MONTHYEARIR 05000237/20224012022-11-30030 November 2022 – Security Baseline Inspection Report 05000237/2022401 and 05000249/2022401 (Cover Letter Only) IR 05000237/20214032022-01-26026 January 2022 Security Baseline Inspection Report 05000237/2021403 and 05000249/2021403 IR 05000237/20214042021-08-0909 August 2021 Security Baseline Inspection Report 05000237/2021404 and 05000249/2021404 IR 05000237/20200102020-02-28028 February 2020 Biennial Problem Identification and Resolution Inspection Report 05000237/2020010 and 05000249/2020010 IR 05000237/20190112019-10-0808 October 2019 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000237/2019011; 05000249/2019011 (DRS-I.Hafeez) ML18003A2112018-01-0303 January 2018 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 and 3 IR 05000237/20180112017-11-0707 November 2017 Information Request for an NRC Triennial 10 CFR 50.59 Baseline Inspection Report 05000237/2018011; 05000349/2018011 (DRS-A.Shaikh) RS-17-007, Request for Improvements in NRC SPAR Model and RASP Handbook Use2017-01-12012 January 2017 Request for Improvements in NRC SPAR Model and RASP Handbook Use IR 05000237/20155012016-02-0303 February 2016 NRC Emergency Preparedness Annual Inspection Report No. 05000237/2015501; 05000249/2015501 SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection ML15020A0952015-01-15015 January 2015 Ltr 2014 Dresden EP Annual Closeout (Rdj) IR 05000237/20135022014-02-12012 February 2014 Ltr 02/12/14 Dresden EP Annual Closeout (RDJ) ML14045A1482014-02-12012 February 2014 EP Annual Closeout (Rdj) ML13101A4382013-04-11011 April 2013 Ti 186 Notice of Inspection IR 05000237/20085012009-02-13013 February 2009 IR 05000237-08-501, IR 05000249-08-501, on 01/01/200 Through 12/31/2008, Dresden Nuclear Power Station - NRC Emergency Preparedness Annual Inspection Report; NRC Security Annual Inspection Report IR 05000237-08-401, IR 05000249-08-401 IR 05000237/20084082008-10-0707 October 2008 IR 05000237-08-408, & IR 05000249-08-408, 08/25/2008 - 08/29/2008, Dresden Nuclear Power Station, Units 2 and 3, Routine Security Baseline Inspection IR 05000237/20075012008-02-14014 February 2008 IR 05000237-07-501, IR 05000249-07-501, and IR 05000237-07-403, IR 05000249-07-403, on 01/01/2007 - 12/31/2007, Dresden NRC Emergency Preparedness Annual Inspection and NRC Security Annual Inspection Reports ML0735304852007-12-21021 December 2007 IR 05000237-07-201, and IR 05000249-07-201, Preliminary Greater than Green for Dresden Nuclear Power Station, Units 2 and 3 IR 05000237/20072012007-12-21021 December 2007 IR 05000237-07-201, and IR 05000249-07-201, Preliminary Greater than Green for Dresden Nuclear Power Station, Units 2 and 3 IR 05000249/20070062007-01-29029 January 2007 Information Request for NRC Biennial Baseline Component Design Basis Inspection, IR 05000249-07-006, (Drs); 05000249-07-006 (DRS) IR 07200037/20060012006-12-20020 December 2006 IR 07200037-06-001, on 12/12/2006, Dresden, Units 2 and 3 IR 05000010/20050152006-09-28028 September 2006 IR 05000010-05-015, on 06/01/2006 & 09/20/2006, Dresden, Unit 1 ML0619906072006-07-11011 July 2006 Final Letter Report for Analytical Results for Fifty-five Water Samples, Batch Five, from the Vicinity of the Dresden Generating Station, Dresden, Illinois (Inspection Report No. 050-00237/2006-007) ML0617200952006-06-16016 June 2006 Orise - Interim Letter Report for Analytical Results for Four of Eight Water Samples, Batch Four, from the Vicinity of the Dresden Generating Station, Dresden, Illinois (Inspection Report No. 050-00237/2006-007) (Rfta No. 06-001) ML0500600382005-01-0505 January 2005 Re Information Request for an NRC Biennial Modification and 10 CFR 50.59 (MOD/50.59) Baseline Inspection IR 05000237/20020092002-05-0606 May 2002 IR 05000237/2002-009(DRS), IR 05000249/2002-009(DRS), on April 12, 2002, Exelon Generation Company, Dresden Nuclear Power Station, Units 2 and 3. Physical Protection. Non-cited Violations Identified IR 05000237/20020042002-04-26026 April 2002 IR 05000237/2002-004(DRP), IR 05000249/2002-004(DRP), Exelon Generation Company, Dresden Nuclear Power Station, Units 2 and 3, Inspection on 02/08/2002-03/31/2002 Re Identification and Resolution of Problems IR 05000249/19760201976-12-23023 December 1976 Letter Regarding Steps Taken by Commonwealth Edison to Correct Noncompliance Identified in 10/20/1976 Letter - Dresden Unit 3 Inspection Report 05000249/1976020 2022-11-30
[Table view] Category:Letter
MONTHYEARIR 05000237/20254012025-03-0303 March 2025 Dresen Nuclear Power Station, Units 2 and 3 - Cyber Security Inspection Report 05000237/2025401 and 05000249/2025401 RS-25-038, Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 20242025-02-27027 February 2025 Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 2024 ML25051A2542025-02-20020 February 2025 Supplement No. 1 - Changes to the Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application RS-25-027, Drensden Nuclear Power Station, Units 2 & 3 and Quad Citiies Nuclear Power Station, Units 1 & 2 - Request Exemptions from 10 CFR 50.55a(a)(3)(iii), Which Incorporates by Reference Regulatory Guide 1.147, Revision 21, for Code Case N-921, a2025-02-14014 February 2025 Drensden Nuclear Power Station, Units 2 & 3 and Quad Citiies Nuclear Power Station, Units 1 & 2 - Request Exemptions from 10 CFR 50.55a(a)(3)(iii), Which Incorporates by Reference Regulatory Guide 1.147, Revision 21, for Code Case N-921, an 05000237/LER-2024-001, Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function2025-01-27027 January 2025 Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function ML24351A1452025-01-23023 January 2025 Request to Replace Previously Submitted Documents and Withhold Information from Public Disclosure 05000249/LER-2024-002, Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications2025-01-21021 January 2025 Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolated Valve Resulted in a Condition Prohibited by Technical Specifications ML25017A2302025-01-17017 January 2025 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 & 3 ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums IR 05000010/20240012024-12-31031 December 2024 NRC Inspection Report No. 05000010/2024001 ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 RS-24-135, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-12-18018 December 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24352A2072024-12-17017 December 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24324A3202024-11-19019 November 2024 Letter from R. Mangum, Achp Regarding DNPS Subsequent License Renewal Environmental Review ML24323A0792024-11-15015 November 2024 Transmittal of Dresden, Units 2 and 3, Core Operating Limits Report Cycle 29 ML25044A0052024-11-14014 November 2024 Letter from J. Nelson, Kickapoo Traditional Tribe of Texas to T. Smith, NRC – Regarding Request to Initiate Section 106 Consultation for DNPS Units 2 and 3 SLR ML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application RS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 2025-03-03
