MONTHYEARIR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 IR 05000237/20240012024-05-0101 May 2024 Integrated Inspection Report 05000237/2024001 & 05000249/2024001 IR 05000237/20244012024-04-18018 April 2024 – Security Baseline Inspection Report 05000237/2024401 and 05000249/2024401 IR 05000237/20230062024-02-28028 February 2024 Annual Assessment Letter for Dresden Nuclear Station, Units 2 and 3 (Report 05000237/2023006; 05000249/2023006) IR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) IR 05000237/20230032023-11-13013 November 2023 Integrated Inspection Report 05000237/2023003 and 05000249/2023003 and Exercise of Enforcement Discretion IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2023005) IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 IR 05000237/20230102023-03-0909 March 2023 Biennial Problem Identification and Resolution Inspection Report 05000237/2023010 and 05000249/2023010 IR 05000237/20220062023-03-0101 March 2023 Annual Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2022006 and 05000249/2022006) IR 05000237/20220042023-02-10010 February 2023 Integrated Inspection Report 05000237/2022004, 05000249/2022004 and 07200037/2022002 IR 05000237/20224022023-01-0505 January 2023 Security Baseline Inspection Report 05000237/2022402 and 05000249/2022402 IR 05000237/20224012022-11-30030 November 2022 – Security Baseline Inspection Report 05000237/2022401 and 05000249/2022401 (Cover Letter Only) IR 05000237/20220032022-10-31031 October 2022 Integrated Inspection Report 05000237/2022003 and 05000249/2022003 ML22270A1032022-09-27027 September 2022 Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) IR 05000237/20220122022-09-0606 September 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000237/2022012 and 05000249/2022012 IR 05000237/20220052022-08-22022 August 2022 Updated Inspection Plan for Dresden Nuclear Power Station (Report 05000237/2022005; 05000249/2022005) IR 05000010/20220012022-08-0808 August 2022 NRC Inspection Report No. 05000010/2022001(DNMS) - Dresden Nuclear Power Station, Unit 1 IR 05000237/20220022022-08-0808 August 2022 Integrated Inspection Report 05000237/2022002; 05000249/2022002 and 07200037/2022002 and Exercise of Enforcement Discretion ML22180A2512022-06-30030 June 2022 2022 Dresden Cover Letter IR 05000237/20220012022-04-20020 April 2022 Integrated Inspection Report 05000237/2022001 and 05000249/2022001 IR 05000237/20220112022-04-12012 April 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000237/2022011 and 05000249/2022011 IR 05000237/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000237/2021006 and 05000249/2021006) IR 05000237/20210042022-02-0707 February 2022 Integrated Inspection Report 05000237/2021004 and 05000249/2021004 IR 05000237/20214032022-01-26026 January 2022 Security Baseline Inspection Report 05000237/2021403 and 05000249/2021403 IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 IR 05000237/20220102021-12-21021 December 2021 Notification of NRC DBAI (Programs) and Initial RFI Inspection Report 05000237/2022010 05000249/2022010 IR 05000010/20210012021-11-0909 November 2021 NRC Inspection Report No. 05000010/2021001(DNMS) - Dresden Nuclear Power Station, Unit 1 IR 05000237/20210032021-11-0101 November 2021 Integrated Inspection Report 05000237/2021003 and 05000249/2021003 IR 05000237/20210112021-09-30030 September 2021 Triennial Fire Protection Inspection Report 05000237/2021011 and 05000249/2021011 IR 05000237/20210052021-09-0101 September 2021 Updated Inspection Plan for Dresden Nuclear Power Station, Units 2 and 3, Report 05000237/2021005 and 05000249/2021005 IR 05000237/20215012021-08-25025 August 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2021501 and 05000249/2021501 IR 05000237/20210022021-08-0909 August 2021 Integrated Inspection Report 05000237/2021002 and 05000249/2021002 IR 05000237/20214042021-08-0909 August 2021 Security Baseline Inspection Report 05000237/2021404 and 05000249/2021404 IR 05000237/20213012021-06-17017 June 2021 NRC Initial License Examination Report 05000237/2021301; 05000249/2021301 IR 05000237/20214012021-05-21021 May 2021 Cyber Security Inspection Report 05000237/2021401 and 05000249/2021401 IR 05000237/20210012021-04-13013 April 2021 Integrated Inspection Report 05000237/2021001 and 05000249/2021001 2024-09-19
[Table view] Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] |
Inspection Report - Dresden - 2005004 |
---|
|
|
Text
rch 2, 2005
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 NRC EVALUATIONS OF CHANGES, TESTS OR EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION REPORT 05000237/2005004(DRS); 05000249/2005004(DRS)
Dear Mr. Crane:
On February 11, 2005, the US Nuclear Regulatory Commission (NRC) completed combined baseline inspection of Evaluation of Changes, Tests, or Experiments, and Permanent Plant Modifications at the Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the inspection findings, which were discussed on February 11, 2005, with Mr. D. Wozniak and other members of your staff at the completion of the inspection.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
On the basis of the results of the inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by Julio Lara Acting for/
David E. Hills, Chief Materials Engineering Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Enclosure: Inspection Report 05000237/2005004(DRS);
05000249/2005004(DRS)
See Attached Distribution
March 2, 2005 Mr. Christopher
SUMMARY OF FINDINGS
IR 05000237/2005004(DRS); 05000249/2005004(DRS); 02/07/2005 - 02/11/2005; Dresden
Nuclear Power Station, Units 2 and 3; Evaluation of Changes, Tests, or Experiments (10 CFR 50.59) and Permanent Plant Modifications.
