|
---|
Category:Letter
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding 2024-09-09
[Table view] |
Text
January 19, 2005 Mr. A. Christopher Bakken, III President & Chief Nuclear Officer PSEG Nuclear - X15 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION, REQUEST FOR ADDITIONAL INFORMATION RE: RELIEF REQUESTS HC-RR-I2-W01 AND HC-RR-I2-30 (TAC NOS. MC5173 AND MC5174)
Dear Mr. Bakken:
By letters dated December 1, 2004, PSEG Nuclear, LLC submitted two relief requests for Hope Creek Generating Station. The applications requested approval of a proposed alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements in the repair and subsequent inspection of the N2K reactor vessel nozzle.
On December 14, 2004, the Nuclear Regulatory Commission (NRC) staff faxed draft questions to Mr. Michael Mosier of your staff in order to support a conference call that occurred on December 22, 2004. On December 27, 2004, the NRC staff granted verbal approval of both the proposed alternatives. The NRC staff has determined that a response to the enclosed questions is necessary to properly document all issues that were discussed prior to granting verbal approval. The NRC staff requests that you provide responses to the enclosed questions within 30 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1427.
Sincerely,
/RA/
Daniel S. Collins, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
Request for Additional Information cc w/encl: See next page
Mr. A. Christopher Bakken, III January 19, 2005 President & Chief Nuclear Officer PSEG Nuclear - X15 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
HOPE CREEK GENERATING STATION, REQUEST FOR ADDITIONAL INFORMATION RE: RELIEF REQUESTS HC-RR-I2-W01 AND HC-RR-I2-30 (TAC NOS. MC5173 AND MC5174)
Dear Mr. Bakken:
By letters dated December 1, 2004, PSEG Nuclear, LLC submitted two relief requests for Hope Creek Generating Station. The applications requested approval of a proposed alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code requirements in the repair and subsequent inspection of the N2K reactor vessel nozzle.
On December 14, 2004, the Nuclear Regulatory Commission (NRC) staff faxed draft questions to Mr. Michael Mosier of your staff in order to support a conference call that occurred on December 22, 2004. On December 27, 2004, the NRC staff granted verbal approval of both the proposed alternatives. The NRC staff has determined that a response to the enclosed questions is necessary to properly document all issues that were discussed prior to granting verbal approval. The NRC staff requests that you provide responses to the enclosed questions within 30 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1427.
Sincerely,
/RA/
Daniel S. Collins, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC DRoberts ECoby, RGN-I WKoo ACRS DCollins AGill OGC PDI-2 Reading MConception TChan CRaynor GMiller ADAMS Accession Number: ML050070054 OFFICE PDI-2/PE PDI-2/PM PDI-2/LA EMCB-B/SC PDI-2/SC NAME GMiller DCollins CRaynor TChan DRoberts DATE 1/12/05 1/19/05 1/12/05 1/4/2005 1/19/05 OFFICIAL RECORD COPY
Hope Creek Generating Station cc:
Mr. John T. Carlin Ms. R. A. Kankus Vice President - Nuclear Assessment Joint Owner Affairs PSEG Nuclear - N10 Exelon Generation Company, LLC P.O. Box 236 Nuclear Group Headquarters KSA1-E Hancocks Bridge, NJ 08038 200 Exelon Way Kennett Square, PA 19348 Mr. Patrick S. Walsh Vice President - Eng/Tech Support Lower Alloways Creek Township PSEG Nuclear - N28 c/o Mary O. Henderson, Clerk P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Michael Brothers Dr. Jill Lipoti, Asst. Director Vice President - Site Operations Radiation Protection Programs PSEG Nuclear - N10 NJ Department of Environmental P.O. Box 236 Protection and Energy Hancocks Bridge, NJ 08038 CN 415 Trenton, NJ 08625-0415 Mr. James A. Hutton Plant Manager Brian Beam PSEG Nuclear - X15 Board of Public Utilities P.O. Box 236 2 Gateway Center, Tenth Floor Hancocks Bridge, NJ 08038 Newark, NJ 07102 Ms. Christina L. Perino Regional Administrator, Region I Director - Licensing & Nuclear Safety U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 475 Allendale Road P.O. Box 236 King of Prussia, PA 19406 Hancocks Bridge, NJ 08038 Senior Resident Inspector Jeffrie J. Keenan, Esquire Hope Creek Generating Station PSEG Nuclear - N21 U.S. Nuclear Regulatory Commission P.O. Box 236 Drawer 0509 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038
REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED ALTERNATIVE TO AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE REQUIREMENTS HOPE CREEK GENERATING STATION DOCKET NO. 50-354 By letters dated December 1, 2004, PSEG Nuclear, LLC (PSEG) submitted two relief requests for Hope Creek Generating Station (Hope Creek). The applications requested approval of a proposed alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirements in the repair and subsequent inspection of the N2K reactor vessel nozzle. On December 14, 2004, the Nuclear Regulatory Commission (NRC) staff faxed draft questions to Mr. Michael Mosier of your staff in order to support a conference call that occurred on December 22, 2004. On December 27, 2004, the NRC staff granted verbal approval of both the proposed alternatives. The NRC staff has determined that a response to the enclosed questions is necessary properly document all issues discussed prior to granting verbal approval Questions Applicable to HC-RR-I2-W01
- 1. In the enclosure of your December 1, 2004, submittal, you stated that the root cause evaluation has not been completed. Describe the plan and schedule for completion of your root cause evaluation.