[Table view] |
Text
January 5, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 INFORMATION REQUEST FOR AN NRC BIENNIAL MODIFICATION AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000237/2005004(DRS);
05000249/2005004(DRS)
Dear Mr. Crane:
On February 7, 2005, the NRC will begin a Modification and 10 CFR 50.59 (Mod/50.59) baseline inspection at the Dresden Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedures (IP) 71111.02, IP 71111.17, and IP 37001. The on-site portion of the inspection will take place on February 7 - 11, 2005.
Experience has shown that these baseline design inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office by no later than January 26, 2005. The inspection team will review this information and, by February 2, 2005, will request specific items that should be available for review when the team arrives on-site.
The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the on-site inspection, February 7, 2005. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our regulatory contact for this inspection is Mr. Joe Griffin of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9717 or via e-mail at ZXF@nrc.gov.
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Materials Engineering Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosure:
Reactor Modification and 10 CFR 50.59 Supporting Documentation Modification and 50.59 Inspection Document Request cc w/encl:
Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
David E. Hills, Chief Materials Engineering Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosure:
Reactor Modification and 10 CFR 50.59 Supporting Documentation Modification and 50.59 Inspection Document Request cc w/encl:
Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: ML050060038.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME ZFalevits:tr MRing DHills DATE 01/05/05 01/05/05 01/05/05 OFFICIAL RECORD COPY
C. Crane ADAMS Distribution:
AJM DFT MXB RidsNrrDipmIipb GEG HBC KGO DRC1 DRPIII DRSIII PLB1 JRK1
INITIAL DOCUMENT REQUEST Enclosure 1
MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report:
05000237/2005004(DRS); 05000249/2005004(DRS)
Inspection Dates:
February 7 - 11, 2005 Inspection Procedures:
IP 71111-02, Changes, Tests, or Experiments IP 71111-17, Permanent Plant Modifications IP 37001, 10 CFR 50.59 Safety Evaluation Program Lead Inspector:
Z. Falevits, Team Leader (630) 829-9717 Team Members:
G. ODwyer, Reactor Inspector M. Munir, Reactor Inspector I.
Information Requested for In-Office Preparation Week The following information is requested by January 26, 2005, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by February 2, 2005. We request that the specific items selected from these lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last combined biennial baseline engineering inspection exit (August 29, 2003) to the present. If you have any questions regarding this information, please call the team leader as soon as possible. All information should be sent electronically if at all possible (to ZXF@nrc.gov).
(1)
List of permanent plant modifications to risk significant systems, structures or components. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications).
The list should contain the number of each document, the title, the revision (or date), the affected system, and the risk significance (if at all possible). In addition to the list, please provide a brief (one paragraph) description of each modification and a list of associated calculations and affected procedures.
(2)
List of all 10 CFR 50.59 completed evaluations involving: (a) changes to the facility (modifications); (b) procedure revisions; (c) tests or non-routine operating configurations; or (d) changes to the USFAR or technical specification bases.
The list should contain the number and title of each document, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.
INITIAL DOCUMENT REQUEST Enclosure 2
(3)
List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) changes to facility (modifications); (b) procedure revisions; (c) tests or non-routine operating configurations; or (d) changes to the USFAR or technical specification bases.
The list should contain the number and title of each document and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4)
List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.
(5)
List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes.
The list should contain the number, title, and revision (or date) of each document, the affected system and corresponding documentation (if applicable),
and should be sorted in order of significance.
(6)
Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.
(7)
Name(s) and phone numbers for the regulatory and technical contacts.
II.
Information Requested to be Available on First Day of Inspection (February 7, 2005)
(1)
Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2)
Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them:
Updated Final Safety Analysis Report; Technical Specifications; Latest IPE/PRA Report; Vendor Manuals; and The Latest 10 CFR 50.59 FSAR Update Submittal.
INITIAL DOCUMENT REQUEST Enclosure 3
(3)
Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:
Drawings supporting the modifications; Procedures affected by the modifications; and UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4)
Current management and engineering organizational chart.
III.
Information Requested to be provided throughout the inspection (1)
Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
(2)
Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
If you have questions regarding the information requested, please contact the team leader.