MONTHYEARIR 05000237/20224012022-11-30030 November 2022 Security Baseline Inspection Report 05000237/2022401 and 05000249/2022401 (Cover Letter Only) IR 05000237/20214032022-01-26026 January 2022 Security Baseline Inspection Report 05000237/2021403 and 05000249/2021403 IR 05000237/20214042021-08-0909 August 2021 Security Baseline Inspection Report 05000237/2021404 and 05000249/2021404 IR 05000237/20200102020-02-28028 February 2020 Biennial Problem Identification and Resolution Inspection Report 05000237/2020010 and 05000249/2020010 ML19281D2032019-10-0808 October 2019 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000237/2019011; 05000249/2019011 (DRS-I.Hafeez) ML18003A2112018-01-0303 January 2018 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 and 3 ML17313B1912017-11-0707 November 2017 Information Request for an NRC Triennial 10 CFR 50.59 Baseline Inspection Report 05000237/2018011; 05000349/2018011 (DRS-A.Shaikh) RS-17-007, Request for Improvements in NRC SPAR Model and RASP Handbook Use2017-01-12012 January 2017 Request for Improvements in NRC SPAR Model and RASP Handbook Use IR 05000237/20155012016-02-0303 February 2016 NRC Emergency Preparedness Annual Inspection Report No. 05000237/2015501; 05000249/2015501 SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection ML15020A0952015-01-15015 January 2015 Ltr 2014 Dresden EP Annual Closeout (Rdj) ML14045A1482014-02-12012 February 2014 EP Annual Closeout (Rdj) IR 05000237/20135022014-02-12012 February 2014 Ltr 02/12/14 Dresden EP Annual Closeout (RDJ) ML13101A4382013-04-11011 April 2013 Ti 186 Notice of Inspection IR 05000237/20085012009-02-13013 February 2009 IR 05000237-08-501, IR 05000249-08-501, on 01/01/200 Through 12/31/2008, Dresden Nuclear Power Station - NRC Emergency Preparedness Annual Inspection Report; NRC Security Annual Inspection Report IR 05000237-08-401, IR 05000249-08-401 IR 05000237/20084082008-10-0707 October 2008 IR 05000237-08-408, & IR 05000249-08-408, 08/25/2008 - 08/29/2008, Dresden Nuclear Power Station, Units 2 and 3, Routine Security Baseline Inspection IR 05000237/20075012008-02-14014 February 2008 IR 05000237-07-501, IR 05000249-07-501, and IR 05000237-07-403, IR 05000249-07-403, on 01/01/2007 - 12/31/2007, Dresden NRC Emergency Preparedness Annual Inspection and NRC Security Annual Inspection Reports IR 05000237/20072012007-12-21021 December 2007 IR 05000237-07-201, and IR 05000249-07-201, Preliminary Greater than Green for Dresden Nuclear Power Station, Units 2 and 3 ML0702905882007-01-29029 January 2007 Information Request for NRC Biennial Baseline Component Design Basis Inspection, IR 05000249-07-006, (Drs); 05000249-07-006 (DRS) IR 07200037/20060012006-12-20020 December 2006 IR 07200037-06-001, on 12/12/2006, Dresden, Units 2 and 3 IR 05000010/20050152006-09-28028 September 2006 IR 05000010-05-015, on 06/01/2006 & 09/20/2006, Dresden, Unit 1 ML0619906072006-07-11011 July 2006 Final Letter Report for Analytical Results for Fifty-five Water Samples, Batch Five, from the Vicinity of the Dresden Generating Station, Dresden, Illinois (Inspection Report No. 050-00237/2006-007) ML0617200952006-06-16016 June 2006 Orise - Interim Letter Report for Analytical Results for Four of Eight Water Samples, Batch Four, from the Vicinity of the Dresden Generating Station, Dresden, Illinois (Inspection Report No. 050-00237/2006-007) (Rfta No. 06-001) ML0500600382005-01-0505 January 2005 Re Information Request for an NRC Biennial Modification and 10 CFR 50.59 (MOD/50.59) Baseline Inspection IR 05000237/20020092002-05-0606 May 2002 IR 05000237/2002-009(DRS), IR 05000249/2002-009(DRS), on April 12, 2002, Exelon Generation Company, Dresden Nuclear Power Station, Units 2 and 3. Physical Protection. Non-cited Violations Identified IR 05000237/20020042002-04-26026 April 2002 IR 05000237/2002-004(DRP), IR 05000249/2002-004(DRP), Exelon Generation Company, Dresden Nuclear Power Station, Units 2 and 3, Inspection on 02/08/2002-03/31/2002 Re Identification and Resolution of Problems IR 05000249/19760201976-12-23023 December 1976 Letter Regarding Steps Taken by Commonwealth Edison to Correct Noncompliance Identified in 10/20/1976 Letter - Dresden Unit 3 Inspection Report 05000249/1976020 2022-11-30
[Table view] Category:Letter
MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] |
Text
January 5, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 INFORMATION REQUEST FOR AN NRC BIENNIAL MODIFICATION AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000237/2005004(DRS);
05000249/2005004(DRS)
Dear Mr. Crane:
On February 7, 2005, the NRC will begin a Modification and 10 CFR 50.59 (Mod/50.59) baseline inspection at the Dresden Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17, and IP 37001. The on-site portion of the inspection will take place on February 7 - 11, 2005.