- 2. When was hydrogen water chemistry and NobleChem implemented at Hope Creek?
In view of the detected flaw at the subject weld (N2K), discuss its effectiveness in mitigating intergranular stress-corrosion cracking (IGSCC) initiation and propagation.
- 3. Provide ultrasonic testing (UT) inspection history of weld N2K. Was IGSCC detected in any other dissimilar metal welds at Hope Creek?
- 4. You stated that the N2K weld was examined in part in accordance with risk-informed classification RA. Describe the risk-informed classification RA and the inspection frequency associated with this weld classification. What is the basis for this frequency?
- 5. You stated in page 3 of your December 1, 2004, submittal and page 4 of its attachment that an Alloy 152 electrode may also be utilized for local repairs to the underlying weld metal. Please confirm that ASME Code Case-638 will not be applied to the repair welding using Alloy 152 since the subject Code Case is limited to the welding using gas tungsten arc welding temper bead technique.
- 6. Clarify the acceptance criteria in ASME Code Section XI Nonmandatory Appendix P that you propose to use for UT examination of weld overlay. It should be noted that Appendix P has not been incorporated in ASME Code nor endorsed by the NRC.
- 7. For the relief from system hydrostatic test, you referenced ASME Code Case N416-1.
Please confirm that you will not take any exception to the subject ASME Code Case such as in item (b) which states that nondestructive examination is required to be performed in accordance with that of the applicable Subsection of the 1992 Edition of Section III.
- 8. In support of the exception to ASME Code Case-638 Paragraph 1.0(a) regarding the maximum allowable weld area, you referenced the conclusion of Electric Power Research Institute Technical Report No. 1008454. Please provide a summary description of how the conclusion was reached, including any testing data or analytical evaluation being performed.
- 9. To support the exception to ASME Code Case-638 Paragraph 2.0(i), which requires that the average lateral expansion of the three heat-affected zone impact tests shall be equal to or greater than the average of the three unaffected base metal tests, please provide the following additional information:
a) What is the RTNDT value for the N2K nozzle base material?
b) Provide justification for your assumption that the nozzle base material initial RTNDT value is consistent with the initial RT value of the low alloy steel material NDT used in the core region pressure boundary. Is there test data to support the assumption?
c) Provide reasons why the referenced requirement in Paragraph 2.0(i) cannot be met.
- 10. On page 8 of the Attachment to your December 1, 2004, submittal, under IWA-4610(a),
you stated that AREVA Framatome ANP welding procedure qualification have been successfully performed using Alloy 52 Alloy welds on P-No. 3 Group No. 3 base material using the ambient temperature temper bead technique. However, in your submittal you are seeking exception to ASME Code Case N-638 Paragraph 2.0(i) because the results of welding procedure qualification failed to meet the requirement specified in the subject paragraph. Please clarify this apparent discrepancy.
- 11. Provide technical justification to support the acceptance of not performing UT of the band area as required in ASME Code Case-638 Paragraph 4.0(b).
- 12. Describe how the contact pyrometer will be calibrated in the temperature range that it will be used. If it has already been calibrated and its accuracy demonstrated, describe the results.
- 13. You requested the approval of the proposed alternative for the remainder of the plant life. The current NRC staff practice is that the staff will approve such as alternative for a period no longer than the remainder of the current in-service inspection 10-year interval because the need for the proposed alternative may change with the improvement of technology and changes of regulatory requirements including the ASME Code. Please
provide a justification of why the requested duration is appropriate or revise the requested duration to the end of the current 10-year interval.
- 14. Provide details of flaw characterization, such as the length and the depth of the flaw, and provide a sketch to show the location of the flaw. On Page 1 of the Enclosure to your December 1, 2004, submittal, you stated that, based on the UT data, the axial indication was contained solely within the safe-end to nozzle weld and buttering.
However, during a conference call, you indicated that the axial indication was contained within the butter. This is consistent with the known IGSCC resistant property associated with Alloy 82 material. Please clarify this in your response.
Questions Applicable to Both Requests
- 1. By letter dated December 23, 2004, the NRC approved an update of the ASME Code of record for Hope Creek to the 1998 Edition with 2000 Addenda. Please clarify the ASME Code of record that these proposed alternatives are applicable to.