete the review.
Regulatory Basis Title 10 of the Code of Federal Regulations (10 CFR) Part 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants," requires that preventive maintenance activities must be sufficient to provide reasonable assurance that structures systems and components (SSCs) are capable of fulfilling their intended functions. As it relates to the proposed inverter AOT extension, 10 CFR 50.65(a)(4) requires the assessment and management of the increase in risk that may result from proposed maintenance activities.
Section 50.63, "Loss of all alternating current power," requires that nuclear power plants must be able to withstand a loss of all alternating current (ac) power for an established period of time and recover from a station blackout.
The following are applicable regulatory guidelines and policy documents for evaluating the risk impact of the proposed change:
- Regulatory Guide 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decision-making: Technical Specifications," May 2011 (ADAMS Accession No.
Enclosure
- ML100910008) describes an acceptable risk-informed approach for assessing proposed permanent TS changes in AOTs. In addition, this RG provides risk acceptance guidelines for evaluating the results of such assessments.
- Regulatory Guide 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, March 2009 (ADAMS Accession No. ML090410014) describes an acceptable approach for determining whether the quality of the probabilistic risk assessment (PRA) models, in total or the parts that are used to support an application, is sufficient to provide confidence in the results, such that the PRA models can be used in regulatory decision making for light-water reactors.
- Regulatory Issue Summary (RIS) 2007-06, Regulatory Guide 1.200 Implementation, March 2007 (ADAMS Accession No. ML070650428) describes how the Nuclear Regulatory Commission (NRC) will implement its technical adequacy review of plant-specific PRAs used to support risk-informed licensing actions after the issuance of RG 1.200.
Request for Additional Information APLA RAI-1 Section 3.2.1 and Attachment 2 of the LAR provides a very detailed discussion about the licensees evaluation of the technical adequacy of the full-power internal events (FPIE) PRA to support the proposed amendment. The discussion includes some details that appear unnecessary, e.g. an extensive discussion of a 1999 peer review and results that were superseded by a 2008 full scope peer review. Other details are difficult to interpret, e.g., that the 2008 peer review was performed using the 2007 American Society of Mechanical Engineers (ASME) ASME PRA Standard endorsed in Regulatory Guide (RG) 1.200 Rev. 1 whereas Rev. 1 of RG 1.200 endorses, with qualifications, the ASME RA-Sb-2005 PRA Standard.
A previous staff review described in Hope Creek Generating Station - Issuance of Amendment RE: Technical Specification Change for Permanent Extension to Type A and Type C Containment Leak Rate Test Frequencies (ADAMS Accession No. ML17291A209) indicated
- that, an independent full-scope peer review of the internal events and internal flooding PRA model was performed in 2008 against the requirements set forth in the 2005 version of the ASME PRA standard and the qualifications provided in the staff's endorsement of that standard in RG 1.200, Revision 1. The peer review was performed against the CC II Supporting Requirements. Following PRA model revisions arising from the peer review, the licensee performed a self-assessment of the Hope Creek [full-power internal events] FPIE PRA model in 2011 to determine if there were any gaps present between the Hope Creek FPIE PRA model and the CC II Supporting Requirements in the 2009 version of the ASME/American Nuclear Society.
Section 3.2.1 of the LAR further added that more recently [t]he Full Power Internal Events and Flooding PRA was the subject of a Facts and Observations (F&Os) closure review completed by the BWR Owners Group in August 2017 [ref]. At this time, there are no F&Os that are considered open.
Please confirm that the above summary of the internal events PRA reviews is current and correct or provide correction and clarification.
APLA RAI-2 In Section 3.2.1 of the LAR, the licensee states that in November 2010 it completed a full-scope peer review of its then current base Fire PRA. However, the licensee does not provide any details as to which standard the peer review was conducted against or what peer review method was used.
Please provide a discussion summarizing the standard to which the peer review was conducted against and the peer review method that was used.
APLA RAI-3 In the resolution to F&O 5-40, the licensee states that joint human error probabilities (JHEPs) are not risk-significant for the inverters or the reported risk evaluation.
Please characterize the process used to determination that JHEPs are not significant for the risk from inverters and provide any quantitative results.