IR 05000249/1976020
| ML17252B140 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/23/1976 |
| From: | Fiorelli G NRC/RGN-III |
| To: | Brian Lee Commonwealth Edison Co |
| References | |
| IR 1976020 | |
| Download: ML17252B140 (3) | |
Text
......
..... ~. ~-.~-....:..~:-i......... _*~ ___
- ._~*-*:_---*-**
.;.
... -*-. *... -.....:..-.. ---... : -*.
.:.~_;___ ___ ; :.........
,.
i :~.:
~
.. *----.***--*-**-*--.*--*** -*-* -***- ---*--=--. -~*ik."~.. l~
--*--*---*--
....,..~.-~:~L::~~t:~:.~ __ :.:_ __
. -.--.. -
-
- --
--**.... -
~
.,.;
~-
.,
~
- ,...-.**.*
ii::.
UNITED STATES NUCLEAR REGULATORY. COMMISSION REGION Ill 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS_ 60137 DEC 2 3 1976-CENTRAL Fl LES Commonwealth.Edison Company ATTN:
Mr. Byron Lee, Jr.
Docket No. 50-249 Vice President P.O. Box 767 Chicago, Illinois
~0690 Gentlemen:
Thank you for your letter da~ed December 9, 1976, informing us /of tlie steps you have taken. to correct.the noncompliance identified in our letter dated October 20, 1976.
We will examine your corrective.,action during a future inspection.
Your cooperation with us is appreciated.
cc:
Mr. B :. B. Stephenson..
Station Superi.ntendent cc w/lti <ltd 12/9/76: *
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Anthony. Roisman, Esq.,
Attorney
Sincerely yours,
. ~.,,
--<i~;-_..4~/~'
~c./
~C" u:,t::-e-<-
Gaston Fiorelli, Chief Reactor Operations and N.uclear Support Branch-9*
'>.
Commonwealth Edison *
One First National Plaza, Chicago, lliinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690
.Mr *. James G. Keppler,. Director Directorate of' Inspection and*
Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 December 9, 1976 Subject:
Dresden Station.Unit 3 IE InspectionfReport 50-249/76~20 1-TRC Docket No~ 50-'249 Reference (a) :
R. L. Bolger (CECo) Le.tter to J. G~.. Keppler (NRC} dated November 8, 1976 -
NRC Dkt. 50-249.
Dear.Mr. Keppler:
In response to subsequent discussi6ns with your* inspector, the Dresden Station refueling interlock.s.urveillance procedure a:qd the.Dresden Station fuel handling procedures have been reviewed.
As a result, the follo\\*1ing further procedu-r:e revisions will be made prior to.the next Unit 2 or Unit 3 re~-q.e,ling outage *
. 1. *Procedure DOS 800-1, "Refueling Interlock Check,; step F. 2.g.,
will be revised.
This rev'isiori will specify a new test weight value *which ensures, regar¢l).ess of*' grapple position, a grapple loaded signal will be present whenever a fuel assembly is on the grapple.
2.
Procedur.es DFP 800-7, "Fuel Handling Inside the Reactor" step
.F.l.i; DFP 800-9, "Fuel Movements From the Spent Fuel Storage Pool to the Reacto:i::" step F.1.1; and DFP 800-10, "Fuel r.fovements
,From,the Reactor to the St0rage Pool" step F.1. h; will be re-
. vised *. These revisions will insert a caution directing the operator not to raise. a fuel assembly if the HOIST LOADED light lails to illuminate.
- This matter is not directly related to the noncompliance i:tem identified in the subject inspection report.
As. described in iefer~~ce (a}, it is our judgemen~ that ~tis not necessary to observe 'the hoist loadcp light. to verify. a*.fuel assemble is "moving.
up" *. This matter concerns the adequacy of the Dresden Station procedures for verification of refueling interlocks.
It is our
. OEC l 3.. i976
- Commonwealth Edison C~m pany Mr. James ~
\\
'vi;
--2 -
Decembe~ 9,. 197.6
' '!;
,,3:tadgement that the existing procedures were adequate to prevent inadvertent criticality during core alterations ;-*;howev:er,_the _
procedure revisions described in the preceding paragraph should provide further assurance.
As requested by your "inspector I this information is submitted in the forin of a supplement to Reference (a) *
Please direct any further questions on thi.s matter to.thi.s *
office.
This letter contains no proprietary information.
very truly your_s,
$&~'1 R. L. Bolger
.