Experience has shown that these baseline design inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office by no later than January 26, 2005. The inspection team will review this information and, by February 2, 2005, will request specific items that should be available for review when the team arrives on-site.
The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the on-site inspection, February 7, 2005. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our regulatory contact for this inspection is Mr. Joe Griffin of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9717 or via e-mail at ZXF@nrc.gov.
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Materials Engineering Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosure:
Reactor Modification and 10 CFR 50.59 Supporting Documentation Modification and 50.59 Inspection Document Request cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Materials Engineering Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosure:
Reactor Modification and 10 CFR 50.59 Supporting Documentation Modification and 50.59 Inspection Document Request cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: ML050060038.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME ZFalevits:tr MRing DHills DATE 01/05/05 01/05/05 01/05/05 OFFICIAL RECORD COPY
C. Crane ADAMS Distribution:
AJM DFT MXB RidsNrrDipmIipb GEG HBC KGO DRC1 DRPIII DRSIII PLB1 JRK1
INITIAL DOCUMENT REQUEST MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report: 05000237/2005004(DRS); 05000249/2005004(DRS)
Inspection Dates: February 7 - 11, 2005 Inspection Procedures: IP 71111-02, Changes, Tests, or Experiments IP 71111-17, Permanent Plant Modifications IP 37001, 10 CFR 50.59 Safety Evaluation Program Lead Inspector: Z. Falevits, Team Leader (630) 829-9717 Team Members: G. ODwyer, Reactor Inspector M. Munir, Reactor Inspector I. Information Requested for In-Office Preparation Week The following information is requested by January 26, 2005, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by February 2, 2005. We request that the specific items selected from these lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last combined biennial baseline engineering inspection exit (August 29, 2003) to the present. If you have any questions regarding this information, please call the team leader as soon as possible. All information should be sent electronically if at all possible (to ZXF@nrc.gov).
(1) List of permanent plant modifications to risk significant systems, structures or components. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications).
The list should contain the number of each document, the title, the revision (or date), the affected system, and the risk significance (if at all possible). In addition to the list, please provide a brief (one paragraph) description of each modification and a list of associated calculations and affected procedures.
(2) List of all 10 CFR 50.59 completed evaluations involving: (a) changes to the facility (modifications); (b) procedure revisions; (c) tests or non-routine operating configurations; or (d) changes to the USFAR or technical specification bases.
The list should contain the number and title of each document, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.
1 Enclosure
INITIAL DOCUMENT REQUEST (3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) changes to facility (modifications); (b) procedure revisions; (c) tests or non-routine operating configurations; or (d) changes to the USFAR or technical specification bases.
The list should contain the number and title of each document and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.
(5) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes.
The list should contain the number, title, and revision (or date) of each document, the affected system and corresponding documentation (if applicable),
and should be sorted in order of significance.
(6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.
(7) Name(s) and phone numbers for the regulatory and technical contacts.
II. Information Requested to be Available on First Day of Inspection (February 7, 2005)
(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them:
- Technical Specifications;
2 Enclosure
INITIAL DOCUMENT REQUEST (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:
- Drawings supporting the modifications;
- Procedures affected by the modifications; and
(4) Current management and engineering organizational chart.
III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
If you have questions regarding the information requested, please contact the team leader.
3 Enclosure