Updated Deficiency Rept Re Failure of Special Doors & Hatches to Perform Intended Function,Initially Reported 801114.Deficiencies Being Investigated.Next Rept Will Be Submitted by 811115
ML20010F863
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/01/1981
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, GO2-81-0261, GO2-81-261, NUDOCS 8109110471
Download: ML20010F863 (3)


Text

_

o7-. 50.55(e) Report .

'[ Docket Nos. 50-397 Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 September 1,1981 9 G02-81-0261 ,,

Docket No. 50-397

.e-j m

Mr. R. H. Engelken '

"mNi U. S. Nuclear Regulatory Commission .

  • s Region V O Suite 202, Walnut Creek Plaza - - -

1990 North California Boulevard Walnut Creek, California 94596

Dear Mr. Engelken:

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 REPORTABLE DEFICIENCY - 10CFR50.55(e) #89 POTENTIALLY REPORTABLE CONDITION ON SPECIAL DOORS AND HATCHES Your office was advised of a potentially reportable condition concerning special doors and hatches installed on November 14, 1980. An interim report was-issued on December 15, 1980, letter #G02-80-0292.

We include an updated report on this condition and will provide another report by November 15, 1981.

If you have any questions, please contact R. T. Johnson at (509) 377-2501 extension 2712.

Very truly'yours, to h.

pfpf . -

R G. Matlock b <'?

RGM/SLN/kh ProgramDirector,WNP-2/__. $[p#

Attachment:

- .-g '3

1. Updated Report 7, '

4, Ng g cc: ,v WS Chin, BPA R: ..

A Forrest, HAPO ND Lewis, NRC TA Mangelsdorf, Bechtel WNP-2 Files RE Snaith, B&R NY V Stello, NRC AD Toth, NRC Resident Inspector, WNP-2 J Plunkett, NRC 7J

.c l ll 8109110471 s10901 gDRADOCK05000 8/1/k

WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 LICENSE NO. CPPR-93 SPECIAL DDORS AND HATCHES UPDATED REPORT Potential Problem Numerous nonconformances have been identified relative to Quality Class I special doors and hatches, which involve materials, fabri-cation, testing and documentation. These doors include water tight doors in the basement of the reactor building; airtight doors and hatches in the reactor and control building; and blast doors in the reactor and control building.

Failure of the doors and hatches to perform their intended function could adversely affect the safe shutdown and the control of radio-active releases during a design basis accident condition.

A question exists as to whether the doors and hatches would have failed in service if the indicated conditions had gone undetected.

NRC Region V was ' notified of the potential deficiency, by telephone on November 14, 1980.

Approach to Resolution of the Problem Evaluate all deficiencies for a particular door, hatch or sets of doors to determine if the deficiencies would have led to inservice failures. The evaluations will include non-destructive examinations of the hardware in conjunction with an engineering review of the vendors design calculations.

Isses direction for correction of all deficiencies as required to meet design criteria.

Status of Proposed Resolution The Engineering and Quality Assurance organizations of the WNP-2 Architect / Engineer have been working with the affected Contractor since March 1980 to identify, provide technical resolution, and close out deficiencies associated with the various types of special doors and hatches. A Management Corrective Action Request was transmitted to the Contractor on Octobar 27, 1980, documenting delays and requesting timely resolution.

1 1

10CFR50.55(e)#89 Updated Report Page 2 e Response to the Corrective Action Request has not been adequate.

e A combined team has surveyed the hardware problems with the doors presently located on the site. The report of this team is scheduled for presentation by September 1,1981. -

e An Inspection Report is being written on each door identifying the hardware problems.

e Rayproof (the door manufacturer) has submitted procedures for inspection, repair / rework and QA to PKS for approval.

e Software for some of the doors has been submitted to Bechtel for review. This review is in progress.

. Reason for Delay of Final Report Additional time is required to identify and evaluate all deficiencits.

Projected Submittal of Update Report

,An update report will be submitted by November 15, 1981.