This report covers a one-week announced baseline inspection on evaluations of changes, tests, or experiments, and permanent plant modifications. The inspection was conducted by three Region III inspectors. No findings of significance were identified.
The NRCs Program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.
A. Inspector-Identified and Self-Revealed Findings No findings of significance were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R02 Evaluations of Changes, Tests, or Experiments
Main article: IP 71111.02
.1 Review of 10 CFR 50.59 Evaluations and Screenings
a. Inspection Scope
From February 7 through 11, 2005, the inspectors reviewed eight evaluations performed pursuant to 10 CFR 50.59. The evaluations related to permanent plant modifications, setpoint changes, procedure changes, conditions adverse to quality, and changes to the updated final safety analysis report. The inspectors reviewed the evaluations to verify that the evaluations were thorough and that prior NRC approval was obtained as appropriate. The inspectors also reviewed 14 screenings where the licensee had determined that a 10 CFR 50.59 evaluation was not necessary. In regard to the changes reviewed where no 10 CFR 50.59 evaluation was performed, the inspectors verified that the changes did not meet the threshold to require a 10 CFR 50.59 evaluation. These evaluations and screenings were chosen based on risk significance of samples from the different cornerstones. The list of documents reviewed by the inspectors is included as an attachment to this report.
The inspectors used, in part, Nuclear Energy Institute (NEI) 96-07, Guidelines for 10 CFR 50.59 Implementation, Revision 1, to determine acceptability of the completed evaluations and screenings. The NEI document was endorsed by the NRC in Regulatory Guide 1.187, Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments, dated November 2000. The inspectors also consulted Part 9900 of the NRC Inspection Manual, 10 CFR Guidance for 10 CFR 50.59, Changes, Tests, and Experiments.
b. Findings
No findings of significance were identified.
1R17 Permanent Plant Modifications
Main article: IP 71111.17B
a. Inspection Scope
From February 7 through 11, 2005, the inspectors reviewed 10 permanent plant modifications that had been installed in the plant during the last two years. The modifications were chosen based upon their effect on systems that had high probabilistic risk analysis (PRA) significance in the licensee's Individual Plant Evaluation (IPE) or high maintenance rule safety significance. The inspectors reviewed the modifications to verify that the completed design changes were in accordance with the specified design requirements and the licensing bases and to confirm that the changes did not affect any systems' safety function. Design and post-modification testing aspects were verified to ensure the functionality of the modification, its associated system, and any support systems. The inspectors also verified that the modifications performed did not place the plant in an increased risk configuration.
The inspectors also used applicable industry standards to evaluate acceptability of the modifications. The list of documents reviewed by the inspectors is included as an attachment to this report.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES (OA)
4OA2 Identification and Resolution of Problems
.1 Routine Review of Condition Reports
a. Inspection Scope
From February 7 through 11, 2005, the inspectors reviewed 10 condition reports that were written by licensee personnel to enter the issues in the corrective action program.
The inspectors reviewed these findings to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions related to the permanent plant design and evaluations for Changes, Tests, or Experiments issues. In addition, two condition reports, written on issues identified during the inspection, were reviewed to verify adequate problem identification and incorporation of the problems into the corrective action system. The specific corrective action documents that were sampled and reviewed by the team are listed in the attachment to this report.
b. Findings
No findings of significance were identified.
4OA6 Meetings
.1 Exit Meeting
The inspectors presented the inspection results to Mr. D. Wozniak and other members of licensee management on February 11, 2005. The licensee acknowledged the inspection results presented. Licensee personnel were asked to identify any documents, materials, or information provided during the inspection that were considered proprietary. No proprietary information was identified.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Wozniak, Plant Manager
- D. Galanis, Design Engineering Manager
- M. Kanavos, Site Engineering Director
- R. Gadbois, Operations Director
- J. Bashor, Work Management Director
- P. Salas, Regulatory Assurance Manager
- C. Symonds, Training Director
- B. Rybak, Lead Licensing Engineer
Nuclear Regulatory Commission
- D. Tharp, Resident Inspector (Clinton)
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
None.
Discussed
None.
Attachment
LIST OF DOCUMENTS REVIEWED