Informs NRC of Change in Schedule for Providing Info Re Environ Qualification Testing of Terminal Blocks for Control Circuits of Conax Electrical Penetrations.Wyle Labs Test Results & Util Review of Results Will Be Sent by 900112
ML19332D043
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/22/1989
From: Holtzscher D
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-601560, NUDOCS 8911290333
Download: ML19332D043 (2)


Text

' '

i 1 .

]

Wy , ,

y

U.601560 l i2 '# i* L42 89(11 22 )-LP - -j

  • 1. 1A.120

, i i /LLINDIS POWER COMPANY 1 cuNTON POWER St ATION. P.o. BOX 678. CLINTON. ILLIN0is 61727 l

"' ' November 22, 1989 l 3

i i

10CFR50.49 Docket No. 50-461

, Nuclear Regulatory Commission  !

Document Control Desk '

- ' washington,-D.C. 20555 i

Subject:

' Environmental Oualification Testine of Terminal' Blocks i i

Dear Sir:

Illinois Power Company (IP) letter #U.601496 to the Nuclear

  • Regulatory Commission (NRC) dated July 21, 1989, stated that IP was .

, proceeding with additional qualification testing of terminal blocks for i control circuits of Conax electrical penetrations and that.the l qualification testing was to be performed by Wyle Laboratories. The.  !

-letter also stated that IP would' inform the NRC of the Wyle Laboratories f test.results and IP's evaluation of these results by November.30, 1989. -

The purpose of.this letter is to formally inform the NRC, as discussed

  • in a management meeting between'IP and Region III on November 14, 1989, of a change in the schedule-for providing this information to the NRC.  !

The Wyle' Laboratories qualification testing,of terminal blocks is i

complete.- Preliminary review of.the test data indicates that some .,

anomalies occurred during the testing, These anomalies are currently  !

being evaluated. The schedule for issuance of the.Wyle Laboratories t

final test report has been delayed, pending completion of the i evaluation. IP will review the fins 1 test report upon receipt from Wyle  ;

Laboratories. By January 12, 1990, IP will inform the NRC of the Wyle

-Laboratories test results and of the results of IP's review, after transmittal of the above information to the NRC, IP will make arrangements to meet with appropriate NRC personnel to review the Wyle Laboratories test results, IP's review of the results, and IP's ccmmitment to replace terminal blocks in safety related control circuits -

with qualified splices. i Sincerely yours, l

N

  • D. L. lloltzscher 1: Acting Manager -

E Licensing and Safety Av{T Q h P -. '

f

.c . . . . - . _ -_.

in -.

. p pf y

._ ,O.

c l

KAB/kra  :

cc: NRC Region.III, Regional Administrator NRC Clinton Licensing Project Manager. .

NRC Resident Office Illinois Department of Nuclear Safety. i

1 L-