ML19318B318

From kanterella
Revision as of 22:01, 11 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 80-010/01T-0:on 800603,w/unit at Power,Leak Developed in A1 Section of Condenser.Caused by Lack of Proper Procedure During Shutdown Condition Allowing Hotwell Level to Rise. Condenser Tubes to Be Decontaminated
ML19318B318
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/17/1980
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19318B317 List:
References
LER-80-010-01T, LER-80-10-1T, NUDOCS 8006250241
Download: ML19318B318 (1)


Text